Final ER Rates ER/IRA 2012 Procurement- ER Labor Rates BAFO
| Contractor Number | 1 | 2 | 3 | 6 | 7 | 8 | 9 | 11 | 15 | 17 | 18 |
| ER Services- Labor | | | | | | | | | | | |
| 1. Project Manager | 90 | 80 | 90 | 95 | 85 | 83 | 83 | 85 | 95 | 90 | 58 |
| 2. Foreman | 77 | 70 | 82.5 | 75 | 75 | 74 | 73 | 78 | 80 | 80 | 49 |
| 3. Skilled Laborer | 60 | 60 | 66 | 65 | 65 | 63 | 55 | 66 | 65 | 65 | 40 |
| 4. Hydrogeo/Geologist/Eng | 95 | 90 | 100 | 95 | 85 | 95 | 95 | 98 | 95 | 85 | 92 |
| 5. CDL Truck Driver | 60 | 65 | 70 | 75 | 75 | 70 | 69 | 73 | 65 | 70 | 42 |
| 6. Chemist | 83 | 95 | 90 | 85 | 80 | 83 | 90 | 89 | 95 | 85 | 52 |
| 7. Clerical | 42 | 40 | 45 | 45 | 40 | 42 | 44 | 45 | 45 | 45 | 39 |
| 8. Licensed Site Professional | 130 | 125 | 140 | 125 | 140 | 130 | 126 | 144 | 145 | 120 | 105 |
Final IRA Labor
| Contractor Number | 1 | 2 | 3 | 4 | 5 | 7 | 8 | 9 | 10 | 11 | 12 | 14 | 15 | 17 | 18 |
| IRA Services- Labor | | | | | | | | | | | | | | | |
| 1. Project Manager | 90 | 80 | 90 | 90 | 90 | 80 | 81 | 83 | 95 | 85 | 95 | 86 | 95 | 90 | 55 |
| 2. Foreman | 77 | 70 | 75 | 65 | 74 | 70 | 73 | 73 | 75 | 78 | 75 | 70 | 80 | 80 | 47 |
| 3. Skilled Laborer | 60 | 60 | 65 | 55 | 63 | 60 | 58 | 55 | 55 | 60 | 45 | 65 | 65 | 65 | 39 |
| 4. Hydrogeo/Geologist/Eng | 95 | 90 | 100 | 90 | 75 | 85 | 90 | 95 | 95 | 98 | 65 | 75 | 95 | 85 | 92 |
| 5. CDL Truck Driver | 60 | 65 | 70 | 65 | 74 | 70 | 65 | 69 | | 73 | | 70 | 65 | 70 | 42 |
| 6. Chemist | 83 | 95 | 90 | 95 | 80 | 75 | 77 | 90 | | 89 | 65 | 65 | 85 | 85 | 56 |
| 7. Clerical | 42 | 40 | 45 | 50 | 45 | 40 | 42 | 44 | 35 | 48 | 35 | 45 | 45 | 45 | 39 |
| 8. Licensed Site Professional | 130 | 125 | 140 | 140 | 135 | 140 | 124 | 126 | 125 | 144 | 105 | 125 | 145 | 120 | 145 |
| 9. Professional Engineer | 130 | 120 | 140 | 140 | 135 | 140 | 83 | 95 | 150 | 174 | 110 | 125 | 105 | 130 | 95 |
| 10. Draftsperson | 66 | 70 | 85 | 70 | 55 | 65 | 65 | 80 | 60 | 66 | 65 | 60 | 65 | 70 | 49 |
| 11. Mechanic | 85 | 85 | 80 | 65 | 53 | 65 | 56 | 69 | | 78 | | | 65 | 80 | 44 |
| 12. Registered Land Surveyor | | 125 | 135 | 110 | 135 | 95 | 85 | 95 | 105 | 125 | | | 85 | 75 | 95 |
| 13. Electrician | | 65 | 100 | 100 | 70 | 85 | 80 | 80 | | 108 | | | 85 | 70 | 66 |
| 14. Plumber | | 75 | 110 | 100 | 70 | 80 | 80 | 80 | | 95 | | | 85 | 65 | 66 |
| 15. Lic ww Op Grade II or better | 66 | 100 | 110 | 100 | 82 | 80 | 75 | 80 | 70 | 81 | | 70 | 65 | 70 | 66 |
Equipment I
| Contractor Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 14 | 15 | 17 | 18 |
| Equipment I | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly |
| 1. Excavators | 179 | 130 | 170 | 175 | 188 | 150 | 170 | 162.75 | 169 | 130 | 155 | | | 165 | 172 | 110 |
| 2. Dump Trucks | | | | | | | | | | | | | | | | |
| 6 wheel | 120 | 95 | 110 | 115 | 100 | 85 | 110 | 115.5 | | 60 | 90 | | 107 | 60 | 106 | 80 |
| 10 wheel | 130 | 105 | 140 | 140 | | 95 | 115 | 138 | | 85 | 110 | | | 75 | 180 | 82 |
| 18 wheel | | 110 | 160 | 150 | | 135 | | 160.5 | | | 155 | | | | 196 | 88 |
| 3. Rack Truck | 105 | 120 | 90 | 110 | 110 | 85 | 110 | 123 | 100.25 | 37.5 | 85 | | | 60 | 128 | 64 |
| 4. Box Truck | 105 | 120 | 135 | 125 | 125 | 85 | 115 | 116.25 | 102.75 | | 105 | | 85 | 90 | | 74 |
| 5. Vacuum Straight Trucks | | | | | | | | | | | | | | | | |
| 500-1,500 gal. | 135 | | | | | 150 | 145 | 180 | 119 | | 145 | | | | | |
| 1501-2,999 gal. | 135 | | | 150 | | 150 | | 180 | | | 150 | | | 165 | | 87 |
| 3,000-3,999 gal. | 135 | | 160 | 175 | 150 | 150 | 145 | 180 | 150 | | 155 | | 168 | 180 | 170 | 87 |
| 6. Vactors/Super Suckers/Cusco | 216 | 175 | 200 | | 195 | 185 | 190 | 210 | 168.75 | | 190 | | | 210 | 170 | 180 |
| 7. Vacuum Trailers | | | | | | | | | | | | | | | | |
| Stainless Steel - 4000 gal. | 171 | | | | | 150 | | 172.5 | | | 180 | | | | | 97 |
| Stainless Steel - 5000 gal. | 171 | | | 175 | 185 | | | 180 | | | 180 | | 185 | | 248 | 97 |
| Stainless Steel - 6000 gal. | 171 | | | | | | 150 | 195 | | | 180 | | | | | 97 |
| Carbon Steel - 4000 gal. | 171 | 125 | | | | 150 | | 165 | | | 180 | | | 225 | | 97 |
| Carbon Steel - 5000 gal. | 171 | | | | 175 | 150 | | 180 | | | 180 | | | | | 97 |
| Carbon Steel - 6000 gal. | 171 | | 160 | | | 150 | | 195 | 150 | | 180 | | | | | |
| 8. Bobcats w/attachments | 124 | 120 | 125 | 125 | 115 | 110 | 115 | 112.5 | 112.5 | 85 | 125 | | 190 | 105 | 120 | 80 |
| 9. Mini-excavators | | 120 | 125 | 130 | 150 | 110 | 140 | 141.75 | | 85 | 125 | | | | 113 | 87 |
| 10. Backhoe | | | | | | | | | | | | | | 105 | | |
| 580 Case or equivalent | 140 | | | 130 | 185 | 110 | 140 | 127.5 | | 90 | 130 | | 207 | 150 | 128 | 77 |
| 680 Case or equivalent | 148.5 | | 150 | | | 115 | 140 | 135 | | | 145 | | 207 | | 221 | 77 |
| 11. Bulldozers | | | | | | | | | | | | | | | | |
| CAT D6 or equivalent | | | | 150 | | 135 | 160 | 165 | | 100 | 125 | | 232 | | 177 | 102 |
| CAT D7 or equivalent | | | | | | 145 | | 195 | | | 145 | | 282 | | 222 | 102 |
| CAT D8 or equivalent | | | | | | 155 | | 210 | | | 155 | | 299 | | 304 | |
| 12. Front End Loaders | | | | 150 | 350 | 150 | | 180 | | 100 | 135 | | 224 | 150 | 169 | 96 |
| 13. Flat Bed (Low Boy) | 120 | | 150 | 125 | 325 | 135 | | 150 | | | 155 | | 100 | 150 | 199 | 156 |
| 14. Welding Truck | 90 | | | | | | | 156 | 97 | 150 | 105 | | | | 121 | 79 |
| 15. Street Sweeper | | 155 | 150 | 135 | | 175 | | 225 | | | 145 | | | 75 | 194 | 125 |
| 16. Drilling-Hollow Stem Auger | | | | | | | | | | | | | | | | |
| Truck Mount Rig | 1489 | 225 | 215 | | | 190 | 250 | 315 | | 262.5 | 227.5 | | 331 | 180 | 237.5 | |
| Track/ATV Mount Rig | 1782 | 240 | 250 | | | 215 | 300 | 367.5 | 181.25 | 306.25 | 247 | | 368 | 190 | | |
| 17. Drilling-Drive & Wash | | | | | | | | | | | | | | | | |
| Truck Mount Rig | 1489 | 225 | 215 | | | 190 | 250 | 315 | | 262.5 | 227.5 | | 331 | 180 | 237.5 | |
| Track/ATV Mount Rig | 1782 | 240 | 250 | | | 215 | 300 | 367.5 | | 306.25 | 247 | | 368 | 190 | | |
| 18. Drilling- Air Rotary | | | | | | | | | | | | | | | | |
| Truck Mount Rig | 1489 | 270 | 325 | | | 315 | 250 | | | | 325 | | 266 | 310 | | |
| Track/ATV Mount Rig | 1782 | 290 | 375 | | | 345 | 300 | | | | 345 | | 303 | 325 | | |
| 19. Direct Push/Hydraulic Punch | | | | | | | | | | | | | | | | |
| Truck Mount Rig | 1489 | 210 | | | | | 250 | 315 | | 262.5 | 202 | | | | 200 | 220 |
| Track/ATV Mount Rig | 1489 | | 215 | | | 190 | 300 | 367.5 | 181.25 | 225 | 202 | | | 170 | | 234 |
Equipment II
| Contractor Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 17 | 18 |
| Equipment II | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily |
| 1. Roll-off | | | | | | | | | | | | | | | | | |
| 2-9 cubic yards (cy) | | | | | | 20 | | 25 | | | 15 | | | | | | 10 |
| 10 cy | | 30 | | | 15 | 20 | 20 | 25 | | | 18 | | | | | | 10 |
| 20 cy | 28 | 35 | 20 | 30 | 20 | 20 | | 40 | 25 | | 20 | | | | | 25 | 10 |
| 30 cy | | | 30 | | 25 | 20 | | 60 | 25 | | 25 | | | | | 25 | 10 |
| 40 cy | | | | | 25 | | | 60 | | | 25 | | | | | | 10 |
| 2. Frac Tank (20,000 gallons) | | | | | | | | | | | | | | | | | |
| Single compartment | 110 | 75 | 75 | | 125 | 38 | 20 | 100 | 75 | | 120 | | | 100 | | 40 | 35 |
| dual compartment | | | 80 | | 150 | 38 | | 125 | 75 | | 140 | | | 125 | | | 35 |
| 3. Boats | | | | | | | | | | | | | | | | | |
| 7'-14' work boat | 120 | 150 | 165 | 100 | 300 | 550 | 300 | 200 | 250 | | 400 | | | 200 | 300 | | 240 |
| 14' or larger- motorized | 385 | | 385 | | 1000 | 725 | 640 | 350 | 500 | | 600 | | | | 350 | 200 | 480 |
| 4. Generators | | | | | | | | | | | | | | | | | |
| 3-Phase | 220 | 225 | 300 | | 150 | 200 | 240 | 200 | | | 250 | | | 200 | 200 | 182 | 840 |
| 5. Mobile Carbon Treatment System | | | | | | | | | | | | | | | | | |
| 50-100 gpm | | 250 | 410 | | 100 | 55 | 80 | 550 | | | 300 | | | | | 100 | 56 |
| 100-500 gpm | | | | | 200 | 160 | | 1250 | | | 600 | | | | | | 104 |
| 1. Generators | | | | | | | | | | | | | | | | | |
| Portable Single Phase | 110 | 165 | 150 | 200 | 60 | 85 | 160 | 100 | 125 | | 100 | | | 100 | 200 | 50 | 80 |
| 2. Compressors | 192 | 190 | 200 | 200 | 185 | 200 | 160 | 175 | 200 | | 300 | | | 175 | 220 | 175 | 156 |
| 3. Jackhammers w/compressors | | | | | | | | | | | | | | | | | |
| and attachments | 144 | 300 | | 130 | 75 | 75 | 160 | 200 | 225 | | 350 | | | 200 | 300 | 205 | 156 |
| 4. Pressure Washers | | | | | | | | | | | | | | | | | |
| (includes water & tank) | 220 | 165 | 275 | 200 | 35 | 325 | 300 | 200 | 350 | | 200 | | | 110 | 200 | 50 | 294 |
| 5. Portable Lights | 137 | | 250 | 200 | | 450 | 240 | 125 | 50 | | 250 | | | 75 | 125 | 115 | 250 |
| 6. Diaphragm Pumps | | | | | | | | | | | | | | | | | |
| 2 inch | 82 | 110 | 100 | 125 | 40 | 110 | 160 | 75 | 150 | | 90 | | | 75 | 75 | 90 | 49 |
| 3 inch | 110 | 110 | | 135 | | 150 | 180 | 100 | 200 | | 100 | | | 100 | 100 | 100 | 58 |
| 7. Transfer Pump | | | | | | | | | | | | | | | | | |
| (gas trash pump) | 82 | 120 | 175 | 200 | 40 | 85 | 160 | 75 | 450 | | 75 | | | 65 | 150 | 130 | 96 |
| 8. Vans/Pickups | 160 | 190 | 175 | 200 | 125 | 200 | 120 | 125 | 175 | | 200 | | | 50 | 140 | 150 | 140 |
| 9. Oil Containment Booms | | | | | | | | | | | | | | | | | |
| 9 (A.) 18" Performance Booms | | | | | | | | | | | | | | | | | |
| 500 ft. | 500 | 1000 | | 625 | | 500 | 500 | 500 | 750 | | 875 | | | | 500 | | 500 |
| 1000 ft. | 1000 | | | | | 1000 | 1000 | 1000 | 1500 | | 1750 | | | | 1000 | | 1000 |
| 1500 ft. | 1500 | | | | | 1500 | 1500 | 1500 | 2250 | | 2625 | | | | 1500 | | 1500 |
| 2000 ft. | 2000 | | | | | 2000 | 2000 | 2000 | 3000 | | 3500 | | | | 2000 | | 2000 |
| 9-(B.) 19" River Boom | | | | | | | | | | | | | | | | | |
| 500 ft. | 500 | | 600 | 625 | | | | 500 | 750 | | 750 | | | | 500 | | 500 |
| 1000 ft. | 1000 | | | | | | | 1000 | 1500 | | 1500 | | | | 1000 | | 1000 |
| 1500 ft. | 1500 | | | | | | | 1500 | 2250 | | 2250 | | | | 1500 | | 1500 |
| 2000 ft. | 2000 | | | | | | | 2000 | 3000 | | 3000 | | | | 2000 | | 2000 |
| 9-(C.) 36" Harbor Boom | | | | | | | | | | | | | | | | | |
| 500 ft. | | | | 625 | | | | 700 | 1500 | | 1000 | | | | 700 | | |
| 1000 ft. | | | | | | | | 1400 | 3000 | | 2000 | | | | 1400 | | |
| 1500 ft. | | | | | | | | 2100 | 4500 | | 3000 | | | | 2100 | | |
| 2000 ft. | | | | | | | | 2800 | 6000 | | 4000 | | | | 2800 | | |
| 10. Fire Boom | | | | | | | | | | | 4000 | | | | | | |
| 11. Confined Space Entry System | 364 | 250 | 175 | 350 | 200 | 375 | 200 | 350 | 250 | | 350 | | | | | 150 | 125 |
| 12. Soil Gas- Probe System w/rods, adaptors, and rotary hammer | | | | | 100 | | | 525 | | 225 | 600 | | | | | | 515 |
Most Used- Weekly
| Contractor Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 14 | 15 | 17 | 18 |
| Most Used Equipment | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly |
| 3. Rack Truck | 3780 | 4000 | 3275 | 3960 | 4000 | 2975 | 3100 | 3280 | 4010 | 1500 | 3200 | | | 1600 | 4540 | 2560 |
| 4. Box Truck | 3780 | 4000 | 5000 | 4500 | 4400 | 2975 | 3300 | 3100 | 4110 | | 3800 | | 2550 | 2400 | | 2368 |
| 6. Vactors/Super Suckers/Cusco | 7776 | 7000 | 7300 | | 12480 | 6475 | 5500 | 5600 | 6750 | | 6800 | | | 5600 | 5800 | 7200 |
| 8. Bobcats w/attachments | 4464 | 4000 | 4500 | 4500 | 4000 | 3850 | 3300 | 3000 | 4500 | 3400 | 4600 | | 5700 | 2800 | 4320 | 2560 |
| 9. Mini-excavators | | 4000 | 4500 | 4680 | 5500 | 3850 | 3900 | 3780 | | 3400 | 4600 | | | 2800 | 4160 | 2784 |
| 15. Street Sweeper | | | 5500 | 4860 | | 6125 | | 6000 | | | 5800 | | | 2000 | 6250 | 4000 |
| 1. Roll off - 20 yd. | 126 | 190 | 150 | 150 | 140 | 140 | 100 | 160 | 125 | | 80 | | | | 112.5 | 40 |
| 2. Frac Tank- single compartment | 495 | 450 | 150 | | 600 | 266 | 100 | 400 | 375 | | 480 | | 300 | | 180 | 140 |
Most Used- Mob Demob
| Contractor Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 14 | 15 | 17 | 18 |
| Most Used Equipment | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob |
| 3. Rack Truck | 105 | 120 | 90 | 110 | 110 | 85 | 110 | 123 | 100 | 37.5 | 85 | | | 50 | 128 | 64 |
| 4. Box Truck | 90 | 120 | 135 | 125 | 125 | 85 | 115 | 116.25 | 100 | | 105 | | 80 | 50 | | 74 |
| 6. Vactors/Super Suckers/Cusco | 216 | 175 | 200 | | 250 | 110 | 190 | 210 | 150 | | 190 | | | 150 | 170 | 180 |
| 8. Bobcats w/attachments | 99 | 100 | 100 | 125 | 500 | 95 | 135 | 90 | 100 | 75 | 145 | | 90 | 75 | 199 | 125 |
| 9. Mini-excavators | | 100 | 125 | 125 | 500 | 95 | 135 | 140 | | 75 | 175 | | | 75 | 199 | 125 |
| 15. Street Sweeper | | | 150 | 110 | | 125 | | 150 | | | 400 | | | 75 | 194 | 125 |
| 1. Roll off - 20 yd. | 99 | 100 | 140 | 150 | 150 | 132 | 145 | 160 | 250 | | 85 | | | | 170 | 93 |
| 2. Frac Tank- single compartment | 120 | 150 | 150 | | 550 | 132 | 100 | 400 | 150 | | 150 | | 80 | | 100 | 93 |
Disposal-drum
| Description - Bulk Rate per Drum | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 1. PETROLEUM: | | | | | | | | | | | | |
| A. Gasoline | | | | | | | | | | | | |
| Liquid | $ 102.30 | $ 250.00 | $ 150.00 | $ 150.00 | $ 180.00 | $ 185.00 | $ 135.00 | $ 150.00 | $ 172.00 | $ 160.00 | cost + 5% | |
| Liquid/water mix(5-95% water) | $ 169.40 | $ 350.00 | $ 240.00 | $ 210.00 | $ 275.00 | $ 300.00 | $ 155.00 | $ 150.00 | $ 172.00 | $ 345.00 | cost + 5% | |
| Solids/Spill Debris | $ 338.80 | $ 500.00 | $ 450.00 | $ 300.00 | $ 425.00 | $ 400.00 | $ 280.00 | $ 250.00 | $ 465.00 | $ 410.00 | cost + 5% | $ 280.00 |
| Semi-Solids | $ 392.70 | | $ 450.00 | $ 250.00 | $ 425.00 | $ 455.00 | $ 420.00 | $ 450.00 | $ 465.00 | $ 410.00 | cost + 5% | $ 280.00 |
| Soils | | | | $ 250.00 | | | | $ 450.00 | | | cost + 5% | $ 280.00 |
| In-state Recycling | | | | | | | | | | | | |
| In-state Landfill | | | | | | | | | | | | |
| Out-of-State Disposal | | $ 125.00 | $ 225.00 | | | | $ 650.00 | | | | cost + 5% | |
| B. #2 Fuel Oil/Diesel | | | | | | | | | | | | |
| Liquid | $ 90.50 | $ 175.00 | $ 105.00 | $ 110.00 | $ 115.00 | $ 160.00 | $ 125.00 | $ 125.00 | $ 165.00 | $ 130.00 | cost + 5% | |
| Liquid/water mix(5-95% water) | $ 129.80 | $ 175.00 | $ 125.00 | $ 210.00 | $ 115.00 | $ 180.00 | $ 107.00 | $ 125.00 | $ 165.00 | $ 130.00 | cost + 5% | |
| Solids/Spill Debris | $ 176.00 | $ 175.00 | $ 150.00 | $ 210.00 | $ 115.00 | $ 225.00 | $ 150.00 | $ 125.00 | $ 165.00 | $ 130.00 | cost + 5% | $ 160.00 |
| Semi-Solids | $ 199.10 | $ 175.00 | $ 150.00 | $ 210.00 | $ 165.00 | $ 235.00 | $ 175.00 | $ 125.00 | $ 165.00 | $ 130.00 | cost + 5% | $ 160.00 |
| Soils | | | | $ 210.00 | | | | $ 125.00 | $ 165.00 | $ 130.00 | cost + 5% | $ 160.00 |
| In-state Recycling | | | | | | | | | | | | |
| In-state Landfill | | | | | | | | | | | | |
| Out-of-State Disposal | | $ 125.00 | $ 150.00 | | | | $ 275.00 | | | | cost + 5% | |
| C. #4, #6 Fuel Oil | | | | | | | | | | | |
| Liquid | $ 90.20 | $ 250.00 | $ 105.00 | $ 110.00 | $ 140.00 | $ 160.00 | $ 125.00 | $ 125.00 | $ 195.00 | cost + 5% | $ 160.00 |
| Liquid/water mix(5-95% water) | $ 133.10 | $ 325.00 | $ 125.00 | $ 210.00 | $ 140.00 | $ 195.00 | $ 120.00 | $ 125.00 | $ 195.00 | cost + 5% | $ 160.00 |
| Solids/Spill Debris | $ 176.00 | $ 200.00 | $ 150.00 | $ 210.00 | $ 115.00 | $ 225.00 | $ 150.00 | $ 125.00 | $ 195.00 | cost + 5% | |
| Semi-Solids | $ 199.10 | $ 325.00 | $ 150.00 | $ 210.00 | $ 165.00 | $ 235.00 | $ 210.00 | $ 125.00 | $ 195.00 | cost + 5% | $ 160.00 |
| Soils | | | | | | | | $ 125.00 | | cost + 5% | |
| In-state Recycling | | | | | | | | | | | |
| In-state Landfill | | | | | | | | | | | |
| Out-of-State Disposal | | | $ 150.00 | | | | $ 285.00 | | | cost + 5% | |
| D. Waste Oils | | | | | | | | | | | |
| Liquid | $ 102.30 | $ 225.00 | $ 105.00 | $ 110.00 | $ 115.00 | $ 160.00 | $ 125.00 | $ 125.00 | $ 165.00 | cost + 5% | $ 160.00 |
| Liquid/water mix(5-95% water) | $ 133.10 | $ 275.00 | $ 125.00 | $ 210.00 | $ 115.00 | $ 250.00 | $ 120.00 | $ 125.00 | $ 165.00 | cost + 5% | $ 160.00 |
| Solids/Spill Debris | $ 176.00 | $ 200.00 | $ 150.00 | $ 210.00 | $ 115.00 | $ 225.00 | $ 200.00 | $ 125.00 | $ 165.00 | cost + 5% | |
| Semi-Solids | $ 199.10 | $ 200.00 | $ 150.00 | $ 210.00 | $ 165.00 | $ 235.00 | $ 160.00 | $ 125.00 | $ 165.00 | cost + 5% | $ 160.00 |
| Soils | | | | $ 210.00 | | | | $ 125.00 | | cost + 5% | |
| In-state Recycling | | | | | | | | | | | |
| In-state Landfill | | | | | | | | | | | |
| Out-of-State Disposal | | $ 250.00 | $ 150.00 | | | | $ 285.00 | | | cost + 5% | |
| 2. NON-CHLORINATED SOLVENTS | | | | | | | | | | |
| Liquid | $ 102.30 | | $ 175.00 | $ 110.00 | $ 150.00 | $ 200.00 | $ 275.00 | $ 150.00 | $ 165.00 | cost + 5% |
| Liquid/water mix(5-95% water) | $ 211.20 | $ 300.00 | $ 240.00 | $ 210.00 | $ 175.00 | $ 205.00 | $ 275.00 | $ 175.00 | $ 275.00 | cost + 5% |
| Solids/Spill Debris | $ 323.40 | $ 375.00 | $ 450.00 | $ 260.00 | $ 250.00 | $ 245.00 | $ 650.00 | $ 225.00 | $ 395.00 | cost + 5% |
| Semi-Solids | $ 411.40 | | $ 450.00 | $ 250.00 | $ 450.00 | $ 265.00 | $ 650.00 | $ 350.00 | $ 395.00 | cost + 5% |
| Soils | $ 392.70 | | $ 450.00 | $ 292.00 | $ 450.00 | $ 250.00 | $ 650.00 | $ 350.00 | $ 395.00 | cost + 5% |
| 3. CHLORINATED SOLVENTS | | | | | | | | | | |
| Liquid | $ 266.20 | $ 375.00 | $ 300.00 | $ 346.10 | $ 455.00 | $ 280.00 | $ 380.00 | $ 350.00 | $ 195.00 | cost + 5% |
| Liquid/water mix(5-95% water) | $ 290.40 | $ 425.00 | $ 300.00 | $ 346.10 | $ 400.00 | $ 350.00 | $ 380.00 | $ 350.00 | $ 345.00 | cost + 5% |
| Solids/Spill Debris | $ 423.50 | $ 525.00 | $ 450.00 | $ 346.10 | $ 510.00 | $ 480.00 | $ 650.00 | $ 400.00 | $ 395.00 | cost + 5% |
| Semi-Solids | $ 453.20 | $ 525.00 | $ 450.00 | $ 346.10 | $ 510.00 | $ 520.00 | $ 650.00 | $ 500.00 | $ 395.00 | cost + 5% |
| Soils | $ 453.20 | $ 525.00 | $ 450.00 | $ 346.10 | $ 510.00 | $ 520.00 | $ 650.00 | $ 500.00 | $ 395.00 | cost + 5% |
| 4. PCBs | | | | | | | | | | |
| PCB Oil | $ 544.50 | $ 350.00 | $ 650.00 | $ 928.00 | | $ 360.00 | $ 740.00 | $ 650.00 | $ 375.00 | cost + 5% |
| PCB Solids | $ 380.60 | $ 350.00 | $ 450.00 | $ 250.00 | $ 525.00 | $ 430.00 | $ 450.00 | $ 1,000.00 | $ 450.00 | cost + 5% |
| 5. CARBON | | | | | | | | | | | |
| Liquid Phase | $ 332.20 | $ 750.00 | $ 240.00 | $ 350.00 | $ 250.00 | $ 185.00 | $ 275.00 | $ 150.00 | $ 165.00 | cost + 5% | $ 160.00 |
| Vapor Phase | $ 332.20 | $ 750.00 | $ 240.00 | $ 350.00 | $ 250.00 | $ 185.00 | $ 275.00 | $ 150.00 | $ 165.00 | cost + 5% | $ 160.00 |
| 6. OTHER: | | | | | | | | | |
| a. Disposal of Empty Drums | $ 36.30 | $ 45.00 | $ 20.00 | $ 80.08 | $ 65.00 | $ 25.00 | $ 45.00 | $ 50.00 | $ 35.00 |
Disposal-bulk
| Description - Bulk Rate per Gal/ton | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 1. PETROLEUM: | | | | | | | | | | | | |
| A. Gasoline | | | | | | | | | | | | |
| Liquid | $ 1.09 | $ 2.00 | $ 1.50 | $ 2.18 | $ 1.85 | $ 1.65 | $ 1.20 | $ 1.25 | $ 0.78 | $ 2.30 | cost + 5% | $ 1.10 |
| Liquid/water mix(5-95% water) | $ 1.57 | $ 2.00 | $ 1.50 | $ 2.18 | $ 1.85 | $ 1.95 | $ 1.50 | $ 1.25 | $ 0.78 | $ 2.30 | cost + 5% | $ 1.10 |
| Solids/Spill Debris | | $ 550.00 | | $ 570.00 | | $ 400.00 | $ 85.00 | $ 1.25 | | | cost + 5% | $ 110.00 |
| Semi-Solids | | $ 550.00 | | | | $ 450.00 | | | | | cost + 5% | $ 110.00 |
| Soils | | | | $ 110.00 | | | | | | | cost + 5% | $ 110.00 |
| In-state Recycling | $ 88.00 | $ 55.00 | $ 75.00 | | $ 95.00 | $ 65.00 | $ 60.00 | $ 65.00 | $ 68.00 | | cost + 5% | |
| In-state Landfill | $ 121.00 | | $ 75.00 | | $ 65.00 | $ 140.00 | $ 85.00 | $ 65.00 | $ 23.00 | | cost + 5% | |
| Out-of-State Disposal | $ 242.00 | $ 75.00 | $ 650.00 | | $ 185.00 | $ 400.00 | $ 78.00 | $ 120.00 | $ 54.00 | | cost + 5% | |
| B. #2 Fuel Oil/Diesel | | | | | | | | | | | | |
| Liquid | $ 0.66 | $ 0.75 | $ 0.65 | $ 1.44 | $ 0.65 | $ 0.65 | $ 0.55 | $ 0.65 | $ 0.57 | $ 0.80 | cost + 5% | $ 0.68 |
| Liquid/water mix(5-95% water) | $ 1.02 | $ 0.75 | $ 0.82 | $ 1.44 | $ 0.65 | $ 0.85 | $ 0.75 | $ 0.65 | $ 0.57 | $ 0.80 | cost + 5% | $ 0.68 |
| Solids/Spill Debris | $ 138.60 | $ 200.00 | $ 350.00 | $ 165.00 | $ 325.00 | $ 225.00 | $ 85.00 | $ 120.00 | $ 160.00 | | cost + 5% | |
| Semi-Solids | $ 181.50 | $ 550.00 | $ 400.00 | | $ 360.00 | $ 235.00 | | | $ 403.00 | | cost + 5% | |
| Soils | | | | $ 98.00 | | | | | | | cost + 5% | |
| In-state Recycling | $ 60.50 | $ 55.00 | $ 75.00 | | $ 75.00 | $ 65.00 | $ 55.00 | $ 65.00 | $ 68.00 | | cost + 5% | |
| In-state Landfill | $ 78.10 | | $ 75.00 | | $ 65.00 | $ 50.00 | $ 65.00 | $ 65.00 | $ 23.00 | | cost + 5% | |
| Out-of-State Disposal | $ 102.30 | $ 75.00 | $ 150.00 | | $ 175.00 | $ 400.00 | $ 85.00 | $ 120.00 | $ 54.00 | | cost + 5% | |
| C. #4, #6 Fuel Oil | | | | | | | | | | | |
| Liquid | $ 1.27 | $ 0.75 | $ 1.25 | $ 1.94 | $ 1.25 | $ 0.95 | $ 1.05 | $ 0.65 | $ 1.30 | cost + 5% | $ 0.68 |
| Liquid/water mix(5-95% water) | $ 1.45 | $ 0.75 | $ 1.50 | $ 1.94 | $ 0.95 | $ 1.95 | $ 1.20 | $ 0.65 | $ 1.30 | cost + 5% | $ 0.68 |
| Solids/Spill Debris | $ 162.80 | $ 550.00 | $ 350.00 | $ 130.80 | $ 325.00 | $ 225.00 | $ 275.00 | $ 300.00 | $ 160.00 | cost + 5% | $ 86.00 |
| Semi-Solids | $ 181.50 | $ 550.00 | $ 400.00 | | $ 360.00 | $ 235.00 | $ 315.00 | $ 300.00 | $ 403.00 | cost + 5% | |
| Soils | | | | $ 98.00 | | | | | | cost + 5% | $ 86.00 |
| In-state Recycling | $ 60.50 | $ 55.00 | $ 75.00 | | $ 75.00 | $ 65.00 | $ 55.00 | $ 65.00 | $ 68.00 | cost + 5% | |
| In-state Landfill | $ 102.30 | | $ 75.00 | | $ 65.00 | $ 50.00 | $ 85.00 | $ 65.00 | $ 23.00 | cost + 5% | $ 67.00 |
| Out-of-State Disposal | $ 108.90 | $ 200.00 | $ 150.00 | | $ 175.00 | $ 400.00 | $ 90.00 | $ 120.00 | $ 54.00 | cost + 5% | |
| D. Waste Oils | | | | | | | | | | | |
| Liquid | $ 0.85 | $ 0.75 | $ 0.80 | $ 1.44 | $ 0.65 | $ 65.00 | $ 0.70 | $ 0.65 | $ 0.57 | cost + 5% | $ 0.68 |
| Liquid/water mix(5-95% water) | $ 1.15 | $ 0.75 | $ 0.85 | $ 1.44 | $ 0.65 | $ 0.90 | $ 0.95 | $ 0.65 | $ 0.57 | cost + 5% | $ 0.68 |
| Solids/Spill Debris | $ 169.40 | $ 550.00 | $ 350.00 | $ 144.96 | $ 325.00 | $ 225.00 | $ 275.00 | $ 300.00 | $ 160.00 | cost + 5% | $ 38.00 |
| Semi-Solids | $ 181.50 | $ 550.00 | $ 400.00 | | $ 360.00 | $ 235.00 | | $ 300.00 | $ 403.00 | cost + 5% | |
| Soils | | | | $ 144.96 | | | $ 75.00 | | | cost + 5% | $ 86.00 |
| In-state Recycling | | | $ 75.00 | | $ 75.00 | $ 65.00 | | $ 65.00 | $ 68.00 | cost + 5% | |
| In-state Landfill | | | $ 75.00 | | $ 65.00 | $ 50.00 | | $ 65.00 | $ 23.00 | cost + 5% | |
| Out-of-State Disposal | $ 121.00 | $ 100.00 | $ 150.00 | | $ 175.00 | $ 400.00 | $ 90.00 | $ 120.00 | $ 54.00 | cost + 5% | |
| 2. NON-CHLORINATED SOLVENTS | | | | | | | | | |
| Liquid | $ 1.09 | $ 5.00 | $ 1.75 | $ 2.32 | $ 1.75 | $ 1.60 | $ 2.50 | $ 1.45 | cost + 5% |
| Liquid/water mix(5-95% water) | $ 1.57 | $ 5.00 | $ 1.75 | $ 2.32 | $ 1.75 | $ 1.90 | $ 4.75 | $ 1.45 | cost + 5% |
| Solids/Spill Debris | $ 423.50 | | $ 650.00 | $ 570.00 | | $ 275.00 | $ 300.00 | | cost + 5% |
| Semi-Solids | $ 1,089.00 | | $ 650.00 | $ 2.32 | | $ 275.00 | | | cost + 5% |
| Soils | $ 1,089.00 | | $ 650.00 | $ 570.00 | | $ 275.00 | $ 350.00 | | cost + 5% |
| 3. CHLORINATED SOLVENTS | | | | | | | | | |
| Liquid | $ 2.11 | $ 8.00 | $ 2.50 | $ 4.70 | $ 2.20 | $ 1.60 | $ 5.25 | $ 1.95 | cost + 5% |
| Liquid/water mix(5-95% water) | $ 2.72 | $ 8.00 | $ 2.00 | $ 4.70 | $ 2.50 | $ 1.90 | $ 5.25 | | cost + 5% |
| Solids/Spill Debris | $ 1,089.00 | $ 650.00 | $ 650.00 | $ 570.00 | | $ 575.00 | $ 2,550.00 | | cost + 5% |
| Semi-Solids | $ 1,089.00 | $ 650.00 | $ 650.00 | $ 4.70 | | $ 575.00 | | | cost + 5% |
| Soils | $ 1,089.00 | $ 650.00 | $ 650.00 | $ 570.00 | | $ 575.00 | $ 2,550.00 | | cost + 5% |
| | | | | | | | | cost + 5% |
| 4. PCBs | | | | | | | | | |
| PCB Oil | | | $ 10.00 | $ 14.88 | | $ 3.95 | | $ 4.50 | cost + 5% |
| PCB Solids | | $ 600.00 | $ 650.00 | $ 305.58 | $ 385.00 | $ 450.00 | $ 2,550.00 | $ 195.00 | cost + 5% |
| 5. CARBON | | | | | | |
| Liquid Phase | $ 1,089.00 | $ 325.00 | $ 160.00 | $1.50/lb | $ 145.00 | cost + 5% |
| Vapor Phase | $ 1,089.00 | $ 325.00 | $ 160.00 | $1.50/lb | $ 145.00 | cost + 5% |