This solicitation is for a bridge replacement project in Alaska. The Department of Transportation Federal Highway Administration is seeking bids to replace the Ghiglione Bridge under solicitation number 69056721B000019. Offerors are to provide all labor, materials, equipment, tools, transportation, supervision and incidentals required to replace the existing bridge structure with a new bridge in accordance with the specifications provided in the attached solicitation documents and plans. The project will be awarded on a full and open competitive basis. The solicitation documents include attachments with details on the project scope, requirements, and response submission process. Bids are due by the date specified in the solicitation for the bridge replacement work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids ghiglione.pdf | ||
| BidSum.pdf | ||
| QA_08-04-2021.pdf | ||
| QA_08-02-2021.pdf | ||
| Amendment A003.pdf | ||
| QA_07-28-2021.pdf | ||
| QA_07-27-2021.pdf | ||
| Amendment A002.pdf | ||
| QA_07-26-2021.pdf | ||
| QA_07-23-2021.pdf | ||
| Amendment A001.pdf | ||
| QA_07-22-2021.pdf | ||
| QA_07-19-2021.pdf | ||
| QA_06-30-2021.pdf | ||
| 9830-011P - Ghiglione Bridge As-Built Plans.pdf | ||
| Ghiglione_ControlSheet.xlsx | XLSX spreadsheet | |
| DENA01036_XS.pdf | ||
| DENA01036_VA.pdf | ||
| DENA01036_HA.pdf | ||
| DENA01036_EW.pdf | ||
| Toklat Pit_Scrape Material Photos.pdf | ||
| Geotech Report No 11-19 Ghiglione Final Foundation Report.pdf | ||
| DENA01036_SUP.pdf | ||
| DENA01036 xml files.zip | ZIP file | |
| CompiledSWPPP_AK for physical data.pdf | ||
| 9830-011P - Ghiglione Bridge Inspection 2019.pdf | ||
| Ghiglione IFB.pdf |
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2020.09.03 20:27:24 -07'00'
-6 w C
.D
'O
.c w
'O
.D
'O C en 'iii
N N
E z
N
N
Fork -----::______ �o
� , ro
NATIONAL
.. -�·•• MP53.88
Tokla_t Pit Material/
Staging/Water Source Tok/at Road Camp
'�Mt. Galen '-----
) Y� ·--� r , (( ! �i \ ) ' -�
\� S tony �- •
H
H
,1/ S tony
� o
, Moose
0 0
\ t \) Overloo
• Thorofare
Pass
• Eielson Visitors Center ooo---
Gorge o
.. ve
Cop· er
•· 0
Mtn. Bar , SCALE IN MILES
1 0 1
PARK
i
STATE PROJECT
SHEET
NUMBER
AK PRA DENA 10(36) A.3
MP43
Staging Area/Disposal See MP 43 Detail
Prett Rocks Slide Area
I
West Eas Fork Bridge
MP 43 DETAIL
NOTES
1. Perform work at the Pretty Rocks Slide Area according to Section 622.
VICINITY MAP
0 .
c----
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I
Typical Section Plan-Profile Erosion
Control Drainage Bridge Plans
Temporary Traffic Control
Permanent Traffic Control
Allowance Bid Schedule
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0030 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0040 15401-0000 CONTRACTOR TESTING LPSM ALL
A0050 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0060 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 519 31 550
A0070 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 2,382 118 2,500
A0080 15706-0200 SOIL EROSION CONTROL, CHECK
DAM EACH 2 2 4
A0090 20101-0000 CLEARING AND GRUBBING ACRE 1.3 0.1 1.4
A0100 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0110 20304-2000 REMOVAL OF BRIDGE LPSM All ALL
A0120 20401-0000 ROADWAY EXCAVATION CUYD 1,276 124 1,400
A0130 20410-0000 SELECT BORROW (GOVERNMENT
FURNISHED) CUYD 1,120 80 1,200
A0140 20702-0300 GEOTEXTILE FILTER, CLASS 1,
TYPE C (NON-WOVEN) SQYD 473 572 55 1,100
A0150 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 410 410 Contract Quantity
A0160 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 (GOVERNMENT FURNISHED) CUYD 70 507 52 629
A0170 25120-0100 RIPRAP DITCH, METHOD A, CLASS
1 (GOVERNMENT FURNISHED) LNFT 433 37 470
A0180 30201-2000 ROADWAY AGGREGATE, METHOD 2
(GOVERNMENT FURNISHED) CUYD 830 80 910
A0190 31402-0000 STOCKPILED AGGREGATE (SELECT
BORROW) CUYD 7,000 7,000
A0200 31402-0000 STOCKPILED AGGREGATE (SURFACE
COURSE WITH BENTONITE) CUYD 10,500 10,500
A0210 55101-0200 CONCRETE FILLED STEEL PIPE
PILE, IN PLACE (18-INCH X
0.5-INCH) LNFT 1,258 1,258
A0220 55104-1000 DYNAMIC PILE LOAD TEST EACH 5 5
A0230 55116-0000 SPLICE (18-INCH DIAMETER) EACH 20 20
A0240 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 230 230
A0250 55401-1000 REINFORCING STEEL LB 20,200 20,200 Contract Quantity MileStone: 100% Date Completed: In Progress Report Date: 06/02/21
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A 2-
Ju n-
:4
PM
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0
G hi gl io ne
B ri dg e su m m ar y.
xl sm ]S he et
STATE PROJECT
B.1PRA DENA 10(36)AK
SHEET
NUMBER
NPS PMIS No. 164256A NPS Drwg. No. 184/80298
Typical Section Plan-Profile Erosion
Control Drainage Bridge Plans
Temporary Traffic Control
Permanent Traffic Control
Allowance Bid Schedule
A0260 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity
COATED LB 44,500 44,500
A0270 55502-0000 STRUCTURAL STEEL, FURNISHED, Contract Quantity
FABRICATED, AND ERECTED LB 137,000 137,000
A0280 55601-1400 BRIDGE RAILING, TIMBER, Contract Quantity
STEEL-BACKED LNFT 388 388
A0290 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 40 40 Contract Quantity
A0300 60201-0800 24-INCH PIPE CULVERT LNFT 173 12 185
A0310 61103-1600 24-INCH ENCASEMENT PIPE, Contract Quantity
POLYVINYL CHLORIDE (PVC)
(PILE SLEEVE) LNFT 180 180
A0320 61707-2000 STRUCTURE TRANSITION RAILING, Contract Quantity
SBT SYSTEM LNFT 40 40
A0330 62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR 1,240 1,240
A0340 62201-1000 WHEEL LOADER, 4 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 340 340
A0350 62201-1350 BULLDOZER, 200HP MINIMUM
FLYWHEEL POWER HOUR 300 300
A0360 62201-2050 ROLLER HOUR 40 40
A0370 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM
BLADE HOUR 340 340
A0380 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 340 340
A0390 62301-0000 GENERAL LABOR HOUR 340 340
A0400 62406-0100 PLACING CONSERVED TOPSOIL,
2-INCH DEPTH ACRE 0.6 0.1 0.7
A0410 62515-1000 MULCHING, DRY METHOD (Placing conserved mulch) ACRE 1.3 1.3
A0420 63302-0000 SIGN SYSTEM SQFT 17 17
A0430 63308-2000 OBJECT MARKER, TYPE 2 EACH 4 4
A0440 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 4 4
A0450 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 45 15 60
A0460 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 4 4
A0470 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 127 13 140
2- Ju n-
:4
PM
MileStone: 100% Date Completed: In Progress Report Date: 06/02/21 c:
\p w -w or k\ d0
G hi gl io ne
B ri dg e su m m ar y.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2PRA DENA 10(36)AK
SHEET
NUMBER
Typical Section Plan-Profile Erosion
Control Drainage Bridge Plans
Temporary Traffic Control
Permanent Traffic Control
Allowance Bid Schedule
A0480 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 800 50 850
A0490 63704-0000 VEHICLE EACH 2 2
A0500 63708-0000 CELLULAR PHONE SERVICE MO 18 18
A0510 63713-0000 FIELD OFFICE SERVICES
(INTERNET) MO 18 18
2- Ju n-
:4
PM
MileStone: 100% Date Completed: In Progress Report Date: 06/02/21 c:
\p w -w or k\ d0
G hi gl io ne
B ri dg e su m m ar y.
xl sm ]S he et
3)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.3PRA DENA 10(36)AK
SHEET
NUMBER
LEGEND:
NOTE:
SCALE IN FEET
50 100 150 200050
N barrier
Existing jersey
NPS
ac ce ss enclosure
Fenced
Raised leach fie ld
NPS Access of existing sheet pile wall
Approximate location
Stored materials see Stockpile Locations Table
Existing stockpile (typ.), Housing Area Contractor
Existing berm borrow added
7,000 CUYDS select material processing area
Proposed contractor for processing
17,500 CUYDS scrape mandatory source
Government provided
NPS access (30' R.O.W.)
X
Shallow well pit
5.
4.
3.
2.
1.
(See Note 5)
See Subsection 107.12 Contractor housing.
Limit work according to Subsection 105.04.
Water source from the shallow well pit.
construction.
Large stockpiles for mixing fines will be available throughout and equipment staging will be determined by the CO.
The final location of all stockpiles, contractor housing, parking to remain clear
NPS access corridors material processing area
Proposed contractor material is processed of existing piles as
Proposed expansion or structures
Existing materials
Contractor staging area
Contractor staging area
(surface course with bentonite) added
10,500 CUYDS stockpiled aggregate
:0
A
M
J u n e
T
O K
L A
T P
IT
O
P E
R A
T
IO
N P
L
N
C
M y F il e s \T y le r' s D o c u m e n ts
\A K
P R
A D
E N
A
(3
G h ig li o n i\
P W d o c s \d e n a c b .d g n
TOKLAT PIT OPERATION PLAN
STATE PROJECT
NUMBER
SHEET
AK PRA DENA 10(36) C.2
NPS Drwg. No. 184/80298 NPS PMIS No. 164256A
:1
M
J u n e
T
A B
U L
A T
IO
c p w w o r k
\d
\d e n a d a .d g n
PLAN AND PROFILE QUANTITIES
TABULATION OF
STATE PROJECT
NUMBER
SHEET
AK PRA DENA 10(36) D.1
NPS PMIS No. 164256A NPS Drwg No. 184/80298
POINT
NUMBER NORTH EAST ELEVATION DESCRIPTION
2997 93102.962 81171.338 3435.333 5/8" IR w/RPC
2998 93234.737 80664.009 3421.876 5/8" IR w/RPC
GHIG1 92975.896 80709.948 3373.364 5/8" IR w/FHWA Alum Cap
PROJECT : Ghiglione Bridge Replacement
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : scaled to project datum
VERTICAL DATUM : NAVD88 GEOID06
Bridge Ground Coordinates NOTE:1 to convert from bridge ground coordinates to project State plane coordinates (grid) add 3,400,000.000 to the northing and 1,600,000.000to the easting then multiply by the average combined scale factor of .999739223607
Grid Bridge Stationing =807+60-809+39.95 Ground Bridge Stationing=1+00-2+80
NOTE:2
C
M yF ile s\
Pr oj ec ts
_2
0\ Al as ka
\D en al i\
G hi gl io ne \b ri dg e_ co nt ro ls he et
G hi gl io ne _g ro un d_ C on tr ol
Sh ee t_ v2
.x ls x] Sh e
-O ct
-2
3:
P
M W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.5
SHEET
NUMBER
PRA DENA 10(36)AK
SURVEY CONTROL
Grid North Grid East Ground North Ground East Grid/Ground station at C/L
Begin Bridge 3492198.761 1680560.907 93109.681 80999.2717 807+60/1+00 End Bridge 3492255.076 1680401.190 93166.0108 80839.5136 809+39.95/2+80
Pier Grid North Grid East Ground North Ground East Grid/Ground station at C/L
Pier 1 3492230.563 1680529.325 93141.4913 80967.6814 808+04.99/1+45 pier1 Pier 2 3492251.614 1680489.757 93162.5484 80928.1031 808+49.98/1+90 pier2 Pier 3 3492260.036 1680445.736 93170.9724 80884.0704 808+94.96/2+35 pier3
Pier Grid North Grid East Ground North Ground East Offset from C/L to Layout Line
Pier 1 3492212.180 1680522.847 93123.1043 80961.2016 ‐19.49 Pier 2 3492226.921 1680481.041 93137.8487 80919.3847 ‐26.19 Pier 3 3492241.654 1680439.257 93152.5852 80877.5902 ‐19.49
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
2997 3492192.043 1680732.928 3435.333 63°33'23.579940"N 149°45'09.904860"W 3482.2516 0.99973585 5/8" IR w/RPC 1.
2998 3492323.784 1680225.731 3421.876 63°33'24.896049"N 149°45'21.091444"W 3468.7874 0.99973644 5/8" IR w/RPC
GHIG1 3492065.010 1680271.658 3373.364 63°33'22.346796"N 149°45'20.099296"W 3420.2823 0.99973876 5/8" IR w/FHWA Alum Cap
PROJECT :Ghiglione Bridge Replacement DATE OF FIELD WORK : June 2009 DATE OF FINAL ADJUSTMENT : June 2009
PROJECT UNITS : US Survey Foot COORDINATE SYSTEM : Alaska zone 4 SPCS NAD83 (CORS96)
EPOCH DATE : 2008.000
VERTICAL DATUM : Orthometric Elevations based on the NAVD88 GEOID06a
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
_2
0\ Al as ka
\D en al i\
G hi gl io ne \b ri dg e_ co nt ro ls he et \G ri d_
C on tr ol sh ee t\ [G hi gl io ne
_C on tr ol
S he et
-O ct -2
3:
P M
W
FL
H D
_S ur ve y
W
FL
H D
S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.6
SHEET
NUMBER
PRA DENA 10(36)AK
SURVEY CONTROL
10.4 x 16 20301 -1900
20702 -0300
25101 -0300
60201 -0800
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
G
EO
TE
X
TI
LE
F
IL
TE
R
C
LA
S S
TY
PE
C
N
O N
-W O
V
EN
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
(G O
V
ER
N M
EN
T
FU
R N
IS
H
ED
-I
N C H
P
IP
E C U
LV
ER
T
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH SQYD CUYD LNFT Lt Rt 805+27 1
806+00 7 163 22 7 55 GS 2 2 1
807+32 LT 44 44
807+43 RT 59 87
809+00 LT 66 38
809+00 RT 79 52
811+00 7 285 22 7 74 GS 2 2 1
813+50 3 78 22 7 44 GS 2 2 1
PROJECT TOTAL 526 1 314 242 173
Allowable Pipe Material
NOTE: GS Galvanized Steel
1. Steel pipe culvert minimum wall thickness is the larger of _0.064" or the thickness required by the Std. 602-1 fill height table.
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w
-w or k\ d0
D ra in ag e.
xl sx ]S he et
-M ar -2
3:
P M
R
M ea do w s 5/
B
V in ce nt
5/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.1
SHEET
NUMBER
PRA DENA 10(36)AK
NPS PMIS No. 164256A DRAWING No. 184/80298
Note: The quantities shown hereon are approximate and are subject to field adjustments.
L
L
L
L
L
L
B. ROBINSON
K. EIKERMANN
HYDRAULIC DATA
Elev.
WS
ft/sec.
V ft /sec
Q
Q
Q
100Q
Q
PROFILE GRADE DIAGRAM
No Scale
Elevations are at profile grade @ C Rdwy.L
Drawing No. Description
BRIDGE DRAWING INDEX
RG3147-A
RG3147-B
RG3147-C
RG3147-D
RG3147-E
RG3147-F
RG3147-G
RG3147-H
RG3147-I
RG3147-J
RG3147-K
RG3147-L
RG3147-M
RG3147-N
RG3147-O
RG3147-P
RG3147-R
RG3147-Q
PLAN AND ELEVATION
GENERAL NOTES AND ESTIMATE
ABUTMENT CAP
ABUTMENT ENDWALL
WINGWALLS
ABUTMENT BEARINGS
PIER 2 CAP
PIER BEARINGS
GIRDER DETAILS
M ea su re d al on g C
Rd w y.
L
R a d ia l
TYPICAL SECTION
BRIDGE RAILING (1 OF 3)
BRIDGE RAILING (2 OF 3)
REBAR LIST (1 OF 4)
REBAR LIST (2 OF 4)
REBAR LIST (3 OF 4)
upstream face of bridge.
Note: Water surface elevations are at
BRIDGE RAILING (3 OF 3)
GIRDER FRAMING PLAN
DECK PLAN - TOP
Superelevation Table
C Rdwy.L
-5.40%
C Rdwy.L
-5.40%
C Rdwy.L
Sta. 806+01.49
Sta. 807+50.00
Sta. 809+75.00 -5.40%
L
PIER 1 & 3 CAP
PIER 1 & 3 DIAPHRAGM
PIER 2 DIAPHRAGM
GIRDER DIAPHRAGMS
FOUNDATION PLAN
GIRDER SPANS 1 & 4
GIRDER SPANS 2 & 3
DECK PLAN - BOTTOM
STRUCTURE TRANSITION RAILING
G.1
RG3147-X
RG3147-W
RG3147-V
RG3147-T
RG3147-U
RG3147-S
Note: Super rotated about C Rdwy.
1 A
ELEVATION
PLAN AND ELEVATION
N. MARSHALL
R. OWEN
Curve Data:
R= 150.00’
T= 240.12’
L= 303.72’ e= 0.054
PLAN
L
L L
1:2
3,390
3,380
3,370
3,360
3,340
3,350
3,320
3,330
Abut. 2 Pier 3
Pier 2 Pier 1 Abut. 1
L
-0.5% Grade
FIX FIX FIXEXP EXP
-0.5000%
,3
.3
100’ VC
K = 17
-6 .2
0%
,3
.8
K = 34
180’ VC
BRIDGE
C Rdwy.
P C .3
Layout Line
N70°35’12"W
(typ. all 4 corners)
Structure Transition Railing
G h ig li o n e C r e e k
Profile Grade timber bridge railing
Steel tube-backed
UNLESS NOTED
1"= 30’-0" al on g gu tt er lin e
Cu rb jt . s pa . m ea su re d
Gutterline (typ.)
’-0
45’-0" 45’-0"
45’-0"
Length of Bridge = 180’-0"
’-2
6 spa. @ 25’-0"= 150’-0"
22’-2" al on g gu tt er lin e
C ur b jt sp a.
m ea su re d
7 spa. @ 24’-6"= 171’-6"
WINGWALL D
WINGWALL C
WINGWALL B
WINGWALL A
3,310
Chord El. 3367.1Low
’-4
5.5
8.3
8.8
9.7
3343.5
3344.2
3344.4
3344.1
Q WS EL 3344.150
1:
3/
Steel rolled beam (typ.)
Q scour = 0 (abut.)
500Q scour = 0 (abut.)
= El. 3328.2 (pier)
= El. 3327.8 (pier)
3,300
(typ.).
filled steel pipe piles
" concrete 2
El. 3323.0
Est. tip
REBAR LIST (4 OF 4)
El. 3307.0
Est. & Min. tip
3,290 ground @ C Rdwy.
Approx. existing
El. 3330.0
Min. tip
El. 3307.0
Min. tip
El. 3289.0
Est. tip
El. 3307.0
Min. tip
El. 3303.0
Est. tip
El. 3329.0
Min. tip
El. 3295.0
Est. tip ground.
finished
Proposed
RG3147-Y
RG3147-Z
RG3147-AA
RG3147-BB
RG3147-C for details.
(typ. @ piers). See
RG3147-CC
STRUCT. TRANSITION RAILING DETAILS
Rdwy. Plans for details.
all 4 corners). See
Object Marker (typ. @ using Begin Bridge as the reference line/point.
Note: Build bridge to dimensions shown in the plans
El.
.35
C Pie r 3 C R dwy.
El.
.77
El. 3370.47
El. 3371.57
C Pier 2 @ C Rdwy.
El. 3371.80
C Pier 1 @ C Rdwy.
El. 3372.60
El. 3371.45
El. 3372.02
Sta. 807+60
Begin Bridge @ C Rdwy.
El. 3371.12
End Bridge @ C Rdwy.
SHEET
NO.
PROJECTSTATE
AK
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
DENALI NATIONAL PARK
DENALI PARK ROAD
DRAWING NO.DATEBRIDGE DRAWINGPROJECT TEAM LEADERSCALE
CHECKED BYDRAWN BY
R.WEHNER
DESIGNED BY
REVISIONSBYDATENO.
REVISIONS
BY
DATE
1/
N F
H
B r id g e
W F
L \R
G
G h ig li o n e
C r e e k
B r id g e \R
G
\C
A D il e s \D
G N
F il e s \r g p e .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of OCTOBER 2020
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
DENALI BOROUGH, ALASKA
STRUCTURE #9830-011P
Item
ESTIMATE NOTES:
Quantity: Unit:Item No. Notes:
ESTIMATE
(1) (2)
GENERAL NOTES:
SPECIFICATIONS:
CONCRETE: 150 lbs. per cubic foot.
DRAINAGE:
STRUCTURAL STEEL: 490 lbs. per cubic foot.
STRUCTURAL STEEL:
DEAD LOAD:
LATERAL EARTH PRESSURE:
LIVE LOAD:
All reinforcing steel shall conform to AASHTO M31, or M322, Grade 60 deformed. The minimum concrete covering to the face of any bar shall be 2 inches, unless noted otherwise on the plans. Minimum splice lengths for all bar sizes shall be as
REINFORCING STEEL:
CONCRETE:
DESIGN CRITERIA:
Structural Steel, Furnished, Fabricated, and Erected
Bearing Device, Elastomeric
LB
LB
LNFT
EACH
(1) (3)
(1) after fabrication.
Welding for welded anchors shall conform to ANSI/AASHTO/AWS D1.5, Chapter 7. Guard angle assemblies shall be galvanized
Structural metal for guard angles shall conform to ASTM A36. Welded anchors shall conform to AASHTO M169 (ASTM A108).
20304-2000
55201-0200
55401-2000
55502-0000
55601-1400
56401-1000
(1)(4) shown on the plans. All superstructure reinforcing steel shall be epoxy coated, as noted on the bar list.
LNFT61707-2000
2 B
(1)
CUYD
55401-1000 Reinforcing Steel
LB
LB
Deck slab designed using approximate elastic method (the "strip" method).
HL-93. Maximum Dynamic Load Allowance (Impact), IM=33%.
SOIL: 120 lbs. per cubic foot.
Structural Concrete, Class A(AE)
Reinforcing Steel, Epoxy Coated
FUTURE PAVING ALLOWANCE: 25 lbs. per square foot, applied to clear roadway width.
NONE
B. ROBINSON
DESIGN: AASHTO LRFD Bridge Design Specifications for Highway Bridges, Seventh Edition, 2014 with 2015 & 2016 interim revisions.
TIMBER: 50 lbs. per cubic foot.
For wingwalls: heq = 2 feet
For abutments: heq = 4 feet
LIVE LOAD SURCHARGE: Equivalent height of soil.
AT REST PRESSURE: Equivalent to a fluid unit weight of soil = 55 pounds per square foot.
ACTIVE PRESSURE: Equivalent to a fluid unit weight of soil = 35 pounds per cubic foot.
by Bureau of Public Roads, Region 10, Juneau, Alaska.
See the following for additional information on existing bridge: "Ghiglione Creek" design No. 956, dated 1957, prepared
EXISTING BRIDGE PLANS:
GENERAL NOTES AND ESTIMATE
Removal of Bridge
(1)
(1)(5)
Bridge Railing, Timber, Steel-Backed
Structure Transition Railing, SBT System
N. MARSHALL
G.2
20200
44500
137000
55104-1000 5 EACHDynamic Pile Load Test
Heavy Hex Style unless noted otherwise on the plans. Welded shear connectors shall conform to AASHTO M169 (ASTM A108).
friction type, Class B and shall be made with temperature Zone 3. These member components shall consist of the rolled girders. All field connections are slip critical, Combination I require mandatory Charpy V-Notch testing. Testing shall conform to AASHTO T243, frequency H for
All primary longitudinal superstructure components and connections subject to tensile stress due to Strength Load
Certification Program. The contractor shall be responsible for the stability of the structure during all phases of construction.
unless otherwise shown on the plans. The steel fabricating company shall be fully certified under the AISC Quality
All structural steel shall be high-strength low alloy corrosion resistant steel conforming to AASHTO M270, Grade 50W
55116-0000 20 EACHSplice (18" diameter)
55101-0200 1258 LNFT (6)")2
1Concrete Filled Steel Pipe Pile, In-Place (18" diameter x
N. MARSHALL
K. EIKERMANN
the long period spectrum acceleration, SD1 = 0.622 g. Site Class = D. Seismic Zone = 4.
acceleration, SDS = 1.057 g. Long period acceleration at 1.0 seconds (S1 = 0.379 g) modified by the Site Coefficient (Fv = 1.642) to give
Short period acceleration at 0.2 seconds (Ss = 0.940 g) modified by the Site Coefficient (Fa = 1.124) to give the short period spectrum
Peak Ground Acceleration (PGA = 0.423 g), modified by the Site Coefficient (Fpga = 1.077) to give a spectrum acceleration, As = 0.456 g.
SEISMIC:
61103-1600 24-inch Encasement Pipe, Polyvinyl Chloride (pile sleeve) 180 LNFT (1)(7)
CONSTRUCTION: Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
WIND LOAD:
Design Wind Speed (Strength III Limit State), V = 110 mph. Wind Exposure Category = C.
additional requirements.
match SAE-AMS-STD-595 color code #16473 "aircraft gray" once the concrete has cured. See Special Contract Requirements for meet the requirements of AASHTO M213. Provide integral coloring to all structural concrete except to that in pipe pile. Color shall cement. Flexible cellular joint filler shall meet the requirements of AASHTO M153, closed cell rubber. Expansion joint filler shall inch, unless noted otherwise on the plans. All concrete shall be made with Type II 4 3Chamfer exposed edges of all concrete
All cast in place concrete shall be structural concrete Class A(AE) with a minimum 28-day compressive strength f’c=4500 psi.
LPSMAll Req’d
Drainage pipe shall conform to AASHTO M252.
installation hole.
Includes cost of furnishing and installing PVC pipe and flange, granular backfill, and boring and cutting shoes.
Includes cost of filling with structural concrete Class A(AE) to the specified elevation, and preboring (if required), required for construction of transition railing.
Includes cost of timber railing elements, steel posts & plates, connection hardware, and all materials concrete coloring agent for concrete curb.
concrete = 8.7 cubic yards. Estimated quantity of epoxy coated reinforcing steel = 2840 lbs. Also includes cost of connection hardware, and all materials required for construction of the railing. Estimated quantity of structural
Includes cost of structural concrete Class A(AE), epoxy coated reinforcing steel, structural steel, timber rails
Estimated weight of guard angles = 445 lbs.
Includes cost of furnishing and installing structural steel guard angles, welded studs, bearing plates and anchor bolts.
structure excavation, estimated quantity = 3 cubic yards.
Also includes cost of furnishing and placing structural backfill, estimated quantity = 32 cubic yards. Also includes cost of sheet drain, estimated quantity = 41 square yards, and weepholes. Also includes cost of concrete coloring agent.
Includes cost of furnishing and installing all joint fillers. Also includes cost of furnishing and installing geocomposite
Contract Quantity
(7)
(6)
(5)
(4)
(3)
(2)
(1)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g g n .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of OCTOBER 2020
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
SECTION B-B
ELEVATION
4 3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g f o u n d a ti o n .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of OCTOBER 2020
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
DENALI BOROUGH, ALASKA
STRUCTURE #9830-011P
BC
0.2
1’D
IA
0.2 4’U
SCGS
FOUNDATION PLAN
K. EIKERMANN
UNLESS NOTED
1"= 20’-0"
FOUNDATION PLAN
3 C
G.3
FOUNDATION NOTES:
GB18-06
GB18-05
P C .3
PT 810+33.07
P T .6
Wilderness Boundary
C Rdwy.L
L
L
N70°35’12"W
G h ig lio n e C r e e k to be removed.
Existing bridge
Layout Line
B. ROBINSON
R. WEHNER
N. MARSHALL
FOUNDATION TABLE
TIP EL.
EST. PILE
TIP EL.
MIN. PILE
(@ top of pile)
(STRENGTH I)
LOAD
PILE AXIAL
MAX. FACTORED
195 kips
235 kips
250 kips
235 kips
195 kips p ie r s ty p s p a a b u ts ty p
L L
L L
L L
L L
L L
C Pier 2 & C Piles
C Rdwy.
L L
L L
L s p a
See Detail A s p a
See Detail B
See Detail C
L
C Pier 1 & C PilesL L
C Rdwy.L
L
C PileL
DETAIL A DETAIL B
DETAIL C
No Scale No Scale
No Scale
C Abut. 1 & C PilesL L
LL
C Rdwy.L
C PileL
Layout Line
GB16
-0
BH
GB16
-0
BH
GB16
-0
BH
GB16
-0
BH
N abuts.)
@ piers &
(typ.).
steel pipe piles concrete filled
" 2 118" Ø x t o L a y o u t
L in e
C PileL t o L a y o u t
L in e
3295.0
3303.0
3289.0
3307.0
3323.0
3329.0
3307.0
3307.0
3307.0
3330.0
Abut. 2
Pier 3
Pier 2
Pier 1
Abut. 1
BB
B o r e d H o le P
V C P ip e
Limits of Bored Hole
Limits of Bored Hole outside diameter) (minimum 32" flange PVC Flange, ASTM D1784
Structural Concrete Class A(AE)
3’-0" Bored Hole
2’-0" PVC Pipe
1’-6" Pipe Pile
1’-6" Pipe Pile
2’-0" PVC Pipe
3’-0" Bored Hole
Finish Grade driving pipe pile.
Backfill annular space between steel pipe pile and PVC pipe after
PVC pipe and bored hole limits prior to driving steel pipe pile.
Bore holes, place PVC pipe, and backfill annular space between
NOTES:
Schedule 80, ASTM D1785
" thick,4
" pipe pile2
" pipe pile2 to Subsection 703.03(a) Granular backfill conforming to Subsection 703.03(a) Granular backfill conforming
R. OWEN
3336.0
3312.0
3312.0
3312.0
3338.0
FILL EL.
CONCRETE
Sta. 807+60
@ C Rdwy.
Begin Bridge
L flush with finish grade.
Trim any pvc pipe protrusion
P a y L im it
Division, Vancouver Washington.
Federal Highway Administration, Western Federal Lands Highway dated February 2020, prepared by U.S. Dept. of Transportation, For additional information see Geotechnical Final Report No. 11-19
Weld splices to conform to ANSI/AWS Structural Welding Code D1.1.
to ASTM A148, Grade 90-60.
damage to the piles during installation. Cutting shoes shall conform
Drive piles open-ended. Provide open end cutting shoes to prevent structural concrete.
elevation specified in Foundation Table and fill with Class A(AE)
After driving pipe piles, remove material from inside pipe pile to
Steel pipe piles shall conform to ASTM A53, Grade B, Fy = 35 ksi.
C R d w y
C A b u t.
C R d w y
C P ie r
C R d w y
C P ie r
C R d w y
C P ie r
C R d w y
C A b u t.
C Rdwy. @ C Pier 2 C Rdwy. @ C Pier 1
C Rdwy. @ C Abut. 1
Sta. 807+60
Begin Bridge @ C Rdwy.
" = 1’-0"2
1Scale: 1
C Gdr. EL C Gdr. DL C Gdr. CL
Layout line
C Gdr. BL C Gdr. AL
-2%
SECTION A-A
L Sta. 807+60
Begin Bridge @ C Rdwy.
"2 17’-45’-3"5’-3"5’-3""8
54’-7
C Rdwy.L
A
A
L L
L
L L
C Rdwy.L
ABUTMENT CAP PLAN
UNLESS NOTED
"= 1’-0"
ABUTMENT CAP
L
Gdr. A Gdr. B Gdr. C Gdr. D Gdr. E
ABUTMENT BEARING SEAT ELEVATIONS
ABUT. 1
ABUT. 2
b.f. = both faces o.f. = other face f.f. = fill face
Abbreviations:
m in
Gdr. spa. @ C Brg.L
Step spa.
Step spa.
(ty p
L
Scale: 1" = 1’-0"
(ABUTMENT 1 SHOWN, ABUTMENT 2 OPPOSITE HAND)
°5 ’5
C Abut.
C Brg. &
L
C Abut.
C Brg. &
L
3’-0"
BB
L
3367.72
3366.80
3367.94
3367.04
3368.16
3367.29
3368.38
3367.55
3368.61
3367.80
El. 3363.80 (Abut. 2)
El. 3364.72 (Abut. 1)
ABUTMENT CAP ELEVATION
N. MARSHALL 4 D
G.4
See RG3147-G.
Anchor bolts (typ.).
See RG3147-G.
Elastomeric bearing pad.
@ C Abut.
C Gdr. E
@ C Abut.
C Gdr. D
@ C Abut.
C Gdr. C
@ C Abut.
C Gdr. B
@ C Abut.
C Gdr. AL L
L
L L
LPile spa. measured along C Brg.
3" Ø weephole spa. measured along C Brg.
5’-3"5’-3""8 32’-2
"8 127’-9"8
11’-9
"8 76’-65’-3"5’-3"5’-3""8
74’-11
"8 32’-2"4
327’-3
"2 118" Ø x
Steel Pipe Pile
Class A(AE)
Concrete
Structural
1’-6" 1’-6" e m b e d
C 18" Ø x 12" concrete filled steel pipe pile
L
R. OWEN
"16 31’-9 3 spa. @ 8’-0" = 24’-0" "16
31’-9
"16 33’-9 2 spa. @ 10’-0" = 20’-0" "16
33’-9
2" clr. (typ.)
2-#6P bars 3 spa. @ 5"=1’-3", Stirrup spa. (typ.)
L
4’-2", 2-#6P bars 5 spa. @ 10"=
3 spa. @ 5"=1’-3", 2-#6P bars
3 eq. spa. =1’-4", #6P bars
2 spa. @ 5"=10", 2-#6P bars
" 16
LMeasured along C Abut.
into pile (4 tot.)
embedded 3’-0"
#8A18 pile anchor
#6A2 (typ.)
2-#6A3 (typ.)
4-#5A16(a-d)
4-#5A17
4-#5A17 4-#5A17
7-#10A11(a-d)
4-#10A12(a-d) & #10A13
#6A4 (typ.)
2-#6A6 (typ.)
#6A7 (typ.)
2-#6A8 (typ.)
#6A9 (typ.)
#8A18 pile anchor (typ.)
#6A bars
Fill face
Other face
#10A14 o.f. & #10A15 f.f.
#10A12d (bott.)
#10A11a (top)#10A11d (top)
#10A14
#10A15
#10A12a (bott.)
C C
#6A1 (typ.)
#6A2 (typ.)
#5A16a
#5A16d
VIEW C-C
C lr
#6A1 (splay end bars) end bars)
2-#6A1 (splay
#8A18 (4 per pile, typ.)
(typ.)
#5A19 ties #6A5 end bars)
2-#6A10 (splay stirrups (typ.)
necessary to avoid
3" Ø weephole. Adjust as c c
Note: Place stirrups parallel to interior steps, except at ends.
2-#10A12(a-d)
10" 4’-5" 5’-3" 4’-4"
(ABUTMENT 1 SHOWN, ABUTMENT 2 OPPOSITE HAND)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g a b u tm e n t.
d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
(2 Req’d)
No Scale
1’-0" (typ.)
1’-0" (typ.)
8"
GUARD ANGLE DETAIL
ELEVATION
SECTION
each leg, staggered.
6"
"8 3L3x3x vertical leg only.
3" b.f. = both faces o.f. = other face f.f. = fill face
Abbreviations:
ABUTMENT ENDWALL
-2% Fill face recommendations.
Attach to endwall per manufacturer’s with Type 1-B geotextile.
Pre-fabricated geocomposite sheet drain joint filler
3" Flexible cellular
C Brg.L
SECTION A-A
1’-9"1’-0" manufacturer.
recommended by connection as
Provide drain grate
See detail.
Guard Angle.
Measured along layout line.
RG3147-G for details.
Abut. bearing. See
Begin Bridge
ABUTMENT ENDWALL PLAN
1’-0"
(M e a su re d a lo n g g u tt e rl in e
L
11’-7"
1’-0"
"8
11’-3
"8
1’-3
B. ROBINSON
UNLESS NOTED
"= 1’-0"
Other Face (typ.)
C Rdwy.L
Geocomposite sheet drain.
Wrap around wing 1’-0"
Fill Face (typ.)
" fillet (typ.)2 1" x 32
Layout line
C Gdr. EL C Gdr. DL C Gdr. CL C Gdr. BL
C Gdr. AL joint filler (typ.)
1" flexible cellular
LC Brg.
(typ.)
" fillet2
" = 1’-0"
3Scale:
Radial
R ad ial
WINGWALL A WINGWALL B
A
A
Note: Galvanize guard angle assemblies after fabrication.
Sta. 807+60
Begin Bridge @ C Rdwy.
N. MARSHALL
See detail.
Guard Angle.
El. 3365.4 (Abut. 2)
El. 3366.3 (Abut. 1)
El. 3366.4 (Abut. 2)
El. 3367.2 (Abut. 1)
(ABUTMENT 1 SHOWN, ABUTMENT 2 OPPOSITE HAND)
(ABUTMENT 1 SHOWN, ABUTMENT 2 OPPOSITE HAND)
ABUTMENT ENDWALL ELEVATION
2-#4EE1 (typ.)
9" 9" gdrs.)
(typ. between
#4EE3 (typ.)
lap splice
1’-10" min.
#4EE1 (typ.)
L
L
3" flexible cellular joint filler
9" s p a
Length = 27’-6"
9"
E E b .f
@ C Gdr.)
#4EE2 (typ.
#4EE3
2-#4EE1 &
1’-1"= 3’-3", 3 spa. @
@ C Gdr.)
#4EE2 (typ.#6EE4
#4EE3
2-#4EE1 &
1’-3"= 3’-9", 3 spa. @
#4EE3
#4EE1
#6EE4 (12 tot.)
#6EE4 b.f (typ.)
#7WE110
#7WE210
#4WE203 (typ.)
#4WE209
G.5
E5
Abut. diaph.
R. OWEN
W in g w a ll ty p
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g e n d w a ll .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
Measured along gutterline
A
1’-0"
"8 11’-3
13’-1"
5’-1"8’-0"
"8
Fill face
Other face
B
1’-0"
"8 11’-3
"8
Fill face
Other face
B
SECTION A-A
SECTION B-B
b.f. = both faces o.f. = other face f.f. = fill face
Abbreviations:
WINGWALLS
" = 1’-0"4
El. 3371.73 (Wing. C)
El. 3372.64 (Wing. A)
El. 3371.77 (Wing. C)
El. 3372.60 (Wing. A)
El. 3370.47 (Wing. D)
El. 3371.45 (Wing. B)
El. 3370.42 (Wing. D)
El. 3371.56 (Wing. B)
Begin/End Bridge
8’-0"
El. 3365.52 (Wing. C)
El. 3366.35 (Wing. A)
Begin/End Bridge
El. 3364.22 (Wing. D)
El. 3365.20 (Wing. B) under railing.
Level roughened surface under railing.
Level roughened surface
8’-0"
N. MARSHALL
3" s p a s p a
3 spa. @ 1’-3" = 3’-9" c lr
3 spa. @ 1’-3" = 3’-9"
5’-1" 8’-0"
13’-1"
3"
Measured along gutterline c lr
ELEVATION WINGWALL A
ELEVATION WINGWALL B
#4WE bars s p a s p a
#4WE bars
& #4WE109
2-#6WE107
#4WE103 (typ.)
#4WE102 b.f.
#6WE107
#4WE109
#4WE103
#6WE bars (typ.)
#4WE bars (typ.)
#5WE104
#5WE104 b.f.
s p a
W
E o .f s p a
W
E f .f
W E a g f .f
W E a d o .f
& #4WE106d o.f.
#6WE105g f.f.
& #4WE106a o.f.
#6WE105a f.f.
#4WE102 b.f. (typ.)
(WINGWALL C SIMILAR)
(WINGWALL D SIMILAR)
1’-4"5 spa. @ 1’-6" = 7’-6", #4WE101(a-f) b.f. & #4WE1033"
#4WE101f
#4WE101a
#4WE203
#6WE207
#4WE209
#6WE bars (typ.)
#4WE bars (typ.)
#5WE204
W E a d o .f
W E a g f .f s p a
W
E o .f s p a
W
E f .f
#5WE204 b.f.
#4WE203 (typ.)
& #4WE209
2-#6WE207
#4WE202 b.f.
#4WE202 b.f. (typ.)
& #4WE206d o.f.
#6WE205g f.f.
& #4WE206a o.f.
#6WE205a f.f.
#4WE201a
#4WE201f
1’-4" 5 spa. @ 1’-6" = 7’-6", #4WE201(a-f) b.f. & #4WE203 3"
G.6
6 F
Railing curb reinforcement not shown.
See RG3147-U & V for details.
Railing curb reinforcement not shown.
See RG3147-U & V for details.
#7WE210 @ fillet (8 tot.)
#7WE110 @ fillet (8 tot.)
R. OWEN
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g w in g .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
NOTES:
7.
6.
5.
4.
3.
2.
1.
ELASTOMERIC PAD DETAIL
PLAN
ELEVATION
ABUTMENT BEARING
C Gdr.
C Brg.
L
L
"16
"16
SECTION A-A
ELEVATION
PLAN
" PL4
PL WASHER
No Scale
(10 Req’d)
ABUTMENT BEARINGS
1" = 1’-0"N. MARSHALL
1’-2"
7"7" and 3 elastomeric inner layers @ 0.40".
"4 11 elastomeric layer (top & bott.) @
" clr.4 all around securely to pad (4 per pad)
14 gage (0.075") steel shim moulded
"2 15"2
4"4"
1"
(typ.)
(ABUTMENT 1 SHOWN, ABUTMENT 2 OPPOSITE HAND)
G.7
7 G
DETAIL B
R. OWEN
C Gdr.L
Brg. stiffeners
A
A
Sole Plate
" x 11" x 2’-0"2
"16
"16
See Detail B
See detail Elastomeric brg. pad.
" x 3" slotted holes, (typ.)16 9w/ 1
"2 13" x 7" x 1
Anchor Rod Shear Plate washer & 2 heavy hex nuts (typ.)
w/ plate washer, elastomeric
" Ø threaded anchor rod 2
L
C Gdr.L
Girder web
Brg. stiffeners
"2 19"2
19"2 12 "2
L
°9
’5
Sole Plate
" x 11" x 2’-0"2
C Abut. & C Brg.L slotted holes C 1 9/16" x 3" w/ 1 9/16" x 3" slotted holes, (typ.)
3" x 7" x 1 1/2" Anchor Rod Shear Plate Bearing seat
" thick elastomeric washer4
Heavy hex nuts, snug tight.
" PL washer. See Detail.4
"16 typ.
" x 3" slotted holes, (typ.)16 9w/ 1
"2 13" x 7" x 1
Anchor Rod Shear Plate
3"
Grade DH. Anchor rods, washers, and nuts shall be galvanized.
conform to ASTM A36. Heavy hex nuts shall conform to ASTM A563, Anchor rods shall conform to ASTM F1554, Grade 105. Plate washers shall permanent and be visible after the bearing is installed.
shall include the bearing location on the bridge. All marks shall be
All bearings shall be marked prior to shipping. The marks field welding. Temperature of the steel to elastomeric pads during
Submit to CO for approval the procedures to prevent heat damage plate.
The elastomeric pad shall be vulcanized to bottom surface of sole
AASHTO LRFD Design method "A" used for elastomeric pad design.
Grade 5 or higher. Steel shim plates shall conform to ASTM A36.
to AASHTO M251 with 60 Durometer hardness, elastomer
Steel reinforced elastomeric bearing pad shall conform
All structural steel plates shall be AASHTO M270, Grade 50W.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g b e a r in g s .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
1Scale: 1
"8 12’-35’-3"5’-3"5’-3"5’-3""8
13’-1Span 1 Gdr. Spa. @ C Brg.
L L
A
A
Gdr. A Gdr. B Gdr. C Gdr. D Gdr. E
PIER BEARING SEAT ELEVATIONS
PIER 1
PIER 3
Step Spa.
Span 2 Gdr. Spa. @ C Brg.L
4’-5"5’-3"5’-3"5’-3""4 16’-2
"8 51’-75’-3"5’-3"5’-3"5’-3""8
53’-8
C Gdr. AL C Gdr. BL
C Rdwy.L
C Gdr. CL
C Gdr. DL
C Gdr. EL
"2 11’-95’-3"5’-3"10"4’-5"5’-3""4
33’-6Measured along C PierL
L
5°9
’5
°2 ’2
C Brg. Span 2L
C Pier 1L
C Brg. Span 1L
C Gdr. AL
C Gdr. BL
C Gdr. CL
C Gdr. DL
C Gdr. EL m in
PIER CAP PLAN
PIER CAP ELEVATION
PIER 1 & 3 CAP
"2 14 spa. @ 101’-9"
= 3’-6"
"2 14 spa. @ 101’-9"
= 3’-6"
"2 14 spa. @ 101’-9"
= 3’-6"
"2 14 spa. @ 101’-9"
= 3’-6"
1’-8" 1’-0" pier bearing details (typ.)
See RG3147-L for
9"
(typ.)
"4 126’-4
3367.55 3367.81 3368.07 3368.33 3368.60
3367.07 3367.34 3367.62 3367.90 3368.18
El. 3364.07 (Pier 3)
El. 3364.55 (Pier 1)
C Rdwy.L
U p s ta ti o n joint filler cellular
" flexible 2 pedestal
" x 10" 2
N. MARSHALL
UNLESS NOTED
" = 1’-0"2
@ 10" 2 spa.
"4 11’-0
= 1’-8"
8 H
G.8
LC Pier
SECTION A-A
Scale: 1" = 1’-0"
4’-0"
2’-0"2’-0"
BB
" x 10" pedestal2
L
L @ C Pier
C Gdr. A
L
L @ C Pier
C Gdr. B
L
L @ C Pier
C Gdr. C
L
L @ C Pier
C Gdr. D
L L @ C Pier
C Gdr. E
L
Pile spa. measured along C PierL
C 18" Ø x 12" concrete filled steel pipe pile
"8 12’-2 3 spa. @ 7’-4" = 22’-0" "8
12’-2 e m b e d
"2 118" Ø x
Steel Pipe Pile
Class A(AE)
Concrete
Structural
2" clr. (typ.)
(PIER 1 CAP SHOWN, PIER 3 CAP OPPOSITE HAND)
(PIER 1 CAP SHOWN, PIER 3 CAP OPPOSITE HAND)
Stirrup spa. (typ.)
3 spa. @ 5"=1’-3", 2-#6P bars
3 eq. spa. =1’-4", #6P bars
3 spa. @ 5"=1’-3", 2-#6P bars
"8
2-#6P bars 3 spa. @ 5"=1’-3", 3’-6", 2-#6P bars
"=2 14 spa. @ 10
#6P2 (typ.)
#6P4 (typ.)
#6P6
#6P7
#6P9 (typ.)
4-#5P164-#5P15
4-#5P15
4-#5P15 7-#10P11
2-#10P13
6-#10P12 & #10P14
#10P11 (7 tot. top)
#10P12 (6 tot. bott.)
#10P13 b.f.
#6P bars
#8P17 pile anchor (typ.)
(embed 2’-0")
#6P18 dowel
R. OWEN
2-#6P1 (typ.)
2-#6P3 (typ.) 2-#6P5 (typ.)
2-#6P8 (typ.)
2-#6P10 (typ.)
into pile (4 tot.)
embedded 3’-0"
#8P17 pile anchor
#6P18 dowel (typ.)
#6P18 dowel spa.
(typ.)
#5P19 ties
#8P17 (4 per pile, typ.)
C Rdwy. @ C Pier 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g p ie r .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
1Scale: 1
C Gdr. AL C Gdr. BL C Gdr. CL C Gdr. DL
C Gdr. EL
C Gdr. AL C Gdr. BL
C Gdr. CL
C Gdr. DL C Gdr. EL
C Rdwy.L
"8 71’-45’-3"5’-3"5’-3"5’-3""8
12’-9
1’-3"5’-3"5’-3"10"4’-5"5’-3"2’-11"Measured along C PierL
Span 2 Gdr. Spa. @ C Brg.L
Step Spa.
Span 3 Gdr. Spa. @ C Brg.L
"2 13’-105’-3"5’-3"5’-3""2
15’-6
"8 71’-45’-3"5’-3"5’-3"5’-3""8
12’-9
C Brg. Span 3L
C Pier 2L
C Brg. Span 2L
°3 ’4 m in
LL
Gdr. A Gdr. B Gdr. C Gdr. D Gdr. E
PIER BEARING SEAT ELEVATIONS
PIER 2
SECTION A-A
L
Scale: 1" = 1’-0"
4’-0"
BB
PIER 2 CAP PLAN
PIER 2 CAP ELEVATION
PIER 2 CAP
C Pier
3367.28 3367.57 3367.85 3368.13 3368.42
N. MARSHALL
U p s ta ti o n pier bearing details (typ.)
See RG3147-L for
"2 14 spa. @ 101’-9"
= 3’-6"
"2 14 spa. @ 101’-9" "2
14 spa. @ 101’-9" "2 14 spa. @ 101’-9" 1’-8" "2
= 3’-6" = 3’-6" = 3’-6"
3"
(typ.) pedestal
" x 10" 2 joint filler cellular
" flexible 2
" x 10" pedestal2
El. 3364.28
L
LL
L
L
C Rdwy.L A
A
UNLESS NOTED
" = 1’-0"2
°3
’4
25’-2"
2 spa.
"2
= 1’-7"
"2 1@ 9
9 I
G.9
@ C Pier
C Gdr. A @ C Pier
C Gdr. B @ C Pier
C Gdr. C @ C Pier
C Gdr. D
L
L L L @ C Pier
C Gdr. E
L
Pile spa. measured along C PierLPile spa. measured along C PierL
L
2’-0"2’-0"
C 18" Ø x 12" concrete filled steel pipe pile
2’-1" 3 spa. @ 7’-0" = 21’-0" 2’-1" e m b e d
"2 118" Ø x
Steel Pipe Pile
Class A(AE)
Concrete
Structural
2" clr. (typ.)
Stirrup spa. (typ.)
2-#6P bars 3 spa. @ 5"=1’-3", 3 spa. @ 5"=1’-3", 2-#6P bars
3 eq. spa. =1’-4", #6P bars
, 2-#6P bars"2 11’-1"=2
13 spa. @ 4
"2
2-#6P bars
"=3’-2", 2
4 spa. @
#6P2 (typ.)
4-#5P15
4-#5P15
4-#5P15 4-#5P16
7-#10P11
2-#10P13
#6P7
#6P9 (typ.)
6-#10P12 & #10P14
#6P6
#6P4 (typ.)
#6P bars
#10P13 b.f.
#8P17 pile anchor (typ.)
#10P12 (6 tot. bott.)
#10P11 (7 tot. top)
(embed 2’-0")
#6P18 dowel
R. OWEN
2-#6P1 (typ.)
2-#6P3 (typ.) 2-#6P5 (typ.)
2-#6P8 (typ.)
2-#6P10 (typ.)
into pile (4 tot.)
embedded 3’-0"
#8P17 pile anchor
#6P18 dowel (typ.)
#6P18 dowel spa.
#8P17 (4 per pile, typ.)
(typ.)
#5P19 ties
C Rdwy. @ C Pier 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g p ie r .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
L L
C Gdr. AL C Gdr. BL
C Rdwy.L
C Gdr. CL C Gdr. DL
C Gdr. EL
"2 11’-95’-3"5’-3"10"4’-5"5’-3""4
33’-6Measured along C PierL
C Pier 1L
C Gdr. AL
C Gdr. BL C Gdr. CL
C Gdr. DL C Gdr. EL
PIER 1 & 3 DIAPHRAGM
9"
PIER DIAPHRAGM PLAN
PIER DIAPHRAGM ELEVATION
A
LL
L L
L
C Gdr. EC Gdr. D
C Gdr. C C Gdr. B
C Gdr. A
C Rdwy.L
2" flexible cellular joint filler (typ.).
A
N. MARSHALL
UNLESS NOTED
" = 1’-0"2
SECTION A-A
Scale: 1" = 1’-0"
4’-0"
2’-0"2’-0"
1’-6"1’-6"
" fillet (typ.)2
" flexible cellular joint filler (typ.).2
1’-10" min. lap splice
C PierL
U p s ta ti o n
"2 110 "2
"2 14 spa. @ 10 "2
110 (typ. between gdrs.)2 spa. @ 10" = 1’-8" "2
(typ.)
2-#4DE1
(typ.)
2-#4DE6
"4 124’-10
(typ.)
2-#4DE6
Deck reinforcement
#4DE6 (typ.)
= 3’-6"
2-#4DE1
(typ.)
10 J
G.10
#6DE3
#4DE4 (typ. @ ends)
#4DE8 (3 tot. @ each end)
#4DE6
#4DE1 or
#5DE7
#5DE2 or
#4DE6
#4DE1 or
#6DE3 (8 tot.)
2-#6DE3
#4DE4 (3 tot. @ each end)
#5DE2 (typ.)
3-#4DE8 (typ. @ ends)
#5DE7 (typ.)
R. OWEN
(PIER 1 CAP SHOWN, PIER 3 CAP OPPOSITE HAND)
(PIER 1 CAP SHOWN, PIER 3 CAP OPPOSITE HAND)
C Rdwy. @ C Pier 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g p ie r .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
LL
L L
L C Rdwy.L
C Gdr. EC Gdr. D
C Gdr. C C Gdr. B
C Gdr. A
C Gdr. AL C Gdr. BL C Gdr. CL C Gdr. DL
C Gdr. EL
C Gdr. AL C Gdr. BL
C Gdr. CL
C Gdr. DL C Gdr. EL
C Rdwy.L
1’-3"5’-3"5’-3"10"4’-5"5’-3"2’-11"Measured along C PierL
C Pier 2L
LL
SECTION A-A
Scale: 1" = 1’-0"
4’-0"
2’-0"2’-0"
C PierL
PIER 2 DIAPHRAGM PLAN
PIER 2 DIAPHRAGM ELEVATION
PIER 2 DIAPHRAGM
N. MARSHALL
1’-6"1’-6"
3"
(typ.)
2" flexible cellular joint filler (typ.).
" fillet (typ.)2
UNLESS NOTED
" = 1’-0"2
U p s ta ti o n
"2 110 "2
"2 110" = 1’-7"2
12 spa. @ 9 "2 14 spa. @ 10 (typ. between gdrs.) "2
#4DE1 (typ.)
" flexible cellular joint filler (typ.).2
1’-10" min. lap splice
(typ.)
2-#4DE1
24’-8"
Deck reinforcement
11 K
G.11
2-#4DE1
2-#4DE1
= 3’-6"
#6DE5
#4DE4 (typ. @ ends)
#4DE8 (3 tot. @ each end)
2-#6DE5
#4DE4 (3 tot. @ each end)
#5DE2 (typ.)
3-#4DE8 (typ. @ ends)
#4DE1
#5DE2
#4DE1
#6DE5 (8 tot.)
C Rdwy. @ C Pier 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g p ie r .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
PLAN
ELEVATION
C Gdr.
C Brg.
L
L
"16
"16
C Gdr.L
"16
"16
See detail Elastomeric brg. pad.
Brg. stiffeners
SECTION A-A
ELEVATION
A
A
2"
" PL4
PL WASHER
No Scale
10"
5"5"
"2 14"2
3"3"
1"
(typ.)
Brg. stiffeners
ELASTOMERIC UNREINFORCED PAD DETAIL
(30 Req’d)
Sole Plate
" x 9" x 1’-8"2
’4
L
Girder web
LC Brg. Span 2
C Gdr.L
°9
’5
C Gdr.L
"2
"2
"2
"2
Sole Plate
" x 9" x 1’-8"2
Sole Plate
" x 9" x 1’-8"2
Girder web
"2
"2
"2
"2
Brg. stiffeners
L
C Pier 1
C Brg. Span 1
L
L
PLAN
PIER 1 BEARING
(PIER 1 SHOWN, PIER 3 OPPOSITE HAND)
NOTES:
N. MARSHALL
w/ plate washer & heavy hex nut.
" Ø threaded anchor rod 4
"2
"2
"2
"2
C Gdr.
Girder web Sole Plate
" x 9" x 1’-8"2
" Ø holes16
C
L
Brg. stiffeners
LC Brg. Span 3
°3
’4
LC Pier 2
C Brg. Span 2L
°3
’4
"2
"2
"2
"2
" Ø holes16
C
L
Sole Plate
" x 9" x 1’-8"2
Brg. stiffeners
C Gdr.L
L
PLAN
PIER 2 BEARING
PIER BEARINGS
End plate (typ.)
End plate (typ.)
" x 1" Ø slotted holes16
C
" x 1" Ø slotted holes16
C
1’-3"
(30 Req’d)
"4 1 11"
(typ.)
2" wedge plates
8.
7.
6.
5.
4.
3.
2.
1.
See RG3147-T for deck pour sequence.
Wedge plates shall be field welded after deck pour 1 has been completed.
Grade DH. Anchor rods, washers, and nuts shall be galvanized.
conform to ASTM A36. Heavy hex nuts shall conform to ASTM A563, Anchor rods shall conform to ASTM F1554, Grade 55. Plate washers shall permanent and be visible after the bearing is installed.
shall include the bearing location on the bridge. All marks shall be
All bearings shall be marked prior to shipping. The marks field welding. Temperature of the steel to elastomeric pads during
Submit to CO for approval the procedures to prevent heat damage plate.
The elastomeric pad shall be vulcanized to bottom surface of sole
AASHTO LRFD Design method "A" used for elastomeric pad design.
Durometer hardness, elastomer Grade 5 or higher.
Elastomeric bearing pad shall conform to AASHTO M251 with 60
All structural steel plates shall be AASHTO M270, Grade 50W.
UNLESS NOTED
1" = 1’-0"
11" (typ.)
"4
G.12
L12
2" PL
WEDGE PLATE PLAN DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g b e a r in g s .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
"8 337’-7 2’-9""8
337’-7"8 744’-3"8
744’-32’-9"
C B r g
A b u t.
C B r g
A b u t.
L L
C Rdwy.L
GIRDER FRAMING PLAN
Layout Line
K. EIKERMANN
G.13
Edge of Deck
Edge of Deck
(ty p.
sp an s 1
Di ap hr ag m S pa cin g
L
L
L
L
L
C Gdr. D
C Gdr. C
C Gdr. B
C Gdr. A ty p
L
L L
L L
L
L L
(typ. spans 2 & 3)
Diaphragm Spacing
S ta
B e g in B r id g e C R d w y
UNLESS NOTED
" = 1’-0"
C Gdr. E
N. MARSHALL
’-5
’-0
’-0
8’-
(typ.)
Abut. diaph.
9’-
’-0
’-0
’-4
’-6
"4 311’-9
11’-0"
11’-0"
"4 111’-0
"4 111’-0
11’-0"
11’-0"
"4 311’-9 diaph. (typ.)
Intermediate
Pier Diaphragm (typ.)
C Gdr. C
C Gdr. B
Layout Line
C Rdwy.
L
L
L
L
ABUTMENT 2 END GEOMETRY DETAIL
C Gdr. C
C Gdr. B
Layout Line
C Rdwy.
L
L
L
L
ABUTMENT 1 END GEOMETRY DETAIL
Geometry Detail
See Abut. 2 End
Geometry Detail
See Abut. 1 End
°9 ’5
1’-0"1’-0"
4’
3°89 p yt(
"0 2’
"55’05° p yt( p yt
).pyt(
13 MR. OWEN
Span 1Span 2Span 3Span 4
(typ.)
ty p
44’-10"
°9 ’5
L Sta. 807+60 Begin Bridge @ C Rdwy.L
C Abut.
C Brg. &
L C Abut.
C Brg. &
L
3’ -3
2’-9"
"16
3’-3
2’-9"
N70°35’12"W
° 90°
GIRDER FRAMING PLAN
abuts.)
@ piers &
C P ie r C R d w y
C P ie r C R d w y
C P ie r C R d w y
E n d B r id g e C R d w y
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g f r a m in g .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
"8
"8
"8
End of Gdr.
" shear connectors (typ.)2 1" Ø x 58
73 -
W33 x 118 gdr.
End of Gdr.
2’-8"
GIRDER FABRICATION NOTES:
camber up.
For girder deflection diagram, see RG3147-P. Girders shall be placed with natural
For all weld details, see RG3147-Q.
within applicable AASHTO/AWS fabrication and construction tolerances.
Under full dead load, beam end and all bearing and jacking stiffeners shall be vertical to the girders will not be allowed.
Transportation, erection and construction methods that require drilling holes or welding perpendicular to girder flanges.
along the bridge grade. Fabricate intermediate diaphragm connection plates
All dimensions shown are either horizontal or vertical. Girders must be fabricated stiffeners to web or flange welds, then shear connectors to top flange & web.
intermediate diaphragm connection plate to web or flange welds, bearing and jacking
The following welding sequence shall be followed:
6.
5.
4.
3.
2.
1.
L
No Scale
DETAIL A
3"
No Scale connection plate
Intermediate diaph.
web
No Scale
DETAIL B
web
DETAIL C
" x 5"8
PL
10" 2’-8"
C Brg.
web shear connectors
"2
GIRDER ELEVATION SPAN 1
(Span 1 Shown, Span 4 Opposite Hand)
(Span 1 Shown, Span 4 Opposite Hand)
GIRDER SPANS 1 & 4
C Brg. Pier 1 C Brg. Abut. 1
L
L
C Gdr.L
C Gdr.
Measured along
L
End of Gdr.
2’-8""8
110’-411’-0"11’-0""8 38’-1"8
See Detail B. See Detail C.
2’-8""8 38’-111’-0"11’-0""8
110’-4
25°9 ’5"
C Gdr.
Measured along
L
C Gdr.
Measured along
L
(typ
AA
GIRDER PLAN SPAN 1 (SECTION A-A)
for details.
See RG3147-Q
End Plate.
(typ
25°9 ’5"
N. MARSHALL
25°9 ’5"
"8 s p a
"8 31’-0
" brg. stiff.2 1" x 52
1PL
81 spa. @ 6" = 40’-6" brg. stiff.
" 2 1" x 52
1PL
jacking stiff.
" 2 1" x 52
1PL
s p a s p a
Ø h o le s p a
Ø h o le s p a c o n n e c to r s p a s h e a r
"8 7Length of Girder = 43’-10
C Brg. Pier 1
C 1" Ø holesL
L
3"
"8 55C Brg. Abut. 1L
2’-8" stiff.
Abut. jacking
"2 1" x 52
PL
Brg. Stiff.
"2 1" x 52
PL
Brg. Stiff.
"2 1" x 52
PL
C 1" Ø holesL
See Detail A
End of Gdr.
UNLESS NOTED
1" = 1’-0" 14 N
G.14
Shear connector spacing. See RG3147-Q for details.
R. OWEN
connection plate (typ.)
" x 5" intermediate diaph. 8
Omit at exterior face of exterior girder.
" x 5" intermediate diaph. connection plate (typ.).8
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g g ir d e r .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
End of Gdr.
"4
"8
W33 x 118 gdr.
C Brg. Pier 2L
C Gdr.L
End of Gdr.
"8 58"8
510’-911’-0"11’-0""8 110’-0"8
See Detail A. See Detail B.
"8 58"8
110’-011’-0"11’-0""8 510’-9
(typ.)
A
GIRDER PLAN SPAN 2 (SECTION A-A)
C Gdr.
Measured along
L
C Gdr.
Measured along
L
A
End of Gdr.
" shear connectors (typ.)2
1" Ø x 58 73 -
L
8°35’40"
GIRDER FABRICATION NOTES:
camber up.
For girder deflection diagram, see RG3147-P. Girders shall be placed with natural
For all weld details, see RG3147-Q.
within applicable AASHTO/AWS fabrication and construction tolerances.
Under full dead load, beam end and all bearing and jacking stiffeners shall be vertical to the girders will not be allowed.
Transportation, erection and construction methods that require drilling holes or welding perpendicular to girder flanges.
along the bridge grade. Fabricate intermediate diaphragm connection plates
All dimensions shown are either horizontal or vertical. Girders must be fabricated stiffeners to web or flange welds, then shear connectors to top flange & web.
intermediate diaphragm connection plate to web or flange welds, bearing and jacking
The following welding sequence shall be followed:
6.
5.
4.
3.
2.
1.
No Scale connection plate
Intermediate diaph.
web
No Scale web
" x 5"8
PL
8°35’40"
GIRDER ELEVATION SPAN 2
(Span 2 Shown, Span 3 Opposite Hand)
(Span 2 Shown, Span 3 Opposite Hand)
GIRDER SPANS 2 & 3
N. MARSHALL
"2 17"2
" brg. stiff.2 1" x 52
1PL
s p a
"8
"8
Measured along C Gdr. 86 spa. @ 6" = 43’-0"
Length of Girder = 44’-3" for details.
See RG3147-Q
End Plate.
C Brg. Pier 1L
End of Gdr.
for details.
See RG3147-Q
End Plate.
Brg. Stiff.
"2 1" x 52
PL
DETAIL A DETAIL B
ty p b o th e n d s
C Brg. Pier 2L
C 1" Ø holesL
Ø h o le s p a brg. stiff.
" 2 1" x 52
1PL
"8
"8
C Brg. Pier 1
C 1" Ø holes
L
L
UNLESS NOTED
1" = 1’-0" 15 O
G.15
Shear connector spacing. See RG3147-Q for details.
R. OWEN
connection plate (typ.)
" x 5" intermediate diaph. 8
Omit at exterior face of exterior girder.
" x 5" intermediate diaph. connection plate (typ.).8
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
GHIGLIONE CREEK BRIDGE
1/
N F id
L \R
G ig li o n e
C r e e k
B r id g e \R
G
\C
A e s \D
G N
F il e s \r g g ir d e r .d g n
RG3147- KARL EIKERMANN
PRA DENA 10(36)
of JUNE 2021
DRAWING NO. 184/80298
NPS PMIS NO.: 164256A
s p a
No Scale
C Brg. Abut. 1
(inches)
ORDINATES
STL. DEFL.
CONC. DEFL.
DEFL.
SUPER DL
Top of girder
DEFL.
SHRINKAGE
0.2 0.4 0.6 0.8
0.2 0.4 0.6 0.8
1.2 1.4 1.6 1.8 2.0
Symmetrical about C Pier 2
1.2 1.4 1.6 1.8 2.0
1.0
1.0
C Pier 1L
0.0
0.0
-0.039
-0.216
-0.004
-0.265-0.166
-0.135
-0.210 -0.334
A L L G
D R
S
DELECTION DIAGRAM
with natural camber up.
Steel beams shall be placed in finished structure
Note: Deflection values shown for information only.
-0.001 -0.002
D L D
E F L E
C T I O
N
DEFLECTION
TOTAL
(see note) Fully deflected position
LL
"4 31 " (typ.)4
4’-9"+ Spans 1 & 4
"+ Spans 2 & 34 15’-2
C MC18 x 42.7 diaphragmL
TYPICAL INTERMEDIATE DIAPHRAGM
"2 15 Equal Spaces = 40’- 5 "4
35 Equal Spaces = 42’-9
DEFLECTION TABLE
SPANS 1 & 4
1.0
SPANS 2 & 3
-0.025
-0.003
-0.039
-0.216
-0.004
-0.265
-0.025
-0.135
-0.002
-0.166
-0.173
-0.032 -0.051
-0.277
-0.051
-0.277
-0.002
-0.333
-0.032
-0.173
-0.001
-0.207
NOTES:
GIRDER DIAPHRAGMS
W33 x 118 gdr. (typ.)
plate (typ.)
connection
" x 5" 8
3PL
C Gdr. AL
C Gdr. BL
5.4% Radial
UNLESS NOTED
" = 1’-0"2
N. MARSHALL
"4 31 " (typ.)4 s p a
C MC18 x 42.7 diaphragmL
5’-3"
W33 x 118 gdr. (typ.)
C Gdr. AL
C Gdr. BL
(Looking Upstation - Normal to C Gdr.)L
(Looking Upstation - Along C Brg.)L
" (typ.)2 11 " (typ.)2
-0.003 -0.006 -0.007 -0.005 -0.004 -0.004 -0.002 -0.001
16 P
G.16 plate (typ.)
bearing
" 2 1PL 1/2 " x 5
" unless noted otherwise.16
154. Hole size shall be
50W (ASTM A709, Grade 50W).
3. All plates and shapes shall conform to AASHTO M270, Grade
2. Bolt threads are excluded from shear planes.
Type 3, Heavy Hex Style.
the requirements of ASTM F3125, Grade A325,
71. All bolts are
TYPICAL ABUTMENT & PIER DIAPHRAGM
Note: See RG3147-J & K for orientation of pier diaphragms.
DEFLECTION TABLE LEGEND
+ CONC. DEFL. + SDL DEFL.
TOTAL DEFLECTION = STL. DEFL. + SHRINKAGE DEFL.
deflections (bridge rails)
= Deflection due to superimposed dead load SDL DEFL.
induced deflection
= Deflection due to concrete deck shrinkage SHRINKAGE DEFL.
= Deflection due to concrete slab deflectionCONC. DEFL.
= Deflection due to structural steel deflectionSTL. DEFL.
No Scale
ALTERNATE BENT PLATE DIAPHRAGM
LC diaphragm
4"
(t y p ra d plate
" 2
TYPICAL SECTION
will be based on MC 18x42.7.
4. Quantity of structural steel in pay item
3. All other details of diaphragm shall apply.
all MC 18x42.7 sections.
2. Alternate diaphragm…