Project_Drawings.pdf

PDF 24 MB Posted

Attached to
COMM. TOWERS, BLDGS, SITEWORK Federal contract opportunity
Solicitation number
DE-SOL-0008115
Issued by
Department of Energy Western Area Power Administration

About this file

Project Drawings

View the file

Other files for this federal contract opportunity

Other files attached to COMM. TOWERS, BLDGS, SITEWORK, newest first.
File Type Posted
Amendment_002_Final.pdf PDF
Amendment_001.pdf PDF
Contract_Clauses_and_Bid_Schedule.pdf PDF
Project_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMUNICATION TOWERS, BUILDINGS, AND SITE WORK

VARIOUS LOCATIONS

SOUTH DAKOTA, NORTH DAKOTA, AND NEBRASKA

SECTION C

DESCRIPTION/SPECIFICATIONS

Solicitation No. DE-SOL-0008115 Spec. No. 15WC111528-671

DIVISION 15 – DRAWINGS

A. GENERAL:

CONSTRUCTION STANDARD DRAWINGS: A complete set of standard drawings are available at http://www.wapa.gov/business/buys.htm. Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAW INGS: Project drawings included herein are reduced reproductions and are not to scale.

Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAW INGS: W here details shown on standard drawings included herein differ from project drawings or text, the details of project drawings or text shall govern.

INFORMATIONAL DRAW INGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAW INGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omission.

B. LIST OF DRAWINGS:

ARMOR SUBSTATION

1. AR 0016 – Rev D – Location and Vicinity Map

BISMARCK SUBSTATION

2. BS 0019 – Rev A – Location and Vicinity Map

HURON MAINTENANCE FACILITY

3. HUM 0015 – Rev C – Location and Vicinity Map

BIJOU HILLS MICROWAVE SITE

4. BJR 0015 – Location and Vicinity Map

5. COM BBJR 7101 – Topography

6. BJR 7102 – Rev D – General Plot Plan

7. BJR 2875 – Rev A – Comm Tower Elevations

CLARK REPEATER

8. CKR 7000 – Rev A – Location and Vicinity Map

9. COM BCKR 7102 – Topography

10. CKR 7012 – Rev A – General Plot Plan

COLMAN REPEATER

11. CLM 0015 – Location and Vicinity Map

12. CB1068 – Concrete Base, Pivoted

13. CA 1030 – Concrete Anchor

CROW LAKE REPEATER

14. CLR 0015 – Location and Vicinity Map

ELLIOT SUBSTATION

15. ELI 0015 – Location and Vicinity Map

16. ELI 1000 – Rev A – General Arrangement Plan (Existing Installation)

17. ELI 1000 – Rev B – General Arrangement Plan

18. ELI 1500 – Grounding Plan (Existing Installation)

19. ELI 1500 – Rev A – Grounding Plan

20. ELI 2200 – Rev A – Foundation Plan (Existing Installation)

21. ELI 2200 – Rev B – Foundation Plan

22. ELI 7012 – General Plot Plan

23. ELI 7013 – Waveguide Bridge Detail

24. ELI 7101 – Tower Layout

25. SST2087 – 20 Ft. SS20T Section

26. SST2088 – 20 Ft. SS20T Section

27. SST2089 – 20 Ft. SS20T Section

28. SST2090 – 20 Ft. SS20T Section

29. SST2091 – 20 Ft. SS20T Section

30. ELI 7104 – Foundation Layout http://www.wapa.gov/business/buys.htm

HURON SUBSTATION

31. HU 0015 – Rev C – Location and Vicinity Map

32. HU 0010 – Rev C – General Plot Plan

33. HU 0018 – Topography

KONES CORNER MICROWAVE SITE

34. KCR 0015 – Location Map

35. KCR 2051 – Rev B – Grading Plan

36. KCR 7010 – 199 Foot Guy – Tower Outline

LAKE ANDES REPEATER

37. LKR 0015 – Location and Vicinity Map

38. COM BLKR 7101 – Rev A – Topography

39. LKR 7102 – Rev E – General Plot Plan

MOE MICROWAVE SITE

40. MOX 0015 – Location and Vicinity Map

41. COM BMOX 7101 – Topography

42. COM BMOX 7102 – Grading Plan

43. COM BMOX 7103 – General Plot Plan

44. MSS3044 – Master Self-Supporting Tower: 120FT

45. CB1070 – Concrete Base for Self-Supporting Tower

46. ABL1038 – Anchor Bolt Layout

47. SST2086BS – 20 FT SS20T Section

48. SST2087 – 20 FT SS20T Section

49. SST2088 – 20 FT SS20T Section

50. SST2089 – 20 FT SS20T Section

51. SST2090 – 20 FT SS20T Section

52. SST2091 – 20 FT SS20T Section

53. WSI5512 – Waveguide Support Installation

54. LSD2001 – Leg Splice Detail

55. TLI5011 – Tower Ladder Installation

56. MIS4024 – Leg Cap Installation

57. MIS4049 – Ladder Base Installation

58. CB1074 – Waveguide Channel Support Footing

59. CB1064 – Propane Tank Footing

60. AMI6579 – Antenna Mntg. Install

61. SPP1063 – Plot Plan – Page 1 of 2

62. SPP1063 – Plot Plan – Page 2 of 2

63. TGI1528 – Grounding Installation

64. MIS4092 – Platform Installation

65. MIS4093 – Platform Installation

ORCHARD RADIO RELAY STATION

66. OR 0015 – Location and Vicinity Map

67. OR 7101 – Topography

68. OR 7100 – General Plot Plan

69. OR 2300 – Foundations – Outline and reinforcement

70. 34163E01 – Spread Footing Foundation 175’ EEI SSTA

71. 34163E02 – Foundation and Templates

72. 34163E03 – 175’ EEI Model SSTA Installation Details

73. 34163E06 – Section SS20TA5S – EL. – 140’ – 160’ Erection Drawing

74. 34163E07 – Section SS15TA5S – EL. – 160’ – 175’ Erection Drawing

75. 34163E08 – Ladder Installation Drawing

76. 34163E09 – Waveguide Ice Bridge Installation

PUKWANA MICROWAVE SITE

77. PUR 0015 – Location and Vicinity Map

78. COM BPUR 7101 – Topography

79. COM BPUR 7102 – Rev A – General Plot Plan

80. SPP1051 – Plot Plan – Page 1 of 2

81. MSS3041 – Master Self-Supporting Tower: 120FT

82. SST2075BS – 20 FT SS20T Section

83. SST2076 – 20 FT SS20T Section

84. SST2077 – 20 FT SS20T Section

85. SST2078 – 20 FT SS20T Section

86. SST2079 – 20 FT SS20T Section

87. SST2080 – 20 FT SS20T Section

88. CB1070 – Concrete Base for Model SS20T

89. ABL1035 – Anchor Bolt Layout

SNAKE BUTTE MICROWAVE SITE

90. SNA 0015 – Location and Vicinity Map

91. AGB5228 – Exterior Elevations for 12’W x 20’L X 9’H Bldg

92. 15B2133G – Building Skid Assembly for 12’W X 20’L Bldg

TRIPP MICROWAVE SITE

93. TRP001 – Tripp Microwave – Cover Sheet

94. TRP002 – Tripp Microwave – Site Plan

TURKEY RIDGE REPEATER

95. TU 7001 – Rev A – Location and Vicinity Map

96. TU 7002 – Rev A – Topography

97. TU 7003 – Rev C – General Plot Plan

WESSINGTON SPRINGS MICROWAVE SITE

98. WSR 7014 – Location map

99. COM BWSR 7101 – 113 FT. TJ – AA Tower

ORCHARD, SD

At Western, we show our co and the work conditions we p who provide products or serv right decisions to ensure that

Our safety program is based o

Safety procedures or common not be set aside to meet a proj

Employees and contractors m action to reduce, if not elimin

Managers and supervisors mu accomplished in a safe and he

Safety is a personal responsib a task.

By integrating these principle work.

ommitment to safety every day through th provide. We expect the same commitmen vices to Western. In performing work for the work environment is as safe as possib on four points:

n sense must be applied by each Federal a oject schedule or for personal convenience must believe that they have the right and th nate, hazardous work environments and h ust lead by example and execute their res ealthy way.

bility. Each individual makes the decisio es into every task we take, together we ca he actions we take, the training we offer nt to safety from each of our contractors r Western, all contractors must make the ble.

and contract employee. Safety should e.

he responsibility to identify and take hazardous work practices.

ponsibility to ensure each job is n on what action to take to accomplish an ensure Western is a safe place to

Mark A. Gabriel Administrator

File details come from the government source that posted it. Updated .