This is a Scope of Work (SOW) document for welding repair services on a U.S. Coast Guard 47-foot Motor Lifeboat (MLB) Asset 47266 located at Station Depoe Bay, Oregon. The contractor is responsible for repairing a 6-inch crack on the port aft stanchion at the mounting point through grinding down existing welds beyond the visible crack, building up new welds, and thoroughly cleaning the area to expose the full extent of the damage. Dye penetrant testing must be utilized to identify any hidden cracks. The period of performance runs from June 11, 2026 through July 11, 2026, with the Unit Point of Contact being MKC Anthony Cervera. The contractor must provide all general labor and welding equipment/supplies necessary to complete the repairs while complying with all applicable U.S. Coast Guard policies, manufacturer specifications, and regulatory requirements.
The contractor is required to conduct air test welds upon completion and demonstrate proper functionality to a U.S. Coast Guard representative. If additional discrepancies are discovered outside the defined scope of work, the contractor must immediately notify the Unit POC and submit a written Condition Found Report with cost estimates and schedule impact assessments; no unauthorized work will be reimbursed. Deliverables include an itemized invoice, service report, parts list with serial numbers, and warranty documentation. All materials must be OEM parts meeting manufacturer and U.S. Coast Guard standards, with proper disposal of hazardous materials and compliance with all federal, state, and local environmental and safety regulations required. The related federal contract opportunity is a Small Business Set-Aside Request for Quote (RFQ) with evaluation criteria based on technical capability, past performance, and fair and reasonable pricing.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK (SOW)
1. General Information Unit: STA Depoe Bay Asset Type: 47’ MLB (B) Hull Number: 47266 Location of Work: Depoe Bay, Oregon 97341 Period of Performance Dates: 11JUN26-11JUL26 Unit POC: (MKC/Anthony Cervera/(775)622-2666/Anthony.j.cervera@uscg.mil)
2. Background Asset 47266 has a 6inch crack on port aft stanchion at mounting point.
3. Scope of Work Requirements
3.1 Contractor Responsibilities:
Contractor shall provide general labor and all welding equipment/supplies necessary to conduct repairs. See attachments for all applicable instructions, schedules, and plans. Work to be accomplished at address above, on CG Asset MLB 47266. Assets are Currently in moored to the floating pier at Station Depoe Bay. Comply with all applicable USCG policies, manufacturer specifications, and regulatory requirements.
3.2 Specific Work Items:
Work Item 1 – 47266: Grind down existing welds beyond the visible crack and build up new welds.
Clean the area thoroughly to expose the full extent of the crack. Utilize dye penetrant to see if any hidden cracks can be exposed.
4. Condition Found Report (CFR) Requirement If additional discrepancies, deficiencies, or required repairs are identified that are outside the defined Scope of Work, the contractor shall:
- Immediately notify the Unit POC.
- Submit a written Condition Found Report (CFR) detailing:
• Description of discrepancy
• Recommended corrective action
• Parts and labor breakdown
• Cost estimate
• Impact to schedule
No additional work outside the approved Scope of Work shall be performed without written authorization from the Government.
Unauthorized work will not be reimbursed.
5. Materials & Parts
- OEM parts required unless otherwise approved.
- Provide part numbers and specifications.
- All materials shall meet manufacturer and USCG standards.
6. Testing & Acceptance
- Conduct operational testing upon completion (Air Test Welds).
- Demonstrate proper functionality to USCG representative.
- Provide written service report and warranty documentation.
- Work considered complete upon Government acceptance.
7. Deliverables
- Itemized invoice
- Service report
- Parts list (with serial numbers if applicable)
- Warranty documentation (if applicable)
8. Environmental & Safety Compliance
- Proper disposal of hazardous materials.
- Spill prevention measures required.
- Compliance with all federal, state, and local regulations.
9. Pictures image2.jpeg image3.jpeg image4.jpeg image1.jpeg
File details come from the government source that posted it. Updated .