DEP.RFR.BWSC.ERIRA.2017.14.2012.Summary.ERIRA.Rates.6.27.17.xlsx
XLSX spreadsheet 57 KB Posted
- Attached to
- DEP-BWSC-ERIRA-2017-14
- Solicitation number
- BD-17-1045-BWSC0-BWSC1-15649
- Issued by
- Massachusetts
About this file
The document provided is a summary of labor rates and equipment pricing for the Emergency Response/Immediate Response Action Support Services Contract (Agency Document No. BWSC-ERIRA-2017-01) issued by the Massachusetts Department of Environmental Protection (MassDEP). This contract is for professional environmental services to support Emergency Response and Immediate Response Actions associated with M.G.L. Chapter 21E and the Massachusetts Contingency Plan (MCP) regulations. The document contains detailed pricing information for labor categories, equipment hourly and daily rates, disposal rates, and mobilization/demobilization costs from multiple contractors. The contract term and renewal options are not specified.
The pricing information covers a wide range of environmental services and equipment, including project management, field staff, drilling rigs, vacuum trucks, excavation equipment, and disposal of various waste streams like petroleum products, solvents, and PCBs. The rates are provided at the contractor level, allowing for comparison across multiple vendors. Disposal rates are listed for both bulk and drummed wastes, with options for in-state recycling, in-state landfill, and out-of-state disposal. No information is provided on any set-asides, funding sources, or incumbent contractors.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final ER Rates ER/IRA 2012 Procurement- ER Labor Rates BAFO
| Contractor Number | 1 | 2 | 3 | 6 | 7 | 8 | 9 | 11 | 15 | 17 | 18 |
| ER Services- Labor | |||||||||||
| 1. Project Manager | 90 | 80 | 90 | 95 | 85 | 83 | 83 | 85 | 95 | 90 | 58 |
| 2. Foreman | 77 | 70 | 82.5 | 75 | 75 | 74 | 73 | 78 | 80 | 80 | 49 |
| 3. Skilled Laborer | 60 | 60 | 66 | 65 | 65 | 63 | 55 | 66 | 65 | 65 | 40 |
| 4. Hydrogeo/Geologist/Eng | 95 | 90 | 100 | 95 | 85 | 95 | 95 | 98 | 95 | 85 | 92 |
| 5. CDL Truck Driver | 60 | 65 | 70 | 75 | 75 | 70 | 69 | 73 | 65 | 70 | 42 |
| 6. Chemist | 83 | 95 | 90 | 85 | 80 | 83 | 90 | 89 | 95 | 85 | 52 |
| 7. Clerical | 42 | 40 | 45 | 45 | 40 | 42 | 44 | 45 | 45 | 45 | 39 |
| 8. Licensed Site Professional | 130 | 125 | 140 | 125 | 140 | 130 | 126 | 144 | 145 | 120 | 105 |
Final IRA Labor
| Contractor Number | 1 | 2 | 3 | 4 | 5 | 7 | 8 | 9 | 10 | 11 | 12 | 14 | 15 | 17 | 18 |
| IRA Services- Labor | |||||||||||||||
| 1. Project Manager | 90 | 80 | 90 | 90 | 90 | 80 | 81 | 83 | 95 | 85 | 95 | 86 | 95 | 90 | 55 |
| 2. Foreman | 77 | 70 | 75 | 65 | 74 | 70 | 73 | 73 | 75 | 78 | 75 | 70 | 80 | 80 | 47 |
| 3. Skilled Laborer | 60 | 60 | 65 | 55 | 63 | 60 | 58 | 55 | 55 | 60 | 45 | 65 | 65 | 65 | 39 |
| 4. Hydrogeo/Geologist/Eng | 95 | 90 | 100 | 90 | 75 | 85 | 90 | 95 | 95 | 98 | 65 | 75 | 95 | 85 | 92 |
| 5. CDL Truck Driver | 60 | 65 | 70 | 65 | 74 | 70 | 65 | 69 | 73 | 70 | 65 | 70 | 42 | ||
| 6. Chemist | 83 | 95 | 90 | 95 | 80 | 75 | 77 | 90 | 89 | 65 | 65 | 85 | 85 | 56 | |
| 7. Clerical | 42 | 40 | 45 | 50 | 45 | 40 | 42 | 44 | 35 | 48 | 35 | 45 | 45 | 45 | 39 |
| 8. Licensed Site Professional | 130 | 125 | 140 | 140 | 135 | 140 | 124 | 126 | 125 | 144 | 105 | 125 | 145 | 120 | 145 |
| 9. Professional Engineer | 130 | 120 | 140 | 140 | 135 | 140 | 83 | 95 | 150 | 174 | 110 | 125 | 105 | 130 | 95 |
| 10. Draftsperson | 66 | 70 | 85 | 70 | 55 | 65 | 65 | 80 | 60 | 66 | 65 | 60 | 65 | 70 | 49 |
| 11. Mechanic | 85 | 85 | 80 | 65 | 53 | 65 | 56 | 69 | 78 | 65 | 80 | 44 | |||
| 12. Registered Land Surveyor | 125 | 135 | 110 | 135 | 95 | 85 | 95 | 105 | 125 | 85 | 75 | 95 | |||
| 13. Electrician | 65 | 100 | 100 | 70 | 85 | 80 | 80 | 108 | 85 | 70 | 66 | ||||
| 14. Plumber | 75 | 110 | 100 | 70 | 80 | 80 | 80 | 95 | 85 | 65 | 66 | ||||
| 15. Lic ww Op Grade II or better | 66 | 100 | 110 | 100 | 82 | 80 | 75 | 80 | 70 | 81 | 70 | 65 | 70 | 66 |
Equipment I
| Contractor Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 14 | 15 | 17 | 18 |
| Equipment I | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly | Hourly |
| 1. Excavators | 179 | 130 | 170 | 175 | 188 | 150 | 170 | 162.75 | 169 | 130 | 155 | 165 | 172 | 110 | ||
| 2. Dump Trucks | ||||||||||||||||
| 6 wheel | 120 | 95 | 110 | 115 | 100 | 85 | 110 | 115.5 | 60 | 90 | 107 | 60 | 106 | 80 | ||
| 10 wheel | 130 | 105 | 140 | 140 | 95 | 115 | 138 | 85 | 110 | 75 | 180 | 82 | ||||
| 18 wheel | 110 | 160 | 150 | 135 | 160.5 | 155 | 196 | 88 | ||||||||
| 3. Rack Truck | 105 | 120 | 90 | 110 | 110 | 85 | 110 | 123 | 100.25 | 37.5 | 85 | 60 | 128 | 64 | ||
| 4. Box Truck | 105 | 120 | 135 | 125 | 125 | 85 | 115 | 116.25 | 102.75 | 105 | 85 | 90 | 74 | |||
| 5. Vacuum Straight Trucks | ||||||||||||||||
| 500-1,500 gal. | 135 | 150 | 145 | 180 | 119 | 145 | ||||||||||
| 1501-2,999 gal. | 135 | 150 | 150 | 180 | 150 | 165 | 87 | |||||||||
| 3,000-3,999 gal. | 135 | 160 | 175 | 150 | 150 | 145 | 180 | 150 | 155 | 168 | 180 | 170 | 87 | |||
| 6. Vactors/Super Suckers/Cusco | 216 | 175 | 200 | 195 | 185 | 190 | 210 | 168.75 | 190 | 210 | 170 | 180 | ||||
| 7. Vacuum Trailers | ||||||||||||||||
| Stainless Steel - 4000 gal. | 171 | 150 | 172.5 | 180 | 97 | |||||||||||
| Stainless Steel - 5000 gal. | 171 | 175 | 185 | 180 | 180 | 185 | 248 | 97 | ||||||||
| Stainless Steel - 6000 gal. | 171 | 150 | 195 | 180 | 97 | |||||||||||
| Carbon Steel - 4000 gal. | 171 | 125 | 150 | 165 | 180 | 225 | 97 | |||||||||
| Carbon Steel - 5000 gal. | 171 | 175 | 150 | 180 | 180 | 97 | ||||||||||
| Carbon Steel - 6000 gal. | 171 | 160 | 150 | 195 | 150 | 180 | ||||||||||
| 8. Bobcats w/attachments | 124 | 120 | 125 | 125 | 115 | 110 | 115 | 112.5 | 112.5 | 85 | 125 | 190 | 105 | 120 | 80 | |
| 9. Mini-excavators | 120 | 125 | 130 | 150 | 110 | 140 | 141.75 | 85 | 125 | 113 | 87 | |||||
| 10. Backhoe | 105 | |||||||||||||||
| 580 Case or equivalent | 140 | 130 | 185 | 110 | 140 | 127.5 | 90 | 130 | 207 | 150 | 128 | 77 | ||||
| 680 Case or equivalent | 148.5 | 150 | 115 | 140 | 135 | 145 | 207 | 221 | 77 | |||||||
| 11. Bulldozers | ||||||||||||||||
| CAT D6 or equivalent | 150 | 135 | 160 | 165 | 100 | 125 | 232 | 177 | 102 | |||||||
| CAT D7 or equivalent | 145 | 195 | 145 | 282 | 222 | 102 | ||||||||||
| CAT D8 or equivalent | 155 | 210 | 155 | 299 | 304 | |||||||||||
| 12. Front End Loaders | 150 | 350 | 150 | 180 | 100 | 135 | 224 | 150 | 169 | 96 | ||||||
| 13. Flat Bed (Low Boy) | 120 | 150 | 125 | 325 | 135 | 150 | 155 | 100 | 150 | 199 | 156 | |||||
| 14. Welding Truck | 90 | 156 | 97 | 150 | 105 | 121 | 79 | |||||||||
| 15. Street Sweeper | 155 | 150 | 135 | 175 | 225 | 145 | 75 | 194 | 125 | |||||||
| 16. Drilling-Hollow Stem Auger | ||||||||||||||||
| Truck Mount Rig | 1489 | 225 | 215 | 190 | 250 | 315 | 262.5 | 227.5 | 331 | 180 | 237.5 | |||||
| Track/ATV Mount Rig | 1782 | 240 | 250 | 215 | 300 | 367.5 | 181.25 | 306.25 | 247 | 368 | 190 | |||||
| 17. Drilling-Drive & Wash | ||||||||||||||||
| Truck Mount Rig | 1489 | 225 | 215 | 190 | 250 | 315 | 262.5 | 227.5 | 331 | 180 | 237.5 | |||||
| Track/ATV Mount Rig | 1782 | 240 | 250 | 215 | 300 | 367.5 | 306.25 | 247 | 368 | 190 | ||||||
| 18. Drilling- Air Rotary | ||||||||||||||||
| Truck Mount Rig | 1489 | 270 | 325 | 315 | 250 | 325 | 266 | 310 | ||||||||
| Track/ATV Mount Rig | 1782 | 290 | 375 | 345 | 300 | 345 | 303 | 325 | ||||||||
| 19. Direct Push/Hydraulic Punch | ||||||||||||||||
| Truck Mount Rig | 1489 | 210 | 250 | 315 | 262.5 | 202 | 200 | 220 | ||||||||
| Track/ATV Mount Rig | 1489 | 215 | 190 | 300 | 367.5 | 181.25 | 225 | 202 | 170 | 234 |
Equipment II
| Contractor Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 17 | 18 |
| Equipment II | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily | Daily |
| 1. Roll-off | |||||||||||||||||
| 2-9 cubic yards (cy) | 20 | 25 | 15 | 10 | |||||||||||||
| 10 cy | 30 | 15 | 20 | 20 | 25 | 18 | 10 | ||||||||||
| 20 cy | 28 | 35 | 20 | 30 | 20 | 20 | 40 | 25 | 20 | 25 | 10 | ||||||
| 30 cy | 30 | 25 | 20 | 60 | 25 | 25 | 25 | 10 | |||||||||
| 40 cy | 25 | 60 | 25 | 10 | |||||||||||||
| 2. Frac Tank (20,000 gallons) | |||||||||||||||||
| Single compartment | 110 | 75 | 75 | 125 | 38 | 20 | 100 | 75 | 120 | 100 | 40 | 35 | |||||
| dual compartment | 80 | 150 | 38 | 125 | 75 | 140 | 125 | 35 | |||||||||
| 3. Boats | |||||||||||||||||
| 7'-14' work boat | 120 | 150 | 165 | 100 | 300 | 550 | 300 | 200 | 250 | 400 | 200 | 300 | 240 | ||||
| 14' or larger- motorized | 385 | 385 | 1000 | 725 | 640 | 350 | 500 | 600 | 350 | 200 | 480 | ||||||
| 4. Generators | |||||||||||||||||
| 3-Phase | 220 | 225 | 300 | 150 | 200 | 240 | 200 | 250 | 200 | 200 | 182 | 840 | |||||
| 5. Mobile Carbon Treatment System | |||||||||||||||||
| 50-100 gpm | 250 | 410 | 100 | 55 | 80 | 550 | 300 | 100 | 56 | ||||||||
| 100-500 gpm | 200 | 160 | 1250 | 600 | 104 | ||||||||||||
| 1. Generators | |||||||||||||||||
| Portable Single Phase | 110 | 165 | 150 | 200 | 60 | 85 | 160 | 100 | 125 | 100 | 100 | 200 | 50 | 80 | |||
| 2. Compressors | 192 | 190 | 200 | 200 | 185 | 200 | 160 | 175 | 200 | 300 | 175 | 220 | 175 | 156 | |||
| 3. Jackhammers w/compressors | |||||||||||||||||
| and attachments | 144 | 300 | 130 | 75 | 75 | 160 | 200 | 225 | 350 | 200 | 300 | 205 | 156 | ||||
| 4. Pressure Washers | |||||||||||||||||
| (includes water & tank) | 220 | 165 | 275 | 200 | 35 | 325 | 300 | 200 | 350 | 200 | 110 | 200 | 50 | 294 | |||
| 5. Portable Lights | 137 | 250 | 200 | 450 | 240 | 125 | 50 | 250 | 75 | 125 | 115 | 250 | |||||
| 6. Diaphragm Pumps | |||||||||||||||||
| 2 inch | 82 | 110 | 100 | 125 | 40 | 110 | 160 | 75 | 150 | 90 | 75 | 75 | 90 | 49 | |||
| 3 inch | 110 | 110 | 135 | 150 | 180 | 100 | 200 | 100 | 100 | 100 | 100 | 58 | |||||
| 7. Transfer Pump | |||||||||||||||||
| (gas trash pump) | 82 | 120 | 175 | 200 | 40 | 85 | 160 | 75 | 450 | 75 | 65 | 150 | 130 | 96 | |||
| 8. Vans/Pickups | 160 | 190 | 175 | 200 | 125 | 200 | 120 | 125 | 175 | 200 | 50 | 140 | 150 | 140 | |||
| 9. Oil Containment Booms | |||||||||||||||||
| 9 (A.) 18" Performance Booms | |||||||||||||||||
| 500 ft. | 500 | 1000 | 625 | 500 | 500 | 500 | 750 | 875 | 500 | 500 | |||||||
| 1000 ft. | 1000 | 1000 | 1000 | 1000 | 1500 | 1750 | 1000 | 1000 | |||||||||
| 1500 ft. | 1500 | 1500 | 1500 | 1500 | 2250 | 2625 | 1500 | 1500 | |||||||||
| 2000 ft. | 2000 | 2000 | 2000 | 2000 | 3000 | 3500 | 2000 | 2000 | |||||||||
| 9-(B.) 19" River Boom | |||||||||||||||||
| 500 ft. | 500 | 600 | 625 | 500 | 750 | 750 | 500 | 500 | |||||||||
| 1000 ft. | 1000 | 1000 | 1500 | 1500 | 1000 | 1000 | |||||||||||
| 1500 ft. | 1500 | 1500 | 2250 | 2250 | 1500 | 1500 | |||||||||||
| 2000 ft. | 2000 | 2000 | 3000 | 3000 | 2000 | 2000 | |||||||||||
| 9-(C.) 36" Harbor Boom | |||||||||||||||||
| 500 ft. | 625 | 700 | 1500 | 1000 | 700 | ||||||||||||
| 1000 ft. | 1400 | 3000 | 2000 | 1400 | |||||||||||||
| 1500 ft. | 2100 | 4500 | 3000 | 2100 | |||||||||||||
| 2000 ft. | 2800 | 6000 | 4000 | 2800 | |||||||||||||
| 10. Fire Boom | 4000 | ||||||||||||||||
| 11. Confined Space Entry System | 364 | 250 | 175 | 350 | 200 | 375 | 200 | 350 | 250 | 350 | 150 | 125 | |||||
| 12. Soil Gas- Probe System w/rods, adaptors, and rotary hammer | 100 | 525 | 225 | 600 | 515 |
Most Used- Weekly
| Contractor Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 14 | 15 | 17 | 18 |
| Most Used Equipment | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly | Weekly |
| 3. Rack Truck | 3780 | 4000 | 3275 | 3960 | 4000 | 2975 | 3100 | 3280 | 4010 | 1500 | 3200 | 1600 | 4540 | 2560 | ||
| 4. Box Truck | 3780 | 4000 | 5000 | 4500 | 4400 | 2975 | 3300 | 3100 | 4110 | 3800 | 2550 | 2400 | 2368 | |||
| 6. Vactors/Super Suckers/Cusco | 7776 | 7000 | 7300 | 12480 | 6475 | 5500 | 5600 | 6750 | 6800 | 5600 | 5800 | 7200 | ||||
| 8. Bobcats w/attachments | 4464 | 4000 | 4500 | 4500 | 4000 | 3850 | 3300 | 3000 | 4500 | 3400 | 4600 | 5700 | 2800 | 4320 | 2560 | |
| 9. Mini-excavators | 4000 | 4500 | 4680 | 5500 | 3850 | 3900 | 3780 | 3400 | 4600 | 2800 | 4160 | 2784 | ||||
| 15. Street Sweeper | 5500 | 4860 | 6125 | 6000 | 5800 | 2000 | 6250 | 4000 | ||||||||
| 1. Roll off - 20 yd. | 126 | 190 | 150 | 150 | 140 | 140 | 100 | 160 | 125 | 80 | 112.5 | 40 | ||||
| 2. Frac Tank- single compartment | 495 | 450 | 150 | 600 | 266 | 100 | 400 | 375 | 480 | 300 | 180 | 140 |
Most Used- Mob Demob
| Contractor Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 14 | 15 | 17 | 18 |
| Most Used Equipment | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob | Mob-Demob |
| 3. Rack Truck | 105 | 120 | 90 | 110 | 110 | 85 | 110 | 123 | 100 | 37.5 | 85 | 50 | 128 | 64 | ||
| 4. Box Truck | 90 | 120 | 135 | 125 | 125 | 85 | 115 | 116.25 | 100 | 105 | 80 | 50 | 74 | |||
| 6. Vactors/Super Suckers/Cusco | 216 | 175 | 200 | 250 | 110 | 190 | 210 | 150 | 190 | 150 | 170 | 180 | ||||
| 8. Bobcats w/attachments | 99 | 100 | 100 | 125 | 500 | 95 | 135 | 90 | 100 | 75 | 145 | 90 | 75 | 199 | 125 | |
| 9. Mini-excavators | 100 | 125 | 125 | 500 | 95 | 135 | 140 | 75 | 175 | 75 | 199 | 125 | ||||
| 15. Street Sweeper | 150 | 110 | 125 | 150 | 400 | 75 | 194 | 125 | ||||||||
| 1. Roll off - 20 yd. | 99 | 100 | 140 | 150 | 150 | 132 | 145 | 160 | 250 | 85 | 170 | 93 | ||||
| 2. Frac Tank- single compartment | 120 | 150 | 150 | 550 | 132 | 100 | 400 | 150 | 150 | 80 | 100 | 93 |
Disposal-drum
| Description - Bulk Rate per Drum | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 1. PETROLEUM: | ||||||||||||
| A. Gasoline | ||||||||||||
| Liquid | $ 102.30 | $ 250.00 | $ 150.00 | $ 150.00 | $ 180.00 | $ 185.00 | $ 135.00 | $ 150.00 | $ 172.00 | $ 160.00 | cost + 5% | |
| Liquid/water mix(5-95% water) | $ 169.40 | $ 350.00 | $ 240.00 | $ 210.00 | $ 275.00 | $ 300.00 | $ 155.00 | $ 150.00 | $ 172.00 | $ 345.00 | cost + 5% | |
| Solids/Spill Debris | $ 338.80 | $ 500.00 | $ 450.00 | $ 300.00 | $ 425.00 | $ 400.00 | $ 280.00 | $ 250.00 | $ 465.00 | $ 410.00 | cost + 5% | $ 280.00 |
| Semi-Solids | $ 392.70 | $ 450.00 | $ 250.00 | $ 425.00 | $ 455.00 | $ 420.00 | $ 450.00 | $ 465.00 | $ 410.00 | cost + 5% | $ 280.00 | |
| Soils | $ 250.00 | $ 450.00 | cost + 5% | $ 280.00 | ||||||||
| In-state Recycling | ||||||||||||
| In-state Landfill | ||||||||||||
| Out-of-State Disposal | $ 125.00 | $ 225.00 | $ 650.00 | cost + 5% |
| B. #2 Fuel Oil/Diesel | ||||||||||||
| Liquid | $ 90.50 | $ 175.00 | $ 105.00 | $ 110.00 | $ 115.00 | $ 160.00 | $ 125.00 | $ 125.00 | $ 165.00 | $ 130.00 | cost + 5% | |
| Liquid/water mix(5-95% water) | $ 129.80 | $ 175.00 | $ 125.00 | $ 210.00 | $ 115.00 | $ 180.00 | $ 107.00 | $ 125.00 | $ 165.00 | $ 130.00 | cost + 5% | |
| Solids/Spill Debris | $ 176.00 | $ 175.00 | $ 150.00 | $ 210.00 | $ 115.00 | $ 225.00 | $ 150.00 | $ 125.00 | $ 165.00 | $ 130.00 | cost + 5% | $ 160.00 |
| Semi-Solids | $ 199.10 | $ 175.00 | $ 150.00 | $ 210.00 | $ 165.00 | $ 235.00 | $ 175.00 | $ 125.00 | $ 165.00 | $ 130.00 | cost + 5% | $ 160.00 |
| Soils | $ 210.00 | $ 125.00 | $ 165.00 | $ 130.00 | cost + 5% | $ 160.00 | ||||||
| In-state Recycling | ||||||||||||
| In-state Landfill | ||||||||||||
| Out-of-State Disposal | $ 125.00 | $ 150.00 | $ 275.00 | cost + 5% |
| C. #4, #6 Fuel Oil | |||||||||||
| Liquid | $ 90.20 | $ 250.00 | $ 105.00 | $ 110.00 | $ 140.00 | $ 160.00 | $ 125.00 | $ 125.00 | $ 195.00 | cost + 5% | $ 160.00 |
| Liquid/water mix(5-95% water) | $ 133.10 | $ 325.00 | $ 125.00 | $ 210.00 | $ 140.00 | $ 195.00 | $ 120.00 | $ 125.00 | $ 195.00 | cost + 5% | $ 160.00 |
| Solids/Spill Debris | $ 176.00 | $ 200.00 | $ 150.00 | $ 210.00 | $ 115.00 | $ 225.00 | $ 150.00 | $ 125.00 | $ 195.00 | cost + 5% | |
| Semi-Solids | $ 199.10 | $ 325.00 | $ 150.00 | $ 210.00 | $ 165.00 | $ 235.00 | $ 210.00 | $ 125.00 | $ 195.00 | cost + 5% | $ 160.00 |
| Soils | $ 125.00 | cost + 5% | |||||||||
| In-state Recycling | |||||||||||
| In-state Landfill | |||||||||||
| Out-of-State Disposal | $ 150.00 | $ 285.00 | cost + 5% |
| D. Waste Oils | |||||||||||
| Liquid | $ 102.30 | $ 225.00 | $ 105.00 | $ 110.00 | $ 115.00 | $ 160.00 | $ 125.00 | $ 125.00 | $ 165.00 | cost + 5% | $ 160.00 |
| Liquid/water mix(5-95% water) | $ 133.10 | $ 275.00 | $ 125.00 | $ 210.00 | $ 115.00 | $ 250.00 | $ 120.00 | $ 125.00 | $ 165.00 | cost + 5% | $ 160.00 |
| Solids/Spill Debris | $ 176.00 | $ 200.00 | $ 150.00 | $ 210.00 | $ 115.00 | $ 225.00 | $ 200.00 | $ 125.00 | $ 165.00 | cost + 5% | |
| Semi-Solids | $ 199.10 | $ 200.00 | $ 150.00 | $ 210.00 | $ 165.00 | $ 235.00 | $ 160.00 | $ 125.00 | $ 165.00 | cost + 5% | $ 160.00 |
| Soils | $ 210.00 | $ 125.00 | cost + 5% | ||||||||
| In-state Recycling | |||||||||||
| In-state Landfill | |||||||||||
| Out-of-State Disposal | $ 250.00 | $ 150.00 | $ 285.00 | cost + 5% |
| 2. NON-CHLORINATED SOLVENTS | ||||||||||
| Liquid | $ 102.30 | $ 175.00 | $ 110.00 | $ 150.00 | $ 200.00 | $ 275.00 | $ 150.00 | $ 165.00 | cost + 5% | |
| Liquid/water mix(5-95% water) | $ 211.20 | $ 300.00 | $ 240.00 | $ 210.00 | $ 175.00 | $ 205.00 | $ 275.00 | $ 175.00 | $ 275.00 | cost + 5% |
| Solids/Spill Debris | $ 323.40 | $ 375.00 | $ 450.00 | $ 260.00 | $ 250.00 | $ 245.00 | $ 650.00 | $ 225.00 | $ 395.00 | cost + 5% |
| Semi-Solids | $ 411.40 | $ 450.00 | $ 250.00 | $ 450.00 | $ 265.00 | $ 650.00 | $ 350.00 | $ 395.00 | cost + 5% | |
| Soils | $ 392.70 | $ 450.00 | $ 292.00 | $ 450.00 | $ 250.00 | $ 650.00 | $ 350.00 | $ 395.00 | cost + 5% |
| 3. CHLORINATED SOLVENTS | ||||||||||
| Liquid | $ 266.20 | $ 375.00 | $ 300.00 | $ 346.10 | $ 455.00 | $ 280.00 | $ 380.00 | $ 350.00 | $ 195.00 | cost + 5% |
| Liquid/water mix(5-95% water) | $ 290.40 | $ 425.00 | $ 300.00 | $ 346.10 | $ 400.00 | $ 350.00 | $ 380.00 | $ 350.00 | $ 345.00 | cost + 5% |
| Solids/Spill Debris | $ 423.50 | $ 525.00 | $ 450.00 | $ 346.10 | $ 510.00 | $ 480.00 | $ 650.00 | $ 400.00 | $ 395.00 | cost + 5% |
| Semi-Solids | $ 453.20 | $ 525.00 | $ 450.00 | $ 346.10 | $ 510.00 | $ 520.00 | $ 650.00 | $ 500.00 | $ 395.00 | cost + 5% |
| Soils | $ 453.20 | $ 525.00 | $ 450.00 | $ 346.10 | $ 510.00 | $ 520.00 | $ 650.00 | $ 500.00 | $ 395.00 | cost + 5% |
| 4. PCBs | ||||||||||
| PCB Oil | $ 544.50 | $ 350.00 | $ 650.00 | $ 928.00 | $ 360.00 | $ 740.00 | $ 650.00 | $ 375.00 | cost + 5% | |
| PCB Solids | $ 380.60 | $ 350.00 | $ 450.00 | $ 250.00 | $ 525.00 | $ 430.00 | $ 450.00 | $ 1,000.00 | $ 450.00 | cost + 5% |
| 5. CARBON | |||||||||||
| Liquid Phase | $ 332.20 | $ 750.00 | $ 240.00 | $ 350.00 | $ 250.00 | $ 185.00 | $ 275.00 | $ 150.00 | $ 165.00 | cost + 5% | $ 160.00 |
| Vapor Phase | $ 332.20 | $ 750.00 | $ 240.00 | $ 350.00 | $ 250.00 | $ 185.00 | $ 275.00 | $ 150.00 | $ 165.00 | cost + 5% | $ 160.00 |
| 6. OTHER: | |||||||||
| a. Disposal of Empty Drums | $ 36.30 | $ 45.00 | $ 20.00 | $ 80.08 | $ 65.00 | $ 25.00 | $ 45.00 | $ 50.00 | $ 35.00 |
Disposal-bulk
| Description - Bulk Rate per Gal/ton | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 1. PETROLEUM: | ||||||||||||
| A. Gasoline | ||||||||||||
| Liquid | $ 1.09 | $ 2.00 | $ 1.50 | $ 2.18 | $ 1.85 | $ 1.65 | $ 1.20 | $ 1.25 | $ 0.78 | $ 2.30 | cost + 5% | $ 1.10 |
| Liquid/water mix(5-95% water) | $ 1.57 | $ 2.00 | $ 1.50 | $ 2.18 | $ 1.85 | $ 1.95 | $ 1.50 | $ 1.25 | $ 0.78 | $ 2.30 | cost + 5% | $ 1.10 |
| Solids/Spill Debris | $ 550.00 | $ 570.00 | $ 400.00 | $ 85.00 | $ 1.25 | cost + 5% | $ 110.00 | |||||
| Semi-Solids | $ 550.00 | $ 450.00 | cost + 5% | $ 110.00 | ||||||||
| Soils | $ 110.00 | cost + 5% | $ 110.00 | |||||||||
| In-state Recycling | $ 88.00 | $ 55.00 | $ 75.00 | $ 95.00 | $ 65.00 | $ 60.00 | $ 65.00 | $ 68.00 | cost + 5% | |||
| In-state Landfill | $ 121.00 | $ 75.00 | $ 65.00 | $ 140.00 | $ 85.00 | $ 65.00 | $ 23.00 | cost + 5% | ||||
| Out-of-State Disposal | $ 242.00 | $ 75.00 | $ 650.00 | $ 185.00 | $ 400.00 | $ 78.00 | $ 120.00 | $ 54.00 | cost + 5% |
| B. #2 Fuel Oil/Diesel | ||||||||||||
| Liquid | $ 0.66 | $ 0.75 | $ 0.65 | $ 1.44 | $ 0.65 | $ 0.65 | $ 0.55 | $ 0.65 | $ 0.57 | $ 0.80 | cost + 5% | $ 0.68 |
| Liquid/water mix(5-95% water) | $ 1.02 | $ 0.75 | $ 0.82 | $ 1.44 | $ 0.65 | $ 0.85 | $ 0.75 | $ 0.65 | $ 0.57 | $ 0.80 | cost + 5% | $ 0.68 |
| Solids/Spill Debris | $ 138.60 | $ 200.00 | $ 350.00 | $ 165.00 | $ 325.00 | $ 225.00 | $ 85.00 | $ 120.00 | $ 160.00 | cost + 5% | ||
| Semi-Solids | $ 181.50 | $ 550.00 | $ 400.00 | $ 360.00 | $ 235.00 | $ 403.00 | cost + 5% | |||||
| Soils | $ 98.00 | cost + 5% | ||||||||||
| In-state Recycling | $ 60.50 | $ 55.00 | $ 75.00 | $ 75.00 | $ 65.00 | $ 55.00 | $ 65.00 | $ 68.00 | cost + 5% | |||
| In-state Landfill | $ 78.10 | $ 75.00 | $ 65.00 | $ 50.00 | $ 65.00 | $ 65.00 | $ 23.00 | cost + 5% | ||||
| Out-of-State Disposal | $ 102.30 | $ 75.00 | $ 150.00 | $ 175.00 | $ 400.00 | $ 85.00 | $ 120.00 | $ 54.00 | cost + 5% |
| C. #4, #6 Fuel Oil | |||||||||||
| Liquid | $ 1.27 | $ 0.75 | $ 1.25 | $ 1.94 | $ 1.25 | $ 0.95 | $ 1.05 | $ 0.65 | $ 1.30 | cost + 5% | $ 0.68 |
| Liquid/water mix(5-95% water) | $ 1.45 | $ 0.75 | $ 1.50 | $ 1.94 | $ 0.95 | $ 1.95 | $ 1.20 | $ 0.65 | $ 1.30 | cost + 5% | $ 0.68 |
| Solids/Spill Debris | $ 162.80 | $ 550.00 | $ 350.00 | $ 130.80 | $ 325.00 | $ 225.00 | $ 275.00 | $ 300.00 | $ 160.00 | cost + 5% | $ 86.00 |
| Semi-Solids | $ 181.50 | $ 550.00 | $ 400.00 | $ 360.00 | $ 235.00 | $ 315.00 | $ 300.00 | $ 403.00 | cost + 5% | ||
| Soils | $ 98.00 | cost + 5% | $ 86.00 | ||||||||
| In-state Recycling | $ 60.50 | $ 55.00 | $ 75.00 | $ 75.00 | $ 65.00 | $ 55.00 | $ 65.00 | $ 68.00 | cost + 5% | ||
| In-state Landfill | $ 102.30 | $ 75.00 | $ 65.00 | $ 50.00 | $ 85.00 | $ 65.00 | $ 23.00 | cost + 5% | $ 67.00 | ||
| Out-of-State Disposal | $ 108.90 | $ 200.00 | $ 150.00 | $ 175.00 | $ 400.00 | $ 90.00 | $ 120.00 | $ 54.00 | cost + 5% |
| D. Waste Oils | |||||||||||
| Liquid | $ 0.85 | $ 0.75 | $ 0.80 | $ 1.44 | $ 0.65 | $ 65.00 | $ 0.70 | $ 0.65 | $ 0.57 | cost + 5% | $ 0.68 |
| Liquid/water mix(5-95% water) | $ 1.15 | $ 0.75 | $ 0.85 | $ 1.44 | $ 0.65 | $ 0.90 | $ 0.95 | $ 0.65 | $ 0.57 | cost + 5% | $ 0.68 |
| Solids/Spill Debris | $ 169.40 | $ 550.00 | $ 350.00 | $ 144.96 | $ 325.00 | $ 225.00 | $ 275.00 | $ 300.00 | $ 160.00 | cost + 5% | $ 38.00 |
| Semi-Solids | $ 181.50 | $ 550.00 | $ 400.00 | $ 360.00 | $ 235.00 | $ 300.00 | $ 403.00 | cost + 5% | |||
| Soils | $ 144.96 | $ 75.00 | cost + 5% | $ 86.00 | |||||||
| In-state Recycling | $ 75.00 | $ 75.00 | $ 65.00 | $ 65.00 | $ 68.00 | cost + 5% | |||||
| In-state Landfill | $ 75.00 | $ 65.00 | $ 50.00 | $ 65.00 | $ 23.00 | cost + 5% | |||||
| Out-of-State Disposal | $ 121.00 | $ 100.00 | $ 150.00 | $ 175.00 | $ 400.00 | $ 90.00 | $ 120.00 | $ 54.00 | cost + 5% |
| 2. NON-CHLORINATED SOLVENTS | |||||||||
| Liquid | $ 1.09 | $ 5.00 | $ 1.75 | $ 2.32 | $ 1.75 | $ 1.60 | $ 2.50 | $ 1.45 | cost + 5% |
| Liquid/water mix(5-95% water) | $ 1.57 | $ 5.00 | $ 1.75 | $ 2.32 | $ 1.75 | $ 1.90 | $ 4.75 | $ 1.45 | cost + 5% |
| Solids/Spill Debris | $ 423.50 | $ 650.00 | $ 570.00 | $ 275.00 | $ 300.00 | cost + 5% | |||
| Semi-Solids | $ 1,089.00 | $ 650.00 | $ 2.32 | $ 275.00 | cost + 5% | ||||
| Soils | $ 1,089.00 | $ 650.00 | $ 570.00 | $ 275.00 | $ 350.00 | cost + 5% |
| 3. CHLORINATED SOLVENTS | |||||||||
| Liquid | $ 2.11 | $ 8.00 | $ 2.50 | $ 4.70 | $ 2.20 | $ 1.60 | $ 5.25 | $ 1.95 | cost + 5% |
| Liquid/water mix(5-95% water) | $ 2.72 | $ 8.00 | $ 2.00 | $ 4.70 | $ 2.50 | $ 1.90 | $ 5.25 | cost + 5% | |
| Solids/Spill Debris | $ 1,089.00 | $ 650.00 | $ 650.00 | $ 570.00 | $ 575.00 | $ 2,550.00 | cost + 5% | ||
| Semi-Solids | $ 1,089.00 | $ 650.00 | $ 650.00 | $ 4.70 | $ 575.00 | cost + 5% | |||
| Soils | $ 1,089.00 | $ 650.00 | $ 650.00 | $ 570.00 | $ 575.00 | $ 2,550.00 | cost + 5% | ||
| cost + 5% | |||||||||
| 4. PCBs | |||||||||
| PCB Oil | $ 10.00 | $ 14.88 | $ 3.95 | $ 4.50 | cost + 5% | ||||
| PCB Solids | $ 600.00 | $ 650.00 | $ 305.58 | $ 385.00 | $ 450.00 | $ 2,550.00 | $ 195.00 | cost + 5% |
| 5. CARBON | ||||||
| Liquid Phase | $ 1,089.00 | $ 325.00 | $ 160.00 | $1.50/lb | $ 145.00 | cost + 5% |
| Vapor Phase | $ 1,089.00 | $ 325.00 | $ 160.00 | $1.50/lb | $ 145.00 | cost + 5% |