DHR_Scaffolding.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- RFP-2024-069
- Issued by
- Alachua County, Graceville City, Florida
About this file
The document is a detailed scaffolding location and task spreadsheet for a Department of Human Resources (DHR) facility, outlining comprehensive scaffolding requirements across multiple levels and areas of a facility. The spreadsheet meticulously details scaffolding needs for various inspection, maintenance, and access points, including boiler areas, air preheaters, silencers, catwalks, stairs, and specialized zones like the Bottom Ash Hopper and ZDS Heat Exchanger. The scaffolding work involves multiple levels from ground to 9th floor, with specific notes about green tagging, door access, and inspection requirements.
The scaffolding services are contextually linked to a Gainesville Regional Utilities (GRU) Request for Proposal (RFP) in Florida, seeking a contractor to provide scaffolding services on an as-needed basis. While the spreadsheet provides granular details of a specific scaffolding project, the RFP suggests a broader procurement strategy for ongoing scaffolding services. The document indicates complex industrial maintenance requirements, with multiple access points, inspection zones, and specialized structural needs that will require precise scaffolding configuration and safety protocols.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 October 2024 DHR Scaffolding Location / Level Notes-make everything Green Tag if feasible Rigging Beam
| Steam Drum | 9th | East side, need door opened and access |
| Boiler Access Doors East and West side | 7th | Boiler Inspection (Backpass) Upper and Lower Doors #'s 705/707/706/708 |
| Maintenance Beam decking | 6th Floor | |
| Front Wall Tertiary Air Access NW corner | 4th | Door 404 (Inspection) |
| Rear Wall Tertiary Air Access SW corner | 4th | Door 406 (Inspection) |
| Upper Silencer West side | 2nd | Door 210 (Inspection) |
| Secondary Air Preheater | 1st | Door 118 (Inspection) West catwalk |
| Primary Air Preheater | 1st | Door 119 (Inspection) East catwalk |
| Boiler Access door 101, NE corner. | 1st | Stairs down inside of Boiler approx 40 feet. Include catwalk at refractory level all the way around furnace 1' off wall. 15' scaffolds on E and W. |
| Hybex Air Duct | Ground | Door 006 (Inspection) West side. |
| Hybex Beam | Ground | Door 009 (Inspection) East side |
| Hybex Air Inlet by elevator | Ground | Door 005 (Inspection) East side |
| Stairs for SMS trailer | Ground | ETA 10/12 |
| Rolling scaffold for Bellows replacement X 2 | Ground | One 8 X 2 and one 8 X 3 |
| Bottom Ash Hopper Area | Ground | After vacuuming, hold off on North Screw. Screw is being removed. |
| ZDS Heat Exchanger | ZDS | Both ends of Heat Exchanger Inspection / Cleaning |
| ZDS Piping and flange ends | ZDS | Hydroblast Piping on Brine Concentrator |
| Crystallizer Feed Tank | ZDS | Platform for entrance |
| Spoolpiece over BC Recirc Pump | ZDS | Vertical section of pipe and Instrumentation. All the way around. |
| Crystallizer Condenser Tank | ZDS | Planks for inspection. Small tower in bottom, start with rope ladder. |
VALVES
| Built |
| Removed |
| Not done |
| Adders not on quote/walkdown |