7 January 2016

Attachment A

Goshen – Torrington 69kV – 115kV Transmission Line Upgrade Project Specifications

DE-SOL-0009344

GOSHEN – TORRINGTON

69-KV to 115-KV TRANSMISSION

LINE UPGRADE

Spec. No. 862

SECTION C

DESCRIPTION/SPECIFICATIONS

WYOMING

EXISTING LINE NEAR STRUCTURES 19/2 THRU 19/7

SECTION C

DESCRIPTION/SPECIFICATIONS

GOSHEN TORRINGTON 69-KV to 115-KV TRANSMISSION LINE UPGRADE

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT

B. DESCRIPTION OF WORK

C. DESCRIPTION OF BIDDING SCHEDULE ITEM

1. Bidding Schedule Item “Mobilization and preparatory work”

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

1. Commencement and Completion

2. Submittal Approval Time

3. Outage And Construction Schedule Restrictions

4. Maximum Available Fault Current

E. CONSTRUCTION PROGRAM

1. Submittal Time

F. MATERIAL

G. RIGHTS-OF-WAY

1. General

2. Access Easements

3. Work on the Right-of-Way

H. GEOLOGIC INVESTIGATIONS

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES

J. WATER FOR CONSTRUCTION PURPOSES

K. CONTRACTOR COMMUNICATIONS FOR WESTERN USE

L. EXPLOSIVES

M. SUBMITTALS

1. General

2. Submittal Response

3. Physical Sample Submittals

4. Project Protocol

DIVISION 2 – SITEWORK

A. GENERAL

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule Item “Removing existing transmission line”

2. Bidding Schedule Item “Tree removal”

3. Bidding Schedule Item “Seeding”

4. Bidding Schedule does not contain separate items

DIVISION 3 – CONCRETE

A. GENERAL

1. Material

2. Test for Potential Reactivity of Sand and Coarse Aggregate

B. DESCRIPTION OF BIDDING SCHEDULE ITEM

1. Bidding Schedule Item “Concrete foundations”

DIVISION 4 – TRANSMISSION LINE SWITCH STRUCTURE METALWORK

A. GENERAL

1. Measurement

B. DESCRIPTION OF BIDDING SCHEDULE ITEM

1. Bidding Schedule Item “Steel structures, welded (galvanized)”

DIVISION 5 – TRANSMISSION LINE STEEL POLE STRUCTURES

A. DESCRIPTION OF BIDDING SCHEDULE ITEM

1. Bidding Schedule Items “Furnishing and installing transmission line steel pole structure”

DIVISION 6 – LIGHT DUTY STEEL POLE STRUCTURES

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule Item for furnishing and installing light duty steel pole structures

DIVISION 7 – WOOD POLE STRUCTURES

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule Item for furnishing and installing wood pole structures

DIVISION 9 – SUBSTATION – ELECTRICAL

A. GENERAL

1. Bidding Schedule items

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule Item “Disconnecting switches, 115-kV, 1,200 amps, with vacuum bottles mounted”

2. Bidding Schedule Item “Associated and miscellaneous equipment and material”

DIVISION 10 – TRANSMISSION LINE ELCTRICAL

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS

1. Bidding Schedule items for Conductor insulator assemblies suitable for 477, 26/7 ACSR

(HAWK)

2. Bidding Schedule items for Overhead ground wire assemblies suitable for 3/8-inch, 7 strand high-strength steel

3. Bidding Schedule Item “Reroute and approach spans”

4. Bidding Schedule Item “Retension”

5. Bidding Schedule items for Conductor weights

6. Bidding Schedule Items for Spare parts

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

A. DESCRIPTION

1. Environmental Quality Protection

GOSHEN – TORRINGTON 69-KV to 115-KV TRANSMISSION LINE UPGRADE

DIVISION 1 – GENERAL REQUIREMENTS

A. CONTRACT REQUIREMENT:

Construct and complete the Goshen – Torrington 69-kV to 115-kV Transmission Line Upgrade project, in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; Western’s Construction Standards, including Standard 1 – General Requirements (September 2013), Standard 2 – Sitework (September 2013), Standard 3 – Concrete (September 2013), Standard 4 – Substation Metalwork and Transmission Line Lattice Structures (September 2013), Standard 5 – Transmission Line Steel Pole Structures (September 2013), Standard 6 – Light Duty Steel Pole Structures (September 2013), Standard 7 – Wood Poles (March 2014), Standard 9 – Substation – Electrical (September 2013), Standard 10 – Transmission Line – Electrical (March 2014), Standard 13 – Environmental Quality Protection (September 2013), Standard 15 – Drawings (September 2013); Standard Drawings; and these Project Specifications and Drawings.

If a conflict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and Drawings are used to take exceptions or provide additions to the Construction Standards. Some paragraphs in the Construction Standards will not apply to this job.

Western’s Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

Western Project Specifications and Construction Standards are explained in Standard 1 – General Requirements, Section 1.1.1, “Standards and Project Specifications”.

B. DESCRIPTION OF WORK:

The principal components of work include replacing the existing 69-kV insulator assemblies with 115-kV insulator assemblies, replacing fourteen (14) wood poles, and rerouting the Torrington line end to the 115-kV side of the Torrington Substation. The project line has a total length of approximately 6.7 miles.

Paragraphs “Description of Bidding Schedule Items” in Divisions – 1, 2, 3, 4, 5, 6, 7, 9, and 10 describe the work to be performed.

The work is located in Goshen County, Wyoming along U.S. Highway 26 between the new Goshen County Substation, located approximately 6 miles east of Torrington, and the Torrington Substation located in Torrington, as shown on Drawing GOS-TO 4100.

C. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule Item “Mobilization and preparatory work” includes the following:

a. Performing mobilization and preparatory work in accordance with Section H of the contract clauses.

b. Providing a Construction Program and Safety and Health Program.

D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

1. COMMENCEMENT AND COMPLETION: See Section F, 52.211-10.

2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 30-calendar days for review of drawings or data submitted for approval.

3. OUTAGE AND CONSTRUCTION SCHEDULE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply:

a. No concurrent 34.5-kV and 115-kV line outages.

b. The Contractor’s work hours shall not exceed 60-hours in 1-calendar week without prior approval from the Contracting Officer’s Representative (COR).

4. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the following:

a. The maximum available fault current on the existing Torrington – Wildcat 34.5-kV line is 10,228 amps and the X/R ratio is 5.47. The line is mutually coupled with the City of Torrington’s 34.5-kV line which may cause induced currents to flow from the energized line to the de-energized line creating a potential hazard. Adequate care is to be taken to ensure worker safety.

b. A minimum of one (1) 1/0 AWG grounds shall be used in the 34.5-kV area.

c. The maximum available fault current on the Lyman – Torrington 115-kV line is 2,850 amps and the X/R ratio is 3.60.

d. A minimum of one (1) 1/0 AWG grounds shall be used in the 115-kV area.

e. Protective Ground Leads: Each protective ground lead shall have a permanent identification tag with unique identification number, certified wire size, and test date. Each protective ground lead shall be tested complete with connectors, in accordance with ASTM F 2249. Protective ground leads shall be retested and recertified annually. A protective ground lead without an identification tag to relate it to the annual certification of that protective ground lead shall not be used. No protective ground lead shall be longer than 36-feet, unless approved by COR. Test results shall be submitted to the COR for approval prior to use of the grounds. When using the DC test method, the Contractor shall submit testing information in the format shown below in the Personal Protective Grounds Test Report. When using the AC test method, the Contractor shall submit testing information in accordance with the test set manufacturers recommendations.

CABLE

ID

CABLE

SIZE

CABLE

CONDITION

CABLE

LENGTH

ASTM

RESISTANCE

(MΩ)

MEASURED

RESISTANCE

(MΩ)

PASS/FAIL

FT IN

Tester’s Signature

Test Temperature ______

Test Date _____________________

E. CONSTRUCTION PROGRAM:

1. SUBMITTAL TIME: Submit a Construction Program to the COR within 15-calendar days after date of Notice to Proceed.

F. MATERIAL: Furnish all material for completing the work.

G. RIGHTS-OF-WAY:

1. GENERAL: Transmission line right-of-way is 40-feet-wide. Western does not represent that the Contractor can gain access to every structure site or travel continuously along the transmission line. The transmission line right-of-way is located adjacent to and on the northerly side of the U.S. Highway 26 right-of-way between Structures 13/12 and 15/5. Between Structures 15/6 and 20/5 the transmission line right-of-way is located adjacent to and on the southerly side of the Burlington Northern Santa Fe Railroad right-of-way.

Orient construction methods and equipment to utilize Government-furnished rights-of-way, or obtain additional temporary access without additional cost to Western. Any additional temporary access acquired by the Contractor shall have prior COR approval. During the contract period, Western reserves the right to use Contractor-obtained access.

Western is to provide railroad and highway crossing permits for the span between Structures 15/5 and 15/6 crossing these entities. Additional permits, if needed, shall be obtained by the Contractor at no additional expense to Western.

2. ACCESS EASEMENTS: Western has acquired access easements from existing public roads to the transmission line, and some off right-of-way access along the transmission line. This off right-of-way access route is to provide access to the transmission line structure sites not accessible by traveling the transmission line.

3. WORK ON THE RIGHT-OF-WAY:

a. General: Perform work on the rights-of-way necessary for access to or along the transmission line. Excavation, dozing, and blading for ease of travel may only be performed after field review and approval by the COR. Unauthorized excavation, dozing, blading shall immediately be repaired, or Western will have the damage repaired and backcharge the Contractor for all costs involved.

b. Ease of Travel and Crane Landings: COR approved excavation, dozing, or blading done for ease of travel on any easement or for crane landings shall be restored to the original contour of the land, and shall be compacted to a dry density not less than the natural in-place dry density of the surrounding earth. The use of water may be required to obtain the required density. Topsoil shall be stockpiled and spread on cuts prior to completion of work.

H. GEOLOGIC INVESTIGATIONS:

Geologic logs of subsurface explorations included in the “Drawings” Division constitute the information and records of geologic investigations for the work. Locations of subsurface investigations are shown on the drawings.

Samples and cores of recovered material were not retained. Bidders shall obtain their own samples and perform tests on the material to evaluate properties, which they believe to be significant.

Western does not guarantee that the geologic information and records show the conditions that will be encountered in performing the work, but only that the geologic information and records show conditions encountered at the particular point and time the information and records were obtained.

The geologic information may not indicate variations, such as those caused by seasonal fluctuations in rainfall and other factors, which may affect the water level. The Contractor shall determine the nature of material to be excavated, the difficulties of making and maintaining required excavations, and doing other work affected by geology and ground water elevations at the worksite.

I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:

Make arrangements and provide all electric power for construction purposes. Provide necessary transmission lines, distribution circuits, transformers, and other electrical equipment for distributing the power to the places of use. At contract completion, remove temporary electrical equipment and distribution lines.

J. WATER FOR CONSTRUCTION PURPOSES:

Furnish water for construction purposes. Make arrangements for obtaining the water, and provide for conveying the water to the points of use.

K. CONTRACTOR COMMUNICATIONS FOR WESTERN USE:

Furnish, install, maintain, and remove up to three (3) Contractor mobile radio units in Western’s inspector’s vehicles. The radio units shall be provided for Western’s use for the duration of the field work and shall be installed ready for use at the beginning of the Contractor’s field work. The radios shall operate on the Contractor’s normal radio frequencies; be complete with appropriate accessories and antenna; be installed, adjusted, and maintained in good working condition; and provide reliable 2-way communication with the Contractor’s office and field crews. When the Contractor’s field work is completed, the radios shall be removed from the inspector’s vehicles and all mounting or antenna holes shall be plugged with appropriate rubber plugs.

L. EXPLOSIVES:

Explosives shall not be used.

M. SUBMITTALS:

1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specifications. Submittals via email shall be in standard PDF, Electronic CAD”*.dwg” (AutoCAD 2010), or Microsoft Excel .xls/.xlsx formats. All submittals shall include the Western conttract number (DE-WA000XXXX), Western project title, and Bidding Schedule Contract Line Item Number (CLIN) and applicable division number. Multiple CLIN’s on a single submittal are not permitted. A cover transmittal letter in Microsoft Word (.doc/.docx) or PDF format shall be included with each email submittal. All project correspondence and submittals shall be delivered to: RMR-J5600-CS@wapa.gov.

2. SUBMITTAL RESPONSE: Western will return all submittals electronically with an "Approved" or “Not Approved" status with comments as appropriate to the email address where the submittal originated.

3. PHYSICAL SAMPLE SUBMITTALS: When physical specimens are required to be submitted for approval, the Contractor shall deliver such specimens to:

Western Area Power Administration ATTN: TBD At Time of Award 12155 W. Alameda Parkway Lakewood, CO 80228-2802

4. PROJECT PROTOCOL:

a. Electronic Correspondence:

EMAIL SUBMITTAL FORMAT:

Subject Line in Email

Submittal number, Subject, Applicable Standard Number, and Project Name/Number Example: Submittal 017, Steel Compression Dead Heads-Std 10, Substation Stage 06-DE-

WA000xxxx

b. Payment Requests:

EMAIL PAYMENT REQUEST FORMAT:

Subject Line in Email

Invoice number and Project Name/Number Example: Invoice 01, Substation Stage 06 DE-WA000xxxx

c. Certified Payrolls-Prime and Sub-Contractors:

EMAIL CERTIFIED PAYROLL FORMAT:

Subject Line in Email

Certified Payroll (CP), Contractor’s names, Week ending (WE), and Project Name/Number Example: CP-(Smith Inc., Bob’s Electrical), WE 09/12/15 & 09/19/15, Substation Stage 06-DE-

WA000xxx

d. Request for Information:

EMAIL (REQUEST FOR INFORMATION) FORMAT:

Subject Line in Email

Request for Information (RFI), Project Name/Number Example: RFI-003, Labeling Info, Substation Stage 06-DE-WA000xxxx

DIVISION 2 – SITEWORK

A. GENERAL: The line parallels and is adjacent to the north side of the U.S. Highway 26 right-of-way for a distance of approximately 1.6 miles. Approximately 5.1 miles parallels and is adjacent to the south side of the Burlington Northern and Santa Fe Railroad. Approximately 5.5 miles of the transmission line is located in dense rural environment with most of the structures located in either pasture or cultivated fields, and 1.2 miles of the transmission line is located in an urban industrial environment. Any excavation with excess material shall be disposed of without interfering with the normal use of the land where the work is completed.

The Contractor shall include any credit to the Government for salvage of the equipment removed in this bid item.

All items to be removed become property of the Contractor and are to be recycled if possible or disposed of in accordance with Standard 13.

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule Item “Removing existing transmission line” includes the following:

a. Removing electrical items, wood pole structures, steel pole structures, and removing or cutting off concrete footings. Items removed from the existing line may not be reused in constructing the new line.

b. Approximate quantities are listed in Tables 2-1, 2-2, and 2-3. The Contractor shall determine the actual quantities to be removed and, regardless of the quantities removed, payment will only be made for the lump sum price bid in the Bidding Schedule.

c. Remove the conductors and overhead ground wires, complete with accessories, listed in Table 2-1.

TABLE 2-1 – ELECTRICAL ITEMS TO BE REMOVED

MATERIAL UNIT QUANTITY

Porcelain post insulator1 assemblies EA 82

Porcelain suspension & jumper insulator assemblies EA 60

Porcelain tension insulator assemblies EA 75

2.5’ steel arms from steel pole Structure 16/14 EA 3

Overhead ground wire suspension assemblies EA 14

Overhead ground wire dead-end assemblies EA 2

Vibration Dampers2 EA 27

Three (3) – 477 kcmil, 26/7 ACSR (HAWK) conductors FT 205

Two (2) – 3/8 HSS overhead groundwires FT 91

Three (3) – 397.5 kcmil, 26/7 ACSR (IBIS) conductors FT 100

1 Item to be removed with care, inspected, and non-damaged items delivered to Western’s Gering, Nebraska field office located at 1099 U St., Gering, Nebraska 69341.

2 Vibration dampers are only to be removed at locations where conductor weights are being added.

d. Remove the wood pole structures complete with any guys and anchors as listed in Table 2-2 and as noted on the plan and profile drawings.

TABLE 2-2 – WOOD POLE STRUCTURES TO BE REMOVED

WOOD POLE STRUCTURE TYPE QUANTITY

Single Pole, 50 class 2 7

Single Pole, 55 class 2 2

Single Pole, 60 class 2 4

Single Pole, 100 class 2 1

e. Remove steel pole and concrete backfill to 3-feet below grade. Backfill the void in remaining portion of the steel pole base with concrete slurry. Backfill the 3-feet above the cut-off section with native soil. See Table 2-3 for steel pole details.

TABLE 2-3 – STEEL POLES TO BE REMOVED

STR TYPE

AND

HEIGHT “H”

HEIGHT

ABOVE GND

(FT-IN)

APPROX

STR

WEIGHT

(LBS)

EXISTING

STR #

EXISTING

STATION FOUNDATION TYPE

O12R-30 1 54’-0” 9455 20/5 1857+13 Direct embedded w/ concrete backfill

1 Drawings are included showing typical structure details.

2. Bidding Schedule Item “Tree removal” includes the removal and disposal of trees and/or branches near the transmission line as identified on the plan and profile drawings and directed by the COR.

3. Bidding Schedule Item “Seeding” includes providing material, preparing areas to be seeded, spreading commercial fertilizer, sowing and maintaining grass seed, and protecting seeded areas. Areas to be seeded include:

a. Disturbed areas, except for cropland.

b. The Contractor shall contact the County Extension Agent to obtain a recommended seed mixture for this area.

(1) Perform seeding during the period March 1 to June 1 or October 1 to November 1, except during unfavorable weather conditions or when soil conditions are not suitable as determined by the COR. Broadcast the seed according to the manufacturer’s recommendations and Western Standards.

4. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.

a. Clearing as directed by the COR.

b. Grading for structure sites as directed by the COR.

c. Excavations for foundations and structures.

d. Placing and compacting earth material and backfill.

e. Disposing of excavated material.

DIVISION 3 – CONCRETE

A. GENERAL:

1. MATERIAL:

a. Cement: Type IIA cement in accordance with ASTM C 150.

b. Compressive Strength:

(1) 3000 psi at 28-days for concrete backfill for direct-embedded steel pole structures.

(2) 4000 psi at 28-days for concrete foundations for the 115-kV 3-way switch structure.

c. Water-Cement Ratio: Net water-cement ratio, exclusive of water absorbed by the aggregates, shall not exceed 0.45 by weight.

d. Type A and D water-reducing and retarding admixtures may be used if approved by the COR.

e. Use of fly ash in concrete is required in accordance with Construction Standard 3.

2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Perform test for each source used.

B. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule Item “Concrete foundations” includes the following:

a. Earthwork, formwork, reinforcement, material used in concrete, void forming material, galvanized anchor bolts, curing, finishing, joints, and other related work and material needed to complete the concrete construction.

b. Four concrete foundations for the 115-kV 3-way switch structure as shown on Drawing LTG 2300.

c. For the 115-kV 3-way switch structure the top of concrete (TOC) elevation shall be 12-inches above ground at highest elevation of the four structure foundation locations. All four (4) 3-way switch structure foundations shall have the same TOC elevation.

d. Unwatering foundation excavations, if required.

e. Casing auger excavations, if required.

Measurement for quantities for concrete foundations will be made on the basis of concrete quantities shown on Drawing LTG 2300. Regardless of the concrete quantities actually placed, payment will be based on the quantities shown on the Drawing.

DIVISION 4 – TRANSMISSION LINE SWITCH STRUCTURE METALWORK

A. GENERAL:

1. MEASUREMENT: Measurement for quantities for Bidding Schedule item “Steel structures, welded (galvanized)”, will be made on the basis of weights calculated in accordance with LRFD, “AISC Code of Standard Practice for Steel Buildings and Bridges”, except that weights for nonrectangular shapes and plates are to be based on actual detailed dimensions.

a. Steel structure weights, calculated as noted above, shall be shown on the Contractor-furnished final shop drawings, and payment will be based thereon. Steel estimated weights are shown on the specification drawings for the structures requiring approval drawings as noted in the Bidding Schedule items “Steel structures, welded (galvanized)”.

B. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule Item “Steel structures, welded (galvanized)” includes furnishing and installing the following materials:

a. One (1) 115-kV 3-way switch structure in accordance with Drawings LTG 2600, LTG 2601, LTG 2602, and LTG 2603. The Contractor shall coordinate the mounting details for the switches and switch operating system.

b. Grounding of 3-way switch structure in accordance with Drawing 41 1034.

c. Three (3) Type I single-switch operating platforms, including grating in accordance with Drawing LTG 2925.

d. Grounding of switch platforms in accordance with Drawing 31 1075.

e. The above material including connection bolts, nuts, washers, and lock nuts shall be galvanized.

f. The structure and platforms require approval drawings.

DIVISION 5 – TRANSMISSION LINE STEEL POLE STRUCTURES

A. DESCRIPTION OF BIDDING SCHEDULE ITEM:

1. Bidding Schedule Items “Furnishing and installing direct embedded transmission line steel pole structure with concrete backfill” includes providing the following:

a. Designing, detailing, and providing one (1) Type 161N-40 (DE) direct-embedded weathering steel pole structure, complete with the following:

(1) Connection bolts, nuts, and locknuts.

(2) Excavation, polyurethane coating, and concrete backfill for direct-embedded structures. Concrete backfill construction includes earthwork, form work, fabric, material used in concrete, curing, finishing, joints, and other work and material needed to complete the required concrete construction.

(3) Grounding in accordance with Drawing 41 1015.

(4) Structure identification plates.

(5) Structure number signs and mounting hardware in accordance with Drawing 41 9027-2, and plan and profile drawings as follows.

(a) Structure number shall be 20/6.

(b) Structure number signs shall be in accordance with the 2-digit mile marker detail on Drawing 41 9027-2.

b. Maintenance provisions in accordance with Drawings 43 2206 and 43 2210 as follows:

(1) Fixed climbing rung sections, attachments for fixed climbing rung sections, connection bolts, nuts, and locknuts.

(2) Clips for removable climbing rung sections and connection bolts.

(3) Belt loops and ring clips for all structures.

(4) Attachments for fixed climbing rung sections, belt loops, hand loops, ladder brackets, and ring clips shall be shop-welded to the structure.

c. Stamp the total weight of individual pole shaft sections at the base of each section. Each section of a spliced pole shall be marked such that the intended mate section can be easily identified.

d. All pole shaft sections shall be jacked together in accordance with manufacturer’s recommendations.

e. Structure embedment depth “E” shall be as listed in Table 5-1.

TABLE 5-1 – STRUCTURE EMBEDMENT DEPTH

STR TYPE

AND HEIGHT

“H” 1

EMBEDMENT

DEPTH “E”

(FT)

MINIMUM

HOLE SIZE 2

161N-40 (DE) 27 48-INCHES

1 “H” refers to height portion of structure designation listed in the Bidding Schedule, which is the height from the ground line to the bottom insulator attachment.

2 The minimum foundation auger diameter for direct-embedded structures shall be the pole base diameter plus 1-foot.

DIVISION 6 – LIGHT DUTY STEEL POLE STRUCTURES

A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule Item for furnishing and installing direct embedded light duty steel pole structures with concrete backfill includes providing the following:

a. Detailing and providing light duty steel pole structure, as identified in Table 6-1 – Light

Duty Steel Poles, complete with the following:

(1) Excavation, polyurethane coating, and concrete backfill for direct-embedded structures. Concrete backfill construction includes earthwork, form work, fabric, material used in concrete, curing, finishing, joints, and other work and material needed to complete the required concrete construction.

(2) Grounding provisions as outlined in Drawing 41 1015. In addition, ground plates are to be installed on the pole near the overhead ground wire location and at each conductor elevation.

(3) Structure number signs and mounting hardware in accordance with

Drawing 41 9027-2, and plan and profile drawings.

(a) Structure number signs shall be in accordance with the 2-digit mile marker detail on Drawing 41 9027-2.

TABLE 6-1 – LIGHT DUTY STEEL POLES

STRUCTURE

NUMBER

POLE

LENGTH

(FT)

CLASS

EMBED-

MENT

DEPTH

(FT)

MINIMUM

HOLE SIZE

POLE TOP

FRAMING FINISH

19/3 105 H2 15 36-INCHES SS-1 Weathering Steel

20/5 80 H1 13 30-INCHES Type Delta Weathering Steel

b. Maintenance provisions as follows:

(1) Attachments to the pole for step bolts shall be provided from 3-foot 0-inches above groundline and extending to pole top. Attachments shall be spaced at 1-foot 0-inches and oriented to provide maximum ease of climbing. Additional attachments for working shall be located at approximately 4-feet below the overhead ground wire elevation(s) and each conductor elevation. Additional working locations may be deemed necessary depending on the type of framing.

Attachments shall be suitable for a 3/4-inch step bolt with a button head. Each step bolt shall use nuts for securing a fall protection anchorage plate next to the pole face as shown on Drawing 43 2217. The entire attachment, step bolt assembly, and pole wall shall be capable of providing adequate strength to the fall protection anchorage plate to support a 5,000 pound minimum shock load.

(2) Step bolts, nuts, and locknuts.

(3) Right and left anchorage plates for steel pole structures as detailed on Drawing

41 2701.

c. Pole shall have bearing plates with a diameter of not more than 2-inches greater than the maximum pole diameter.

d. Pole is to be drilled by the manufacturer prior to finishing and shipment for the type of framing specific to each pole type. Holes shall be 1/16-inches larger than the nominal diameter of the bolts that will be used at each hole location. Holes must be smooth and cylindrical without excessive tear out or depressions. Any burrs that remain shall be removed.

e. Structure Identification Plates – Each pole shall be permanently marked on the pole shaft

60-inches above groundline on the backspan side of the pole with the following identifying information:

(1) Structure Number.

(2) Length and Class of pole (or ultimate groundline moment if noncatalog item).

(3) Owner’s Name (WAPA).

(4) Total Pole Weight in pounds.

(5) Manufacturer Name.

(6) Month and Year of Manufacture.

The method of identification shall be approved by the COR. The lettering shall be 3/4-inch in height, and be either raised or engraved such that the identifying information can be easily read. Each pole section shall be marked with a readable stamp or welded bead on the butt and tip with the pole length and class, structure number if known, and weight of that particular section. Each section of a spliced pole shall be marked such that the intended mate section can be easily identified.

f. The overall length of the assembled pole shall not be less than 6-inches of the specified length and not more than 12-inches.

g. All pole shaft sections shall be jacked together in accordance with manufacturer’s recommendations.

DIVISION 7 – WOOD POLE STRUCTURES

1. Bidding Schedule Item for furnishing and installing SS-1 wood pole structures include furnishing and installing structure grounding, structure signs, overhead ground wire and insulator support assemblies and the following:

a. Wood pole structures, as summarized in Table 7-1 – Wood Poles and further detailed on the plan and profile drawings, complete with the following:

(1) Excavation and Backfill.

(2) Grounding in accordance with Drawing 41 1012.

(3) Structure number signs and mounting hardware in accordance with Drawing 41 9004, and the plan and profile drawings. The attachment height for the structure number signs shall be eight (8) feet above ground.

TABLE 7-1 – WOOD POLES

POLE

LENGTH

(FT)

CLASS STRUCTURE

NUMBERS

55 1 14/9, 14/12, 15/3, 17/3, 18/10, 18/12, 18/14

55 H1 13/14

60 H1 17/6, 17/7, 18/6

65 H1 15/4, 16/15

b. Submit certified copies of Data Sheets and Certifications in accordance with Western’s

Construction Standard 7 – Wood Poles.

DIVISION 9 – SUBSTATION – ELECTRICAL

A. GENERAL: Electrical equipment and material shall be as specified in Western’s “WAPA ES”

Standard Equipment Specifications, as shown on project drawings, and in accordance with NEMA, ANSI, IEEE, ASTM, and Federal specifications and standards as applicable. Applicable requirements shall be met under the following service conditions:

Ambient Temperatures:

Maximum ........................................................................................... +40°C Maximum 24-Hour Average .............................................................. +30°C Minimum ............................................................................................. -30°C

Elevation:

Above Mean Sea Level .............................................................. 4,100-Feet

ASCE-7 Wind Load:

Minimum Basic Wind Speed .......................................................... 90 MPH Importance Factor ................................................................................ 1.15

1. Bidding Schedule items shall include the following:

a. Providing (furnishing and installing) bidding schedule items.

b. Furnishing equipment and material not furnished by Western.

c. Installing bidding schedule items as shown on drawings.

Installation of electrical equipment and material shall be provided in accordance with Standards 9 respectively.

B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:

1. Bidding Schedule Item “Disconnecting switches, 115-kV, 1,200 amps, with vacuum bottles mounted” includes providing switches in accordance with WAPA ES 8.1 Equipment Standard.

DESIGNATION 661, 663, 665

Type

3-pole, worm gear, outdoor, group operated, vertical break, rotating insulator

System Nominal Voltage Rating (kV) 115

Rated Maximum Voltage (kV) 121

Basic Impulse Insulation Level (kV) 550

Continuous Current Rating (Amps) 1,200

DESIGNATION 661, 663, 665

Momentary Current Rating (kA) 61

Grounding Blades No

Phase Spacing 10’-0”

Mounting Position Horizontal upright

Insulator Technical Reference No. 286

Vacuum Bottles Yes

2. Bidding Schedule Item “Associated and miscellaneous equipment and material” includes providing equipment, material, and services required to complete the following 3-way switch structure installation as shown on the drawings:

a. Outdoor strain and jumper buses and overhead ground wire. Insulators for the strain bus shall be of the same color and material as the transmission line insulator assemblies.

b. Signs:

(1) Phase-Identification Signs, in accordance with Drawing 31 1000:

(a) Phase A – 3 required.

(b) Phase B – 3 required.

(c) Phase C – 3 required.

c. Equipment Identification Signs, in accordance with Drawing 31 1000. A total of three (3) are required. Lettering on the signs shall be as follows:

(1) GOSHEN LINE

LTG 661

DISCONNECT SW 115KV

(2) LYMAN LINE

LTG 663

(3) TORRINGTON LINE

LTG 665

DIVISION 10 – TRANSMISSION LINE ELCTRICAL

1. Bidding Schedule items for Conductor insulator assemblies suitable for 477, 26/7 ACSR (HAWK) includes furnishing and installing the insulator, connecting hardware and conductor hardware as shown on Drawings 41 1020, 41 1022, and/or 41 1024. An estimate of conductor insulator assemblies at each structure location is shown on Drawing GOS-TO 1003 and the plan and profile drawings.

a. Suspension, jumper I-string, and tension type insulator assemblies shall be porcelain, brown in color, and comply with the characteristics of Table 10-1.

Table 10-1 – PORCELAIN INSULATOR ASSEMBLY CHARACTERISTICS

SUSPENSION

INSULATOR

ASSEMBLY

SI11-B and

SIA11-B

I-STRING

JUMPER

INSULATOR

ASSEMBLY

SI11-B

TENSION

INSULATOR

ASSEMBLY

TI11-B

Specified mechanical load (M&E) rating (LBS) 20,000 20,000 20,000

ANSI Class 52-3 52-3 52-3

Number of 5-3/4”x10” Porcelain Bells / string 1 9 9 10

Maximum suspension string length including end fittings and clamp (IN) 62 62 n/a

Minimum tension string length including end fittings (IN) n/a n/a 80

1 Unless indicated otherwise on the plan and profile drawings.

b. Horizontal line post type insulators shall be a composite polymer type insulator having a fiberglass core rod with housing (sheath) and weathersheds made of silicone-rubber that comply with the characteristics of Table 10-2.

Table 10-2 POLYMER HORIZONTAL LINE POST

INSULATOR ASSEMBLY CHARACTERISTICS

HORIZONTAL

LINE POST

INSULATOR

ASSEMBLY

HS1-G

JUMPER

LINE POST

INSULATOR

ASSEMBLY

HS1-F

Minimum Switching Surge Impulse, Positive Critical (kV) 575 575

Minimum Power Frequency, 60Hz Wet (kV) 330 330

Minimum Leakage Distance (IN) 95 95

Minimum Dry Arcing Distance (IN) 35 35

HORIZONTAL

LINE POST

INSULATOR

ASSEMBLY

HS1-G

JUMPER

LINE POST

INSULATOR

ASSEMBLY

HS1-F

Maximum Insulator Length (IN) 49 49

Minimum Ultimate Cantilever (SCL) (LBS) 3800 3800

Minimum Ultimate Tensile (SML) ( (LBS) 15,000 15,000

Minimum Core Rod Diameter (IN) 2.5 2.5

c. Approval drawings and the manufacturer’s combined loading chart and tabular values

(in .xls or .xlsx file format) using ultimate strength values are to be submitted to the COR and engineer for review and approval prior to acceptance.

d. At locations where structures are being replaced the vibration dampers are to be moved so they are located the same distance from the suspension clamp as measured at the existing structure.

e. At locations where conductor weights are being added armor rods shall be used. Armor rods for 477 kcmil, 26/7 strand, ACSR conductor shall be:

Rod wire diameter 0.250-inches

Overall maximum diameter of installed rods 1.358-inches

Direction of lay Right-hand

Rods per set 12

Armor rod color code blue

2. Bidding Schedule items for Overhead ground wire assemblies suitable for 3/8-inch, 7 strand high-strength steel includes furnishing and installing the pole line and connecting hardware and ground wire hardware as shown on the plan and profile drawings and detailed on Drawings 41 1018 and 41 1019. The assembly shall have a minimum ultimate assembly strength of 15,000 pounds. The overhead ground wire assembly will not be replaced on existing structures that are only having the conductor insulator assemblies replaced.

3. Bidding Schedule Item “Reroute and approach spans” includes furnishing material and performing work for conductor, splices, overhead ground wire, and line markers, necessary to complete the line sections and approach spans at the Torrington Substation as shown and the plan and profile drawings and Drawing GOS-TO 1003.

a. Materials:

(1) Conductor: Work includes furnishing, stringing, splicing, repairing, sagging, and clipping in the conductors; installing jumper loops; and furnishing and installing material to complete the conductor installations, except for material furnished and installed as a part of insulator assemblies and accessories. Furnish and install material including conductor, conductor joints, conductor repair sleeves, and joint inhibitor compound required to complete conductor installation. Conductor shall be

ACSR in accordance with ASTM B 232 and shall comply with the characteristics in Table 10-3. Approximate quantities of each are presented in the Installation section below.

TABLE 10-3 – CONDUCTOR CHARACTERISTICS

CODE WORD HAWK

Completed conductor size (circular kcmils) 477

Ultimate strength, as computed for the strength of the individual strands, not less than (LBS) 19,500

Outside Diameter, Overall (IN) 0.858

Aluminum Strands 26

Diameter (IN) 0.1354

Steel Strands 7

Diameter (IN) 0.1053

(2) Overhead Ground Wire: Work includes furnishing, stringing, splicing, sagging, and clipping in the overhead ground wire, as described; and furnishing and installing material to complete the overhead ground wire installation.

Overhead ground wire shall be 3/8 HSS, Class B steel strand in accordance with

ASTM A 363.

b. Installation: Install all materials in accordance with Construction Standard 10. Sag wires in accordance with Construction Standard 10. Stringing charts for all cables are shown in Drawings GOS-TO 1009, GOS-TO 1010, and GOS-TO 1011. Distances shown are centerline distances.

(1) Provide three (3) 477, 26/7 ACSR (HAWK) conductors between Structure 20/4 and the upper level, north side of the LTG as shown on Drawing GOS-TO 4108, having a distance of approximately 614 feet.

(2) Provide one (1) 3/8 HSS overhead ground wire between Structure 20/4 and 20/6 as shown on Drawing GOS-TO 4108, having a distance of approximately 379-feet.

(3) Provide two (2) 3/8 HSS overhead ground wires between Structure 20/6 and the north side of the LTG as shown on Drawing GOS-TO 4108, having a distance of approximately 235-feet.

(4) Provide three (3) 477, 26/7 ACSR (HAWK) conductors between the lower level, east side of the LTG and the Torrington TOS as shown on Drawing GOS-TO 4108, having a distance of approximately 98-feet.

(5) Intersect the existing two (2) 3/8 HSS overhead ground wires in the LY-TO 115-kV line and dead-end each cable to each of the four (4) corners of the LTG. Retension the cables in the span between the LTG and the TO TOS in accordance with Drawing GOS-TO 1011.

(6) Intersect the existing three (3) 397.5, 26/7 ACSR (IBIS) conductors in the LY-TO

115-kV line and dead-end each conductor to the lower level, west side of the LTG. Dispose of the remaining conductor in accordance with Standard 13.

4. Bidding Schedule Item “Retension” includes furnishing material and performing work for conductor retensioning, of the bottom phase only, between Structures 19/16 and 20/4 as shown on the plan and profile Drawings GOS-TO 4107 and GOS-TO 4108 using the stringing chart as shown on Drawing GOS-TO 1008.

5. Bidding Schedule items for Conductor weights includes furnishing and installing clamshell type conductor weights and armor rods as shown on Drawing GOS-TO 1006 at locations shown on the plan and profile drawings. Armor rods shall be used at all locations where conductor weights are required. Conductor weights shall be installed over the armor rod.

6. Bidding Schedule Items for Spare parts includes furnishing the following material:

a. Twelve (12) polymer horizontal post insulators with a gain base for use on wood poles, and having the same characteristics as outlined earlier in this specification.

b. Three (3) polymer horizontal post insulators with a flat base for use on steel poles, and having the same characteristics as outlined earlier in this specification.

DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION

A. DESCRIPTION:

1. ENVIRONMENTAL QUALITY PROTECTION: The Bidding Schedule does not contain separate items for the following. Include these items in the applicable Bidding Schedule items.

a. Environmental Requirements (See Section 13.3 of Standard).

b. Landscape Preservation (See Section 13.4 of Standard).

c. Preservation of Cultural and Paleontological Resources (See Section 13.5 of Standard).

d. Noxious Weed Control (See Section 13.6 of Standard).

e. Recycled Material Quantities (See Section 13.7 of Standard).

f. Use of Recovered and Bio based Material Projects (See Section 13.8 of Standard).

g. Disposal of Waste Material (See Section 13.9 of Standard).

h. Contractor’s Liability for Regulated Material Incidents (See Section 13.10 of Standard).

i. Pollutant Spill Prevention, Notification, and Cleanup (See Section 13.11 of Standard).

j. Pesticides (See Section 13.12 of Standard).

k. Treated Wood Utility Poles and Crossarms Recycling or Disposal (See Section 13.13 of Standard).

l. Prevention of Air Pollution (See Section 13.14 of Standard).

m. Prevention of Water Pollution (See Section 13.17 of Standard).

n. Conservation of Natural Resources (See Section 13.20 of Standard).

Message from the Administrator

At Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western. In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

Safety procedures or common sense must be applied by each

Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish a task.

By integrating these principles into every task we take, together we can ensure Western is a safe place to work.

Mark A. Gabriel Administrator

DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
B. DESCRIPTION OF WORK:
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule Item “Mobilization and preparatory work” includes the following:
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT AND COMPLETION: See Section F, 52.211-10.
2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 30-calendar days for review of drawings or data submitted for approval.
3. OUTAGE AND CONSTRUCTION SCHEDULE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage restrictions shall apply:
4. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the f...
E. CONSTRUCTION PROGRAM:
1. SUBMITTAL TIME: Submit a Construction Program to the COR within 15-calendar days after date of Notice to Proceed.
F. MATERIAL: Furnish all material for completing the work.
G. RIGHTS-OF-WAY:
1. GENERAL: Transmission line right-of-way is 40-feet-wide. Western does not represent that the Contractor can gain access to every structure site or travel continuously along the transmission line. The transmission line right-of-way is located adj...
2. ACCESS EASEMENTS: Western has acquired access easements from existing public roads to the transmission line, and some off right-of-way access along the transmission line. This off right-of-way access route is to provide access to the transmission...
3. WORK ON THE RIGHT-OF-WAY:
H. GEOLOGIC INVESTIGATIONS:
I. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
J. WATER FOR CONSTRUCTION PURPOSES:
K. CONTRACTOR COMMUNICATIONS FOR WESTERN USE:
L. EXPLOSIVES:
M. SUBMITTALS:
1. GENERAL: The Contractor shall furnish submittals via email as specified in the Construction Standards and this Project Specifications. Submittals via email shall be in standard PDF, Electronic CAD”*.dwg” (AutoCAD 2010), or Microsoft Excel .xls/.x...
2. SUBMITTAL RESPONSE: Western will return all submittals electronically with an "Approved" or “Not Approved" status with comments as appropriate to the email address where the submittal originated.
3. PHYSICAL SAMPLE SUBMITTALS: When physical specimens are required to be submitted for approval, the Contractor shall deliver such specimens to:
4. PROJECT PROTOCOL:
DIVISION 2 – SITEWORK
A. GENERAL: The line parallels and is adjacent to the north side of the U.S. Highway 26 right-of-way for a distance of approximately 1.6 miles. Approximately 5.1 miles parallels and is adjacent to the south side of the Burlington Northern and Santa ...
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule Item “Removing existing transmission line” includes the following:
2. Bidding Schedule Item “Tree removal” includes the removal and disposal of trees and/or branches near the transmission line as identified on the plan and profile drawings and directed by the COR.
3. Bidding Schedule Item “Seeding” includes providing material, preparing areas to be seeded, spreading commercial fertilizer, sowing and maintaining grass seed, and protecting seeded areas. Areas to be seeded include:
4. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items.
DIVISION 3 – CONCRETE
A. GENERAL:
1. MATERIAL:
2. TEST FOR POTENTIAL REACTIVITY OF SAND AND COARSE AGGREGATE: Perform test for each source used.
B. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule Item “Concrete foundations” includes the following:
DIVISION 4 – TRANSMISSION LINE SWITCH STRUCTURE METALWORK
A. GENERAL:
1. MEASUREMENT: Measurement for quantities for Bidding Schedule item “Steel structures, welded (galvanized)”, will be made on the basis of weights calculated in accordance with LRFD, “AISC Code of Standard Practice for Steel Buildings and Bridges”, e...
B. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule Item “Steel structures, welded (galvanized)” includes furnishing and installing the following materials:
DIVISION 5 – TRANSMISSION LINE STEEL POLE STRUCTURES
A. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule Items “Furnishing and installing direct embedded transmission line steel pole structure with concrete backfill” includes providing the following:
DIVISION 6 – LIGHT DUTY STEEL POLE STRUCTURES
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule Item for furnishing and installing direct embedded light duty steel pole structures with concrete backfill includes providing the following:
DIVISION 7 – WOOD POLE STRUCTURES
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule Item for furnishing and installing SS-1 wood pole structures include furnishing and installing structure grounding, structure signs, overhead ground wire and insulator support assemblies and the following:
DIVISION 9 – SUBSTATION – ELECTRICAL
A. GENERAL: Electrical equipment and material shall be as specified in Western’s “WAPA ES” Standard Equipment Specifications, as shown on project drawings, and in accordance with NEMA, ANSI, IEEE, ASTM, and Federal specifications and standards as app...
1. Bidding Schedule items shall include the following:
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule Item “Disconnecting switches, 115-kV, 1,200 amps, with vacuum bottles mounted” includes providing switches in accordance with WAPA ES 8.1 Equipment Standard.
2. Bidding Schedule Item “Associated and miscellaneous equipment and material” includes providing equipment, material, and services required to complete the following 3-way switch structure installation as shown on the drawings:
DIVISION 10 – TRANSMISSION LINE ELCTRICAL
A. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule items for Conductor insulator assemblies suitable for 477, 26/7 ACSR (HAWK) includes furnishing and installing the insulator, connecting hardware and conductor hardware as shown on Drawings 41 1020, 41 1022, and/or 41 1024. An est...
2. Bidding Schedule items for Overhead ground wire assemblies suitable for 3/8-inch, 7 strand high-strength steel includes furnishing and installing the pole line and connecting hardware and ground wire hardware as shown on the plan and profile drawin...
3. Bidding Schedule Item “Reroute and approach spans” includes furnishing material and performing work for conductor, splices, overhead ground wire, and line markers, necessary to complete the line sections and approach spans at the Torrington Substat...
4. Bidding Schedule Item “Retension” includes furnishing material and performing work for conductor retensioning, of the bottom phase only, between Structures 19/16 and 20/4 as shown on the plan and profile Drawings GOS-TO 4107 and GOS-TO 4108 using t...

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .