DDPM262610_Replace Boilers and Waterlines_REFERENCE ONLY PHOTOS.pdf
PDF 13 MB Posted
- Solicitation number
- W50S7626QA004
- Issued by
-
Department of the Army National Guard
About this file
This file is a visual documentation collection of boiler and waterline replacement work for federal contract opportunity DDPM262610. The document contains photographs of existing boiler systems, water shutoff valves, piping configurations, control panels, drain lines, and related mechanical equipment across multiple buildings.
The photographs document equipment in Buildings 1670, 1671, 1672, 1676, 4160, and 4175. Building 1670 contains a Bryan boiler with associated control panels (interior and exterior views), drain lines, gas lines, flow switches, and hot water/gas piping configurations. Building 1671 features a Lochinvar boiler with exhaust/intake lines, hot water lines, and flow switch installations. Building 1672 shows water shutoff valve positioning on the left-hand side of the mechanical room. Building 1676 displays a water shutoff valve on the right-hand side of the boiler mechanical room. Buildings 4160 and 4175 contain multiple boiler systems with MultiCross and HydroTherm/Burnham equipment respectively, including detailed views of boiler piping, chemical pots, circuit breaker panels, gas lines, drain configurations, and electrical connections. Water shutoff valve locations are documented for all buildings to establish baseline conditions. The photographs serve as reference material for bid preparation and scope definition for the boiler and waterline replacement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Water Shutoff Valves
Bldg 1671 water shutoff valve RHS of mechanical room
DDPM262610_Replace Boilers and Waterlines
Bldg 1672 Water Shutoff valve LHS of mechanical Room
Bldg 1676 water shutoff valve RHS of boiler mechanical room
Bldg 4175 water shutoff valve LHS basement mechanical room
1670 Boiler Pictures
Bldg. 1670 boiler control panel (interior) front of boiler
Bldg 1670 boiler control panel
(Exterior) front of boiler
Bldg 1670 boiler drain lines RHS of boiler
Bldg 1670 boiler gas lines and flow switch LHS of boiler
Bldg 1670 boiler piping (HW and gas) RHS of mechanical room
Bldg 1670 boiler Piping (HW and gas lines) LHS of mechanical room above boiler
Bldg 1670 LHS of boiler
Bldg 1670 RHS of boiler
Bldg 1670 Bryan boiler
Bldg 1670 boiler front of burner and combustion section
Bldg 1670 piping/ducting on top of boiler
1671 Boiler Pics
1671 Lochinvar boiler Front view RHS of mechanical room
Bldg 1671 boiler exhaust/ intake lines top of boiler
Bldg. 1671 LHS of boiler, flow switch and boiler lines (HW and gas)
Bldg 1671 LHS of boiler HW lines
Bldg 1671 HW lines running towards boiler RHS of mechanical room
Bldg 1671 Rear of Boiler exhaust/intake lines and incoming power
Bldg 1671 RHS view of boiler and attached chemical pot
4160 boiler pics
Bldg. 4160 LHS of boiler one
Bldg 4160 Front view of boiler one
Bldg. 4160 RHS of boiler two
Bldg 4160 Front of Boiler two with front panel removed
Bldg 4160 boiler piping (HW lines, HW pump, and chemical pot)
Bldg 4160 RHS of boiler one with data plate
Bldg 4160 LHS of mechanical room with drain lines and HW lines for boilers
Bldg 4160 Boiler gas lines, HW lines, and exhaust/ intake ducting
Bldg 4160 Alternative view of boiler gas lines, HW lines, and exhaust/intake ducting
Bldg 4160 ceiling piping for HW and exhaust
Bldg 4160 Rear of boiler two
Bldg 4160 incoming power for both boilers
Bldg 4160 rear of boiler one
Bldg 4160 boiler circuit breaker panel
Bldg 4160 circuit breaker panel
Bldg 4160 Continuous view or piping/ ducting from rear of boilers
4175 Boiler Pics
Bldg. 4175 Boiler Circuit breakers
Bldg 4175 boiler circuit breakers
Bldg 4175 drain lines for boilers and water heater Infront of Burnham boiler back corner of basement mechanical room
Bldg 4175 green boiler drain lines
Bldg. 4175 Continued drain line path for green boiler
Bldg 4175 Burnham boiler control panel (interior) back wall by boiler control panel (exterior)
Bldg 4175 Front of Burnham Boiler
Bldg 4175 RHS of Burnham boiler and flow switch
Bldg 4175 Front door for Burnham Boiler and Burner
Bldg 4175 Burnham Boiler Ducting
Bldg 4175 continued ducting for Burnham boiler to the rear
Bldg 4175 LHS of Burnham boiler, incoming power and gas
Bldg 4175 Boiler Gas valves burner
Bldg 4175 Burnham boiler HW piping on top
Bldg 4175 Burnham Boiler continued top HW piping into boiler
Bldg 4175 RHS green boiler basement mechanical room
Bldg 4175 LHS of green Boiler and HW pumps with piping
Bldg 4175 green boiler exhaust from top of boiler
| Bldg water shutoff valves.pdf.pdf |
| 1670 boiler pics and description.pdf |
| 1671 boiler pics and description.pdf |
| 4160 boiler pics and description.pdf |
| 4175 boiler pics and description.pdf |
File details come from the government source that posted it. Updated .