This is a Detailed Information Worklist for a road maintenance contract (MR 26-1) for the Willamette National Forest. The contract covers surface maintenance and spot surfacing work on multiple National Forest System Roads (NFSR).

The work scope includes implementing temporary traffic control on all roads, completing grading work with water application and compaction as needed, and performing surface maintenance at two levels with roller compaction. Spot surfacing work requires acquiring 200 cubic yards of aggregate (Grading F 1-1/2 or ODOT 3/4) from commercial sources for placement on roads 2643 and 2643 Spur roads, with locations to be staked and approved by the Contracting Officer Representative. Material disposal locations will be designated by the Contracting Officer Representative. The contract specifies that loosening, water application, and compaction are incidental to grading work.

The detailed worklist identifies specific road segments and mileposts requiring work across multiple NFSR numbers including 1900500, 1993, 2638356, 2643, 2643420, 2643436, 2643440, 2643470, 2643471, 2643473, 2643476, 2643480, and 2649. Total contract quantities are: 38.20 miles of Item 811(1) Surface Maintenance Level 2 Roads with Roller Compaction; 11.13 miles of Item 811(2) Surface Maintenance Level 3 Roads with Roller Compaction; 200 cubic yards of Item 813(1) Spot Surfacing; and Item 881(1) Mobilization designated as "ALL" (lump sum for all roads).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NUMBER: 811(1) 811(2) 813(1) 881(1)

UNIT OF MEASURE: MI MI CY LS

BEGIN END DESCRIPTION OF WORK

ALL ROADS

IMPLEMENT TEMPORARY TRAFFIC CONTROL

MATERIAL DISPOSAL LOCATIONS WILL DESGINATED BY

CONTRACTING OFFICER REPRESENTATIVE. CONTRACTOR

SHALL COMPLETE GRADING WORK ACCORDING TO

SPECIFICATION 811(1) OR (2) SURFACE MAINTENANCE AS

SPECIFIED. HAUL AND APPLY WATER DURING GRADING

WHEN SUFFICIENT MOISTURE IS NOT PRESENT.

COMPACTION SHALL COMMENCE IMMEDIATELY FOLLOWING

GRADING. LOOSENING, WATER APPLICATION AND

COMPACTION WILL BE CONSIDERED INCIDENTAL TO

GRADING.

200 X

813(1) SPOT SURFACING GRADING F (1-1/2) or ODOT (3/4).

ACQUIRE AGGREGATE FROM COMMERCIAL SOURCE. *200

CY AGGREGATE TO BE PLACED ON ROADS 2643 AND 2643

SPUR ROADS. LOCATION SHALL BE AS STAKED AND

APPROVED BY CONTRACTING OFFICER REPRESENTATIVE.

0.00 BOP - NFSR #1900500 (Jct W/ NFSR 1900)

BEGIN SURFACE MAINTENANCE

1.33

1.33

END SURFACE MAINTENANCE

EOP - NFSR #1900500 (Jct W/ SLIDE CREEK CAMPGROUND)

2.40

BOP - NFSR #1993 (END OF AC)

BEGIN SURFACE MAINTENANCE

17.00

19.40

END SURFACE MAINTENANCE

EOP - NFSR #1993 (BEGINNING OF AC)

0.00 BOP - NFSR #2638356 (Jct W/ NFSR 2638)

BEGIN SURFACE MAINTENANCE

5.10

5.10

END SURFACE MAINTENANCE

EOP - NFSR #2638356 (Jct W/ NFSR 1993)

7.70

BOP - NFSR #2643 (END OF AC)

BEGIN SURFACE MAINTENANCE, SPOT SURFACING*

3.90

11.60

END SURFACE MAINTENANCE & SPOT SURFACING

EOP - NFSR #2643 (Jct W/ FOLEY RIDGE TRAILHEAD)

0.00 BOP - NFSR #2643420 (Jct W/ NFSR 2643)

BEGIN SURFACE MAINTENANCE, SPOT SURFACING*

0.51

0.51

END SURFACE MAINTENANCE & SPOT SURFACING

EOP - NFSR #2643420 (END OF ROAD)

0.00 BOP - NFSR #2643436 (Jct W/ NFSR 2643)

BEGIN SURFACE MAINTENANCE, SPOT SURFACING*

0.90

0.90

END SURFACE MAINTENANCE & SPOT SURFACING

EOP - NFSR #2643436 (END OF ROAD)

MILEPOST

X - SIGNIFIES LS QUANTITY

DESIGNATED AS "ALL"

Detailed Information Worklist for MR 26-1- Road Maintenance QUANTITIES

WILLAMETTE NATIONAL FOREST

ROAD MAINTENANCE

SUPPLEMENTAL SPECIFICATIONS

S U

R F

A C

E M

A

IN

T E

N A

N C

E

LE

V

E L

R

O A

D S

W

IT

H

R O

LL

E

R C

O M

P A

C T

IO

N

S P

O T

S U

R F

A C

IN

G

S T

A K

E D

B Y

C O

M O

B

IL

IZ

A

T

IO

N

S U

R F

A C

E M

A

IN

T E

N A

N

E L

R

O A

D S

W

LL

E

R C

O M

P A

C T

IO

N

ITEM NUMBER: 811(1) 811(2) 813(1) 881(1)

UNIT OF MEASURE: MI MI CY LS

BEGIN END DESCRIPTION OF WORK

MILEPOST

X - SIGNIFIES LS QUANTITY

DESIGNATED AS "ALL"

Detailed Information Worklist for MR 26-1- Road Maintenance QUANTITIES

WILLAMETTE NATIONAL FOREST

ROAD MAINTENANCE

SUPPLEMENTAL SPECIFICATIONS

S U

R F

A C

E M

A

IN

T E

N A

N

E L

R

O A

D S

W

LL

E

R C

O M

P A

C T

IO

N

S P

O T

S U

R F

A C

IN

G

S T

A K

E D

B Y

C O

M O

B

IL

IZ

A

T

IO

N

S U

R F

A C

E M

A

IN

T E

N A

N

E L

R

O A

D S

W

LL

E

R C

O M

P A

C T

IO

N

0.00 BOP - NFSR #2643440 (Jct W/ NFSR 2643)

BEGIN SURFACE MAINTENANCE, SPOT SURFACING*

1.10

1.10

END SURFACE MAINTENANCE & SPOT SURFACING

EOP - NFSR #2643440 (END OF ROAD)

0.00 BOP - NFSR #2643470 (Jct W/ NFSR 2643)

BEGIN SURFACE MAINTENANCE, SPOT SURFACING*

1.00

1.00

END SURFACE MAINTENANCE & SPOT SURFACING

EOP - NFSR #2643470

0.00 BOP - NFSR #2643471 (Jct W/ NFSR 2643470)

BEGIN SURFACE MAINTENANCE, SPOT SURFACING*

0.62

0.62

END SURFACE MAINTENANCE & SPOT SURFACING

EOP - NFSR #2643471 (Jct W/ NFSR 2643468)

0.00 BOP - NFSR #2643473 (Jct W/ NFSR 2643471)

BEGIN SURFACE MAINTENANCE, SPOT SURFACING*

0.80

0.80

END SURFACE MAINTENANCE & SPOT SURFACING

EOP - NFSR #2643473 (END OF ROAD)

0.00 BOP - NFSR #2643476 (Jct W/ NFSR 2643470)

BEGIN SURFACE MAINTENANCE, SPOT SURFACING*

0.60

0.60

END SURFACE MAINTENANCE & SPOT SURFACING

EOP - NFSR #2643476 ( END OF ROAD)

0.00 BOP - NFSR #2643480 (Jct W/ NFSR 2643)

BEGIN SURFACE MAINTENANCE

1.37

1.50

END SURFACE MAINTENANCE

EOP - NFSR #2643480 (Jct W/ NFSR 2643500 & BERM )

0.00 BOP - NFSR #2649 (Jct W/ HWY 126)

BEGIN SURFACE MAINTENANCE

5.30 9.80

15.10

END SURFACE MAINTENANCE

EOP - NFSR #2649 (END OF ROAD)

38.20 11.13 200 ALLTOTAL