7 January 2016
Attachment B
Goshen – Torrington 69kV – 115kV Transmission Line Upgrade Project Drawings
DE-SOL-0009344
PROJECT DRAWINGS
GOSHEN – TORRINGTON
69-KV – 115-KV TRANSMISSION LINE
UPGRADE
EXISTING LINE NEAR STRUCTURES 19/2 THRU 19/7
WYOMING
SECTION C
DESCRIPTION/SPECIFICATIONS
Spec. No. 862
GOSHEN – TORRINGTON 69-KV to115-KV TRANSMISSION LINE UPGRADE
15-1
A. GENERAL:
CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx. Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.
Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.
B. LIST OF DRAWINGS:
TRANSMISSION LINE LOCATION MAP:
1. GOS-TO 4100 – Drawing Summary and Location Map
TRANSMISSION LINE PLAN AND PROFILES:
2. TO-WLC 4017 Rev. A – Station 1504+00 to Station 1559+00 (Existing Installation)
3. TO-WLC 4018 – Station 1549+00 to Station 1599+81.18 (Existing Installation)
4. TO-WLC 4019 – Station 1599+81.18 to Station 1657+00 (Existing Installation)
5. TO-WLC 4020 – Station 1652+00 to Station 1702+00 (Existing Installation)
6. TO-WLC 4021 – Station 1697+00 to Station 1757+00 (Existing Installation)
7. TO-WLC 4022 Rev. A – Station 1747+00 to Station 1802+05 (Existing Installation)
8. TO-WLC 4023-1 – Station 1793+90 to Station 1815+00 (Existing Installation)
9. TO-WLC 4023 – Station 1802+05 to Station 1842+75.18 (Existing Installation)
10. TO-WLC 4024 – Station 1842+75.18 to Station 1858+39.69 (Existing Installation)
11. GOS – TO 4101 – Str GOS TO to Str 14/9
12. GOS – TO 4102 – Str 14/9 to Str 15/8
13. GOS – TO 4103 – Str 15/8 to Str 16/9
14. GOS – TO 4104 – Str 16/9 to Str 17/6
15. GOS – TO 4105 – Str 17/7 to Str 18/7
16. GOS – TO 4106 – Str 18/7 to Str 19/7
17. GOS – TO 4107 – Str 19/7 to Str 20/2
18. GOS – TO 4108 – Str 20/3 to Str TO TOS
TRANSMISSION LINE ELECTRICAL:
19. GOS-TO 1003 – Material Quantities
20. GOS-TO 1006 – Conductor Weights
TRANSMISSION LINE STEEL AND LIGHT DUTY STEEL POLE STRUCTURES:
21. 41 6115 Rev. B – Tangent Suspension Structure, Type SS-1 69 and 115kV
22. GOS-TO 1007 – Tangent Structures, Type Delta
23. 43 O12R 2300 – Valmont Dwg No. 211338Z (Informational Drawings)
24. 43 O12R 2400 – Valmont Dwg No. 211338A Page 1 of 2 (Informational Drawings)
25. 43 O12R 2401 – Valmont Dwg No. 211338A Page 2 of 2 (Informational Drawings)
26. 43-161N 2200 – Outline and Design Loads, Type 161N
27. 41 2701 Rev. A – Fall Protection Anchorage Plates, Steel Pole Structures and Lattice Towers
28. 43 2210 Rev. I - Maintenance Provisions – Details, Steel Pole Structures
29. 43 2217 – Maintenance Provisions – Details, Light Duty Steel Pole Structures
30. 41 9027-2 –Structure Number Signs, Steel Pole Structures
TRANSMISSION LINE WOOD POLE STRUCTURES:
31. 41 6115 Rev. B – Tangent Suspension Structure, Type SS-1 69 and 115kV
SWITCH STRUCTURES ELECTRICAL:
32. LTG 1000 – Arrangement Plan
33. 41 1034 – Grounding Details
SWITCH STRUCTURES FOUNDATIONS:
34. LTG 2300 – Foundation and Outline and Reinforcement
SWITCH STRUCTURES STEEL:
35. LTG 2600 – 115KV 3-Way Box Structure Plans, Design Loads, and Notes
36. LTG 2601 – Elevations
37. LTG 2602 – Assemblies and Connections
38. LTG 2603 – Assemblies and Connections
39. LTG 2604 – Anchor Bolts
40. LTG 2925 – Switch Operating Platforms Steel Design and Details
STRINGING REQUIREMENTS:
41. GOS-TO 1008 – Stringing Chart
42. GOS-TO 1009 – Stringing Chart
43. GOS-TO 1010 – Stringing Chart
44. GOS-TO 1011 – Stringing Chart
GEOLOGY:
45. GS-LIM 8003 – Geologic and Exploration Location Map
46. GS-LIM 8004 – Geologic and Exploration Location Map
47. GS-LIM 8056 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-49
48. GS-LIM 8057 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-50
49. GS-LIM 8058 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-51
50. GS-LIM 8059 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-52
51. GS-LIM 8060 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-53
52. GS-LIM 8061 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-54
53. GS-LIM 8062 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-55
54. GS-LIM 8063 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-56
55. GS-LIM 8064 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-57
GOSHEN – TORRINGTON 69-KV to115-KV TRANSMISSION LINE UPGRADE
15-2
56. GS-LIM 8065 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-58
57. GS-LIM 8066 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-59
58. GS-LIM 8067 – Subsurface Exploration Penetration Resistance and Log, Bore Hole 90-60
Following is a partial list of standard drawings that will be needed for this specification. The standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx
31 1000 Rev. D – Substation Standards, Identification and Security Signs 31 1075 Rev. J – Substation Standards, Switch Operating and Equipment Platforms, Electrical Design and Details 31 1500 Rev. B – Substation Standards, Grounding Plans, Typical Components 41 1012 Rev. C – Grounding Details, Wood Pole Structures 41 1015 Rev. K – Grounding Details, Weathering Steel and Concrete Pole Structures 41 1018 Rev. C – Overhead Ground Wire Assemblies for Steel and Concrete Pole Structures 41 1019 Rev. D – Overhead Ground Wire Assemblies for Wood Pole Structures 41 1020 Rev. B – Suspension Insulator Assemblies, Single String 41 1022 Rev. B – Tension Insulator Assemblies, Single Sting 41 1024 Rev. A – Horizontal Post Insulator Assemblies 41 6106 Rev. B – Douglas Fir Poles – Drilling Details 41 9004 Rev. E – Aerial Patrol Mile Marker and Structure Number Signs, Wood Pole Structures 43 2206 Rev. H – Maintenance Provisions, Outlines, Steel Pole Structures
9 7 10
20 21 19 22
27 30 28
32 33
10 11
13 16
23 21
32 33 34 35
S E
C T
IO
N
T
N
R
W
S E
C T
IO
N
C T
IO
N
C T
IO
N
C T
IO
N
C T
IO
N
C T
IO
N
SECTION 29
SECTION 20
SECTION 30
SECTION 19
SECTION 30
SECTION 19
S E
C T
IO
N
N
R
C T
IO
N
C T
IO
N
SECTION 24
SECTION 13 SECTION 24
SECTION 13
S E
C T
IO
N
C T
IO
N
SECTION 15
SECTION 10
SECTION 15
SECTION 10
S E
C T
IO
N
C T
IO
N
C T
IO
N
C T
IO
WESTERN AREA POWER ADMINISTRATION
UNITED STATES DEPARTMENT OF ENERGY
C A
E
HEADQUARTERS - LAKEWOOD, COLORADO
D E
S
IG
N R
E F.
F
IL
P
LS
APPROVED DESIGNED
GOSHEN - TORRINGTON
115-KV TRANSMISSION LINE
WYOMING
PLAN & PROFILE
GOS - TO
STEVEN ROCK
ELECTRICAL ENGINEERING MANAGER
JEFFREY A MILLER, P.E.
HENRY
TORRINGTON
GOSHEN COUNTY SUBSTATION
HENRY
D J-S
G
L-TO
L Y
-T O
WLC-GOS
SR 154
SR 156
S R
US HWY 26
U S H
W Y 8
GOS-TO
W Y
O M
IN
B R
A S
K A
TORRINGTON
SUBSTATION
P A
T H
S
P
R O
JE
C
T S
\T R
A N
S M
IS
S
IO
N
L
IN
E S
\G O
S H
E N
T
O R
R
IN
G T
O N
.2 \P
L S
C A
D D
\X Y
Z G
O S
-T O
R B
L D
.X
Y Z
S
-C A
D D
P R
O
JE
C T
L
IN
E
E D
IT
P
R O
P O
S E
D
K
V P
O L Y
M E
R P
O S
T
L
IN
E A
R
M R
W O
P T
T H
IS
S
H E
E T
G E
N E
R A
T E
D /6
/2
:0
:5
P
M P
L S
-C A
D D
V E
R S
IO
N
.0
X
J A
M
IL
L
R
O
S -T
O R
B L D
.X
Y
DRAWING SUMMARY & LOCATION MAP
N
R
N R
GOSHEN COUNTY, WYOMING
SCALE 1 INCH = 1/2 MILE
GOSHEN COUNTY
SUBST
DJ-SG
230-KV 13/12
15/5
15/6
19/7
20/6
LY-TO
115-KV
TORRINGTON
SUBST
GOS-TO 4101
GOS TO TOS - 14/9
GOS-TO 4102
14/9 - 15/8
GOS-TO 4103
15/8 - 16/9
GOS-TO 4104
16/9 - 17/6
GOS-TO 4105
17/7 - 18/7
GOS-TO 4106
18/7 - 19/7
GOS-TO 4107
19/7 - 20/2
GOS-TO 4108
20/3 - TO TOS
BEGIN DBL CKT W/
CITY OF TORRINGTON
GENERAL NOTES
1. SCALES SHOWN ARE ACCURATE FOR 22"X34" SHEET SIZE ONLY.
2. STRUCTURE LOCATIONS SHOWN ARE PROPOSED LOCATIONS AFTER
WORK HAS BEEN COMPLETED.
3. THE GOSHEN-TORRINGTON (GOS-TO) 115-KV LINE IS AN UPGRADE FROM THE
GERING-WILDCAT-TORRINGTON-LINGLE-LIMESTONE (GS-WLC-TO-L-LIM) 34.5-KV
AT 69-KV) T-LINE. WITH THE CONSTRUCTION OF THE GOSHEN COUNTY SUBSTATION,
THE WLC-TO LINE SECTION, STRUCTURES NUMBERED 0/1 TO 20/5, BECOMES THE
WILDCAT-GOSHEN (WLC-GOS) 34.5-KV T-LINE, AND THE GOS-TO 115-KV LINE. THE
GOSHEN COUNTY SUBSTATION IS LOCATED BETWEEN STRUCTURES 13/11 IN THE
WLC-GO 34.5-KV LINE AND 13/12 IN THE GOS-TO 115-KV LINE. THE GOS-TO LINE
STATIONING AND STRUCTURE NUMBERS REMAIN THE SAME, STARTING WITH 13/12
AT GOSHEN.
THE GOS-TO 115-KV LINE AND THE LYMAN-TORRINGTON (LY-TO) 115-KV LINE COME
TOGETHER AT A HORIZONTAL THREE LINE SWITCH STRUCTURE OUTSIDE THE
TORRINGTON SUBSTATION WITH THE LOAD LINE INTO THE TORRINGTON SUBSTATION.
PROJECT SUMMARY
1. NESC 250B: 0° F + 0.5" ICE + 4 PSF WIND (HEAVY)
2. NESC 250C: 60° F + 0" ICE + 100 MPH WIND
3. RIME ICE: 30° F + 1.5" ICE + 4 PSF WIND
4. CONDUCTOR: 477KCMIL, 26/7 ACSR (HAWK)
5. OGW: 3/8-INCH - 7 STRAND HIGH STRENGTH STEEL
6. SINGLE WOOD POLES W/ POLYMER POST INSULATORS
7. SINGLE STEEL POLES W/ PORCELAIN INSULATOR SUSPENSION
AND TENSION STRINGS
LOCATION MAP
N.T.S.
REFERENCE DRAWINGS
GROUNDING DETAILS - WOOD POLE STRUCTURES
GROUNDING DETAILS - WEATHERING STEEL &
CONCRETE POLE STRUCTURES
OVERHEAD GROUND WIRE ASSEMBLIES FOR STEEL
& CONCRETE POLE STRUCTURES
OVERHEAD GROUND WIRE ASSEMBLIES
WOOD POLE STRUCTURES
SUSPENSION INSULATOR ASSEMBLIES
SINGLE STRING
TENSION INSULATOR ASSEMBLIES
SINGLE STRING
HORIZONTAL POST INSULATOR ASSEMBLIES
TANGENT SUSPENSION STRUCTURE - TYPE SS-1
STEEL POLE STRUCTURE - TYPE 161N-40
115-KV 3-WAY SWITCH STRUCTURE
CONDUCTOR WEIGHTS
TANGENT SUSPENSION STRUCTURE
TYPE DELTA
STRINGING CHART
STRINGING CHART
STRINGING CHART
STRINGING CHART
ABBREVIATIONS
COT
GOS
TO
AH
ATT
B/T
BK
BP
BTM
CNTR
CONC
COND
DBL CKT
DE
(DE)
EA
GL
HWY
MDL
MRW
OGW
POLY
PORC
STA
STR
TOS
WLDSTL
WSTL
WT
WTS
Ø
CITY OF TORRINGTON
GOSHEN
TORRINGTON
AHEAD
ATTACHMENT
BETWEEN
BACK
BASE PLATE
BOTTOM
CENTER
CONCRETE
CONDUCTOR
DOUBLE CIRCUIT
DEAD END
DIRECT EMBED
EACH
GLUED LAMINATED WOOD POLE
HIGHWAY
MIDDLE
MAKE-READY-WORK
OVERHEAD GROUND WIRE
POLYMER
PORCELAIN
STATION
STRUCTURE
TAKE OFF STRUCTURE
WEATHERING LIGHT DUTY STEEL
WEATHERING STEEL
WEIGHT
WEIGHTS
POUND
PHASE
41 1012
41 1015
41 1018
41 1019
41 1020
41 1022 41 1024 41 6115 43 161N
LTG 2600
GOS-TO 1006
GOS-TO 1007
GOS-TO 1008
GOS-TO 1009
GOS-TO 1010
GOS-TO 1011
PHONE NUMBERS
SHERIFF:
GOSHEN COUNTY
HOSPITAL:
TORRINGTON
AIR LIFE:
NATIONWIDE
INFORMATION:
ROAD/WEATHER
307.532.4026
307.532.4181
800.332.4923
307.777.4321
JANUARY 6, 2016
EXISTING INSTALLATION
EXISTING INTALLATION
1800+00 1810+00
P I
°0
'0
P I
°5
'4
/1
S U
N N
Y
:3
/2
S U
N N
Y
E E
L
E E
L
/3
X
/3
S
-1
S U
N N
Y
-S
A
.9
.5
/2
-S
A
.1
.7
/3
-S
A
.8
.3
/4
T
-7
A
.1
.2
P I -0
°3
'5
E X
/4
-2
-0
R
D C
IR
C
IT
/4
-2
-0
R D
C
IR
C
C /L
B R
ID
G
E
F
/5
T
-8
A
.9
I
°0
'0
E X
/5
-0
S D
C
IR
C
/5
S U
N N
Y
:0
/6
-0
S D
C
IR
C
/6
B M
\4
/7
/6
T
-6
A
.4
/7
T
-3
A
PT 124+77.96
PI 131+74.41
PC 122+76.30
4097.56
GOVR 19
33+06.40
A L
U M
W A
P
E E
L
IN
E
T
R E
E L
IN
E
PT 124+77.96
PI 123+77.37
125+00
130+00
TS 131+07.69
SC 132+07.69
PI 131+74.41
N
Â
º 4 ' 1
. 2
" E
PC 122+76.30
4096.50
4097.56 OVR 18
GOVR 19
SC 132+07.69
C S 1
34+01.2
PI 133+06.40 S
T 1
34+01.2
T S 1
34+01.3
C
+7 6.
1'
1.
8"
OVR 18
E X
G N
D
/L
L E
H E
IG
H
T
IM
A T
D
125+00
130+00
+07.69
2+07.69
4096.50
GOVR 18
2+07.69
C S 134+01.24
S T 1
34+01.25
T S 1
34+01.35
C
+76 .3
5 1
+0
0 CS 139+72.57
140+00
ST 140+72.57
PI 140+06.05
POT 143+48.38
S
Â
º 3 ' 3
.5
" W
GOVR 18
A L
U M
W A
P
L E
H E
IG
T
IM
A T
7\
/W
1796+70.00 0°00'00"
1801+83.17 0°55'46"
1801+83.17 0°55'46"
1804+99.90 -0°39'58"
1804+99.90 -0°39'58"
1808+39.33 0°00'00"
19/1 19/2 19/3 19/4 19/4 19/5 19/5 19/6 19/7
RULING
SPAN
STRUCTURE NUMBER CONDUCTOR
NESC TMAX
OPGW
NESC TMAX
OGW
NESC TMAX FROM TO
313 16/13 19/4 5332
19/5 19/6 5390 19/6 19/7 5328
3569 FEBRUARY 6, 2012 4023-1
SUPERSEDES DWG NO. TO-WLC 4023 (IN PART).
19/4 19/5 5324 3552
CENTERLINE
1"=200' HORIZONTAL
1"=40' VERTICAL
SCALE:
WESTERN AREA POWER ADMINISTRATION
UNITED STATES DEPARTMENT OF ENERGY
C A
E
CORPORATE SERVICES OFFICE - LAKEWOOD, COLORADO
D E
S
IG
N R
E F.
F
IL
APPROVED DESIGNED
TORRINGTON - WILDCAT
69-KV TRANSMISSION LINE
WYOMING
PLAN & PROFILE
TO-WLC
ROSS CLARK
ELECTRICAL ENGINEERING MANAGER
JOSH ROSS
/7
/2
, S :\P
R O
JE
C
T S
\T R
A N
S M
IS
S
IO
N
L
IN
E S
\T O
R R
IN
G
T O
N
W
IL
D C
A T
B R
ID
G
E .2
\P
L S
C A
D D
\X Y
Z \T
O
W L
C
_W
LC
_9
0.
X
1793+90 TO 1815+00
NESC HEAVY LOADING
COND - 477 KCMIL, ACSR, 26/7, STANDARD STRENGTH, "HAWK"
CURVE SHOWN AT 176°F, FINAL CONDITIONS
OGW - 3/8-INCH, EHS, 7-STRAND STEEL
CURVE SHOWN AT 0°F, INITIAL CONDITIONS
DESIGN RULING SPAN VARIES
GROUND CLEARANCE = 22` MINIMUM
MAXIMUM DESIGN OPERATING TEMP = 176°F
STRUCTURE SPOTTING BY PLS-CADD
COORDINATES AND BEARINGS ARE BASED
ON THE WYOMING STATE PLAN COORDINATE
SYSTEM, EAST ZONE, NAD83 DATUM.
UNITS ARE IN US SURVEY FEET.
plathrop Typewritten Text
EXISTING INSTALLATION
plathrop Typewritten Text plathrop Line plathrop Line
1510+00 1520+00 1530+00 1540+00 1550+00
P I °0
'0
P I °3
'0
P I °3
'0
P I -4
°2 '4
359 395 399
DJ-SG 230KV
OGW
DJ-SG 230KV
COND
P I -4
°2 '4
300 321 320 319 320 320 319 326 314 315
-1
-1
-1
-1
/1
109/1B
EX-13/13 13/13
EX-13/12
109/2
13/12
S E
C T
IO
N
S E
C T
IO
N
TOS
STA=1510+28
TO BE COMPLETED W/
GOSHEN SUBST PROJ
VERIFY 10 BELLS IN
EACH TENSION STRING
TOS
13/12
STA=1513+86
TO BE COMPLETED W/
GOSHEN SUBST PROJ
60-ST-1 GL
VERIFY 8 BELLS IN
EACH TENSION STRING
13/12
13/13
STA=1517+45
TO BE COMPLETED W/
GOSHEN SUBST PROJ
55-SS-1 CL 1
OGW DE AH
7/16 HSS
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1-G (69KV)
13/13
13/14
STA=1521+40
MRW
INSTALL
55-SS-1 CL H1
SET 20' BK FROM EXISTING
REMOVE
55-SS-1
13/14
13/15
STA=1525+39
EXISTING
012A-30
WSTL
INSTALL
3 HS1-F (115KV)
REMOVE
3 HS1 (PORC)
13/15
13/16
STA=1528+39
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
13/16
14/1
STA=1531+60
EXISTING
50-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/1
14/2
STA=1534+80
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/2
14/3
STA=1537+99
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/3
14/4
STA=1541+19
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/4
14/5
STA=1544+40
EXISTING
50-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/5
14/6
STA=1547+59
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/6
14/7
STA=1550+85
EXISTING
50-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/7
14/8
STA=1553+99
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/8
14/9
STA=1557+14
MRW
INSTALL
55-SS-1 CL 1
SET 5' BK FROM EXISTING
REMOVE
50-SS-1
14/9
PI 1510+27.65
0°00'00"
PI 1513+86.25
97°34'01" PI 1525+39.34
-4°23'47"
TOS 13/12 13/13 13/14 13/15 13/16 14/1 14/2 14/3 14/4 14/5 14/6 14/7 14/8 14/9
WESTERN AREA POWER ADMINISTRATION
UNITED STATES DEPARTMENT OF ENERGY
C A
E
HEADQUARTERS - LAKEWOOD, COLORADO
D E
S
IG
N R
E F.
F
IL
CENTERLINE
1"=200' HORIZONTAL
1"=40' VERTICAL
SCALE:
APPROVED DESIGNED
GOSHEN - TORRINGTON
115-KV TRANSMISSION LINE
WYOMING
PLAN & PROFILE
GOS - TO
STEVEN ROCK
ELECTRICAL ENGINEERING MANAGER
JEFFREY A MILLER, P.E.
RULING
SPAN
STRUCTURE NUMBER CONDUCTOR
NESC TMAX
OPGW
NESC TMAX
OGW
NESC TMAX FROM TO
SUPERSEDES DWG NO.
PHASING
A B C
PHASING
A B C
STR 13/12
PHASING
A B
C
TYPICAL
(LOOKING NW)
PHASING
A
B C
STR 13/15
(LOOKING NW)
TOS
(LOOKING NORTH)
21.1 FT
CLEARANCE
LINE
P A
T H
S
P
R O
JE
C
T S
\T R
A N
S M
IS
S
IO
N
L
IN
E S
\G O
S H
E N
T
O R
R
IN
G T
O N
.2 \P
L S
C A
D D
\X Y
Z G
O S
-T O
R B
L D
.X
Y
S
-C A
D D
P R
O
JE
C T
L
IN
E
E D
IT
P
R O
P O
S E
D
K
V P
O L Y
M E
R P
O S
T
L
IN
E A
R
M R
W O
P T
T H
IS
S
H E
E T
G E
N E
R A
T E
D /6
/2
:0
:0
P
M P
L S
-C A
D D
V E
R S
IO
N
.0
X
J A
M
IL
L
COND. - 477 KCMIL 26/7 "HAWK" ACSR
SHOWN AT 176° F, FINAL
OGW - 3/8 INCH, 7 STRAND HS STEEL
SHOWN AT 90° F, FINAL
MAXIMUM OPERATING TEMP (MOT) = 176° F
GROUND CLEARANCE = 21.1 FT. MINIMUM
LIDAR SURVEY & IMAGERY: DATED 5/2012
CABLE TENSIONS SHOWN ARE BASED ON LIDAR &
NERC STUDY COMPLETED 5/2012 AND LINE
MODIFICATION DWGS COMPLETED AFTER 5/2012.
PLS-CADD SIGN CONVENTION:
( ) UNSIGNED: RT AH AND OFFSET R OF C/L
(-) NEG. SIGN: LT AH AND OFFSET L OF C/L
COORDINATES SHOWN ARE WY EAST, STATE PLANE
NAD 83 - GND. SCALE FACTOR BETWEEN GROUND
AND GRID IS 1/0.999871392.
UNITS ARE US SURVEY FEET.
STA. 1507+28 - STA. 1558+52
STR TOS TO STR 14/9 G
O
S -T
O R
B L D
.X
SCALE SHOWN IS ACCURATE FOR 22"X34" SHEET SIZE.
O
S -T
S -W
GOS-TO
GOS TOS 13/12 4000 - - 2000
US HWY 26
BNSF RXR
TO - WLC 4017 AND
GOS 0880 (PART)
U S
H W
Y
H W
Y
DJ-SG
STR 109/1B
DJ-SG
STR 109/2
DJ-SG
STR 109/1B
SECTIONS 28 & 29
TOWNSHIP 24 NORTH, RANGE 60 WEST
13/12 15/6 5580 - - - - 13/13 15/6 - - - - 2605
JANUARY 6, 2016
1560+00 1570+00 1580+00 1590+00 1600+00
P I -3
°2
'0
325 321 316 324 319 321 310 330 320 315
P I -3
°2
'0
P I °2
'5
U S
H W
Y
S F
R
36.5 33.8
I °2
'5
329 325
S E
C T
IO
N
S E
C T
IO
N
SECTION 29
SECTION 20
S E
C T
IO
N
C T
IO
N
C T
IO
N
C T
IO
N
C T
IO
S E
C T
IO
N
SECTION 30
SECTION 19
14/9
STA=1557+14
MRW
INSTALL
55-SS-1 CL 1
SET 5' BK FROM EXISTING
REMOVE
50-SS-1
14/9
14/10
STA=1560+39
EXISTING
50-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/10
14/11
STA=1563+59
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/11
14/12
STA=1566+75
MRW
INSTALL
55SS-1 CL 1
SET 5' BK FROM EXISTING
REMOVE
50-SS-1
14/12
14/13
STA=1569+99
EXISTING
50-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/13
14/14
STA=1573+18
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/14
14/15
STA=1576+39
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/15
14/16
STA=1579+49
EXISTING
50-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
14/16
15/1
STA=1582+80
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/1
15/2
STA=1585+99
EXISTING
50-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/2
15/3
STA=1589+14
MRW
INSTALL
55-SS-1 CL 1
SET 5' BK FROM EXISTING
REMOVE
50-SS-1
15/3
15/4
STA=1592+45
MRW
INSTALL
65-SS-1 CL H1
SET 5' BK FROM EXISTING
REMOVE
60-SS-1
15/4
15/5
STA=1595+80
EXISTING
O12F-50
WSTL
INSTALL
3 SIA11-B (115KV)
REMOVE
3 SIA11-B (69KV)
15/5
15/6
STA=1599+81
EXISTING
O12M-45
WSTL
INSTALL
6 T11-B (115KV)
3 HS1-F (115KV)
REMOVE
6 T11-B (69KV)
3 HS1 (PORC)
15/6
15/7
STA=1602+99
EXISTING
65-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/7
15/8
STA=1606+28
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/8
PI 1595+80.48
-38°22'00"
PI 1599+80.65
38°22'52"
14/9 14/10 14/11 14/12 14/13 14/14 14/15 14/16 15/1 15/2 15/3 15/4 15/5 15/6 15/7 15/8
WESTERN AREA POWER ADMINISTRATION
UNITED STATES DEPARTMENT OF ENERGY
C A
E
HEADQUARTERS - LAKEWOOD, COLORADO
D E
S
IG
N R
E F.
F
IL
1"=40' VERTICAL
SCALE:
APPROVED DESIGNED
GOSHEN - TORRINGTON
115-KV TRANSMISSION LINE
WYOMING
PLAN & PROFILE
GOS - TO
STEVEN ROCK
ELECTRICAL ENGINEERING MANAGER
JEFFREY A MILLER, P.E.
RULING
SPAN
STRUCTURE NUMBER CONDUCTOR
NESC TMAX
OPGW
NESC TMAX
OGW
NESC TMAX FROM TO
SUPERSEDES DWG NO.
PHASING
A B C
STR 15/6
PHASING
A B
C
STR 15/5
(LOOKING NW)
BNSF RXR
US HWY 26
US HW
Y 26
US HW
Y 26
BNSF RXR
BNSF RXR
US HWY 26
P A
T H
S
P
R O
JE
C
T S
\T R
A N
S M
IS
S
IO
N
L
IN
E S
\G O
S H
E N
T
O R
R
IN
G T
O N
.2 \P
L S
C A
D D
\X Y
Z G
O S
-T O
R B
L D
.X
Y
S
-C A
D D
P R
O
JE
C T
L
IN
E
E D
IT
P
R O
P O
S E
D
K
V P
O L Y
M E
R P
O S
T
L
IN
E A
R
M R
W O
P T
T H
IS
S
H E
E T
G E
N E
R A
T E
D /6
/2
:0
:1
P
M P
L S
-C A
D D
V E
R S
IO
N
.0
X
J A
M
IL
L
OGW - 3/8 INCH, 7 STRAND HS STEEL
SHOWN AT 90° F, FINAL
MAXIMUM OPERATING TEMP (MOT) = 176° F
MODIFICATION DWGS COMPLETED AFTER 5/2012.
PLS-CADD SIGN CONVENTION:
( ) UNSIGNED: RT AH AND OFFSET R OF C/L
(-) NEG. SIGN: LT AH AND OFFSET L OF C/L
COORDINATES SHOWN ARE WY EAST, STATE PLANE
NAD 83 - GND. SCALE FACTOR BETWEEN GROUND
AND GRID IS 1/0.999871392.
UNITS ARE US SURVEY FEET.
STA. 1557+14 - STA. 1608+38
STR 14/9 TO STR 15/8 G
O
S -T
O R
B L D
.X
DISTR
TO - WLC 4018 AND
TO - WLC 4019 (PART)
SECTIONS 29, 30 & 19
TOWNSHIP 24 NORTH, RANGE 60 WEST
334 13/12 15/6 5580 - - - - 333 13/13 15/6 - - - - 2605 319 15/6 16/13 5295 - - 2545
JANUARY 6, 2016
1610+00 1620+00 1630+00 1640+00 1650+00 1660+00
325 321 315 320 324 336 330 330 325 334 329 326 330 314 325 296 300 305
S E
C T
IO
N
T 24N
60W
SECTION 30
SECTION 19
S E
C T
IO
N
T 24N
61W
15/8
STA=1606+28
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/8
15/9
STA=1609+54
EXISTING
65-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/9
15/10
STA=1612+74
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/10
15/11
STA=1615+89
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/11
15/12
STA=1619+09
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/12
15/13
STA=1622+33
EXISTING
65-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/13
15/14
STA=1625+70
EXISTING
65-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/14
15/15
STA=1629+00
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/15
15/16
STA=1632+29
EXISTING
65-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
15/16
16/1
STA=1635+55
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/1
16/2
STA=1638+89
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/2
16/3
STA=1642+18
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/3
16/4
STA=1645+44
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/4
16/5
STA=1648+74
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/5
16/6
STA=1651+88
EXISTING
65-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/6
16/7
STA=1655+14
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/7
16/8
STA=1658+09
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/8
16/9
STA=1661+09
EXISTING
65-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/9
15/8 15/9 15/10 15/11 15/12 15/13 15/14 15/15 15/16 16/1 16/2 16/3 16/4 16/5 16/6 16/7 16/8 16/9
WESTERN AREA POWER ADMINISTRATION
UNITED STATES DEPARTMENT OF ENERGY
C A
E
HEADQUARTERS - LAKEWOOD, COLORADO
D E
S
IG
N R
E F.
F
IL
1"=40' VERTICAL
SCALE:
APPROVED DESIGNED
GOSHEN - TORRINGTON
115-KV TRANSMISSION LINE
WYOMING
PLAN & PROFILE
GOS - TO
STEVEN ROCK
ELECTRICAL ENGINEERING MANAGER
JEFFREY A MILLER, P.E.
RULING
SPAN
STRUCTURE NUMBER CONDUCTOR
NESC TMAX
OPGW
NESC TMAX
OGW
NESC TMAX FROM TO
SUPERSEDES DWG NO.
ADJACENT DISTR
LINE APPROX
12` - 14` NORTH
P A
T H
S
P
R O
JE
C
T S
\T R
A N
S M
IS
S
IO
N
L
IN
E S
\G O
S H
E N
T
O R
R
IN
G T
O N
.2 \P
L S
C A
D D
\X Y
Z G
O S
-T O
R B
L D
.X
Y
S
-C A
D D
P R
O
JE
C T
L
IN
E
E D
IT
P
R O
P O
S E
D
K
V P
O L Y
M E
R P
O S
T
L
IN
E A
R
M R
W O
P T
T H
IS
S
H E
E T
G E
N E
R A
T E
D /6
/2
:0
:3
P
M P
L S
-C A
D D
V E
R S
IO
N
.0
X
J A
M
IL
L
OGW - 3/8 INCH, 7 STRAND HS STEEL
SHOWN AT 90° F, FINAL
MAXIMUM OPERATING TEMP (MOT) = 176° F
MODIFICATION DWGS COMPLETED AFTER 5/2012.
PLS-CADD SIGN CONVENTION:
( ) UNSIGNED: RT AH AND OFFSET R OF C/L
(-) NEG. SIGN: LT AH AND OFFSET L OF C/L
COORDINATES SHOWN ARE WY EAST, STATE PLANE
NAD 83 - GND. SCALE FACTOR BETWEEN GROUND
AND GRID IS 1/0.999871392.
UNITS ARE US SURVEY FEET.
STA. 1606+28 - STA. 1663+52
STR 15/8 TO STR 16/9 G
O
S -T
O R
B L D
.X
TO - WLC 4019 AND
TO - WLC 4020 (PART)
SECTION 19
TOWNSHIP 24 NORTH, RANGE 60 WEST
SECTION 24
TOWNSHIP 24 NORTH, RANGE 61 WEST
319 15/6 16/13 5295 - - 2545
REMOVE TREES
TO THE SOUTH
REMOVE TREES
TO THE SOUTH
JANUARY 6, 2016
1670+00 1670+00 1680+00 1690+00 1700+00
S T
A T
IO
N
E Q
U A
T
IO
N
.7
B
A C
K S
T A
T
IO
N E
Q U
A T
IO
N
.0
A
H E
A D
S T
A T
IO
N
E Q
U A
T
IO
N
.7
B
A C
K S
T A
T
IO
N E
Q U
A T
IO
N
.0
A
H E
A D
P I -0
°0 '5
305 300
P I °4
'4
P I °4
'4
P I -3
°4 '2
P I -3
°4 '2
P I -0
°5 '1
P I -0
°5 '1
P I -0
°0 '3
350 350 350 340 359 351
320 385
X X X
X
X X
X X X X X
X
X X X X
X X X X
X
X X X
X X X
X
SECTION 24
SECTION 13
16/9
STA=1661+09
EXISTING
65-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/9
16/10
STA=1664+15
EXISTING
60-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/10
16/11
STA=1667+14
EXISTING
65-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/11
16/12
STA=1670+14
EXISTING
70-SS-1 CL 1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/12
16/13
STA=1673+10
EXISTING
O12M-50
WSTL
INSTALL
6 T11-B (115KV)
3 HS1-F (115KV)
REMOVE
6 T11-B (69KV)
3 HS1 (PORC)
16/13
16/14
STA=1675+98
EXISTING-MRW
O12B-35
WSTL
INSTALL
3 HS1-F (115KV) 2' BLW
STL ARM (CNTR-CNTR)
REMOVE
3 SI11-B (69KV)
STEEL ARMS
50# WT ON BTM PHASE
16/14
16/15
16/15
STA=1678+95
MRW
INSTALL
65-SS-1 CL H1
SET 5' BK FROM EXISTING
REMOVE
55-SS-1
2 50# WTS
16/16
STA=1682+00
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/16
16/17
STA=1685+50
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
16/17
17/1
STA=1689+00
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/1
17/2
STA=1692+50
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/2
17/3
STA=1695+90
MRW
INSTALL
55-SS-1 CL 1
SET 10' BK FROM EXISTING
REMOVE
50-SS-1
17/3
17/4
STA=1699+49
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/4
17/5
STA=1703+00
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/5
17/6
STA=1706+20
MRW
INSTALL
60-SS-1 CL H1
SET 10' BK FROM EXISTING
REMOVE
60-SS-1 CL 1
17/6
PI 1670+14.37
-0°09'53"
PI 1678+99.58
-0°54'16"
PI 1692+49.51
-0°01'34"
16/9 16/10 16/11 16/12 16/13 16/14 16/15 16/16 16/17 17/1 17/2 17/3 17/4 17/5 17/6
WESTERN AREA POWER ADMINISTRATION
UNITED STATES DEPARTMENT OF ENERGY
C A
E
HEADQUARTERS - LAKEWOOD, COLORADO
D E
S
IG
N R
E F.
F
IL
1"=40' VERTICAL
SCALE:
APPROVED DESIGNED
GOSHEN - TORRINGTON
115-KV TRANSMISSION LINE
WYOMING
PLAN & PROFILE
GOS - TO
STEVEN ROCK
ELECTRICAL ENGINEERING MANAGER
JEFFREY A MILLER, P.E.
RULING
SPAN
STRUCTURE NUMBER CONDUCTOR
NESC TMAX
OPGW
NESC TMAX
OGW
NESC TMAX FROM TO
SUPERSEDES DWG NO.
PHASING
A B C
STR 16/13
PHASING
A B
C
STR 16/14
(LOOKING NW)
ADJACENT DISTR
LINE APPROX
12` - 14` NORTH
DISTR
ADJACENT
DISTR LINE
APPROX 12`
- 14` NORTH
P A
T H
S
P
R O
JE
C
T S
\T R
A N
S M
IS
S
IO
N
L
IN
E S
\G O
S H
E N
T
O R
R
IN
G T
O N
.2 \P
L S
C A
D D
\X Y
Z G
O S
-T O
R B
L D
.X
Y
S
-C A
D D
P R
O
JE
C T
L
IN
E
E D
IT
P
R O
P O
S E
D
K
V P
O L Y
M E
R P
O S
T
L
IN
E A
R
M R
W O
P T
T H
IS
S
H E
E T
G E
N E
R A
T E
D /6
/2
:0
:4
P
M P
L S
-C A
D D
V E
R S
IO
N
.0
X
J A
M
IL
L
OGW - 3/8 INCH, 7 STRAND HS STEEL
SHOWN AT 90° F, FINAL
MAXIMUM OPERATING TEMP (MOT) = 176° F
MODIFICATION DWGS COMPLETED AFTER 5/2012.
PLS-CADD SIGN CONVENTION:
( ) UNSIGNED: RT AH AND OFFSET R OF C/L
(-) NEG. SIGN: LT AH AND OFFSET L OF C/L
COORDINATES SHOWN ARE WY EAST, STATE PLANE
NAD 83 - GND. SCALE FACTOR BETWEEN GROUND
AND GRID IS 1/0.999871392.
UNITS ARE US SURVEY FEET.
STA. 1661+09 - STA. 1709+22
STR 16/9 TO STR 17/6 G
O
S -T
O R
B L D
.X
TO - WLC 4020 AND
TO - WLC 4021 (PART)
SECTIONS 24 & 13
TOWNSHIP 24 NORTH, RANGE 61 WEST
319 15/6 16/13 5295 - - 2545 342 16/13 19/4 5370 - - 2620
JANUARY 6, 2016
1710+00 1720+00 1730+00 1740+00 1750+00 1760+00
P I -0
°0 '3
373 320 374
P I °0
'2
326 349 350 351 349 350 351 349 350 351 357 342 350
X X
X X
S E
C T
IO
N
S E
C T
IO
N
SECTION 24
SECTION 13
X X
X X
17/7
STA=1710+05
MRW
INSTALL
60-SS-1 CL H1
SET 5' AH FROM EXISTING
REMOVE
60-SS-1 CL 1
17/7
17/8
STA=1713+78
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/8
17/9
STA=1716+98
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/9
17/10
STA=1720+72
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/10
17/11
STA=1723+99
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/11
17/12
STA=1727+48
EXISTING
50 SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/12
17/13
STA=1730+98
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/13
17/14
STA=1734+48
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/14
17/15
STA=1737+98
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
17/15
18/1
STA=1741+47
EXISTING
50-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/1
18/2
STA=1744+98
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/2
18/3
STA=1748+47
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/3
18/4
STA=1751+97
EXISTING
60-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/4
18/5
STA=1755+48
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/5
18/6
STA=1759+05
MRW
INSTALL
60-SS-1 CL H1
SET 5' AH FROM EXISTING
REMOVE
60-SS-1 CL 1
18/6
18/7
STA=1762+47
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/7
PI 1720+72.50
-0°07'38"
PI 1727+47.66
0°06'21"
17/7 17/8 17/9 17/10 17/11 17/12 17/13 17/14 17/15 18/1 18/2 18/3 18/4 18/5 18/6 18/7
WESTERN AREA POWER ADMINISTRATION
UNITED STATES DEPARTMENT OF ENERGY
C A
E
HEADQUARTERS - LAKEWOOD, COLORADO
D E
S
IG
N R
E F.
F
IL
1"=40' VERTICAL
SCALE:
APPROVED DESIGNED
GOSHEN - TORRINGTON
115-KV TRANSMISSION LINE
WYOMING
PLAN & PROFILE
GOS - TO
STEVEN ROCK
ELECTRICAL ENGINEERING MANAGER
JEFFREY A MILLER, P.E.
RULING
SPAN
STRUCTURE NUMBER CONDUCTOR
NESC TMAX
OPGW
NESC TMAX
OGW
NESC TMAX FROM TO
SUPERSEDES DWG NO.
P A
T H
S
P
R O
JE
C
T S
\T R
A N
S M
IS
S
IO
N
L
IN
E S
\G O
S H
E N
T
O R
R
IN
G T
O N
.2 \P
L S
C A
D D
\X Y
Z G
O S
-T O
R B
L D
.X
Y
S
-C A
D D
P R
O
JE
C T
L
IN
E
E D
IT
P
R O
P O
S E
D
K
V P
O L Y
M E
R P
O S
T
L
IN
E A
R
M R
W O
P T
T H
IS
S
H E
E T
G E
N E
R A
T E
D /6
/2
:0
:0
P
M P
L S
-C A
D D
V E
R S
IO
N
.0
X
J A
M
IL
L
OGW - 3/8 INCH, 7 STRAND HS STEEL
SHOWN AT 90° F, FINAL
MAXIMUM OPERATING TEMP (MOT) = 176° F
MODIFICATION DWGS COMPLETED AFTER 5/2012.
PLS-CADD SIGN CONVENTION:
( ) UNSIGNED: RT AH AND OFFSET R OF C/L
(-) NEG. SIGN: LT AH AND OFFSET L OF C/L
COORDINATES SHOWN ARE WY EAST, STATE PLANE
NAD 83 - GND. SCALE FACTOR BETWEEN GROUND
AND GRID IS 1/0.999871392.
UNITS ARE US SURVEY FEET.
STA. 1708+22 - STA. 1765+46
STR 17/7 TO STR 18/7 G
O
S -T
O R
B L D
.X
TO - WLC 4021 AND
TO - WLC 4022 (PART)
SECTIONS 14 & 15
TOWNSHIP 24 NORTH, RANGE 61 WEST
342 16/13 19/4 5370 - - 2620
JANUARY 6, 2016
1770+00 1780+00 1790+00 1800+00 1810+00
P I -0
°4 '1
350 351 345 355 350 350 346 354
P I -0
°4 '1
P I -0
°0 '0
P I °1
'4
P I °1
'1
P I °1
'1
P I -2
°0
'4
317 314
U S
H W
Y
V
E R
P A
32.7
E
C T
IO
N
S E
C T
IO
N
SECTION 15
SECTION 10
18/7
STA=1762+47
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/7
18/8
STA=1765+97
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/8
18/9
STA=1769+48
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/9
18/10
STA=1772+93
MRW
INSTALL
55-SS-1 CL 1
SET 5' BK FROM EXISTING
REMOVE
50-SS-1
18/10
18/11
STA=1776+48
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/11
18/12
STA=1779+97
MRW
INSTALL
55-SS-1 CL 1
SET 5' BK FROM EXISTING
REMOVE
50-SS-1
18/12
18/13
STA=1783+47
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/13
18/14
STA=1786+93
MRW
INSTALL
55-SS-1 CL 1
SET 5' BK FROM EXISTING
REMOVE
50-SS-1
18/14
18/15
STA=1790+47
EXISTING
55-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (PORC)
18/15
19/1
19/1
STA=1793+87
EXISTING
65-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (POLY)
19/2
STA=1796+59
EXISTING
80-SS-1
INSTALL
3 HS1-G (115KV)
REMOVE
3 HS1 (POLY)
19/2
19/3
STA=1799+48
MRW
INSTALL
105-SS-1 CL H2
WLDSTL
SAME HOLE SET
EMBED 15'
BACKFILL W/ CONC
REMOVE
100-SS-1
19/3
19/4
STA=1801+81
EXISTING
156T-70
WSTL BP
BEGIN COT 34.5KV
INSTALL
6-T11-B (115KV)
3 SI11-B (115KV)
REMOVE
6-T11-B (69KV)
3 SI11-B (69KV)
19/4
19/5
STA=1804+98
EXISTING
156T-80
WSTL BP
INSTALL
6 T11-B (115KV)
3 SI11-B (115KV)
REMOVE
6 T11-B (69KV)
3 SI11-B (69KV)
19/5
19/6
STA=1808+12
EXISTING
156T-60
WSTL BP
INSTALL
6 T11-B (115KV)
3 SI11-B (115KV)
REMOVE
6 T11-B (69KV)
3 SI11-B (69KV)
19/6
19/7
STA=1811+58
EXISTING
O13T-30
WSTL
INSTALL
6 T11-B (115KV)
3 SI11-B (115KV)
REMOVE
6 T11-B (69KV)
3 SI11-B (69KV)
19/7
PI 1793+97.37
-0°41'18"
PI 1811+57.63
-23°05'46"
18/7 18/8 18/9 18/10 18/11 18/12 18/13 18/14 18/15 19/1 19/2 19/3 19/4 19/5 19/6 19/7
WESTERN AREA POWER ADMINISTRATION
UNITED STATES DEPARTMENT OF ENERGY
C A
E
HEADQUARTERS - LAKEWOOD, COLORADO
D E
S
IG
N R
E F.
F
IL
1"=40' VERTICAL
SCALE:
APPROVED DESIGNED
GOSHEN - TORRINGTON
115-KV TRANSMISSION LINE
WYOMING
PLAN & PROFILE
GOS - TO
STEVEN ROCK
ELECTRICAL ENGINEERING MANAGER
JEFFREY A MILLER, P.E.
RULING
SPAN
STRUCTURE NUMBER CONDUCTOR
NESC TMAX
OPGW
NESC TMAX
OGW
NESC TMAX FROM TO
SUPERSEDES DWG NO.
PHASING
A B C
STR 19/4 -
20/4
(LOOKING NW)
CITY OF
TORRINGTON
34.5KV
BRIDGE DECK
BEGIN DBL CKT
W/ CITY OF
TORRINGTON`S
34.5KV LINE
477, 26/7 ACSR
3/8-7STR HSS
P A
T H
S
P
R O
JE
C
T S
\T R
A N
S M
IS
S
IO
N
L
IN
E S
\G O
S H
E N
T
O R
R
IN
G T
O N
.2 \P
L S
C A
D D
\X Y
Z G
O S
-T O
R B
L D
.X
Y
S
-C A
D D
P R
O
JE
C T
L
IN
E
E D
IT
P
R O
P O
S E
D
K
V P
O L Y
M E
R P
O S
T
L
IN
E A
R
M R
W O
P T
T H
IS
S
H E
E T
G E
N E
R A
T E
D /6
/2
:0
:2
P
M P
L S
-C A
D D
V E
R S
IO
N
.0
X
J A
M
IL
L
OGW - 3/8 INCH, 7 STRAND HS STEEL
SHOWN AT 90° F, FINAL
MAXIMUM OPERATING TEMP (MOT) = 176° F
MODIFICATION DWGS COMPLETED AFTER 5/2012.
PLS-CADD SIGN CONVENTION:
( ) UNSIGNED: RT AH AND OFFSET R OF C/L
(-) NEG. SIGN: LT AH AND OFFSET L OF C/L
COORDINATES SHOWN ARE WY EAST, STATE PLANE
NAD 83 - GND. SCALE FACTOR BETWEEN GROUND
AND GRID IS 1/0.999871392.
UNITS ARE US SURVEY FEET.
STA. 1762+47 - STA. 1811+58
STR 18/7 TO STR 19/7 G
O
S -T
O R
B L D
.X
TO - WLC 4022 AND
TO - WLC 4023-1
SECTIONS 14 & 15
TOWNSHIP 24 NORTH, RANGE 61 WEST
342 16/13 19/4 5370 - - 2620 317 19/4 19/5 5324 - - 3552 339 19/5 19/6 5390 - - 3638 320 19/6 19/7 5328 - - 3569
JANUARY 6, 2016
1820+00 1830+00 1840+00 1850+00
P I -2
°0
'4
P I -2
°0
'4
P I °5
'3
P I °5
'3
P I °1
'1
P I °1
'2
355 342 1
I °1
'1
437 416 407
27.2
P I °1
'1
P I -1
°2 '2
P I -1
°2 '2
P I -9
°5 '2
275, 74
P I -9
°5 '2
328 354
X
X X X
X X
X
X X X
X X X X
X X X
X
X X X X X X X X X
X X
X
X X X X X X X
X X X
SECTION 15
SECTION 10
X X
X X
X X
X
X X
X X X
S E
C T
IO
N
S E
C T
IO
N
IO
N
SEC
TIO
N
X X X X X X
X X X X
SEC
TIO
N
SEC
TIO
N
X X
X X
X X X X X X
X X X X
C T
IO
N
S E
C T
IO
N
19/7
STA=1811+58
EXISTING
O13T-30
WSTL
INSTALL
6 T11-B (115KV)
3 SI11-B (115KV)
REMOVE
6 T11-B (69KV)
3 SI11-B (69KV)
19/7
19/8
STA=1814+49
EXISTING
O13T-30
WSTL
INSTALL
6 T11-B (115KV)
3 SI11-B (115KV)
REMOVE
6 T11-B (69KV)
3 SI11-B (69KV)
19/8
19/9
STA=1818+01
EXISTING-MRW
O13S-35
WSTL
INSTALL
3 SI11-B (115KV)
PLACE 200# WTS ON
EA SIDE OF COND ATT
REMOVE
3 SI11-B (69KV)
19/9
19/10
STA=1821+56
EXISTING-MRW
O13S-45
WSTL
INSTALL
3 SI11-B (115KV)
PLACE 50# WTS ON
EA SIDE OF COND ATT
REMOVE
3 SI11-B (69KV)
19/10
19/11
STA=1824+98
EXISTING-MRW
O13S-45
WSTL
INSTALL
3 SI11-B (115KV)
PLACE 100# WTS ON
EA SIDE OF COND ATT
REMOVE
3 SI11-B (69KV)
19/11
19/12
STA=1829+35
EXISTING-MRW
O13S-40
WSTL
INSTALL
3 SI11-B (115KV)
PLACE 150# WTS ON
EA SIDE OF COND ATT
REMOVE
3 SI11-B (69KV)
19/12
19/13
STA=1833+51
EXISTING-MRW
O13S-40
WSTL
INSTALL
3 SI11-B (115KV)
PLACE 150# WTS ON
EA SIDE OF COND ATT
REMOVE
3 SI11-B (69KV)
19/13
19/14
STA=1837+58
EXISTING
O13T-35
WSTL
INSTALL
6 TI11-B (115KV)
3 SI11-B (115KV)
REMOVE
6 T11-B (69KV)
3 SI11-B (69KV)
19/14
19/15
STA=1839+97
EXISTING
O13T-45
WSTL
INSTALL
6 TI11-B (115KV)
3 SI11-B (115KV)
REMOVE
6 T11-B (69KV)
3 SI11-B (69KV)
19/15
19/16
STA=1842+71
EXISTING-MRW
O13T-40
WSTL
INSTALL
6 TI11-B (115KV)
TIGHTEN BTM Ø AH
3 SI11-B (115KV)
REMOVE
6 T11-B (69KV)
3 SI11-B (69KV)
19/16
20/1
STA=1846+27
EXISTING-MRW
O13S-35
WSTL
INSTALL
3 SI11-B (115KV)
TIGHTEN BTM Ø
PLACE 150# WTS ON
EA SIDE OF COND ATT
REMOVE
3 SI11-B (69KV)
20/1
20/2
STA=1849+55
EXISTING-MRW
O13S-35
WSTL
INSTALL
3 SI11-B (115KV)
TIGHTEN BTM Ø
PLACE 100# WTS ON
EA SIDE OF COND ATT
REMOVE
3 SI11-B (69KV)
20/2
PI 1818+00.93
0°14'11"
PI 1824+97.93
0°13'26"
PI 1837+58.05
11°16'14"
19/7 19/8 19/9 19/10 19/11 19/12 19/13 19/14 19/15 19/16 20/1 20/2
WESTERN AREA POWER ADMINISTRATION
UNITED STATES DEPARTMENT OF ENERGY
C A
E
HEADQUARTERS - LAKEWOOD, COLORADO
D E
S
IG
N R
E F.
F
IL
1"=40' VERTICAL
SCALE:
APPROVED DESIGNED
GOSHEN - TORRINGTON
115-KV TRANSMISSION LINE
WYOMING
PLAN & PROFILE
GOS - TO
STEVEN ROCK
ELECTRICAL ENGINEERING MANAGER
JEFFREY A MILLER, P.E.
RULING
SPAN
STRUCTURE NUMBER CONDUCTOR
NESC TMAX
OPGW
NESC TMAX
OGW
NESC TMAX FROM TO
SUPERSEDES DWG NO.
M A
IN
IN
ST
DISTR
DISTR
ADJACENT DISTR
LINE APPROX
4` SOUTH
ADJACENT DISTR
LINE APPROX
20` NORTH
SVC
SVC
DISTR
XING SVC
P A
T H
S
P
R O
JE
C
T S
\T R
A N
S M
IS
S
IO
N
L
IN
E S
\G O
S H
E N
T
O R
R
IN
G T
O N
.2 \P
L S
C A
D D
\X Y
Z G
O S
-T O
R B
L D
.X
Y
S
-C A
D D
P R
O
JE
C T
L
IN
E
E D
IT
P
R O
P O
S E
D
K
V P
O L Y
M E
R P
O S
T
L
IN
E A
R
M R
W O
P T
T H
IS
S
H E
E T
G E
N E
R A
T E
D /6
/2
:0
:5
P
M P
L S
-C A
D D
V E
R S
IO
N
.0
X
J A
M
IL
L
OGW - 3/8 INCH, 7 STRAND HS STEEL
SHOWN AT 90° F, FINAL
MAXIMUM OPERATING TEMP (MOT) = 176° F
MODIFICATION DWGS COMPLETED AFTER 5/2012.
PLS-CADD SIGN CONVENTION:
( ) UNSIGNED: RT AH AND OFFSET R OF C/L
(-) NEG. SIGN: LT AH AND OFFSET L OF C/L
COORDINATES SHOWN ARE WY EAST, STATE PLANE
NAD 83 - GND. SCALE FACTOR BETWEEN GROUND
AND GRID IS 1/0.999871392.
UNITS ARE US SURVEY FEET.
STA. 1810+58 - STA. 1852+82
STR 19/7 TO STR 20/2 G
O
S -T
O R
B L D
.X
TO - WLC 4023 AND
TO - WLC 4024 (PART)
SECTIONS 15, 10 & 9
TOWNSHIP 24 NORTH, RANGE 61 WEST
-- B/T STRS 19/16 AND 20/4 --
TIGHTEN BOTTOM PHASE BY
PLACING CONDUCTOR IN
STRINGING BLOCKS AT STRS 20/1,
20/2, & 20/3. BRING CABLE UP TO
TENSION AS SHOWN IN STRINGING
CHART GOS-TO 1008 AND MAKE
SURE CABLE BALANCES
THROUGHOUT THE RULING SPAN.
291 19/7 19/8 4955 - - 2285 390 19/8 19/14 5900 - - 2670 238 19/14 19/15 3725 - - 3410 275 19/15 19/16 3900 - - 2810 338 19/16 20/4 5280 - - 2600
338 19/16 20/4 6000 - - - - BTM Ø
JANUARY 6, 2016
1860+00 700+00
S T
A T
IO
N
E Q
U A
T
IO
N
.3
B
A C
K S
T A
T
IO
N E
Q U
A T
IO
N
.9
A
H E
A D
S T
A T
IO
N
E Q
U A
T
IO
N
.3
B
A C
K S
T A
T
IO
N E
Q U
A T
IO
N
.9
A
H E
A D
P I -1
°4
'5
P I -1
°4
'5
P I -1
°3
'0
187, 115 192
P I -1
°3
'0
P I -9
°1
'2
P I -9
°1
'2
P I °0
'0
X X
X X X X X X X X
R)
(S36°15'E R) (2236' R)
X X
X X X X X X X X X X
X X
(S59°52'E R) (403.2' R)
(S
°
'E R
(4
.2
' R
X X
X X X X X X X X X X X X
(S59°52'E R) (403.2' R)
(S36°15'E R)
(2236' R
20/3
STA=1853+09
EXISTING-MRW
O13S-35
WSTL
INSTALL
3 SI11-B (115KV)
TIGHTEN BTM Ø
PLACE 150# WTS ON
EA SIDE OF COND ATT
REMOVE
3 SI11-B (69KV)
20/3
20/4
STA=1856+18
EXISTING-MRW
O13T-30
WSTL
INSTALL
6 TI11-B (115KV)
TIGHTEN BTM Ø BK
3 SI11-B (115KV)
REMOVE
6 T11-B (69KV)
3 SI11-B (69KV)
20/4
20/5
STA=1858+05
NEW
INSTALL
80 CL H1 WLDSTL
EMBED 13'
BACKFILL W/ CONC
TYPE DELTA
(GOS-TO 1007)
REMOVE
EX O12R-30 WSTL POLE
6 TI11-B
3 OGW-TV
COND & OGW IN
BK/AH SPANS
20/5
20/6
STA=1859+97
NEW
161N-40 (DE)
INSTALL
43-161N-2200
WSTL
EMBED 27'
BACKFILL W/ CONC
6 TI11-B (115KV)
3 OGW-TV
20/6
LTG
STA=699+25
NEW
INSTALL
115KV 3-WAY SWITCH STR
4 CAISSON FOUND
6 T111-B (115KV-477)
3 T111-B (115KV-397.5)
6 OGW-TH
NEW 477 ACSR B/T
LTG AND TOS
LTG
TOS
STA=700+23
EXISTING
INSTALL
3 TI11-B (115KV)
REMOVE
3 TI11-B (69KV)
TOS
PI 1856+17.51
-15°49'51"
PI 1859+96.51
-103°37'07"
20/3 20/4 20/5 20/6 LTG
TOS
TORRINGTON REROUTE
X X
X X X X X X X X X X
X X
(S59°52'E R) (403.2' R)
20/4
20/5
20/6
LTG
TOS
LY-TO 13/3
EXISTING STR 20/5
TO BE REMOVED
BURIED GAS LINE
BURIED GAS LINE
-- NOT TO SCALE --
EXISTING CONDUCTORS
INTO SUBSTATION
TO BE REMOVED
REROUTE
WESTERN AREA POWER ADMINISTRATION
UNITED STATES DEPARTMENT OF ENERGY
C A
E
HEADQUARTERS - LAKEWOOD, COLORADO
D E
S
IG
N R
E F.
F
IL
1"=40' VERTICAL
SCALE:
APPROVED DESIGNED
GOSHEN - TORRINGTON
115-KV TRANSMISSION LINE
WYOMING
PLAN & PROFILE
GOS - TO
STEVEN ROCK
ELECTRICAL ENGINEERING MANAGER
JEFFREY A MILLER, P.E.
RULING
SPAN
STRUCTURE NUMBER CONDUCTOR
NESC TMAX
OPGW
NESC TMAX
OGW
NESC TMAX FROM TO
SUPERSEDES DWG NO.
PHASING
A B C
PHASING
A B C
STR 20/6
PHASING
A
B C
STR 20/5
(LOOKING NW)
TOS
(LOOKING EAST)
PHASING
A B C
STR 20/4
(LOOKING NW)
CITY OF
TORRINGTON
34.5KV
PHASING
A B C
LTG
A B C
A B C
LYMAN
TORRINGTON
G O
S
EN
END OF CITY OF
TORRINGTON`S
34.5KV DBL CKT
CITY OF
TORRINGTON`S
34.5KV CKT
L - TO
69KV CKT
TORRINGTON
SUBSTATION
TORRINGTON
SUBSTATION
P A
T H
S
P
R O
JE
C
T S
\T R
A N
S M
IS
S
IO
N
L
IN
E S
\G O
S H
E N
T
O R
R
IN
G T
O N
.2 \P
L S
C A
D D
\X Y
Z G
O S
-T O
R B
L D
.X
Y
S
-C A
D D
P R
O
JE
C T
L
IN
E
E D
IT
P
R O
P O
S E
D
K
V P
O L Y
M E
R P
O S
T
L
IN
E A
R
M R
W O
P T
T H
IS
S
H E
E T
G E
N E
R A
T E
D /6
/2
:0
:1
P
M P
L S
-C A
D D
V E
R S
IO
N
.0
X
J A
M
IL
L
OGW - 3/8 INCH, 7 STRAND HS STEEL
SHOWN AT 90° F, FINAL
MAXIMUM OPERATING TEMP (MOT) = 176° F
MODIFICATION DWGS COMPLETED AFTER 5/2012.
PLS-CADD SIGN CONVENTION:
( ) UNSIGNED: RT AH AND OFFSET R OF C/L
(-) NEG. SIGN: LT AH AND OFFSET L OF C/L
COORDINATES SHOWN ARE WY EAST, STATE PLANE
NAD 83 - GND. SCALE FACTOR BETWEEN GROUND
AND GRID IS 1/0.999871392.
UNITS ARE US SURVEY FEET.
STA. 1851+82 - STA. 703+23
STR 20/3 TO STR TOS G
O
S -T
O R
B L D
.X
EXISTING STR 20/5
TO BE REMOVED
TO - WLC 4024
SECTIONS 9
TOWNSHIP 24 NORTH, RANGE 61 WEST
LY - TO
115KV LINE
LY - TO
STR 13/3
EXISTING STR 20/5
TO BE REMOVED
EXISTING STR 20/5
TO BE REMOVED
LY - TO
115KV LINE
GOS - TO
115KV REROUTE
BURIED
GAS LINE
BURIED
GAS LINE
B U
R
IE
S L
GAS LINE SHOWN IS APPROXIMATE
BASED ON PIPELINE MARKERS
338 19/16 20/4 5280 - - 2600
338 19/16 20/4 6000 - - - - BTM Ø
189 20/4 20/6 3100 - - 1825 NEW
214 20/6 BOX 3100 - - 1800 NEW
80 BOX TO TOS 2000 - - 715 NEW
JANUARY 6, 2016
FOR INFORMATION ONLY
Goshen County Substation
Torrington Substation
565758 474849
596061 505152
626364 535455
656667 565758
| gos-to 4100 |
| to_wlc_4017a_ei |
| to_wlc_4018_ei |
| to_wlc_4019_ei |
| to_wlc_4020_ei |
| to_wlc_4021_ei |
| to_wlc_4022a_ei |
| to_wlc_4023_1_ei |
| to_wlc_4023_ei |
| to_wlc_4024_ei |
| gos-to 4101 |
| gos-to 4102 |
| gos-to 4103 |
| gos-to 4104 |
| gos-to 4105 |
| gos-to 4106 |
| gos-to 4107 |
| gos-to 4108 |
| gos_to_1003 |
| gos_to_1006 |
| 41_6115b |
| 41_6115b |
| gos_to_1007 |
| 43_012_r_2300_fio |
| 43_012_r_2400_fio |
| 43_012_r_2401_fio |
| 43_161_n_2200 |
| 41_2701a |
| 43_2210i |
| 43_2217 |
| 41_9027_2 |
| 41_6115b |
| 41_6115b |
| ltg_1000 |
| 41_1034 |
| ltg_2300 |
| ltg_2600 |
| ltg_2601 |
| ltg_2602 |
| ltg_2603 |
| ltg_2604 |
| ltg_2925 |
| gos_to_1008 |
| gos_to_1009 |
| gos_to_1010 |
| gos_to_1011 |
| gs_lim_8003 |
| gs_lim_8004 |
| gs_lim_8056_57_58 |
| gs_lim_8059_60_61 |
| gs_lim_8062_63_64 |
| gs_lim_8065_66_67 |
| Goshen-Torrnington _Project Dwg List.pdf |
| A. GENERAL: |
| B. LIST OF DRAWINGS: |
File details come from the government source that posted it. Updated .