DEP.RFR.BWSC.ERIRA.2017.14.2012.Summary.ERIRA.Rates.6.27.17.xlsx

XLSX spreadsheet 57 KB Posted

Attached to
DEP-BWSC-ERIRA-2017-14
Solicitation number
BD-17-1045-BWSC0-BWSC1-15649
Issued by
Massachusetts

About this file

The document provided is a summary of labor rates and equipment pricing for the Emergency Response/Immediate Response Action Support Services Contract (Agency Document No. BWSC-ERIRA-2017-01) issued by the Massachusetts Department of Environmental Protection (MassDEP). This contract is for professional environmental services to support Emergency Response and Immediate Response Actions associated with M.G.L. Chapter 21E and the Massachusetts Contingency Plan (MCP) regulations. The document contains detailed pricing information for labor categories, equipment hourly and daily rates, disposal rates, and mobilization/demobilization costs from multiple contractors. The contract term and renewal options are not specified.

The pricing information covers a wide range of environmental services and equipment, including project management, field staff, drilling rigs, vacuum trucks, excavation equipment, and disposal of various waste streams like petroleum products, solvents, and PCBs. The rates are provided at the contractor level, allowing for comparison across multiple vendors. Disposal rates are listed for both bulk and drummed wastes, with options for in-state recycling, in-state landfill, and out-of-state disposal. No information is provided on any set-asides, funding sources, or incumbent contractors.

View the file

Other files

File Type Posted
commbuys.bus.ref.frm.doc DOC document
commbuys.jobaid.sellers.submit.questions.view.answers.QA.tab.4.17.15.pdf PDF
DEP.RFR.BWSC.ERIRA.2017.14.Example.Conflict.of.Interest.Form.6.27.17.docx DOCX document
DEP.RFR.BWSC.ERIRA.2017.14.Attach.3.ER.IRA.RFR.Coversheet.docx DOCX document
commbuys.jobaid.sellers.withdraw.reopen.resubmit.a.quote.5.29.15.pdf PDF
commbuys.jobaid.sellers.create.a.quote.11.25.14.pdf PDF
commbuys.comm.tc.frm.doc DOC document
commbuyrs.epp.frm.doc DOC document
DEP.RFR.BWSC.ERIRA.2017.14.5.11.17.docx DOCX document
commbuys.ppd.frm.doc DOC document
DEP.RFR.BWSC.ERIRA.2017.14.Attach.5.ER.IRA.Project.Description.Form.docx DOCX document
DEP.RFR.BWSC.ERIRA.2017.14.Attach7.ER.IRA.Labor.and.Equip.Rate.Schedules.xlsx XLSX spreadsheet
commbuys.sdp.plan.declar.frm2.docx DOCX document
commbuys.eft.frm.pdf PDF
commbuys.con.author.sign.list.frm.doc DOC document
commbuys.sdp.plan.commit.frm1.docx DOCX document
BWSC.ERIRA.2017.14.WTO.CK.5.4.17.docx DOCX document
commbuys.jobaid.sellers.revise.a.quote.after.bid.closes.5.13.16.pdf PDF
DEP.RFR.BWSC.ERIRA.2017.14.Attach 1.ER.IRA.SUPP.TERMS.CONDITIONS.docx DOCX document
DEP.RFR.BWSC.ERIRA.2017.14.proc.calendar.amend.6.6.17.docx DOCX document
DEP.RFR.BWSC.ERIRA.2017.14.Attach.4.ER.IRA.Resume.Form.docx DOCX document
commbuys.sdp.pln.report.frm3.xlsx XLSX spreadsheet
DEP.RFR.BWSC.ERIRA.2017.14.Attach.2.ER.IRA.Pay.Terms.Conditions.docx DOCX document
DEP.RFR.BWSC.ERIRA.2017.14.prebid.conf.ppt.7.11.17.docx.ppt PPT presentation
DEP.RFR.BWSC.ERIRA.2017.14.prebid.signin.sheet.7.11.17.docx.pdf PDF
commbuys.w9.frm.doc DOC document
DEP.RFR.BWSC.ERIRA.2017.14.QandA.repsonses.6.27.17.docx DOCX document
DEP.RFR.BWSC.ERIRA.2017.14.Attach.6.ER.IRA.Business.Ref.Form.docx DOCX document
commbuys.stan.con.frm.doc DOC document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Final ER Rates ER/IRA 2012 Procurement- ER Labor Rates BAFO

Contractor Number123678911151718
ER Services- Labor
1. Project Manager9080909585838385959058
2. Foreman777082.57575747378808049
3. Skilled Laborer6060666565635566656540
4. Hydrogeo/Geologist/Eng95901009585959598958592
5. CDL Truck Driver6065707575706973657042
6. Chemist8395908580839089958552
7. Clerical4240454540424445454539
8. Licensed Site Professional130125140125140130126144145120105

Final IRA Labor

Contractor Number1234578910111214151718
IRA Services- Labor
1. Project Manager908090909080818395859586959055
2. Foreman777075657470737375787570808047
3. Skilled Laborer606065556360585555604565656539
4. Hydrogeo/Geologist/Eng9590100907585909595986575958592
5. CDL Truck Driver60657065747065697370657042
6. Chemist8395909580757790896565858556
7. Clerical424045504540424435483545454539
8. Licensed Site Professional130125140140135140124126125144105125145120145
9. Professional Engineer130120140140135140839515017411012510513095
10. Draftsperson667085705565658060666560657049
11. Mechanic858580655365566978658044
12. Registered Land Surveyor125135110135958595105125857595
13. Electrician6510010070858080108857066
14. Plumber751101007080808095856566
15. Lic ww Op Grade II or better6610011010082807580708170657066

Equipment I

Contractor Number12345678910111214151718
Equipment IHourlyHourlyHourlyHourlyHourlyHourlyHourlyHourlyHourlyHourlyHourlyHourlyHourlyHourlyHourlyHourly
1. Excavators179130170175188150170162.75169130155165172110
2. Dump Trucks
6 wheel1209511011510085110115.560901076010680
10 wheel13010514014095115138851107518082
18 wheel110160150135160.515519688
3. Rack Truck1051209011011085110123100.2537.5856012864
4. Box Truck10512013512512585115116.25102.75105859074
5. Vacuum Straight Trucks
500-1,500 gal.135150145180119145
1501-2,999 gal.13515015018015016587
3,000-3,999 gal.13516017515015014518015015516818017087
6. Vactors/Super Suckers/Cusco216175200195185190210168.75190210170180
7. Vacuum Trailers
Stainless Steel - 4000 gal.171150172.518097
Stainless Steel - 5000 gal.17117518518018018524897
Stainless Steel - 6000 gal.17115019518097
Carbon Steel - 4000 gal.17112515016518022597
Carbon Steel - 5000 gal.17117515018018097
Carbon Steel - 6000 gal.171160150195150180
8. Bobcats w/attachments124120125125115110115112.5112.58512519010512080
9. Mini-excavators120125130150110140141.758512511387
10. Backhoe105
580 Case or equivalent140130185110140127.59013020715012877
680 Case or equivalent148.515011514013514520722177
11. Bulldozers
CAT D6 or equivalent150135160165100125232177102
CAT D7 or equivalent145195145282222102
CAT D8 or equivalent155210155299304
12. Front End Loaders15035015018010013522415016996
13. Flat Bed (Low Boy)120150125325135150155100150199156
14. Welding Truck901569715010512179
15. Street Sweeper15515013517522514575194125
16. Drilling-Hollow Stem Auger
Truck Mount Rig1489225215190250315262.5227.5331180237.5
Track/ATV Mount Rig1782240250215300367.5181.25306.25247368190
17. Drilling-Drive & Wash
Truck Mount Rig1489225215190250315262.5227.5331180237.5
Track/ATV Mount Rig1782240250215300367.5306.25247368190
18. Drilling- Air Rotary
Truck Mount Rig1489270325315250325266310
Track/ATV Mount Rig1782290375345300345303325
19. Direct Push/Hydraulic Punch
Truck Mount Rig1489210250315262.5202200220
Track/ATV Mount Rig1489215190300367.5181.25225202170234

Equipment II

Contractor Number1234567891011121314151718
Equipment IIDailyDailyDailyDailyDailyDailyDailyDailyDailyDailyDailyDailyDailyDailyDailyDailyDaily
1. Roll-off
2-9 cubic yards (cy)20251510
10 cy30152020251810
20 cy2835203020204025202510
30 cy3025206025252510
40 cy25602510
2. Frac Tank (20,000 gallons)
Single compartment11075751253820100751201004035
dual compartment80150381257514012535
3. Boats
7'-14' work boat120150165100300550300200250400200300240
14' or larger- motorized3853851000725640350500600350200480
4. Generators
3-Phase220225300150200240200250200200182840
5. Mobile Carbon Treatment System
50-100 gpm250410100558055030010056
100-500 gpm2001601250600104
1. Generators
Portable Single Phase11016515020060851601001251001002005080
2. Compressors192190200200185200160175200300175220175156
3. Jackhammers w/compressors
and attachments1443001307575160200225350200300205156
4. Pressure Washers
(includes water & tank)2201652752003532530020035020011020050294
5. Portable Lights1372502004502401255025075125115250
6. Diaphragm Pumps
2 inch8211010012540110160751509075759049
3 inch11011013515018010020010010010010058
7. Transfer Pump
(gas trash pump)82120175200408516075450756515013096
8. Vans/Pickups16019017520012520012012517520050140150140
9. Oil Containment Booms
9 (A.) 18" Performance Booms
500 ft.5001000625500500500750875500500
1000 ft.10001000100010001500175010001000
1500 ft.15001500150015002250262515001500
2000 ft.20002000200020003000350020002000
9-(B.) 19" River Boom
500 ft.500600625500750750500500
1000 ft.100010001500150010001000
1500 ft.150015002250225015001500
2000 ft.200020003000300020002000
9-(C.) 36" Harbor Boom
500 ft.62570015001000700
1000 ft.1400300020001400
1500 ft.2100450030002100
2000 ft.2800600040002800
10. Fire Boom4000
11. Confined Space Entry System364250175350200375200350250350150125
12. Soil Gas- Probe System w/rods, adaptors, and rotary hammer100525225600515

Most Used- Weekly

Contractor Number12345678910111214151718
Most Used EquipmentWeeklyWeeklyWeeklyWeeklyWeeklyWeeklyWeeklyWeeklyWeeklyWeeklyWeeklyWeeklyWeeklyWeeklyWeeklyWeekly
3. Rack Truck37804000327539604000297531003280401015003200160045402560
4. Box Truck3780400050004500440029753300310041103800255024002368
6. Vactors/Super Suckers/Cusco7776700073001248064755500560067506800560058007200
8. Bobcats w/attachments446440004500450040003850330030004500340046005700280043202560
9. Mini-excavators400045004680550038503900378034004600280041602784
15. Street Sweeper55004860612560005800200062504000
1. Roll off - 20 yd.12619015015014014010016012580112.540
2. Frac Tank- single compartment495450150600266100400375480300180140

Most Used- Mob Demob

Contractor Number12345678910111214151718
Most Used EquipmentMob-DemobMob-DemobMob-DemobMob-DemobMob-DemobMob-DemobMob-DemobMob-DemobMob-DemobMob-DemobMob-DemobMob-DemobMob-DemobMob-DemobMob-DemobMob-Demob
3. Rack Truck105120901101108511012310037.5855012864
4. Box Truck9012013512512585115116.25100105805074
6. Vactors/Super Suckers/Cusco216175200250110190210150190150170180
8. Bobcats w/attachments991001001255009513590100751459075199125
9. Mini-excavators100125125500951351407517575199125
15. Street Sweeper15011012515040075194125
1. Roll off - 20 yd.991001401501501321451602508517093
2. Frac Tank- single compartment1201501505501321004001501508010093

Disposal-drum

Description - Bulk Rate per Drum123456789101112
1. PETROLEUM:
A. Gasoline
Liquid$ 102.30$ 250.00$ 150.00$ 150.00$ 180.00$ 185.00$ 135.00$ 150.00$ 172.00$ 160.00cost + 5%
Liquid/water mix(5-95% water)$ 169.40$ 350.00$ 240.00$ 210.00$ 275.00$ 300.00$ 155.00$ 150.00$ 172.00$ 345.00cost + 5%
Solids/Spill Debris$ 338.80$ 500.00$ 450.00$ 300.00$ 425.00$ 400.00$ 280.00$ 250.00$ 465.00$ 410.00cost + 5%$ 280.00
Semi-Solids$ 392.70$ 450.00$ 250.00$ 425.00$ 455.00$ 420.00$ 450.00$ 465.00$ 410.00cost + 5%$ 280.00
Soils$ 250.00$ 450.00cost + 5%$ 280.00
In-state Recycling
In-state Landfill
Out-of-State Disposal$ 125.00$ 225.00$ 650.00cost + 5%
B. #2 Fuel Oil/Diesel
Liquid$ 90.50$ 175.00$ 105.00$ 110.00$ 115.00$ 160.00$ 125.00$ 125.00$ 165.00$ 130.00cost + 5%
Liquid/water mix(5-95% water)$ 129.80$ 175.00$ 125.00$ 210.00$ 115.00$ 180.00$ 107.00$ 125.00$ 165.00$ 130.00cost + 5%
Solids/Spill Debris$ 176.00$ 175.00$ 150.00$ 210.00$ 115.00$ 225.00$ 150.00$ 125.00$ 165.00$ 130.00cost + 5%$ 160.00
Semi-Solids$ 199.10$ 175.00$ 150.00$ 210.00$ 165.00$ 235.00$ 175.00$ 125.00$ 165.00$ 130.00cost + 5%$ 160.00
Soils$ 210.00$ 125.00$ 165.00$ 130.00cost + 5%$ 160.00
In-state Recycling
In-state Landfill
Out-of-State Disposal$ 125.00$ 150.00$ 275.00cost + 5%
C. #4, #6 Fuel Oil
Liquid$ 90.20$ 250.00$ 105.00$ 110.00$ 140.00$ 160.00$ 125.00$ 125.00$ 195.00cost + 5%$ 160.00
Liquid/water mix(5-95% water)$ 133.10$ 325.00$ 125.00$ 210.00$ 140.00$ 195.00$ 120.00$ 125.00$ 195.00cost + 5%$ 160.00
Solids/Spill Debris$ 176.00$ 200.00$ 150.00$ 210.00$ 115.00$ 225.00$ 150.00$ 125.00$ 195.00cost + 5%
Semi-Solids$ 199.10$ 325.00$ 150.00$ 210.00$ 165.00$ 235.00$ 210.00$ 125.00$ 195.00cost + 5%$ 160.00
Soils$ 125.00cost + 5%
In-state Recycling
In-state Landfill
Out-of-State Disposal$ 150.00$ 285.00cost + 5%
D. Waste Oils
Liquid$ 102.30$ 225.00$ 105.00$ 110.00$ 115.00$ 160.00$ 125.00$ 125.00$ 165.00cost + 5%$ 160.00
Liquid/water mix(5-95% water)$ 133.10$ 275.00$ 125.00$ 210.00$ 115.00$ 250.00$ 120.00$ 125.00$ 165.00cost + 5%$ 160.00
Solids/Spill Debris$ 176.00$ 200.00$ 150.00$ 210.00$ 115.00$ 225.00$ 200.00$ 125.00$ 165.00cost + 5%
Semi-Solids$ 199.10$ 200.00$ 150.00$ 210.00$ 165.00$ 235.00$ 160.00$ 125.00$ 165.00cost + 5%$ 160.00
Soils$ 210.00$ 125.00cost + 5%
In-state Recycling
In-state Landfill
Out-of-State Disposal$ 250.00$ 150.00$ 285.00cost + 5%
2. NON-CHLORINATED SOLVENTS
Liquid$ 102.30$ 175.00$ 110.00$ 150.00$ 200.00$ 275.00$ 150.00$ 165.00cost + 5%
Liquid/water mix(5-95% water)$ 211.20$ 300.00$ 240.00$ 210.00$ 175.00$ 205.00$ 275.00$ 175.00$ 275.00cost + 5%
Solids/Spill Debris$ 323.40$ 375.00$ 450.00$ 260.00$ 250.00$ 245.00$ 650.00$ 225.00$ 395.00cost + 5%
Semi-Solids$ 411.40$ 450.00$ 250.00$ 450.00$ 265.00$ 650.00$ 350.00$ 395.00cost + 5%
Soils$ 392.70$ 450.00$ 292.00$ 450.00$ 250.00$ 650.00$ 350.00$ 395.00cost + 5%
3. CHLORINATED SOLVENTS
Liquid$ 266.20$ 375.00$ 300.00$ 346.10$ 455.00$ 280.00$ 380.00$ 350.00$ 195.00cost + 5%
Liquid/water mix(5-95% water)$ 290.40$ 425.00$ 300.00$ 346.10$ 400.00$ 350.00$ 380.00$ 350.00$ 345.00cost + 5%
Solids/Spill Debris$ 423.50$ 525.00$ 450.00$ 346.10$ 510.00$ 480.00$ 650.00$ 400.00$ 395.00cost + 5%
Semi-Solids$ 453.20$ 525.00$ 450.00$ 346.10$ 510.00$ 520.00$ 650.00$ 500.00$ 395.00cost + 5%
Soils$ 453.20$ 525.00$ 450.00$ 346.10$ 510.00$ 520.00$ 650.00$ 500.00$ 395.00cost + 5%
4. PCBs
PCB Oil$ 544.50$ 350.00$ 650.00$ 928.00$ 360.00$ 740.00$ 650.00$ 375.00cost + 5%
PCB Solids$ 380.60$ 350.00$ 450.00$ 250.00$ 525.00$ 430.00$ 450.00$ 1,000.00$ 450.00cost + 5%
5. CARBON
Liquid Phase$ 332.20$ 750.00$ 240.00$ 350.00$ 250.00$ 185.00$ 275.00$ 150.00$ 165.00cost + 5%$ 160.00
Vapor Phase$ 332.20$ 750.00$ 240.00$ 350.00$ 250.00$ 185.00$ 275.00$ 150.00$ 165.00cost + 5%$ 160.00
6. OTHER:
a. Disposal of Empty Drums$ 36.30$ 45.00$ 20.00$ 80.08$ 65.00$ 25.00$ 45.00$ 50.00$ 35.00

Disposal-bulk

Description - Bulk Rate per Gal/ton123456789101112
1. PETROLEUM:
A. Gasoline
Liquid$ 1.09$ 2.00$ 1.50$ 2.18$ 1.85$ 1.65$ 1.20$ 1.25$ 0.78$ 2.30cost + 5%$ 1.10
Liquid/water mix(5-95% water)$ 1.57$ 2.00$ 1.50$ 2.18$ 1.85$ 1.95$ 1.50$ 1.25$ 0.78$ 2.30cost + 5%$ 1.10
Solids/Spill Debris$ 550.00$ 570.00$ 400.00$ 85.00$ 1.25cost + 5%$ 110.00
Semi-Solids$ 550.00$ 450.00cost + 5%$ 110.00
Soils$ 110.00cost + 5%$ 110.00
In-state Recycling$ 88.00$ 55.00$ 75.00$ 95.00$ 65.00$ 60.00$ 65.00$ 68.00cost + 5%
In-state Landfill$ 121.00$ 75.00$ 65.00$ 140.00$ 85.00$ 65.00$ 23.00cost + 5%
Out-of-State Disposal$ 242.00$ 75.00$ 650.00$ 185.00$ 400.00$ 78.00$ 120.00$ 54.00cost + 5%
B. #2 Fuel Oil/Diesel
Liquid$ 0.66$ 0.75$ 0.65$ 1.44$ 0.65$ 0.65$ 0.55$ 0.65$ 0.57$ 0.80cost + 5%$ 0.68
Liquid/water mix(5-95% water)$ 1.02$ 0.75$ 0.82$ 1.44$ 0.65$ 0.85$ 0.75$ 0.65$ 0.57$ 0.80cost + 5%$ 0.68
Solids/Spill Debris$ 138.60$ 200.00$ 350.00$ 165.00$ 325.00$ 225.00$ 85.00$ 120.00$ 160.00cost + 5%
Semi-Solids$ 181.50$ 550.00$ 400.00$ 360.00$ 235.00$ 403.00cost + 5%
Soils$ 98.00cost + 5%
In-state Recycling$ 60.50$ 55.00$ 75.00$ 75.00$ 65.00$ 55.00$ 65.00$ 68.00cost + 5%
In-state Landfill$ 78.10$ 75.00$ 65.00$ 50.00$ 65.00$ 65.00$ 23.00cost + 5%
Out-of-State Disposal$ 102.30$ 75.00$ 150.00$ 175.00$ 400.00$ 85.00$ 120.00$ 54.00cost + 5%
C. #4, #6 Fuel Oil
Liquid$ 1.27$ 0.75$ 1.25$ 1.94$ 1.25$ 0.95$ 1.05$ 0.65$ 1.30cost + 5%$ 0.68
Liquid/water mix(5-95% water)$ 1.45$ 0.75$ 1.50$ 1.94$ 0.95$ 1.95$ 1.20$ 0.65$ 1.30cost + 5%$ 0.68
Solids/Spill Debris$ 162.80$ 550.00$ 350.00$ 130.80$ 325.00$ 225.00$ 275.00$ 300.00$ 160.00cost + 5%$ 86.00
Semi-Solids$ 181.50$ 550.00$ 400.00$ 360.00$ 235.00$ 315.00$ 300.00$ 403.00cost + 5%
Soils$ 98.00cost + 5%$ 86.00
In-state Recycling$ 60.50$ 55.00$ 75.00$ 75.00$ 65.00$ 55.00$ 65.00$ 68.00cost + 5%
In-state Landfill$ 102.30$ 75.00$ 65.00$ 50.00$ 85.00$ 65.00$ 23.00cost + 5%$ 67.00
Out-of-State Disposal$ 108.90$ 200.00$ 150.00$ 175.00$ 400.00$ 90.00$ 120.00$ 54.00cost + 5%
D. Waste Oils
Liquid$ 0.85$ 0.75$ 0.80$ 1.44$ 0.65$ 65.00$ 0.70$ 0.65$ 0.57cost + 5%$ 0.68
Liquid/water mix(5-95% water)$ 1.15$ 0.75$ 0.85$ 1.44$ 0.65$ 0.90$ 0.95$ 0.65$ 0.57cost + 5%$ 0.68
Solids/Spill Debris$ 169.40$ 550.00$ 350.00$ 144.96$ 325.00$ 225.00$ 275.00$ 300.00$ 160.00cost + 5%$ 38.00
Semi-Solids$ 181.50$ 550.00$ 400.00$ 360.00$ 235.00$ 300.00$ 403.00cost + 5%
Soils$ 144.96$ 75.00cost + 5%$ 86.00
In-state Recycling$ 75.00$ 75.00$ 65.00$ 65.00$ 68.00cost + 5%
In-state Landfill$ 75.00$ 65.00$ 50.00$ 65.00$ 23.00cost + 5%
Out-of-State Disposal$ 121.00$ 100.00$ 150.00$ 175.00$ 400.00$ 90.00$ 120.00$ 54.00cost + 5%
2. NON-CHLORINATED SOLVENTS
Liquid$ 1.09$ 5.00$ 1.75$ 2.32$ 1.75$ 1.60$ 2.50$ 1.45cost + 5%
Liquid/water mix(5-95% water)$ 1.57$ 5.00$ 1.75$ 2.32$ 1.75$ 1.90$ 4.75$ 1.45cost + 5%
Solids/Spill Debris$ 423.50$ 650.00$ 570.00$ 275.00$ 300.00cost + 5%
Semi-Solids$ 1,089.00$ 650.00$ 2.32$ 275.00cost + 5%
Soils$ 1,089.00$ 650.00$ 570.00$ 275.00$ 350.00cost + 5%
3. CHLORINATED SOLVENTS
Liquid$ 2.11$ 8.00$ 2.50$ 4.70$ 2.20$ 1.60$ 5.25$ 1.95cost + 5%
Liquid/water mix(5-95% water)$ 2.72$ 8.00$ 2.00$ 4.70$ 2.50$ 1.90$ 5.25cost + 5%
Solids/Spill Debris$ 1,089.00$ 650.00$ 650.00$ 570.00$ 575.00$ 2,550.00cost + 5%
Semi-Solids$ 1,089.00$ 650.00$ 650.00$ 4.70$ 575.00cost + 5%
Soils$ 1,089.00$ 650.00$ 650.00$ 570.00$ 575.00$ 2,550.00cost + 5%
cost + 5%
4. PCBs
PCB Oil$ 10.00$ 14.88$ 3.95$ 4.50cost + 5%
PCB Solids$ 600.00$ 650.00$ 305.58$ 385.00$ 450.00$ 2,550.00$ 195.00cost + 5%
5. CARBON
Liquid Phase$ 1,089.00$ 325.00$ 160.00$1.50/lb$ 145.00cost + 5%
Vapor Phase$ 1,089.00$ 325.00$ 160.00$1.50/lb$ 145.00cost + 5%

File details come from the government source that posted it. Updated .