Project_Drawings.pdf

PDF 11 MB Posted

Attached to
BISMARCK-JAMESTOWN NO. 1 & BISMARCK-MEDORA 230-kV TRANSMISSION LINE SPANS
Solicitation number
DE-SOL-0008800
Issued by

About this file

Project Drawings

View the file

Other files

File Type Posted
Contract_Clauses_and_Bidding_Schedule.pdf PDF
Project_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BISMARCK-JAMESTOWN NO. 1

& BISMARCK-MEDORA 230-kV TRANSMISSION LINE SPANS

NORTH DAKOTA

SECTION C

DESCRIPTION/SPECIFICATIONS

Solicitation No. DE-SOL-0008800 Spec. No. 15WC113951-856

PROJECT DRAWINGS

A. GENERAL:

CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at:

https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx Construction drawings are the specification drawings and any additional drawings required for use in construction.

The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.

B. LIST OF DRAWINGS:

LOCATION MAPS:

1. BS 0019 Rev. D – Bismarck Substation – Location and Vicinity Map

2. JT 0016 Rev. C – Jamestown Substation – Location and Vicinity Map

3. BS-JT 0003 – Bismarck-Jamestown 230-kV Transmission Line – Key Map

STEEL LATTICE STRUCTURES:

4. 43-206S 2200 – 230 kV Single Circuit Bismarck – Jamestown Transmission Line Suspension Type 206S Tower

5. 43-206S 2202 Rev. A – 230 kV Single Circuit Bismarck – Jamestown Transmission Line Legs to 60’-0” & 80’-0” Body Type 206S Tower

STEEL LATTICE TOWER CONCRETE FOOTINGS:

6. BS-JT 2002 Rev. A EI – 230 kV Transmission Lines Bismarck – Jamestown Single Circuit Type SH Tower

Special Concrete Footing (Existing Installation)

7. BS-JT 1 2004 EI – 230 kV Transmission Lines Single Circuit Steel Towers Types SAH and SAH-1 Towers

Concrete Footings (Existing Installation)

TRANSMISSION LINE STEEL POLE STRUCTURE FOUNDATIONS:

8. BS-JT 2101 FIO – Bismarck- Jamestown No. 1 230-kV Transmission Line – Type 285D Steel Pole Structures

– Foundations (For Information Only)

TRANSMISSION LINE STEEL POLE STRUCTURES:

9. 41--9027 Rev. E – Transmission Line Standards Steel Pole Structures Aerial Patrol Mile Marker and Structure

Number Signs – Details and Locations –

285D-60 Shop Drawings:

10. 31451-01494AAA Rev. B – Anchor Bolt Assembly Clustered

11. 31451-01494AAT Rev. B – 91’-0” 285D-60 (BP) #49/4A – Sheet 1 of 2

12. 31451-01494AAT – 91’-0” 285D-60 (BP) #49/4A – Sheet 2 of 2

13. 31451-3007 Rev. B – Shaft Assembly, 50’-0” Long – Sheet 1 of 2

14. 31451-3007 – Shaft Assembly, 50’-0” Long – Sheet 2 of 2

15. 31451-3008 Rev. B – Shaft Assembly, 47’-0” Long

285D-100 Shop Drawings:

16. 31451-025001AA Rev. B – Anchor Bolt Assembly Clustered

17. 31451-025001ATRev. B – 131’-0” 285D-100 (BP) Pole No: 50/1 – Sheet 1 of 2

18. 31451-025001AT – 131’-0” 285D-100 (BP) Pole No: 50/1 – Sheet 2 of 2

19. 31451-3009 Rev. B – Shaft Assembly, 50’-0” Long – Sheet 1 of 2

20. 31451-3009 – Shaft Assembly, 50’-0” Long – Sheet 2 of 2

21. 31451-3010 Rev. A – Shaft Assembly, 37’-9” Long – Sheet 1 of 1

22. 31451-3011 Rev. A – Shaft Assembly, 45’-0” Long – Sheet 1 of 1

23. 31451-3012 Rev. B – Shaft Assembly, 23’-4” Long – Sheet 1 of 1

285D Fixed Ladders:

24. 31451-SPECNOTE – Special Notes & Drawing Index – Sheet 5 of 7

25. 31451-SPECNOTE – Special Notes & Drawing Index – Sheet 6 of 7

285D Davit Arms:

26. 31451-C Rev. B – Arm Assembly, 15’-6” Long – Sheet 1 of 1

27. 31451-D Rev. B – Arm Assembly, 19’-0” Long – Sheet 1 of 1 https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx

PROJECT DRAWINGS

Assembly and Erection:

28. SSG001 Rev. J – General Notes, Assembly and Erection Information – Sheet 1 of 2

29. SSG001 – General Notes, Assembly and Erection Information – Sheet 2 of 2

30. SSG002 Rev. B – Galvanized Pole Lifting Requirements

31. SSG004 Rev. D – Jacking Nut Locations

32. SSG005 Rev. E – Jacking Instructions

TRANSMISSION LINE ELECTRICAL:

33. BS-JT 1 1000 – Bismarck-Jamestown No. 1, 230-kV Transmission Line – Material Quantities

34. WDD-BEF 1001 – Ward Delivery-Belfield 230-kV Transmission Line – Material Quantities

35. 41-1018 Rev. C – Transmission Line Standards Steel and Concrete Pole Structures Overhead Ground Wire

Assembly

36. 41-1020 Rev. B – Transmission Line Standards Suspension Insulator Assemblies – Single String

37. 41-1023 Rev. D – Transmission Line Standards Tension Insulator Assemblies – Double String

38. 41-1031 Rev. F – Transmission Line Standards Optical Ground Wire Assemblies

PLAN AND PROFILES:

39. BS-JT 4024 Rev. C – Bismarck-Jamestown 230-kV Transmission Line – Plan & Profile – Station 0+00 to Station

104+00

40. WDD-BEF 4311 – Ward Delivery-Belfield 230-kV Transmission Line – Plan & Profile – Structure 197/1 to Structure 198/1

41. WDD-BEF 4312 – Ward Delivery-Belfield 230-kV Transmission Line – Plan & Profile – Structure 198/1 to Structure 198/3

42. WDD-BEF 4313 – Ward Delivery-Belfield 230-kV Transmission Line – Plan & Profile – Structure 199/1 to Structure 200/1

EXISTING INSTALLATION

FOR INFORMATION ONLY

denton Line denton Line

10410+00 10420+00 10430+00 10440+00 10450+00

1700 1600

1720 1620

1740 1640

1760 1660

1780 1680

1800 1700

1820 1720

1840 1740

1860 1760

1880 1780

1900 1800

1920 1820

1940 1840

1960 1860

1980 1880

2000 1900

2020 1920

2040 1940

2060 1960

2080 1980

2100 2000

C L

D

IR

T /G

R A

V E

L R

D X

IN

G

D

R

IV

E W

A Y

X

IN

G

N

/1

S

T A

X

.2

Y

.6

A N

G E

H -6

L E

G S

-4

.5

/2

A

.5

N

G E

-8

G S

-4

.5

.5

/3

A

.7

.6

N

G E

G S

-4 )5

.0

.0

.0

.0

1226 1348

P I -2

°3

'1

W

IR

E X

W

IR

E X

/4

A

.4

.9

N

G E

-8

G S

-4

.5

IR

E X

E X

A

G

L E

D

-9

O

G W

-D

G

S

-4

.5

.5

10410+00 10420+00 10430+00 10440+00

EC

0 MORTON, NORTH DAKOTA

T.139N R.81W, SEC 9

N87°36'32"E

10450+00

W A

T E

R C

O U

R S

E X

F

N C

E X

IN

G

U

W A

T E

R X

IN

G

C

P A

V E

D R

D X

IN

G

R

N C

E X

IN

G

W

IR

E

X

T E

R C

O U

R S

E X

D

IR

T /G

R A

V E

L R

G

R

IV

E W

A Y

X

W

IR

E

X

W

IR

E

X

3+

W

IR

E

X

2+

W

IR

E

X

3+

W

IR

E

X

10452+42.00 -22°36'15"

10452+42.00 -22°36'15"

197/1 197/2 197/3

197/4

198/1

WESTERN AREA POWER ADMINISTRATION

UNITED STATES DEPARTMENT OF ENERGY

C A

E

CORPORATE SERVICES OFFICE - LAKEWOOD, COLORADO

P

LS

CENTERLINE

1"=200' HORIZONTAL

1"=40' VERTICAL

SCALE:

APPROVEDDESIGNED

ROSS CLARK

ELECTRICAL ENGINEERING MANAGER

AS BUILT

LT 30 FT PROFILE LINE

RT 30 FT PROFILE LINE

ORIGINAL LINE DAWSON COUNTY-BISMARCK (DC-BS 4000-4132) INCLUDES STRUCTURES NUMBERED BETWEEN 0/1 THROUGH 208/5.

DC-BS WAS SUPERSEDED BY DAWSON COUNTY-BELFIELD (DC-BEF 4000-4065) INCLUDES STRUCTURES NUMBERED 0/1 THROUGH 94/2.

DC-BS WAS SUPERSEDED BY WARD DELIVERY-BELFIELD (WDD-BEF 4000-4068), INCLUDES STRUCTURES NUMBERED 94/3 THROUGH 202/2.

DC-BS WAS SUPERSEDED BY BISMARCK-WARD DELIVERY (BS-WDD 4000-4004), INCLUDES STRUCTURES NUMBERED 202/3 THROUGH 208/5.

NOTE:

NORTH DAKOTA

WARD DELIVERY-BELFIELD

230-KV TRANSMISSION LINE

PLAN & PROFILE

WDD-BEF

LEG EXTENSION FT

4 1

3 2

LOOKING AHEAD

C/L

STR BD2 TO 202/1

LOOKING AHEAD

C A B

PHASING

RIGHT OF WAY 125 FT

STRUCTURE RANGE - CABLE TYPE - RULING SPAN

SUPERSEDES DWG. NO. WDD-BEF 4062

AND 4063 (IN PART)

NESC HEAVY LOADING

COND. - 954 KCMIL 45/7 "RAIL" ACSR

CURVE SHOWN AT 176 °F FINAL CONDTIONS

OGW - 1/2 INCH, 7 STRAND HS STEEL

CURVE SHOWN AT 60 °F FINAL CONDITIONS

MAXIMUM DESIGN OPERATING TEMP. = 176 °F

GROUND CLEARANCE = 22.4 FT.

LIDAR SURVEY: DATED 11/2011

IMAGERY: DATED 11/2011

PLS-CADD ANALYSIS V 12.10

PLS-CADD SIGN CONVENTION:

( ) UNSIGNED: RT AH

(-) NEG. SIGN: LT AH

COORDINATES AND BEARINGS ARE BASED

ON THE NORTH DAKOTA SOUTH STATE PLANE

COORDINATE SYSTEM, NAD83 DATUM.

UNITS ARE US SURVEY FEET.

STA. 10404+22 - STA. 10458+46

STRUCTURE 197/1 TO STRUCTURE 198/1

D E

S

IG

N R

E F

. F

IL

-5

T O

B

S S

U B

.X

Z

:\E

N G

IN

E

E R

IN

G

\P L

S L

IB

R

A R

IE

S

A N

D S

T R

U C

T U

R E

M O

D E

L S

\N E

R C

S

T U

D

IE

S \U

G P

\B

IS

M A

R C

K

M E

D O

R A

\P L

S C

A D

D \X

Y Z

A

-5

T

O

B S

S

B

E E

D

IT

P N

P

R S

A

S D

E S

IG

N

E D

O P

G W

/1

T O

W A

R D

D E

L

IV

E

MARCH 7, 2014

198/1 - 198/2, CC-72-504 - 8000.WIR, RULING SPAN 1924 (FT)

188/3 - 198/1, 1_2-7_STRAND_HS_STEEL.WIR, RULING SPAN 1150 (FT)

188/3 - 198/1, 1_2-7_STRAND_HS_STEEL.WIR, RULING SPAN 1150 (FT)

198/1 - 198/2, 1_2-7_STRAND_HS_STEEL.WIR, RULING SPAN 1918 (FT)

198/1 - 199/1, DRAKE_ACSR.WIR, RULING SPAN 2160 (FT)

186/7 - 198/1, RAIL_ACSR.WIR, RULING SPAN 1150 (FT)

10460+00 10470+00 10480+00 10490+00 10500+00

W

IR

E X

E X

W

IR

E T

E L

E G

R A

P

R A

IL

R

O A

D X

.P

.R .Y

R

A N

C H

L

IN

E

W

IR

E

T E

L E

L

IN

E

X

P A

V E

D R

D X

O

C K

H A

V

R B

O R

R

W A

T E

R S

Y S

T

M

IR

E

P O

W E

R L

IN

E

X

G E

O

IS

S

O U

R I

R

IV

G E

S

O U

R I

R

IV

E X

D

IR

T /G

R A

V

X

IN

G

O L

IV

E

E

E X

E X

A

G

L E

-9

O

G W

G

S

-4

.5

.5

A

.8

.3

N

G E

-H -2

O G

W

A

.1

N

G E

-H -2

O G

W

1926 2449

10460+00 10470+00 10480+00 10490+00 10500+00 1

N65°00'18"E

MORTON, NORTH DAKOTA

T.139N R.81W, SEC 10

SEC 10

SEC 3

BURLEIGH, NORTH DAKOTA

T.139N R.81W, SEC 10

N6

M O

R T O

N C

O U

T Y

R

LE

IG

H

C O

U

TY

T E

R C

O U

R S

E X

6+

P A

V E

D R

D X

IN

G

7+

O C

K H

A V

E N

H A

R B

O R

R

9+

W

W E

R L

IN

E

X

0+

W

IR

E

X

D

IR

T /G

R A

V E

L

G

O L

IV

E

T R

E E

4+

W

IR

E

X

5+

W

IR

E

X

N C

E X

IN

G

2+

W

IR

E

X

3+

W

IR

E

X

6+

W

L E

G R

A P

H L

N C

E X

IN

G

R A

IL

R

O A

D X

IN

G

6+

.P .R

.Y

B R

A N

C H

L

IN

E

7+

W

L E

LI

N E

X

N C

E X

IN

G

W A

T E

R X

IN

G

9+

/2

W

A T

IP

E

LI

N

E

M

IS

S O

U R

I W

E S

T W

A T

E R

S Y

S T

N C

E X

IN

G

3+

E

D G

E

S O

U R

I R

IV

8+

E

D G

E

S O

U R

I R

IV

N C

E X

IN

G

N C

E X

IN

G

10452+42.00 -22°36'15"

198/1 198/2 198/3

WESTERN AREA POWER ADMINISTRATION

UNITED STATES DEPARTMENT OF ENERGY

C A

E

CORPORATE SERVICES OFFICE - LAKEWOOD, COLORADO

P

LS

CENTERLINE

1"=200' HORIZONTAL

1"=40' VERTICAL

SCALE:

APPROVEDDESIGNED

ROSS CLARK

ELECTRICAL ENGINEERING MANAGER

AS BUILT

LT 30 FT PROFILE LINE

RT 30 FT PROFILE LINE

ORIGINAL LINE DAWSON COUNTY-BISMARCK (DC-BS 4000-4132) INCLUDES STRUCTURES NUMBERED BETWEEN 0/1 THROUGH 208/5.

DC-BS WAS SUPERSEDED BY DAWSON COUNTY-BELFIELD (DC-BEF 4000-4065) INCLUDES STRUCTURES NUMBERED 0/1 THROUGH 94/2.

DC-BS WAS SUPERSEDED BY WARD DELIVERY-BELFIELD (WDD-BEF 4000-4068), INCLUDES STRUCTURES NUMBERED 94/3 THROUGH 202/2.

DC-BS WAS SUPERSEDED BY BISMARCK-WARD DELIVERY (BS-WDD 4000-4004), INCLUDES STRUCTURES NUMBERED 202/3 THROUGH 208/5.

NOTE:

NORTH DAKOTA

WARD DELIVERY-BELFIELD

230-KV TRANSMISSION LINE

PLAN & PROFILE

WDD-BEF

LEG EXTENSION FT

4 1

3 2

LOOKING AHEAD

C/L

STR BD2 TO 202/1

LOOKING AHEAD

C A B

PHASING

RIGHT OF WAY 125 FT

STRUCTURE RANGE - CABLE TYPE - RULING SPAN

SUPERSEDES DWG. NO. WDD-BEF 4063

AND 4064 (IN PART)

BETWEEN STRUCTURES 198/1 TO 199/1

COND. - 795 KCMIL 26/7 "DRAKE" ACSR

CURVE SHOWN AT 176°F, FINAL (FE) COND`S

NESC HEAVY LOADING

COND. - 954 KCMIL 45/7 "RAIL" ACSR

CURVE SHOWN AT 176 °F FINAL CONDTIONS

OGW - 1/2 INCH, 7 STRAND HS STEEL

CURVE SHOWN AT 60 °F FINAL CONDITIONS

MAXIMUM DESIGN OPERATING TEMP. = 176 °F

GROUND CLEARANCE = 22.4 FT.

LIDAR SURVEY: DATED 11/2011

IMAGERY: DATED 11/2011

PLS-CADD ANALYSIS V 12.10

PLS-CADD SIGN CONVENTION:

( ) UNSIGNED: RT AH

(-) NEG. SIGN: LT AH

COORDINATES AND BEARINGS ARE BASED

ON THE NORTH DAKOTA SOUTH STATE PLANE

COORDINATE SYSTEM, NAD83 DATUM.

UNITS ARE US SURVEY FEET.

STA. 10452+42 - STA. 10509+66

STRUCTURE 198/1 TO STRUCTURE 198/3

D E

S

IG

N R

E F

. F

-5

T O

B

S S

U B

.X

N G

IN

E

E R

IN

G

\P L

S L

IB

R

A R

IE

S

A N

D S

T R

U C

T U

R E

M O

D E

L S

\N E

R C

S

T U

D

IE

S \U

G P

\B

IS

M A

R C

K

M E

D O

R A

\P L

S C

A D

D \X

Y Z

A

-5

T

O

B S

S

E E

D

IT

P N

P

R S

A

S D

E S

IG

N

E D

O P

G W

/1

T O

W A

R D

D E

L

IV

E

198/3 - 199/1, CC-72-504 - 8000.WIR, RULING SPAN 1960 (FT)

198/1 - 198/2, CC-72-504 - 8000.WIR, RULING SPAN 1924 (FT)

198/2 - 198/3, CC-72-504 - 8100.WIR, RULING SPAN 2449 (FT)

188/3 - 198/1, 1_2-7_STRAND_HS_STEEL.WIR, RULING SPAN 1150 (FT)

198/2 - 198/3, 1_2-7_STRAND_HS_STEEL.WIR, RULING SPAN 2450 (FT)

198/3 - 199/1, 1_2-7_STRAND_HS_STEEL.WIR, RULING SPAN 1968 (FT)

188/3 - 198/1, 1_2-7_STRAND_HS_STEEL.WIR, RULING SPAN 1150 (FT)

198/1 - 198/2, 1_2-7_STRAND_HS_STEEL.WIR, RULING SPAN 1918 (FT)

198/1 - 199/1, DRAKE_ACSR.WIR, RULING SPAN 2160 (FT)

186/7 - 198/1, RAIL_ACSR.WIR, RULING SPAN 1150 (FT)

10510+00 10520+00 10530+00 10540+00 10550+00 10560+00

P I

°5

'0

H G

T

IR

E

R .E

.A . P

O W

E

X

P A

V E

D

G

B U

R

E E

K L

O

A

G

L E

-9

O

G W

G

S

-4

A

N

G E

G S

-4

A

.3

N

G E

G S

-4

A

N

G E

G S

-4

1220 1219 1230

10510+00

S

SEC 10

SEC 3

N65°00'18"E

W A

T E

R C

O U

R S

E X

2+

N C

E X

IN

G

N C

E X

IN

G

6+

W

IR

E R

.E .A

P

O W

E R

L

IN

E X

10520+00 10530+00 10540+00 10550+00 10560+00

BURLEIGH, NORTH DAKOTA

T.139N R.81W, SEC 2

N89°57'20"E

BURLEIGH, NORTH DAKOTA

T.139N R.81W, SEC 2

N89°57'20"E

6+

W

IR

E R

.E .A

P

O W

E R

L

IN

E X

N C

E X

IN

G

P A

V E

D R

D X

IN

G

6+

U R

N T

C R

E E

K L

O

T E

R C

O U

R S

E X

8+

10515+85.74 24°57'02"

10515+85.74 24°57'02"

199/1 199/2 199/3 200/1

WESTERN AREA POWER ADMINISTRATION

UNITED STATES DEPARTMENT OF ENERGY

C A

E

CORPORATE SERVICES OFFICE - LAKEWOOD, COLORADO

P

LS

CENTERLINE

1"=200' HORIZONTAL

1"=40' VERTICAL

SCALE:

APPROVEDDESIGNED

ROSS CLARK

ELECTRICAL ENGINEERING MANAGER

AS BUILT

LT 30 FT PROFILE LINE

RT 30 FT PROFILE LINE

ORIGINAL LINE DAWSON COUNTY-BISMARCK (DC-BS 4000-4132) INCLUDES STRUCTURES NUMBERED BETWEEN 0/1 THROUGH 208/5.

DC-BS WAS SUPERSEDED BY DAWSON COUNTY-BELFIELD (DC-BEF 4000-4065) INCLUDES STRUCTURES NUMBERED 0/1 THROUGH 94/2.

DC-BS WAS SUPERSEDED BY WARD DELIVERY-BELFIELD (WDD-BEF 4000-4068), INCLUDES STRUCTURES NUMBERED 94/3 THROUGH 202/2.

DC-BS WAS SUPERSEDED BY BISMARCK-WARD DELIVERY (BS-WDD 4000-4004), INCLUDES STRUCTURES NUMBERED 202/3 THROUGH 208/5.

NOTE:

NORTH DAKOTA

WARD DELIVERY-BELFIELD

230-KV TRANSMISSION LINE

PLAN & PROFILE

WDD-BEF

LEG EXTENSION FT

4 1

3 2

LOOKING AHEAD

C/L

STR BD2 TO 202/1

LOOKING AHEAD

C A B

PHASING

RIGHT OF WAY 125 FT

STRUCTURE RANGE - CABLE TYPE - RULING SPAN

SUPERSEDES DWG. NO. WDD-BEF 4064

AND 4065 (IN PART)

BETWEEN STRUCTURES 198/1 TO 199/1

COND. - 795 KCMIL 26/7 "DRAKE" ACSR

CURVE SHOWN AT 176°F, FINAL (FE) COND`S

NESC HEAVY LOADING

COND. - 954 KCMIL 45/7 "RAIL" ACSR

CURVE SHOWN AT 176 °F FINAL CONDTIONS

OGW - 1/2 INCH, 7 STRAND HS STEEL

CURVE SHOWN AT 60 °F FINAL CONDITIONS

MAXIMUM DESIGN OPERATING TEMP. = 176 °F

GROUND CLEARANCE = 22.4 FT.

LIDAR SURVEY: DATED 11/2011

IMAGERY: DATED 11/2011

PLS-CADD ANALYSIS V 12.10

PLS-CADD SIGN CONVENTION:

( ) UNSIGNED: RT AH

(-) NEG. SIGN: LT AH

COORDINATES AND BEARINGS ARE BASED

ON THE NORTH DAKOTA SOUTH STATE PLANE

COORDINATE SYSTEM, NAD83 DATUM.

UNITS ARE US SURVEY FEET.

STA. 10508+66 - STA. 10562+90

STRUCTURE 199/1 TO STRUCTURE 200/1

D E

S

IG

N R

E F

. F

-5

T O

B

S S

U B

.X

N G

IN

E

E R

IN

G

\P L

S L

IB

R

A R

IE

S

A N

D S

T R

U C

T U

R E

M O

D E

L S

\N E

R C

S

T U

D

IE

S \U

G P

\B

IS

M A

R C

K

M E

D O

R A

\P L

S C

A D

D \X

Y Z

A

-5

T

O

B S

S

E E

D

IT

P N

P

R S

A

S D

E S

IG

N

E D

O P

G W

/1

T O

W A

R D

D E

L

IV

E

198/3 - 199/1, CC-72-504 - 8000.WIR, RULING SPAN 1960 (FT)

199/1 - 202/2, CC-72-504 -6200.WIR, RULING SPAN 1161 (FT)

198/3 - 199/1, 1_2-7_STRAND_HS_STEEL.WIR, RULING SPAN 1968 (FT)

199/1 - 202/2, 1_2-7_STRAND_HS_STEEL.WIR, RULING SPAN 1161 (FT)

198/1 - 199/1, DRAKE_ACSR.WIR, RULING SPAN 2160 (FT)

199/1 - 202/2, RAIL_ACSR.WIR, RULING SPAN 1150 (FT)

Message from the Administrator

At Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western.

right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

� Safety procedures or common sense must be applied by each Federal and not be set aside to meet a project schedule or for personal convenience.

� Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, haz

� Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

� Safety is a personal responsibility. Each individual make a task.

By integrating these principles into every task we take, together we can ensure Western is a safe place to work.

Message from the Administrator t Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors who provide products or services to Western. In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Our safety program is based on four points:

Safety procedures or common sense must be applied by each Federal and not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take action to reduce, if not eliminate, hazardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is accomplished in a safe and healthy way.

Safety is a personal responsibility. Each individual makes the decision on what action to take to accomplish

By integrating these principles into every task we take, together we can ensure Western is a safe place to t Western, we show our commitment to safety every day through the actions we take, the training we offer and the work conditions we provide. We expect the same commitment to safety from each of our contractors

In performing work for Western, all contractors must make the right decisions to ensure that the work environment is as safe as possible.

Safety procedures or common sense must be applied by each Federal and contract employee. Safety should not be set aside to meet a project schedule or for personal convenience.

Employees and contractors must believe that they have the right and the responsibility to identify and take ardous work environments and hazardous work practices.

Managers and supervisors must lead by example and execute their responsibility to ensure each job is s the decision on what action to take to accomplish

By integrating these principles into every task we take, together we can ensure Western is a safe place to

Mark A. Gabriel

Administrator

bs_0019d
jt_0016c
bs_jt_0003
43_206_s_2200
43_206_s_2202a
bs_jt_2002a_ei
bs_jt_1_2101_fio
bs_jt_1_2004_ei
41_9027e
31451-01494aaa - 285d-60 anchor bolt cage
31451-01494aat - 285d-60 erection dwg - sheet 1 of 2
31451-0149aat - 285d-60 erection dwg - sheet 2 of 2
31451-3007 - 285d-60 top shaft assembly - sheet 1 of 2
31451-3007 - 285d-60 top shaft assembly - sheet 2 of 2
31451-3008 - 285d-60 bottom shaft assembly
31451-025001aa - 285d-100 anchor bolt cage
31451-02500at - 285d-100 erection dwg - sheet 1 of 2
31451-02500at - 285d-100 erection dwg - sheet 2 of 2
31451-3009 - 285d-100 top shaft assembly - sheet 1 of 2
31451-3009 - 285d-100 top shaft assembly - sheet 2 of 2
31451-3010 - 285d-100 upper middle shaft assembly
31451-3011 - 285d-100 lower middle shaft assembly
31451-3012 - 285d-100 bottom shaft assembly
31451-specnote sheet 5 of 7 - fixed ladders
31451-specnote sheet 6 of 7 - fixed ladders
31451-c - 285d ogw davit arm
31451-d - 285d conductor davit arm
ssg001 - sheet 1 of 2
ssg001 - sheet 2 of 2
ssg002
ssg004
ssg005
bs_jt_1_1000
wdd_bef_1001
41_1018c
41_1020b
41_1023d
41_1031f
bs_jt_4024c
wdd_bef_4311
wdd_bef_4312
wdd_bef_4313
Drawings Index Rev 31 Jul 15.pdf
A. GENERAL:
B. LIST OF DRAWINGS:

File details come from the government source that posted it. Updated .