Delivery Instructions.pdf

PDF 189 KB Posted

Attached to
3605--Upright Conveyor Dishwasher- EUCCW8 PRO CW PRO-Series or EQUAL
Solicitation number
36C24825Q0972
Issued by

About this file

The document is a detailed delivery instructions map for the Bay Pines VA Healthcare System, providing specific routing and access guidelines for delivery vehicles and personnel. Key instructions include: delivery trucks must enter through the east gate (not the main entrance), with two designated truck routes marked on the map. The kitchen loading dock requires the most truck maneuvering but is closest, while the logistics loading dock is farther but covered from dock to kitchen. Food deliveries are scheduled on Mondays and Thursdays, which must be considered when planning dock usage. Two foot routes are identified - one through the kitchen loading dock entrance (smaller door but closer) and another through the breezeway and SPS hallway (larger but farther). A dumpster is located at building 36, and the map provides a comprehensive visual guide with color-coded routes and specific entry/exit points for efficient logistics management.

View the file

Other files

File Type Posted
Champion EUCCW8 Cutsheets.pdf PDF
Kitchen Floor Plan.pdf PDF
36C24825Q0972_1.docx DOCX document
Dishwasher and Utilities.pdf PDF
dishwasher and utiltiies PBR3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Delivery Instructions

LEGEND

= Kitchen

= Truck Route 1

= Truck Route 2

=Kitchen Loading Dock

=Logistics Loading Dock

=VA Dumpdters

=Foot Route 1

=Foot Route 2

=Main entrance, do not use

=East Entrance, USE

Discussion Points

• Delivery trucks must enter through the east gate. DO

NOT USE THE MAIN ENTRANCE.

• Kitchen loading dock requires the most amount of truck backing up but is closest.

• Kitchen loading dock must be planned around food deliveries (Mondays and Thursdays).

• Logistics loading dock is farther but is covered from loading dock to kitchen.

• Entrance at kitchen loading dock has a smaller door but is closer (foot route 1).

• Entrance at breezeway and SPS hallway is larger, but farther (foot route 2).

• Dumpter is available at building 36

Slide 1

File details come from the government source that posted it. Updated .