This is an engineering design report prepared by Bolton & Menk, Inc. for the Iowa Department of Agriculture and Land Stewardship (IDALS) documenting the design of the Kracht Water Quality Wetland in Clay County, Iowa. The project involves the construction of a wetland system on the Kracht property near Rossie, Iowa, designed to provide nutrient reduction benefits to the watershed of Drainage District #103. The constructed wetland will convert nitrates to nitrogen gas through natural processes and capture sediment with phosphorus as water passes through the facility. An embankment will be built over the existing stream, and the existing tile main of Drainage District #103 will be re-laid at a flatter slope to daylight into the pool. The project includes a primary spillway consisting of a 49-foot-wide full-flow open sheet pile drop structure and a 25-foot-wide earthen auxiliary spillway. The design is based on NRCS Conservation Practice Standards 656 (Constructed Wetland) and 378 (Pond), with the project classified as NRCS Job Class IV due to its 990-acre watershed. The report was certified by professional engineer Brandon C. Short on June 10, 2026, with his license renewal date of December 31, 2026.
The design incorporates comprehensive hydrological analysis using HydroCAD modeling with multiple rainfall event scenarios (5-year, 10-year, 25-year, 50-year, and 100-year events) utilizing MSE 4 distribution from the National Engineering Handbook. The permanent pool will have an elevation of 1,360.00 feet with a surface area of 5.36 acres and normal storage of 11.65 acre-feet, with the ability to accommodate larger storm events up to 1,364.50 feet elevation containing 39.42 acre-feet at the top of the dam. The dam does not require an Iowa DNR construction permit as it meets low hazard classification criteria (14.5-foot height, 39.42 acre-feet storage at top of dam). A permanent easement on the Kracht property will be recorded by IDALS, and the project will be permitted under USACE Regional Permit 39. The design includes sediment calculations estimating approximately 28.8 tons of annual sediment delivery, with 21 tons retained annually in the reservoir, and projects sediment accumulation of 3,200 tons over a 150-year period. Soil analysis determined the site contains primarily silty clay loam and loam soils, and survey-grade GPS equipment and LiDAR data were used to establish elevations referenced to NAVD88 and coordinates in the Iowa State Plane North system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Book.pdf | ||
| Specifications.pdf | ||
| Schedule of Prices.pdf | ||
| Doc CC Proposal - Acknowledgement - Affidavit.pdf | ||
| Doc EE Bid Bond.pdf | ||
| Wetland QA QC Plan.pdf | ||
| Plans.pdf | ||
| Notice to Bidders 09-25-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submitted by:
Bolton & Menk, Inc.
1519 Baltimore Drive Ames, IA 50010-8783 P: (515) 233-6100
Kracht Wetland Engineering Design Report
Iowa Department of Agriculture and Land Stewardship June 10, 2026
Prepared by: Bolton & Menk, Inc. Certification Kracht Wetland ǀ 25X.140338.000
Certification
Design Report
For
Kracht Water Quality Wetland
CLA953734C
Iowa Department of Agriculture and Land Stewardship
Clay County, Iowa 25X.140338.000
I hereby certify that this engineering document was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
(Signature)_____________________________ (Date)_________________
Printed or typed name: Brandon C. Short, PE
My renewal date is: December 31, 2026
License Number is: 29449
Pages or sheets covered by this seal: Full Document brandon.short Text Box 6/10/2026
H:\IDALS\25X140338000\3_Design\C_Reports\Kracht Wetland Design Report.docx
Kracht Wetland Design Report Site No. CLA953734C Clay County, Iowa
Project Overview This constructed wetland is planned to provide nutrient reduction benefits to the watershed of Drainage District #103 in Clay County, Iowa. Nitrates will be converted to nitrogen gas through natural processes as the water passes through the wetland. Sediment with phosphorus will also be captured but will need to be removed from time to time.
The project location is on the property of Duane and Erneta Kracht near Rossie, Iowa. An embankment will be built over the existing stream, and the existing tile main of Drainage District #103 will be re-laid at a flatter slope to daylight into the pool. Surface runoff and the re-laid tile main will feed the wetland.
Diversion berms are proposed within the permanent pool to encourage mixing and reduce short-cutting of water out of the wetland. Tile flows and storm flows will be released through the primary spillway which is a 49-foot-wide full-flow open sheet pile drop structure. The 25-foot-wide earthen spillway will act as an auxiliary outlet during larger storm events.
Site Selection & Analysis This site was deemed viable because of the size of its watershed (990 acres) and its topography. The slopes are gentle enough to allow the impounding of a large wetland pool without an excessively large berm or a deep pool. Initial payment information was presented to the landowner, who wished to proceed with the project.
Bolton & Menk reviewed the soil survey data for the location and found the soils to be primarily silty clay loam and loam. After this review, it was determined that soil borings were unnecessary unless deep excavation work was determined to be needed. The wetland watersheds were analyzed using LiDAR data, with land uses delineated and existing ponds and culverts accounted for. A map of the contributing watersheds is included with this report. Curve number calculations and runoff analysis are provided in the attached hydrology report.
The site was surveyed with survey-grade GPS equipment, and additional topographic information was provided from a publicly available LiDAR database. LiDAR was verified with survey data. Elevations are referenced to NAVD88, and the Iowa State Plane North (Survey Foot) coordinate system was used for horizontal coordinates. Survey data was collected electronically and is available in .csv files.
Name: Kracht Wetland Design Report Date: June 10, 2026 Page: 2
Design Standards Iowa NRCS Conservation Practice Standard (CPS) 656 Constructed Wetland, dated December 2023, was used to develop this project. CPS 378 (Pond) was used to design the primary and auxiliary spillways and the embankment. The project is NRCS Job Class IV under CPS 656 because the watershed is between 300 and 1000 acres.
Project Layout A permanent pool elevation and embankment location were selected based on the ability to maximize pool area while minimizing the deep (greater than three feet) pool area and embankment height. The watershed information and rainfall data were used to develop hydrographs in HydroCAD. The storm distribution used was MSE 4, with rainfall depths from the National Engineering Handbook. These hydrographs and the proposed stage-storage information were used to size primary and auxiliary spillways for the wetland. Exceeding the minimum design standards of NRCS CPS 378, the auxiliary spillway is placed above the 25-year storm, and the spillways and embankment are designed to provide at least one foot of freeboard during the 100-year storm. HydroCAD outputs are provided in the appendix.
Existing Tiles One known tile, the Drainage District #103 main, is planned to be re-laid into the wetland pool. A new tile will be installed and will tie into the new district main, to ensure proper drainage of the site. Profiles are provided in the plans for these tiles. There may be unknown tiles on the site that will be found during construction. If applicable, these tiles will be re-laid into the wetland pool and will be sized and placed such that they will not inhibit the pre-existing drainage conditions of the neighboring properties.
Pipe sizing calculations are provided in the appendix.
Dam Regulation A dam construction permit is required by the Iowa DNR if it (1) has a height of at least 25 feet and a storage of 15-acre feet at the top of the dam elevation; or (2) has a storage of at least 50 acre-feet at the top of dam and a height of at least 6 feet; or (3) is assigned a hazard potential of high hazard. This dam does not require a dam construction permit because the height is 14.5 feet, the storage at top of dam is
39.42 acre-feet, and the hazard potential is low hazard.
The dam is classified as “low hazard” if failure of the dam would result in no probable loss of human life, low economic losses, and low public damages. This dam meets the requirements of a low hazard dam.
Land Rights & Permits The permanent easement for this project will be on the Kracht property. IDALS-DSWQ is currently in the process of updating the abstracts and will have a signed easement recorded for the area as shown in the plans. No additional land rights are needed.
Page: 3
The project will be permitted under USACE Regional Permit 39. The permit will be obtained by the Iowa Department of Agriculture and Land Stewardship (IDALS). A floodplain permit application will also be obtained by IDALS if necessary.
Sincerely, Bolton & Menk, Inc.
Brandon C. Short, PE Water Resources Project Engineer
Appendices:
A. Soil Survey Map B. Watershed Map C. Hydrology Report D. HydroCAD Output E. Stilling Basin Calculations F. Sheet Pile Weir Calculations G. Pipe Capacity Calculations
Page: 4
Appendix A: Soil Survey Map
Page: 5
Appendix B: Watershed Map
Page: 6
Appendix C: Hydrology Report
25-year Event: 5.60'' 100-year Event: 7.80''
* Hydrologic Soil Groups: B, C, C/D
* Runoff Curve Number: 85.0 (based on land use shown in this report)
* Primary Spillway Weir Coefficent = 3.1
Tc = 4.4 hours determined by the sum of sheet, shallow concentrated and channel flow times.
Design Parameters and Procedures:
Hydrology Analysis Summary
Rainfall events used for this site were MSE 4 distribution, 24-hour, 5-, 10-, 25-, and 100-year events. The primary spillway is a 49-foot-wide sheet pile open drop structure. The auxiliary spillway is a 35-foot earthen spillway placed above the 25-year rainfall event high water level.
Normal Pool area is 5.36 ac; surface watershed area is approx. 990.3 ac or 1.55 square miles
Report Summary
Design hydrology and hydraulic study of this site was completed. The drainage area was determined and a stage-area-storage curve was developed based on the topographic survey, LIDAR data available from the Iowa Department of Natural Resources, and grading design for the wetland. Land use and treatment were determined through a site visit and aerial photo review. Hydrologic data was compiled, sediment calculations were made, the structure was flood routed using the SCS TR-55 method in HydroCAD, and all the output was reviewed.
H:\IDALS\25X140338000\3_Design\C_Reports\Kracht Wetland Hydrology Report.xlsm
IDALS ID Number: CLA953734C Job: Kracht
BMI Project Number: 25X.140338 Designed By: BCS Date: 12/18/2025
Rainfall Data
Clay
MSE 4
Northwest
NEH Title 210 (Figure IA2-25)
SUDAS Design Manual 2025 Edition NOAA Atlas 14
2 2.90 2.92 2.95
5 3.70 3.67 3.73
10 4.40 4.39 4.48
25 5.60 5.50 5.67
50 6.60 6.46 6.70
100 7.80 7.50 7.85
The following rainfall data was used for the hydrologic analysis of the site. Rainfall depths from the NEH Title 210 Figure IA2-25 were used, and two additional sources are shown for reference only.
County:
Storm Distribution:
Iowa Climactic Section (SUDAS):
Data Source
24-hr Rainfall Depths (in) Return Period (Years)
Used
Surface-Drained DA = 990 ac = 1.55 sq mi
H:\IDALS\25X140338000\3_Design\C_Reports\Kracht Wetland Hydrology Report.xlsm Page 2
BMI Project Number: 25X.140338 Designed By: BCS Date: 12/18/2025
Tributary Watershed Data
Area Area Time of Concentration
Watershed (ac) (sq. mi.) Tile/Surface Drained (min)
Direct 556 0.87 Tile & Surface 157.1
Northwest 308 0.48 Tile & Surface 425.4
Northeast 127 0.20 Tile & Surface 339.3
Surface Total = 990 ac. 1.55 sq. mi. Average TC = 264 Min.
Tile Main Total = 990 ac. 1.55 sq. mi. Average TC = 4.40 Hrs.
H:\IDALS\25X140338000\3_Design\C_Reports\Kracht Wetland Hydrology Report.xlsm Page 3
BMI Project Number: 25X.140338 Designed By: BCS Date: 12/18/2025
Soil Portion Name1 HSG1 Cover Type and Hyd. Condition of W/S CN2 Product percent
Moneta loam B Straight Row Crops, Good 0.4% 78 0.312
Sac silty clay loam, et al. C Straight Row Crops, Good 6.7% 85 5.695
McCreath and Gillett Grove silty clay loam, et al.
C/D Straight Row Crops, Good 92.9% 85 78.965
Total 100.0% 85.0
References 1 USDA - NRCS Soil Survey of Clay County, Iowa.
2 USDA - NRCS Technical Release 55, Chapter 2, June 1986.
= 1.55 sq mi Runoff Curve Number Surface-Drained DA = 990 ac
H:\IDALS\25X140338000\3_Design\C_Reports\Kracht Wetland Hydrology Report.xlsm Page 4
BMI Project Number: 25X.140338 Designed By: BCS Date: 12/18/2025
Sediment Calculations
DA1
990 acres 1.547 sqmi
Trap efficiency, very short storage time2 73 percent
Average annual sheet and rill erosion3
0.9 tons/ac/yr
Area of depressions not subject to sediment delivery 0 acres
Area subject to sheet and rill erosion 990 acres
Average annual sheet and rill erosion 869 tons
Delivery ratio5
3.5 percent
Sheet and rill erosion delivered to site 30.4 tons/yr
Adjustment for LRA 1032
0.5 factor
Adjusted sheet and rill erosion delivered 15.2 tons/yr
Average annual gully erosion rate4
0.2 cuft/ft
Length of gully erosion 1,700 ft
In place density of gully material 80 lb/cuft
Average annual gully erosion (100% delivered) 13.6 t/yr
Total sediment delivered 28.8 t/yr
Weight of sediment retained in resevoir at 73.0 percent trapped2 21 t/yr
Sediment accumulation during 150 -year period 3,200 tons
Estimate 80 percent of delivered sediment will not be submerged2 2,560 tons
Volume of submerged sediment at 1,307 t/acft2 1.96 acft
Normal pool volume 11.6 acft, will not be full
Estimate 20 percent of delivered sediment will be aerated2 640 tons
Volume of aerated sediment at 1,742 t/acft2 0.37 acft
References 1 Determined by Engineer 2 USDA-NRCS, Engr. Field Man., Chap. 11, Amend. IA 27, Fig.2, May 1986,. Adjusted. See notes.
3 Estimated by preparer.
4 Estimated by preparer.
5 Delivery curve for Des Moines lobe. Source: Iowa Geological Survey
Surface-Drained DA = 990 ac
= 1.55 sq mi
H:\IDALS\25X140338000\3_Design\C_Reports\Kracht Wetland Hydrology Report.xlsm Page 5
BMI Project Number: 25X.140338 Designed By: BCS Date: 12/18/2025
Stage-Storage
Contour Elev. Area Area
Average Area
Incremental Volume
Cumulative Volume
Volume Above Weir
(Ft) (Sq ft) (Acres) (Arces) (Ac-ft) (Ac-ft) (Ac-ft)
1355.00 1399 0.03 0.03 0.00 0.00
1356.00 27566 0.63 0.33 0.33 0.33
1357.00 47270 1.09 0.86 0.86 1.19
1358.00 92763 2.13 1.61 1.61 2.80
1359.00 222287 5.10 3.62 3.62 6.42
1360.00 233629 5.36 5.23 5.23 11.65 0.00
1361.00 249452 5.73 5.55 5.55 17.19 5.55
1362.00 261002 5.99 5.86 5.86 23.05 11.40
1362.75 271900 6.24 6.12 4.59 27.64 15.99
1363.00 277298 6.37 6.30 1.59 29.23 17.58
1364.00 300382 6.90 6.63 6.63 35.86 24.21
1364.50 319122 7.33 7.11 3.56 39.42 27.77
Storage at Normal Pool = 11.65 Acre-feet
Elevation of weir = 1360.00 Feet
Storage at Overflow = 27.64 Acre-feet
Elevation = 1362.75 Feet 2.17 Feet
Notes:
= 1.55 sq mi
Surface-Drained DA = 990 ac
Average Depth =
Storage areas include final earthwork borrow in pool area. Contour data is compiled from LIDAR, topographic survey, and proposed grading.
Average Depth = Storage at Normal Pool
Area at Normal Pool
H:\IDALS\25X140338000\3_Design\C_Reports\Kracht Wetland Hydrology Report.xlsm Page 6
BMI Project Number: 25X.140338 Designed By: BCS Date: 12/18/2025
Weir Flow Hydraulics DA = 990 ac
= 1.55 sq mi
Input
Q = CLH1.5
Use C = 3.1
Output
Pool Elev. = 1360.00
Weir Length (ft) 35 40 49 55 60
W.S. Elev. Q (cfs) Q (cfs) Q (cfs) Q (cfs) Q (cfs)
1360.00 0.0 0.0 0.0 0.0 0.0
1360.28 16.2 18.5 22.7 25.4 27.7
1360.56 45.8 52.3 64.1 71.9 78.5
1360.84 84.1 96.1 117.7 132.1 144.2
1361.13 129.5 148.0 181.3 203.4 221.9
1361.41 180.9 206.8 253.3 284.3 310.2
1361.69 237.8 271.8 333.0 373.8 407.7
1361.97 299.7 342.5 419.6 471.0 513.8
1362.25 366.2 418.5 512.7 575.4 627.8
1362.53 437.0 499.4 611.7 686.6 749.1
1362.81 511.8 584.9 716.5 804.2 877.3
1363.09 590.4 674.8 826.6 927.8 1012.1
1363.38 672.7 768.8 941.8 1057.1 1153.3
1363.66 758.5 866.9 1062.0 1192.0 1300.4
1363.94 847.7 968.8 1186.8 1332.2 1453.3
1364.22 940.2 1074.5 1316.2 1477.4 1611.7
MAX POOL 1364.50 1035.7 1183.7 1450.0 1627.6 1775.5
USED
H:\IDALS\25X140338000\3_Design\C_Reports\Kracht Wetland Hydrology Report.xlsm Page 7
BMI Project Number: 25X.140338 Designed By: BCS Date: 12/18/2025
Results Surface-Drained DA = 990 ac The following are based on surface flows and storm response. Discharge includes tile flow and overland flow.
= 1.55 sq mi
0100200300400500600700800
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Discharge (cfs)
E le va ti o n ft
Pool Area (ac)
Pool Area-Elevation-Discharge Graph
Normal Pool
Pool Area (ac)
Discharge (cfs)
1360.00
1360.50
1361.00
1361.50
1362.00
1362.50
1363.00
1363.50
0 4 8 12 16 20 24
E le va ti o n ft
Duration (hours)
Duration-Elevation Graph
5-Year
10-Year
25-year
100-year
H:\IDALS\25X140338000\3_Design\C_Reports\Kracht Wetland Hydrology Report.xlsm Page 8
BMI Project Number: 25X.140338 Designed By: BCS Date: 12/18/2025
Results
1355.00 0.03
1356.00 0.63
1357.00 1.09
1358.00 2.13
1359.00 5.10
1360.00 5.36
1361.00 5.73
1362.00 5.99
1362.75 6.24
1363.00 6.37
5-year 10-year 25-year 100-year Duration Elevation Duration Elevation Duration Elevation Duration Elevation
0 1361.74 0 1362.06 0 1362.64 0 1363.49 2 1361.45 2 1361.74 2 1362.18 2 1362.95 4 1361.17 4 1361.37 4 1361.71 4 1362.28 6 1360.93 6 1361.10 6 1361.37 6 1361.79 8 1360.73 8 1360.85 8 1361.06 8 1361.38
10 1360.56 10 1360.67 10 1360.82 10 1361.07 12 1360.45 12 1360.52 12 1360.64 12 1360.85 14 1360.32 14 1360.39 14 1360.49 14 1360.66 16 1360.22 16 1360.27 16 1360.35 16 1360.49 18 1360.16 18 1360.19 18 1360.25 18 1360.37 20 1360.11 20 1360.15 20 1360.18 20 1360.27 22 1360.09 22 1360.09 22 1360.13 22 1360.20 24 1360.05 24 1360.06 24 1360.09 24 1360.14
The Duration-Elevation table below shows the duration that the pool is at each listed elevation during the design storms. This is based on surface inflows during the design storms listed. The design for the wetland is based on tile flows, but the entire watershed is analyzed, including surface flows, to show that the proposed wetland does not have adverse impacts on surrounding properties during rainfall events.
Duration-Elevation Table
Surface Discharge (cfs)
The Elevation-Discharge table below shows outflows from the wetland for various elevations.
Elevation (ft) Pool Area (ac)
= 1.55 sq mi Surface-Drained DA = 990 ac
159.38 474.07 706.68 807.82
H:\IDALS\25X140338000\3_Design\C_Reports\Kracht Wetland Hydrology Report.xlsm Page 9
Page: 7
Appendix D: HydroCAD Output
1S
Northwest Watershed
2S
Northeast Watershed
3S
Direct Watershed
6R
North Waterway
7R
NE Waterway
8R
Combined Waterway
4P
Wetland Pool 5P
Box Culvert
Routing Diagram for Kracht HydroCAD Prepared by Bolton & Menk, Inc, Printed 4/29/2026
HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
Kracht HydroCAD Printed 4/29/2026Prepared by Bolton & Menk, Inc
Page 2HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Rainfall Events Listing
Event# Event
Name
Storm Type Curve Mode Duration
(hours)
B/B Depth
(inches)
AMC
1 5 Year MSE 24-hr 4 Default 24.00 1 3.70 2
2 10 Year MSE 24-hr 4 Default 24.00 1 4.40 2
3 25 Year MSE 24-hr 4 Default 24.00 1 5.60 2
4 50 Year MSE 24-hr 4 Default 24.00 1 6.60 2
5 100 Year MSE 24-hr 4 Default 24.00 1 7.80 2
Page 3HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
(acres)
CN Description
(subcatchment-numbers)
990.300 85 Row crops, straight row, Good, HSG C (1S, 2S, 3S)
990.300 85 TOTAL AREA
Page 4HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area
(acres)
Soil
Group
Subcatchment
Numbers
0.000 HSG A
0.000 HSG B
990.300 HSG C 1S, 2S, 3S
0.000 HSG D
0.000 Other
990.300 TOTAL AREA
Page 5HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A
(acres)
HSG-B
(acres)
HSG-C
(acres)
HSG-D
(acres)
Other
(acres)
Total
(acres)
Ground
Cover
Subcatchment
Numbers
0.000 0.000 990.300 0.000 0.000 990.300 Row crops, straight row, Good 1S, 2S, 3S
0.000 0.000 990.300 0.000 0.000 990.300 TOTAL AREA
Page 6HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Pipe Listing (all nodes)
Line# Node
Number
In-Invert
(feet)
Out-Invert
(feet)
Length
(feet)
Slope
(ft/ft) n Width
(inches)
Diam/Height
(inches)
Inside-Fill
(inches)
Node
Name
1 5P 1,349.25 1,348.88 50.0 0.0074 0.012 72.0 72.0 0.0
MSE 24-hr 4 5 Year Rainfall=3.70"Kracht HydroCAD
Page 7HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Time span=5.00-96.00 hrs, dt=0.05 hrs, 1821 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=308.000 ac 0.00% Impervious Runoff Depth=2.19"Subcatchment 1S: Northwest Watershed Flow Length=7,732' Tc=425.4 min CN=85 Runoff=83.62 cfs 56.250 af
Runoff Area=126.500 ac 0.00% Impervious Runoff Depth=2.19"Subcatchment 2S: Northeast Watershed Flow Length=6,220' Tc=339.3 min CN=85 Runoff=40.94 cfs 23.103 af
Runoff Area=555.800 ac 0.00% Impervious Runoff Depth=2.19"Subcatchment 3S: Direct Watershed Flow Length=7,549' Tc=150.5 min CN=85 Runoff=338.38 cfs 101.506 af
Avg. Flow Depth=0.50' Max Vel=2.19 fps Inflow=83.62 cfs 56.250 afReach 6R: North Waterway n=0.025 L=2,940.0' S=0.0058 '/' Capacity=9,820.14 cfs Outflow=82.82 cfs 56.250 af
Avg. Flow Depth=0.51' Max Vel=1.77 fps Inflow=40.94 cfs 23.103 afReach 7R: NE Waterway n=0.025 L=4,375.0' S=0.0055 '/' Capacity=9,519.90 cfs Outflow=39.80 cfs 23.103 af
Avg. Flow Depth=1.47' Max Vel=2.88 fps Inflow=121.40 cfs 79.353 afReach 8R: Combined Waterway n=0.025 L=1,700.0' S=0.0035 '/' Capacity=5,235.03 cfs Outflow=121.22 cfs 79.353 af
Peak Elev=1,361.68' Storage=21.165 af Inflow=355.41 cfs 180.860 afPond 4P: Wetland Pool Outflow=347.33 cfs 180.859 af
Peak Elev=1,356.97' Storage=0.655 af Inflow=347.33 cfs 180.859 afPond 5P: Box Culvert Primary=347.02 cfs 181.376 af Secondary=0.00 cfs 0.000 af Outflow=347.02 cfs 181.376 af
Total Runoff Area = 990.300 ac Runoff Volume = 180.860 af Average Runoff Depth = 2.19" 100.00% Pervious = 990.300 ac 0.00% Impervious = 0.000 ac
Page 8HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Northwest Watershed
Runoff = 83.62 cfs @ 17.50 hrs, Volume= 56.250 af, Depth= 2.19" Routed to Reach 6R : North Waterway
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs MSE 24-hr 4 5 Year Rainfall=3.70"
Area (ac) CN Description
308.000 85 Row crops, straight row, Good, HSG C
308.000 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
19.8 100 0.0050 0.08 Sheet Flow, Sheet Flow
Cultivated: Residue>20% n= 0.170 P2= 2.90"
311.9 4,125 0.0006 0.22 Shallow Concentrated Flow, Shallow, Flat
Cultivated Straight Rows Kv= 9.0 fps
93.7 3,507 0.0048 0.62 Shallow Concentrated Flow, Shallow, Steep
Cultivated Straight Rows Kv= 9.0 fps
425.4 7,732 Total
Subcatchment 1S: Northwest Watershed
Runoff
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F lo w
(c fs
MSE 24-hr 4 5 Year Rainfall=3.70"
Runoff Area=308.000 ac Runoff Volume=56.250 af
Runoff Depth=2.19" Flow Length=7,732'
Tc=425.4 min
CN=85
83.62 cfs
Page 9HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Northeast Watershed
Runoff = 40.94 cfs @ 16.55 hrs, Volume= 23.103 af, Depth= 2.19" Routed to Reach 7R : NE Waterway
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs MSE 24-hr 4 5 Year Rainfall=3.70"
Area (ac) CN Description
126.500 85 Row crops, straight row, Good, HSG C
126.500 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
11.4 100 0.0200 0.15 Sheet Flow, Sheet Flow
Cultivated: Residue>20% n= 0.170 P2= 2.90"
250.1 3,820 0.0008 0.25 Shallow Concentrated Flow, Shallow, Flat
Cultivated Straight Rows Kv= 9.0 fps
77.8 2,300 0.0030 0.49 Shallow Concentrated Flow, Shallow, Steep
Cultivated Straight Rows Kv= 9.0 fps
339.3 6,220 Total
Subcatchment 2S: Northeast Watershed
Runoff
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
MSE 24-hr 4 5 Year Rainfall=3.70"
Runoff Area=126.500 ac Runoff Volume=23.103 af
Runoff Depth=2.19" Flow Length=6,220'
Tc=339.3 min
40.94 cfs
Page 10HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Direct Watershed
[47] Hint: Peak is 355% of capacity of segment #3 [47] Hint: Peak is 134% of capacity of segment #5
Runoff = 338.38 cfs @ 14.03 hrs, Volume= 101.506 af, Depth= 2.19" Routed to Pond 4P : Wetland Pool
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs MSE 24-hr 4 5 Year Rainfall=3.70"
Area (ac) CN Description
555.800 85 Row crops, straight row, Good, HSG C
555.800 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
19.8 100 0.0050 0.08 Sheet Flow, Sheet Flow
Cultivated: Residue>20% n= 0.170 P2= 2.90"
44.1 952 0.0016 0.36 Shallow Concentrated Flow, Cultivated Straight Rows Kv= 9.0 fps
4.5 927 0.0065 3.41 95.39 Channel Flow, Ditch
Area= 28.0 sf Perim= 28.2' r= 0.99' n= 0.035 Earth, dense weeds
70.5 3,070 0.0065 0.73 Shallow Concentrated Flow, Cultivated Straight Rows Kv= 9.0 fps
11.6 2,500 0.0053 3.61 252.43 Channel Flow, Area= 70.0 sf Perim= 70.0' r= 1.00' n= 0.030 Earth, grassed & winding
150.5 7,549 Total
Page 11HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Subcatchment 3S: Direct Watershed
Runoff
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
MSE 24-hr 4 5 Year Rainfall=3.70"
Runoff Area=555.800 ac Runoff Volume=101.506 af
Runoff Depth=2.19" Flow Length=7,549'
Tc=150.5 min
338.38 cfs
Page 12HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Reach 6R: North Waterway
Inflow Area = 308.000 ac, 0.00% Impervious, Inflow Depth = 2.19" for 5 Year event Inflow = 83.62 cfs @ 17.50 hrs, Volume= 56.250 af Outflow = 82.82 cfs @ 17.81 hrs, Volume= 56.250 af, Atten= 1%, Lag= 18.6 min Routed to Reach 8R : Combined Waterway
Routing by Dyn-Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 2.19 fps, Min. Travel Time= 22.4 min Avg. Velocity = 0.96 fps, Avg. Travel Time= 50.9 min
Peak Storage= 111,183 cf @ 17.81 hrs Average Depth at Peak Storage= 0.50' , Surface Width= 112.21' Bank-Full Depth= 4.00' Flow Area= 1,256.0 sf, Capacity= 9,820.14 cfs
Custom cross-section, Length= 2,940.0' Slope= 0.0058 '/' Constant n= 0.025 Earth, clean & straight Inlet Invert= 1,391.00', Outlet Invert= 1,374.00'
Offset Elevation Chan.Depth (feet) (feet) (feet)
0.00 1,384.00 0.00
142.00 1,382.00 2.00
272.00 1,380.00 4.00
310.00 1,380.00 4.00
475.00 1,382.00 2.00
552.00 1,384.00 0.00
Depth End Area Perim. Width Storage Discharge (feet) (sq-ft) (feet) (feet) (cubic-feet) (cfs)
0.00 0.0 38.0 0.0 0 0.00
2.00 371.0 333.0 333.0 1,090,740 1,802.05
4.00 1,256.0 552.1 552.0 3,692,640 9,820.14
Page 13HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 6R: North Waterway
Inflow Outflow
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
Inflow Area=308.000 ac Avg. Flow Depth=0.50'
Max Vel=2.19 fps n=0.025
L=2,940.0' S=0.0058 '/'
Capacity=9,820.14 cfs
83.62 cfs82.82 cfs
Reach 6R: North Waterway
Primary
Stage-Discharge
Discharge (cfs) 9,0008,0007,0006,0005,0004,0003,0002,0001,0000
D ep th
(f ee t)
Page 14HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 6R: North Waterway
Storage
Stage-Storage
Storage (cubic-feet) 3,500,0003,000,0002,500,0002,000,0001,500,0001,000,000500,0000
D t)
Page 15HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Reach 7R: NE Waterway
Inflow Area = 126.500 ac, 0.00% Impervious, Inflow Depth = 2.19" for 5 Year event Inflow = 40.94 cfs @ 16.55 hrs, Volume= 23.103 af Outflow = 39.80 cfs @ 17.09 hrs, Volume= 23.103 af, Atten= 3%, Lag= 32.5 min Routed to Reach 8R : Combined Waterway
Routing by Dyn-Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 1.77 fps, Min. Travel Time= 41.2 min Avg. Velocity = 0.66 fps, Avg. Travel Time= 110.4 min
Peak Storage= 98,305 cf @ 17.09 hrs Average Depth at Peak Storage= 0.51' , Surface Width= 88.12' Bank-Full Depth= 4.00' Flow Area= 1,312.0 sf, Capacity= 9,519.90 cfs
Custom cross-section, Length= 4,375.0' Slope= 0.0055 '/' Constant n= 0.025 Earth, clean & straight Inlet Invert= 1,399.00', Outlet Invert= 1,375.00'
Offset Elevation Chan.Depth (feet) (feet) (feet)
0.00 1,392.00 0.00
114.00 1,390.00 2.00
294.00 1,388.00 4.00
460.00 1,390.00 2.00
620.00 1,392.00 0.00
Depth End Area Perim. Width Storage Discharge (feet) (sq-ft) (feet) (feet) (cubic-feet) (cfs)
0.00 0.0 0.0 0.0 0 0.00
2.00 346.0 346.0 346.0 1,513,750 1,523.18
4.00 1,312.0 620.1 620.0 5,740,000 9,519.90
Page 16HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 7R: NE Waterway
Inflow Outflow
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
Inflow Area=126.500 ac Avg. Flow Depth=0.51'
Max Vel=1.77 fps n=0.025
L=4,375.0' S=0.0055 '/'
Capacity=9,519.90 cfs
40.94 cfs
39.80 cfs
Reach 7R: NE Waterway
Primary
Stage-Discharge
Discharge (cfs) 9,0008,0007,0006,0005,0004,0003,0002,0001,0000
D t)
Page 17HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 7R: NE Waterway
Storage
Stage-Storage
Storage (cubic-feet) 5,500,0005,000,0004,500,0004,000,0003,500,0003,000,0002,500,0002,000,0001,500,0001,000,000500,0000
D t)
Page 18HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Reach 8R: Combined Waterway
[62] Hint: Exceeded Reach 6R OUTLET depth by 0.97' @ 17.65 hrs [61] Hint: Exceeded Reach 7R outlet invert by 0.47' @ 17.70 hrs
Inflow Area = 434.500 ac, 0.00% Impervious, Inflow Depth = 2.19" for 5 Year event Inflow = 121.40 cfs @ 17.58 hrs, Volume= 79.353 af Outflow = 121.22 cfs @ 17.70 hrs, Volume= 79.353 af, Atten= 0%, Lag= 7.2 min Routed to Pond 4P : Wetland Pool
Routing by Dyn-Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 2.88 fps, Min. Travel Time= 9.9 min Avg. Velocity = 1.03 fps, Avg. Travel Time= 27.5 min
Peak Storage= 71,677 cf @ 17.70 hrs Average Depth at Peak Storage= 1.47' , Surface Width= 57.34' Bank-Full Depth= 6.00' Flow Area= 716.0 sf, Capacity= 5,235.03 cfs
Custom cross-section, Length= 1,700.0' Slope= 0.0035 '/' (102 Elevation Intervals) Constant n= 0.025 Earth, clean & straight Inlet Invert= 1,374.00', Outlet Invert= 1,368.00'
Offset Elevation Chan.Depth (feet) (feet) (feet)
0.00 1,374.00 0.00
33.00 1,372.00 2.00
57.00 1,370.00 4.00
91.00 1,368.00 6.00
135.00 1,370.00 4.00
193.00 1,372.00 2.00
240.00 1,374.00 0.00
Depth End Area Perim. Width Storage Discharge (feet) (sq-ft) (feet) (feet) (cubic-feet) (cfs)
0.00 0.0 0.0 0.0 0 0.00
2.00 78.0 78.1 78.0 132,600 275.19
4.00 316.0 160.2 160.0 537,200 1,754.93
6.00 716.0 240.3 240.0 1,217,200 5,235.03
Page 19HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 8R: Combined Waterway
Inflow Outflow
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
Inflow Area=434.500 ac Avg. Flow Depth=1.47'
Max Vel=2.88 fps n=0.025
L=1,700.0' S=0.0035 '/'
Capacity=5,235.03 cfs
121.40 cfs121.22 cfs
Reach 8R: Combined Waterway
Primary
Stage-Discharge
Discharge (cfs) 5,0004,5004,0003,5003,0002,5002,0001,5001,0005000
D t)
Page 20HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 8R: Combined Waterway
Storage
Stage-Storage
Storage (cubic-feet) 1,200,0001,100,0001,000,000900,000800,000700,000600,000500,000400,000300,000200,000100,0000
D t)
Page 21HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Pond 4P: Wetland Pool
Inflow Area = 990.300 ac, 0.00% Impervious, Inflow Depth = 2.19" for 5 Year event Inflow = 355.41 cfs @ 14.18 hrs, Volume= 180.860 af Outflow = 347.33 cfs @ 14.37 hrs, Volume= 180.859 af, Atten= 2%, Lag= 11.7 min Primary = 347.33 cfs @ 14.37 hrs, Volume= 180.859 af Routed to Pond 5P : Box Culvert
Routing by Dyn-Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 1,360.00' Surf.Area= 5.363 ac Storage= 11.648 af Peak Elev= 1,361.68' @ 14.37 hrs Surf.Area= 5.908 ac Storage= 21.165 af (9.516 af above start)
Plug-Flow detention time= 93.0 min calculated for 169.210 af (94% of inflow) Center-of-Mass det. time= 27.2 min ( 1,089.6 - 1,062.4 )
Volume Invert Avail.Storage Storage Description #1 1,355.00' 39.394 af Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet)
1,355.00 0.032 0.000 0.000 1,356.00 0.633 0.333 0.333 1,357.00 1.085 0.859 1.192 1,358.00 2.130 1.607 2.799 1,359.00 5.103 3.616 6.415 1,360.00 5.363 5.233 11.648 1,361.00 5.727 5.545 17.193 1,362.00 5.992 5.859 23.053 1,362.50 6.130 3.030 26.083 1,363.00 6.366 3.124 29.207 1,364.00 6.896 6.631 35.838 1,364.50 7.326 3.556 39.394
Device Routing Invert Outlet Devices #1 Primary 1,360.00' 49.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #2 Primary 1,362.75' 35.0' long + 3.0 '/' SideZ x 15.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63
Primary OutFlow Max=347.25 cfs @ 14.37 hrs HW=1,361.68' TW=1,356.96' (Dynamic Tailwater) 1=Sharp-Crested Rectangular Weir (Weir Controls 347.25 cfs @ 4.24 fps) 2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 22HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Pond 4P: Wetland Pool
Inflow Primary
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
Inflow Area=990.300 ac Peak Elev=1,361.68'
Storage=21.165 af
355.41 cfs
347.33 cfs
Pond 4P: Wetland Pool
Primary
Stage-Discharge
Discharge (cfs) 1,6001,4001,2001,0008006004002000
E le va ti o n t)
1,364
1,363
1,362
1,361
1,360
1,359
1,358
1,357
1,356
1,355
Sharp-Crested Rectangular Weir
Broad-Crested Rectangular Weir
Page 23HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Pond 4P: Wetland Pool
Surface Storage
Stage-Area-Storage
Storage (acre-feet) 35302520151050
Surface/Horizontal/Wetted Area (acres) 76543210
E le va ti t)
1,364
1,363
1,362
1,361
1,360
1,359
1,358
1,357
1,356
1,355
Starting Elevation
Custom Stage Data
Page 24HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Pond 5P: Box Culvert
Inflow Area = 990.300 ac, 0.00% Impervious, Inflow Depth = 2.19" for 5 Year event Inflow = 347.33 cfs @ 14.37 hrs, Volume= 180.859 af Outflow = 347.02 cfs @ 14.42 hrs, Volume= 181.376 af, Atten= 0%, Lag= 3.0 min Primary = 347.02 cfs @ 14.42 hrs, Volume= 181.376 af Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 1,353.00' Surf.Area= 0.053 ac Storage= 0.089 af Peak Elev= 1,356.97' @ 14.42 hrs Surf.Area= 0.261 ac Storage= 0.655 af (0.565 af above start)
Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= (not calculated: outflow precedes inflow)
Volume Invert Avail.Storage Storage Description #1 1,349.00' 2.676 af Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet)
1,349.00 0.000 0.000 0.000 1,350.00 0.007 0.004 0.004 1,351.00 0.017 0.012 0.016 1,352.00 0.039 0.028 0.043 1,353.00 0.053 0.046 0.089 1,354.00 0.068 0.061 0.150 1,355.00 0.145 0.106 0.256 1,356.00 0.202 0.173 0.430 1,357.00 0.263 0.233 0.662 1,358.00 0.337 0.300 0.962 1,359.00 0.411 0.374 1.337 1,360.00 0.509 0.460 1.797 1,361.00 0.612 0.561 2.357 1,361.50 0.664 0.319 2.676
Device Routing Invert Outlet Devices #1 Primary 1,349.25' 72.0" W x 72.0" H Box Box Culvert
L= 50.0' Box, 30-75° wingwalls, square crown, Ke= 0.400 Inlet / Outlet Invert= 1,349.25' / 1,348.88' S= 0.0074 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 36.00 sf
#2 Secondary 1,359.83' Roadway, Cv= 2.62 (C= 3.28) Elev. (feet) 1,359.83 1,360.00 1,360.50 1,361.00 1,361.50 1,362.00 Width (feet) 0.00 61.56 116.46 160.90 195.03 228.25
Primary OutFlow Max=346.94 cfs @ 14.42 hrs HW=1,356.97' (Free Discharge) 1=Box Culvert (Barrel Controls 346.94 cfs @ 9.99 fps)
Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=1,353.00' (Free Discharge) 2=Roadway ( Controls 0.00 cfs)
Page 25HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Pond 5P: Box Culvert
Inflow Outflow Primary Secondary
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
Inflow Area=990.300 ac Peak Elev=1,356.97'
Storage=0.655 af
347.33 cfs347.02 cfs347.02 cfs
0.00 cfs
Pond 5P: Box Culvert
Total Primary Secondary
Stage-Discharge
Discharge (cfs) 1,8001,6001,4001,2001,0008006004002000
E le va ti t)
1,362
1,361
1,360
1,359
1,358
1,357
1,356
1,355
1,354
1,353
1,352
1,351
1,350
1,349 Box Culvert
Roadway
Page 26HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Pond 5P: Box Culvert
Surface Storage
Stage-Area-Storage
Storage (acre-feet)
Surface/Horizontal/Wetted Area (acres) 0.650.60.550.50.450.40.350.30.250.20.150.10.050
E le va ti t)
1,362
1,361
1,360
1,359
1,358
1,357
1,356
1,355
1,354
1,353
1,352
1,351
1,350
1,349
MSE 24-hr 4 10 Year Rainfall=4.40"Kracht HydroCAD
Page 27HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Time span=5.00-96.00 hrs, dt=0.05 hrs, 1821 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=308.000 ac 0.00% Impervious Runoff Depth=2.82"Subcatchment 1S: Northwest Watershed Flow Length=7,732' Tc=425.4 min CN=85 Runoff=108.03 cfs 72.334 af
Runoff Area=126.500 ac 0.00% Impervious Runoff Depth=2.82"Subcatchment 2S: Northeast Watershed Flow Length=6,220' Tc=339.3 min CN=85 Runoff=52.87 cfs 29.708 af
Runoff Area=555.800 ac 0.00% Impervious Runoff Depth=2.82"Subcatchment 3S: Direct Watershed Flow Length=7,549' Tc=150.5 min CN=85 Runoff=435.60 cfs 130.529 af
Avg. Flow Depth=0.57' Max Vel=2.35 fps Inflow=108.03 cfs 72.334 afReach 6R: North Waterway n=0.025 L=2,940.0' S=0.0058 '/' Capacity=9,820.14 cfs Outflow=107.09 cfs 72.334 af
Avg. Flow Depth=0.56' Max Vel=1.89 fps Inflow=52.87 cfs 29.708 afReach 7R: NE Waterway n=0.025 L=4,375.0' S=0.0055 '/' Capacity=9,519.90 cfs Outflow=51.53 cfs 29.708 af
Avg. Flow Depth=1.62' Max Vel=3.06 fps Inflow=156.89 cfs 102.042 afReach 8R: Combined Waterway n=0.025 L=1,700.0' S=0.0035 '/' Capacity=5,235.03 cfs Outflow=156.69 cfs 102.042 af
Peak Elev=1,362.01' Storage=23.104 af Inflow=460.68 cfs 232.572 afPond 4P: Wetland Pool Outflow=452.37 cfs 232.571 af
Peak Elev=1,358.60' Storage=1.177 af Inflow=452.37 cfs 232.571 afPond 5P: Box Culvert Primary=451.41 cfs 233.088 af Secondary=0.00 cfs 0.000 af Outflow=451.41 cfs 233.088 af
Total Runoff Area = 990.300 ac Runoff Volume = 232.572 af Average Runoff Depth = 2.82"
Page 28HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Northwest Watershed
Runoff = 108.03 cfs @ 17.50 hrs, Volume= 72.334 af, Depth= 2.82" Routed to Reach 6R : North Waterway
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs MSE 24-hr 4 10 Year Rainfall=4.40"
Area (ac) CN Description
308.000 85 Row crops, straight row, Good, HSG C
308.000 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
19.8 100 0.0050 0.08 Sheet Flow, Sheet Flow
Cultivated: Residue>20% n= 0.170 P2= 2.90"
311.9 4,125 0.0006 0.22 Shallow Concentrated Flow, Shallow, Flat
Cultivated Straight Rows Kv= 9.0 fps
93.7 3,507 0.0048 0.62 Shallow Concentrated Flow, Shallow, Steep
Cultivated Straight Rows Kv= 9.0 fps
425.4 7,732 Total
Subcatchment 1S: Northwest Watershed
Runoff
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
MSE 24-hr 4 10 Year Rainfall=4.40"
Runoff Area=308.000 ac Runoff Volume=72.334 af
Runoff Depth=2.82" Flow Length=7,732'
Tc=425.4 min
108.03 cfs
Page 29HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Subcatchment 2S: Northeast Watershed
Runoff = 52.87 cfs @ 16.27 hrs, Volume= 29.708 af, Depth= 2.82" Routed to Reach 7R : NE Waterway
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs MSE 24-hr 4 10 Year Rainfall=4.40"
Area (ac) CN Description
126.500 85 Row crops, straight row, Good, HSG C
126.500 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
11.4 100 0.0200 0.15 Sheet Flow, Sheet Flow
Cultivated: Residue>20% n= 0.170 P2= 2.90"
250.1 3,820 0.0008 0.25 Shallow Concentrated Flow, Shallow, Flat
Cultivated Straight Rows Kv= 9.0 fps
77.8 2,300 0.0030 0.49 Shallow Concentrated Flow, Shallow, Steep
Cultivated Straight Rows Kv= 9.0 fps
339.3 6,220 Total
Subcatchment 2S: Northeast Watershed
Runoff
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
MSE 24-hr 4 10 Year Rainfall=4.40"
Runoff Area=126.500 ac Runoff Volume=29.708 af
Runoff Depth=2.82" Flow Length=6,220'
Tc=339.3 min
52.87 cfs
Page 30HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Subcatchment 3S: Direct Watershed
[47] Hint: Peak is 457% of capacity of segment #3 [47] Hint: Peak is 173% of capacity of segment #5
Runoff = 435.60 cfs @ 13.98 hrs, Volume= 130.529 af, Depth= 2.82" Routed to Pond 4P : Wetland Pool
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs MSE 24-hr 4 10 Year Rainfall=4.40"
Area (ac) CN Description
555.800 85 Row crops, straight row, Good, HSG C
555.800 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs)
19.8 100 0.0050 0.08 Sheet Flow, Sheet Flow
Cultivated: Residue>20% n= 0.170 P2= 2.90"
44.1 952 0.0016 0.36 Shallow Concentrated Flow, Cultivated Straight Rows Kv= 9.0 fps
4.5 927 0.0065 3.41 95.39 Channel Flow, Ditch
Area= 28.0 sf Perim= 28.2' r= 0.99' n= 0.035 Earth, dense weeds
70.5 3,070 0.0065 0.73 Shallow Concentrated Flow, Cultivated Straight Rows Kv= 9.0 fps
11.6 2,500 0.0053 3.61 252.43 Channel Flow, Area= 70.0 sf Perim= 70.0' r= 1.00'
Page 31HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Subcatchment 3S: Direct Watershed
Runoff
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
MSE 24-hr 4 10 Year Rainfall=4.40"
Runoff Area=555.800 ac Runoff Volume=130.529 af
Runoff Depth=2.82" Flow Length=7,549'
Tc=150.5 min
435.60 cfs
Page 32HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Reach 6R: North Waterway
Inflow Area = 308.000 ac, 0.00% Impervious, Inflow Depth = 2.82" for 10 Year event Inflow = 108.03 cfs @ 17.50 hrs, Volume= 72.334 af Outflow = 107.09 cfs @ 17.74 hrs, Volume= 72.334 af, Atten= 1%, Lag= 14.4 min Routed to Reach 8R : Combined Waterway
Routing by Dyn-Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 2.35 fps, Min. Travel Time= 20.9 min Avg. Velocity = 1.00 fps, Avg. Travel Time= 48.8 min
Peak Storage= 134,178 cf @ 17.74 hrs Average Depth at Peak Storage= 0.57' , Surface Width= 122.07' Bank-Full Depth= 4.00' Flow Area= 1,256.0 sf, Capacity= 9,820.14 cfs
Custom cross-section, Length= 2,940.0' Slope= 0.0058 '/' Constant n= 0.025 Earth, clean & straight Inlet Invert= 1,391.00', Outlet Invert= 1,374.00'
Offset Elevation Chan.Depth (feet) (feet) (feet)
0.00 1,384.00 0.00
142.00 1,382.00 2.00
272.00 1,380.00 4.00
310.00 1,380.00 4.00
475.00 1,382.00 2.00
552.00 1,384.00 0.00
Depth End Area Perim. Width Storage Discharge (feet) (sq-ft) (feet) (feet) (cubic-feet) (cfs)
0.00 0.0 38.0 0.0 0 0.00
Page 33HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 6R: North Waterway
Inflow Outflow
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
Inflow Area=308.000 ac Avg. Flow Depth=0.57'
Max Vel=2.35 fps n=0.025
L=2,940.0' S=0.0058 '/'
Capacity=9,820.14 cfs
108.03 cfs107.09 cfs
Reach 6R: North Waterway
Primary
Stage-Discharge
Discharge (cfs) 9,0008,0007,0006,0005,0004,0003,0002,0001,0000
D t)
Page 34HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 6R: North Waterway
Storage
Stage-Storage
Storage (cubic-feet) 3,500,0003,000,0002,500,0002,000,0001,500,0001,000,000500,0000
D t)
Page 35HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Reach 7R: NE Waterway
Inflow Area = 126.500 ac, 0.00% Impervious, Inflow Depth = 2.82" for 10 Year event Inflow = 52.87 cfs @ 16.27 hrs, Volume= 29.708 af Outflow = 51.53 cfs @ 17.02 hrs, Volume= 29.708 af, Atten= 3%, Lag= 45.1 min Routed to Reach 8R : Combined Waterway
Routing by Dyn-Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 1.89 fps, Min. Travel Time= 38.6 min Avg. Velocity = 0.69 fps, Avg. Travel Time= 106.3 min
Peak Storage= 119,399 cf @ 17.02 hrs Average Depth at Peak Storage= 0.56' , Surface Width= 97.16' Bank-Full Depth= 4.00' Flow Area= 1,312.0 sf, Capacity= 9,519.90 cfs
Custom cross-section, Length= 4,375.0' Slope= 0.0055 '/' Constant n= 0.025 Earth, clean & straight Inlet Invert= 1,399.00', Outlet Invert= 1,375.00'
Offset Elevation Chan.Depth (feet) (feet) (feet)
0.00 1,392.00 0.00
114.00 1,390.00 2.00
294.00 1,388.00 4.00
460.00 1,390.00 2.00
620.00 1,392.00 0.00
Depth End Area Perim. Width Storage Discharge (feet) (sq-ft) (feet) (feet) (cubic-feet) (cfs)
0.00 0.0 0.0 0.0 0 0.00
Page 36HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 7R: NE Waterway
Inflow Outflow
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
Inflow Area=126.500 ac Avg. Flow Depth=0.56'
Max Vel=1.89 fps n=0.025
L=4,375.0' S=0.0055 '/'
Capacity=9,519.90 cfs
52.87 cfs
51.53 cfs
Reach 7R: NE Waterway
Primary
Stage-Discharge
Discharge (cfs) 9,0008,0007,0006,0005,0004,0003,0002,0001,0000
D t)
Page 37HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 7R: NE Waterway
Storage
Stage-Storage
Storage (cubic-feet) 5,500,0005,000,0004,500,0004,000,0003,500,0003,000,0002,500,0002,000,0001,500,0001,000,000500,0000
D t)
Page 38HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Reach 8R: Combined Waterway
[62] Hint: Exceeded Reach 6R OUTLET depth by 1.05' @ 17.55 hrs [62] Hint: Exceeded Reach 7R OUTLET depth by 0.07' @ 18.00 hrs
Inflow Area = 434.500 ac, 0.00% Impervious, Inflow Depth = 2.82" for 10 Year event Inflow = 156.89 cfs @ 17.54 hrs, Volume= 102.042 af Outflow = 156.69 cfs @ 17.64 hrs, Volume= 102.042 af, Atten= 0%, Lag= 6.1 min Routed to Pond 4P : Wetland Pool
Routing by Dyn-Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Max. Velocity= 3.06 fps, Min. Travel Time= 9.2 min Avg. Velocity = 1.07 fps, Avg. Travel Time= 26.4 min
Peak Storage= 86,916 cf @ 17.64 hrs Average Depth at Peak Storage= 1.62' , Surface Width= 63.15' Bank-Full Depth= 6.00' Flow Area= 716.0 sf, Capacity= 5,235.03 cfs
Custom cross-section, Length= 1,700.0' Slope= 0.0035 '/' (102 Elevation Intervals) Constant n= 0.025 Earth, clean & straight Inlet Invert= 1,374.00', Outlet Invert= 1,368.00'
Offset Elevation Chan.Depth (feet) (feet) (feet)
0.00 1,374.00 0.00
33.00 1,372.00 2.00
57.00 1,370.00 4.00
91.00 1,368.00 6.00
135.00 1,370.00 4.00
193.00 1,372.00 2.00
240.00 1,374.00 0.00
Depth End Area Perim. Width Storage Discharge (feet) (sq-ft) (feet) (feet) (cubic-feet) (cfs)
0.00 0.0 0.0 0.0 0 0.00
2.00 78.0 78.1 78.0 132,600 275.19
Page 39HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 8R: Combined Waterway
Inflow Outflow
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
Inflow Area=434.500 ac Avg. Flow Depth=1.62'
Max Vel=3.06 fps n=0.025
L=1,700.0' S=0.0035 '/'
Capacity=5,235.03 cfs
156.89 cfs156.69 cfs
Reach 8R: Combined Waterway
Primary
Stage-Discharge
Discharge (cfs) 5,0004,5004,0003,5003,0002,5002,0001,5001,0005000
D t)
Page 40HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Reach 8R: Combined Waterway
Storage
Stage-Storage
Storage (cubic-feet) 1,200,0001,100,0001,000,000900,000800,000700,000600,000500,000400,000300,000200,000100,0000
D t)
Page 41HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Pond 4P: Wetland Pool
Inflow Area = 990.300 ac, 0.00% Impervious, Inflow Depth = 2.82" for 10 Year event Inflow = 460.68 cfs @ 14.05 hrs, Volume= 232.572 af Outflow = 452.37 cfs @ 14.33 hrs, Volume= 232.571 af, Atten= 2%, Lag= 17.1 min Primary = 452.37 cfs @ 14.33 hrs, Volume= 232.571 af Routed to Pond 5P : Box Culvert
Routing by Dyn-Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 1,360.00' Surf.Area= 5.363 ac Storage= 11.648 af Peak Elev= 1,362.01' @ 14.33 hrs Surf.Area= 5.994 ac Storage= 23.104 af (11.456 af above start)
Plug-Flow detention time= 77.2 min calculated for 220.801 af (95% of inflow) Center-of-Mass det. time= 25.1 min ( 1,080.4 - 1,055.2 )
Volume Invert Avail.Storage Storage Description #1 1,355.00' 39.394 af Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet)
1,355.00 0.032 0.000 0.000 1,356.00 0.633 0.333 0.333 1,357.00 1.085 0.859 1.192 1,358.00 2.130 1.607 2.799 1,359.00 5.103 3.616 6.415 1,360.00 5.363 5.233 11.648 1,361.00 5.727 5.545 17.193 1,362.00 5.992 5.859 23.053 1,362.50 6.130 3.030 26.083 1,363.00 6.366 3.124 29.207 1,364.00 6.896 6.631 35.838 1,364.50 7.326 3.556 39.394
Device Routing Invert Outlet Devices #1 Primary 1,360.00' 49.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) #2 Primary 1,362.75' 35.0' long + 3.0 '/' SideZ x 15.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63
Primary OutFlow Max=452.29 cfs @ 14.33 hrs HW=1,362.01' TW=1,358.58' (Dynamic Tailwater) 1=Sharp-Crested Rectangular Weir (Weir Controls 452.29 cfs @ 4.63 fps)
Page 42HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Pond 4P: Wetland Pool
Inflow Primary
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
Inflow Area=990.300 ac Peak Elev=1,362.01'
Storage=23.104 af
460.68 cfs452.37 cfs
Pond 4P: Wetland Pool
Primary
Stage-Discharge
Discharge (cfs) 1,6001,4001,2001,0008006004002000
E le va ti t)
1,364
1,363
1,362
1,361
1,360
1,359
1,358
1,357
1,356
1,355
Page 43HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Pond 4P: Wetland Pool
Surface Storage
Stage-Area-Storage
Storage (acre-feet) 35302520151050
Surface/Horizontal/Wetted Area (acres) 76543210
E le va ti t)
1,364
1,363
1,362
1,361
1,360
1,359
1,358
1,357
1,356
1,355
Page 44HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Summary for Pond 5P: Box Culvert
Inflow Area = 990.300 ac, 0.00% Impervious, Inflow Depth = 2.82" for 10 Year event Inflow = 452.37 cfs @ 14.33 hrs, Volume= 232.571 af Outflow = 451.41 cfs @ 14.41 hrs, Volume= 233.088 af, Atten= 0%, Lag= 4.7 min Primary = 451.41 cfs @ 14.41 hrs, Volume= 233.088 af Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af
Routing by Dyn-Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.05 hrs Starting Elev= 1,353.00' Surf.Area= 0.053 ac Storage= 0.089 af Peak Elev= 1,358.60' @ 14.41 hrs Surf.Area= 0.381 ac Storage= 1.177 af (1.088 af above start)
Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= (not calculated: outflow precedes inflow)
Volume Invert Avail.Storage Storage Description #1 1,349.00' 2.676 af Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store (feet) (acres) (acre-feet) (acre-feet)
1,349.00 0.000 0.000 0.000 1,350.00 0.007 0.004 0.004 1,351.00 0.017 0.012 0.016 1,352.00 0.039 0.028 0.043 1,353.00 0.053 0.046 0.089 1,354.00 0.068 0.061 0.150 1,355.00 0.145 0.106 0.256 1,356.00 0.202 0.173 0.430 1,357.00 0.263 0.233 0.662 1,358.00 0.337 0.300 0.962 1,359.00 0.411 0.374 1.337 1,360.00 0.509 0.460 1.797 1,361.00 0.612 0.561 2.357 1,361.50 0.664 0.319 2.676
Device Routing Invert Outlet Devices #1 Primary 1,349.25' 72.0" W x 72.0" H Box Box Culvert
L= 50.0' Box, 30-75° wingwalls, square crown, Ke= 0.400 Inlet / Outlet Invert= 1,349.25' / 1,348.88' S= 0.0074 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 36.00 sf
#2 Secondary 1,359.83' Roadway, Cv= 2.62 (C= 3.28) Elev. (feet) 1,359.83 1,360.00 1,360.50 1,361.00 1,361.50 1,362.00 Width (feet) 0.00 61.56 116.46 160.90 195.03 228.25
Primary OutFlow Max=451.33 cfs @ 14.41 hrs HW=1,358.60' (Free Discharge) 1=Box Culvert (Barrel Controls 451.33 cfs @ 12.54 fps)
Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=1,353.00' (Free Discharge) 2=Roadway ( Controls 0.00 cfs)
Page 45HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Pond 5P: Box Culvert
Inflow Outflow Primary Secondary
Hydrograph
Time (hours) 9590858075706560555045403530252015105
F
Inflow Area=990.300 ac Peak Elev=1,358.60'
Storage=1.177 af
452.37 cfs451.41 cfs451.41 cfs
0.00 cfs
Pond 5P: Box Culvert
Total Primary Secondary
Stage-Discharge
Discharge (cfs) 1,8001,6001,4001,2001,0008006004002000
E le va ti t)
1,362
1,361
1,360
1,359
1,358
1,357
1,356
1,355
1,354
1,353
1,352
1,351
1,350
1,349
Page 46HydroCAD® 10.20-5c s/n 00709 © 2023 HydroCAD Software Solutions LLC
Pond 5P: Box Culvert
Surface Storage
Stage-Area-Storage
Storage (acre-feet)
Surface/Horizontal/Wetted Area (acres) 0.650.60.550.50.450.40.350.30.250.20.150.10.050
E le va ti t)
1,362