Delivery Order SPRRA2-26-D-0002_SPRRA2-26-F-F0004 Vendor Acceptance DMR 12.29.25 KO Signed.pdf
PDF 250 KB Posted
- Attached to
- CABLE ASSEMBLY SPEC
- Solicitation number
- SPRRA2-26-D-0002
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Delivery Order (DO) from the Defense Logistics Agency (DLA) awarded to DMR Consulting, Inc. for 75 Cable Assemblies (NSN: 5995-01-307-9058, Part Number: 13264875) in support of the Avenger Weapon System, with a total contract value of $74,742.75. The unit price is $996.57 per cable assembly, and the contract is rated as a small disadvantaged business set-aside with a Firm Fixed Price contract type.
The delivery order requires the contractor to deliver 175 units within 360 days to the Redstone Technical Test Center, with a Production Lot Test (PLT) process. The government reserves the right to inspect and potentially reject lots with defective units. The contract includes specific requirements for electronic fabrication, parts control, lead-free materials, and counterfeit risk management. The contract is administered by DCMA Southeast, with payment to be processed through the Defense Finance and Accounting Service in Columbus, Ohio.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Base Contract SPRRA2-26-D-0002_Vendor Acceptance of Award DMR 12.29.25 KO SIGNED.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF
ORDER FOR SUPPLIES OR SERVICES
1. CONTRACT PURCH ORDER/AGREEMENT NO. 2. DELIVERY ORDER/CALL NO. 3. DATE OF ORDER/CALL
(YYYYMMMDD)
4. REQUISITION/PURCH REQUEST NO. 5. PRIORITY
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than 6) CODE 8. DELIVERY FOB
DESTINATION
OTHER
(See Schedule if other)
9. CONTRACTOR CODE FACILITY 10. DELIVER TO FOB POINT BY (Date) 11. X IF BUSINESS IS
• • (YYYYMMMDD)
SMALL
SMALL
NAME 12. DISCOUNT TERMS DISADVANTAGED
AND
ADDRESS WOMAN-OWNED
• • 13. MAIL INVOICES TO THE ADDRESS IN BLOCK
14. SHIP TO CODE 15. PAYMENT WILL BE MADE BY CODE MARK ALL
PACKAGES AND
PAPERS WITH
IDENTIFICATION
NUMBERS IN
BLOCKS 1 AND 2
16. DELIVERY/
CALL THIS DELIVERY ORDER IS ISSUED ON ANOTHER GOVERNMENT AGENCY OR IN ACCORDANCE WITH AND SUBJECT TO TERMS AND CONDITIONS OF ABOVE NUMBERED CONTRACT.
TYPE
OF
ORDER
PURCHASE
Reference your Oral Written Quotation ________________________ , Dated ________________.
____________________________ furnish the following on terms specified herein.
ACCEPTANCE. THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.
NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED
(YYYYMMMDD)
If this box is marked, supplier must sign Acceptance and return the following number of copies:
17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE
18. ITEM NO. 19. SCHEDULE OF SUPPLIES/SERVICE 20. QUANTITY
ORDERED/
ACCEPTED*
21.
UNIT
22. UNIT PRICE 23. AMOUNT
* If quantity accepted by the Government is 24. UNITED STATES OF AMERICA 25. TOTAL same as quantity ordered, indicate by X. 26.
If different, enter actual quantity accepted below DIFFERENCES quantity ordered and encircle. BY: CONTRACTING/ORDERING OFFICER 27a. QUANTITY IN COLUMN 20 HAS BEEN
INSPECTED RECEIVED ACCEPTED, AND CONFORMS TO CONTRACT EXCEPT AS NOTED ____________________________________________________
b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE c. DATE d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
(YYYYMMMDD) REPRESENTATIVE
e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 28. SHIP. NO. 29. D.O. VOUCHER NO. 30. INITIALS
PARTIAL
32. PAID BY 33. AMOUNT VERIFIED CORRECT FOR
f. TELEPHONE NUMBER g. E-MAIL ADDRESS
FINAL
31. PAYMENT 34. CHECK NUMBER
36. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT.
COMPLETE
a. DATE b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
PARTIAL
35. BILL OF LADING NO.
(YYYYMMMDD)
FINAL
37. RECEIVED AT 38. RECEIVED BY (Print) 39. DATE RECEIVED
(YYYYMMMDD)
40. TOTAL CON-
TAINERS
41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO.
DD FORM 1155, DEC 2001 PREVIOUS EDITION IS OBSOLETE.
SPRRA2-26-D-0002 SPRRA226F0004 SEE SCHEDULE DOA2
SPRRA2
DEFENSE LOGISTICS AGENCY
5201 MARTIN ROAD/DLA-AVN-AH
REDSTONE ARSENAL AL 35898-7340
RODNEY O HAYGOOD
EMAIL: RODNEY.HAYGOOD@DLA.MIL
S1002A
DCMA SOUTHEAST
3555 MAGUIRE BLVD
ORLANDO, FL 32803-3726
X
1LJG7
DMR CONSULTING, INC.
7512 HOLLEY CIR
PANAMA CITY BEACH, FL 32408-4952
SEE SCHEDULE
X
X
See Block 15
SEE SCHEDULE
HQ0338
DFAS-COLUMBUS CENTER
SOUTH ENTITLEMENT OPERATIONS
P O BOX 182317
COLUMBUS OH 43218-2317
X
SEE CONTRACT ADMINISTRATION DATA
SEE SCHEDULE
MICHAEL ROMINE
MICHAEL.1.ROMINE@DLA.MIL (256)876-0324
$74,742.75
DMR Consulting, Inc. Rachael McCrary, Vice President 2025 DEC 29
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: RODNEY O HAYGOOD
Buyer Office Symbol/Telephone Number: DLA-AVN-AHD/(256)690-5733
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Type of Business: Small Disadvantaged Business Performing in U.S.
Surveillance Criticality Designator: B
Weapon System: AVENGER
*** End of Narrative A0000 ***
A-1. Delivery Order (DO) SPRRA2-26-F-0004 is issued with Firm Fixed Prices and Firm Delivery Schedules pursuant to the basic Contract
SPRRA2-26-D-0002 and is subject to and incorporates by reference all terms and conditions of the basic contract.
A-2. DO SPRRA2-26-F-0004 is for a quantity of 75 each of Cable Assembly, Spec; NSN: 5995-01-307-9058; Part Number: 13264875; The Unit
Price at which the order is issued in accordance with Base Contract Pricing for the first ordering period is $996.57.00 each for CLIN
0001AA for the Production Quantity for a total extended price of $74,742.75
A-3. This requirement is in support of Avenger M-DP.
A-4. The following summarizes total obligations to date and contract ceiling balance:
Contract Maximum/Ceiling is: $174,399.75
Obligated this Delivery Order is: $74,742.75
Remaining Available balance is: $99,657.00
Remaining Available Quantity is: 100
A-5. The contractor's point of contact for this requirement is as follows:
Name: Rachael McCrary
Phone: 850-387-2997
Email: rmccrary@dmrinc.com
A-6. The DCMA ACO point of contact for this requirement is as follows:
Name: Penny Viljoen
Phone: 850-613-3119
Email: penny.1.viljoen.civ@mail.mil
A-7. The Contract Specialist point of contact for this requirement is as follows:
Name: Rodney Haygood
Office Symbol: DLA-AHCA
Address: 5202 Martin RD, Redstone Arsenal, AL, 35898
Email: rodney.haygood@dla.mil
A-8. The DLA Post Award Team point of contact for this requirement is as follows:
Email: dlahsvmslpostaward@dla.mil
A-9. Delivery shall commence as outlined within this order (SPRRA2-26-F-0004) until shipment is completed.
A-10. Packaging shall be provided as outlined within this order.
2 13
SPRRA2-26-D-0002/SPRRA226F0004
DMR CONSULTING, INC.
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A-11. Production Lot Testing: Government Facility is required. See H Narrative, "Production Lot Test Requirements-Government Tested" for further instructions.
A-12. Defense Priority and Allocations System (DPAS):This is a DO DPAS rated order, and you are required to notify DLA within 15 days of receipt of order if the rated order cannot be fulfilled as written. This includes conflicting rated order schedules. If no response is received during the required response time, the contractor self-attests order acceptance as is.
*** END OF NARRATIVE A0001 ***
3 13
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 CABLE ASSEMBLY,SPEC
NSN: 5995-01-307-9058
Mfr CAGE: 18876
Mfr Part Number: 13264875
0001AA GOVERNMENT PRODUCTION LOT TEST 75 EA $ 996.57000 $ 74,742.75 ______________________________ ______________ __________________
PROGRAM YEAR: 1
COMMODITY NAME: CABLE ASSEMBLY,SPEC
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: D15F0130D1 PRON AMD: 06 ACRN: AA
AMS CD: SM2B1100000
PSC: 5995
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-2073-1 MARKING SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ALL WOOD PACKAGING MATERIAL(WPM) MUST BE ISPM-15
COMPLIANT.
THE FOLLOWING MIL-STD-2073-1 CODES, APPENDIX J SHALL
APPLY
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM[EA]
JV/CD [NA]
JVI/CT [A]
JVII/UC [ED] JVII/IC [00]
JIX/A/PK [Q] JX/SM [00]
JVIIIA/OPI[M]
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES)
WT [8.4]
LN [18.0]
WD [18.0]
DP [12.0]
SUPPLEMENTAL INFORMATION:
CUSHION CONNECTORS-COIL TO 20 IN DIA-TIE AND WRAP
(End of narrative D001)
4 13
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Government Approval/Disapproval Days: 60
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W31G3H5120TD01 W31P0W J 2
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 75 11-DEC-2026
FOB POINT: Destination
SHIP TO:
(W31P0W) SR W0H9 US ARMY AVN & MISSLES CMD
REDSTONE TECHNICAL TEST CENTER
COTTONWOOD RD BLDG 8022 MF 4500
REDSTONE ARSENAL,AL,35898-8052
CONTRACT/DELIVERY ORDER NUMBER ______________________________
SPRRA2-26-D-0002/SPRRA226F0004
5 13
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT ADMINISTRATION DATA
PRON/ PRON/
AMS CD/ AMS CD/
LINE MIPR/ OBLG JO NO/ OBLIGATEDLINE MIPR/ OBLG JO NO/ OBLIGATED
ITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNTITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNT_____ _________ _____ ___________ ____ _______________ _________ _____ ___________ ____ __________
0001AA D15F0130D1 2 AA $ 74,742.75
SM2B1100000
TOTAL $ 74,742.75
OBLIGATED OBLIGATED
ACRN ACCOUNTING CLASSIFICATION AMOUNTACRN ACCOUNTING CLASSIFICATION AMOUNT____ _________________________ ______________ _________________________ __________
AA 97 X4930AC9F 6X 26K6 S01021 W31G3H $ 74,742.75 __________________
TOTAL $ 74,742.75
LINELINE
ITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATIONITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATION_____ ____ _______________________________________ ____ __________________________________
0001AA AA 97 0X0X4930AC9F S01021 6X0000SM2B110000026K6 S01021 W31G3H
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) JAN/2023
(a) Definitions. As used in this clause
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003 , Electronic Submission of Payment Requests and
Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003 , Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
6 13
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(ii) For fixed price line items
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
COMBINATION INVOICE AND RECEIVING REPORT
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
INSPECTION: SOURCE ACCEPTANCE: DESTINATION: FBO: DESTINATION
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.r
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0338
Issue By DoDAAC SPRRA2
Admin DoDAAC** S1002A
Inspect By DoDAAC S1002A
Ship To Code W31P0W
Ship From Code 1LJG7
Mark For Code W90CGJ
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or
"Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
ACO: Penny Viljoen 850-613-3119 penny.1.viljoen.civ@mail.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
7 13
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
8 13
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SPECIAL CONTRACT REQUIREMENTS
H-1. ELECTRONIC FABRICATION: REQUIREMENTS FOR ELECTRICAL AND ELECTRONIC ASSEMBLIES
Notwithstanding any other provision contained in any part of this contract to the contrary, the minimum requirements/standards for soldering electrical and electronic assemblies shall be the non-military joint industry standard, ANSI/J-STD-001, Class 3. The revision of ANSI/J-STD-001 in effect on the effective date of the contract shall govern the hardware produced hereunder. A copy of ANSI/J-STD-001 may be obtained from the Institute for Interconnecting and Packaging Electronic Circuits (IPC), 2215 Sanders Road, Northbrook, IL, 60062-
6135, telephone number (847) 509-9700, fax number (847) 509-9798.
2. The contractor shall establish and maintain an electronic/electrical parts control program and shall maintain and make available to the Government records and data which will provide visibility and traceability of all parts used in the production of the equipment under this contract. This selection of parts shall not be construed to relieve the contractor of meeting specified performance of the end item in which the part is used.
3. The Technical Data Package (TDP) shall serve as the baseline Program Parts Selection List (PPSL) and the parts and sources listed therein are the standard parts and sources. A Non Standard Part is defined as a part or source other than that cited in the PPSL. When the contractor desires to use a part or source other than those cited in the PPSL, the change must be approved by the
Government via a Request for Deviation (RFD) as defined elsewhere in this contract. Failure on the part of the contractor to submit such
RFDs may result in the replacement of the nonstandard part with the standard part by the Government at the contractor's expense for all affected items.
4. The contractor shall provide objective evidence such as form, fit, function, and interchangeability data that shows the proposed part complies with the requirements of applicable parts documentation. The RFD shall detail the technical justification for the use of the part and advantages of the nonstandard part, if any. Compare the nonstandard part to the standard part whose characteristics are nearest to those required for the application. Include, when applicable:
Part Number and Source
Size and weight data.
c.Electrical and mechanical characteristics d.Reliability (with data if requested) e.Availability of the standard part (delivery schedules, still available etc.)
Supplemental data such as existing control drawings, specifications, vendor data sheets, and other pertinent data. Data need not be furnished for nonstandard parts covered by documents listed in the Department of Defense Index of Specifications and Standards (DoDISS) or Standardized Military Drawings (SMD).
5. The Contractor shall maintain a Lead Free Control Plan (LFCP) and make available to the Government upon request. The requirement for a Lead Free Control Plan shall be flowed down to suppliers of equipment that may include lead-free materials. The LFCP shall follow the guidelines set forth in GEIA-STD-0005-1, "Performance Standard for Aerospace and High Performance Electronic Systems
Containing Lead- Free Solder" or its equivalent. In addition, the LFCP shall also include tin whisker mitigation plans in accordance with GEIA-STD-0005- 2, "Standard for Mitigating the Effects of Tin Whiskers in Aerospace and High Performance Electronic Systems" or its equivalent, at control level 2C or equivalent. The Contractor should include in the LFCP any special design considerations, manufacturing process controls, test and qualification requirements, quality inspection and screening, marking and identification, maintenance and repair processes, and other steps taken to mitigate risk.
6. The Contractor shall prepare, or update existing, Counterfeit Risk Management Plan and make available to the
Government upon request. The Plan shall meet the requirements of SAE AS5553 for electronic items. The Contractor shall procure parts from original manufacturers or the original manufacturer's franchised distributors. Contractors shall report counterfeits and suspected counterfeits to the Government and in the Government Industry Data Exchange Program (GIDEP), in accordance with the GIDEP
Operations Manual, SO300-BT-PRO- 010.
H-2. TITLE: ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION
CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Requests for Variance
(RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.
. Format.
a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not
9 13
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that DD Form 1692, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs, which meet the requirements of Class II ECPs, shall be prepared using DD
Form 1692 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Priority", and Block 8 "Justification Codes."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.
e. Each ECP and RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense
Contract Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFV proposal.
f. Classification of RFVs.
(1) Major RFVs. RFVs written against CIs shall be designated as major when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability;
reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFVs. RFVs written against CIs shall be designated as critical when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFVs. RFVs written against CIs shall be designated as minor when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs f(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
g. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
h. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.
i. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.
j. Times allowed for technical decisions for ECP and RFV proposals will be worked out via mutual agreement between the Contractor and the Government.
k. The Contractor shall submit, concurrent with the ECP, a separate DD Form 1696, "Specification Change Notice"
(SCN), for each specification that would require revision if the ECP were approved.
l. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.
m. The Contractor shall utilize DD Form 2617, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.
n. The Contractor shall utilize DD Form 1695, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.
. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO).
One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, or RFVs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.
4. Distribution.
10 13
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO.
Microsoft Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Office of the Secretary of Defense Executive Services Directorate DoD Directives Division website
(://www.esd.whs.mil/DD/ ) via the DoD Forms menu. The forms are provided in fillable Adobe Acrobat Portable Document Format (PDF). In order to access and use the forms, the user must have the "Adobe Acrobat" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO.
b. Hard Copy Distribution of Class I or II ECPs and RFVs, For each Class I or II ECP, or each RFV that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:
Aviation and Missile Research, Development, and Engineering Center
ATTN: RDMR-SET
Redstone Arsenal, Al 35898-5000
Telephone: 256-876-1335
c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the VEPM.
Aviation and Missile Research, Development, and Engineering Center
ATTN: RDMR-SEI
Redstone Arsenal, Al 35898-5000
Telephone: 256-876-8163
5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The
Government will notify the Contractor in writing if a proposal is determined to be unacceptable.
H-3. PRODUCTION LOT TEST REQUIREMENTS - GOVERNMENT TESTED
(a) The Contractor shall deliver 175 units of all CLINS within 360 days negotiated to the Government at REDSTONE TECHNICAL TEST CENTER, COTTONWOOD RD BLDG 8022 MF 4500, REDSTONE ARSENAL, AL 35898-8052 for Production Lot Test (PLT). The shipping documentation shall contain this contract number and the Lot/Item identification. If the quantity required for PLT is less than the actual production quantity, the sample(s) to be shipped shall be selected at random during manufacture by the DCMA QAR. Selected copies of all available in-process documentation to include copies of Instruction Letters, Inspection Sheets/records, Material Test Results, and Certificates of Compliance/Conformance shall be made available to the Government upon request.
(b) PLT sample(s) must meet all the requirements of the Technical Data Package (TDP) and all other contractual requirements. If the entire lot is required for testing, delivery of the total quantity required herein shall be accomplished in no more than two (2) shipments. Delivery in one (1) shipment is desirable; however, when two (2) shipments are necessary, fifty percent (50%) or more of the total quantity shall be included in the first shipment, and the remaining quantity shall be included in the second shipment.
(c) Within 60 calendar days after the Government receives the PLT sample(s), the Contracting Officer will notify the Contractor, in writing, of the acceptance or rejection of the quality verification sample(s). The notice of acceptance shall not relieve the
Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of rejection shall cite reasons for the rejection.
(d) If the PLT sample(s) is/are rejected, the Government may choose to have the contractor remedy the non-conformances found on the product by rework when appropriate, or require the contractor to provide newly manufactured product for inspection. The Contractor, upon Government request, shall make any necessary changes to meet the requirements of this contract. The Contractor shall furnish any reworked or newly manufactured PLT sample(s) to the Government as appropriate, under the terms and conditions and within the time specified by the Government. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule and/or for any additional costs to the Government related to these inspection retests.
(e) The Government reserves the right to reject any lot in which one or more defective units of production are found. The Government, at its discretion, may elect to perform a 100 percent screen on a lot and accept only those items that are conforming to all contract requirements. Under no circumstances shall the Government accept or be obligated to accept known defective hardware as a part of any lot.
11 13
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(f) The contractor may ship the balance of the production lot quantity prior to government approval.
[FOR Aviation non-OEMs, replace paragraph f:]
(f) The contractor shall withhold (25%) of the production lot quantity pending government approval of the lot for use.The 75% balance of the production lot may be shipped prior to government approval.
H-4. REVISIONS TO DRAWINGS/PART NUMBERS
(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the
Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.
If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of AMCOM's data records.
(b) The contractor hereby verifies previous contractual submission of technical data:
Contract Nunber:
Contractor:
Explanation of Data Rights:
(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.
(d) All proposed part number changes shall be submitted pursuant to the requirements of the clause entitled, "Engineering Change
Proposal (ECP), Value Engineering Change Proposal (VECP), Request for Deviation (RFD), and Request for Waiver (RFW) (USAAMCOM).
H-5. IDENTIFICATION MARKING REQUIREMENTS Item shall be marked per MIL-STD-130.
H-6. DEFENSE PRIORITY AND ALLOCATIONS SYSTEM (DPAS) RATED AWARDS
Defense Priorities and Allocations System (DPAS) Rated Awards (JUNE 2025)
A DPAS rated order indicates the priority the contractor must give to the performance of the award. There are two priority ratings:
"DX" and "DO". All "DX" rated orders have equal priority with each other and take preference over "DO" rated orders and unrated orders.
All "DO" rated orders have equal priority with each other and take preference over unrated orders.(see 15 CFR 700.11 and DoDM 4400.1-
M).
Mandatory Contractor Performance Scheduling
A contractor must schedule operations, including the acquisition of all needed production items, in a timely manner to satisfy the delivery requirements of each DPAS rated order. Additionally, contractors are required to use DPAS rated orders with their U.S.
suppliers to obtain items needed to fill rated orders (15 CFR 700.15). Contractors may also use DPAS rated orders to obtain replacements of inventoried items used to fill rated orders (see 15 CFR 700.17(b)). Modifying production or delivery schedules is necessary only when required delivery dates for a rated order cannot otherwise be met. Since "DX" indicates the highest rated order, the manufacturer will schedule its production before processing other lower or unrated orders. "DX" rated orders must be given production preference over "DO" rated orders and unrated orders if necessary to meet required delivery dates, even if this requires the diversion of items being processed or ready for delivery against unrated orders. Similarly, "DO" rated orders must be given preference over unrated orders. If an accepted rated order of equal priority status conflicts with other accepted rated orders of equal priority status, the contractor must prioritize the rated orders in the sequence in which the rated orders are to be delivered or performed (see
15 CFR 700.14).
Contractor Acceptance of a DPAS rated order:
12 13
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
[Contractors receiving an award that includes a DPAS rating shall advise DLA via the post award mailbox (HYPERLINK
"mailto:DLAHSVPostAwardTeam@dla.mil"DLAHSVPostAwardTeam@dla.mil) , if they cannot perform in accordance with the requirements of the applied DPAS rating. When rejecting an order in full, communication to the contracting officer must include a detailed reason for rejection. If the order can be fulfilled at a later date, the contractor must provide, a) the earliest possible delivery date, b) a detailed reason why the awarded delivery date cannot be met (e.g. reason should not simply state a production delay) and, c) an offer to accept the order based on that date. Contractors must advise DLA within fifteen (15) working days after receipt of a "DO" rated order, and within ten (10) working days after receipt of a "DX" rated order if they cannot perform in accordance with the DPAS rating.
Contractors that do not contact DLA are self-attesting that they acknowledge receipt of the award and will conform to the DPAS rating requirement. If the prescribed response time has passed and the contractor learns that shipment or performance will be delayed, the contractor is still required to notify DLA immediately.
Special Priority Assistance:
Preferential scheduling is a must for DPAS rated orders (see 15 CFR 700.14). If a contractor learns that a shipment or performance will be delayed after the allotted response time has passed or any other issue arises that will affect deliveries during the duration of the contract, the contractor is required to notify DLA immediately through the use of Form BIS-999, Special Priorities Assistance (SPA).
Deviations from schedules cannot be approved without the completion and submission of this form. Once submitted, DLA and its customers will discuss the SPA for approval. The Department of Commerce requires an approved BIS-999 prior to reprioritizing DPAS rated orders and its schedules (See 15 CFR 700.50). Please contact DLA post award for any SPA questions or concerns.
*** END OF NARRATIVE H0001 ***
13 13
| 2025-12-30T06:29:18-0600 | |
| ROMINE.MICHAEL.C.1538480882 |
File details come from the government source that posted it. Updated .