This Contract Data Requirements List (CDRL) outlines five data items required under a potential federal contract for Artificial Intelligence/Machine Learning development processes and technologies. The contractor will be required to submit monthly status reports no later than the 10th day of each month, addressing progress made. Additionally, the contractor must provide a draft final research and development project summary two weeks before the end of the period of performance, with the final report due by the end of the period of performance. The contractor will also need to submit any administrative reports or documentation as directed by the contracting officer's representative. The contractor must deliver technical assessments and a program management plan as specified in the CDRL. All reports are to be submitted electronically in a format chosen by the government.

View the file

Other files

File Type Posted
Solicitation_QandA.xlsx XLSX spreadsheet
SF33 (AIML).pdf PDF
Past Performance Questionnaire (AI_ML).docx DOCX document
Section L (Instructions to Offerors) (AIML).docx DOCX document
Section M (Evaluation Approach) (AIML).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template last updated 09/29/2017

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MGMT

D. SYSTEM/ITEM

AIML

E. CONTRACT/PR NO.

TBD / PR 0011875197

F. CONTRACTOR

To Be Determined

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

CONTRACTOR’S PROGRESS, STATUS, AND MANAGEMENT REPORT

3. SUBTITLE

MONTHLY STATUS REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81928

5. CONTRACT REFERENCE

PERFORMANCE WORK STATEMENT (PWS) C.4.1

6. REQUIRING OFFICE

FCDD-RLC-CT

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

C

10. FREQUENCY

MTHLY

12. DATE OF FIRST SUBMISSION

NO LATER THAN (NLT) THE 10TH DAY OF THE FIRST CALENDAR MONTH AFTER CONTRACT AWARD (ACA) 14.

DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 4: EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FTP (FILE TRANSFER PROTOCOL), CD-ROM, AND DVD-ROM.

BLK 13: THE CONTRACTOR SHALL SUBMIT THESE REPORTS TO THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) AND TECHNICAL MONITOR (TM) NLT THE 10TH DAY OF EACH CALENDAR MONTH ACA.

FCDD-RLC-CT
0
1
1
15. TOTAL
0
1
1

G. PREPARED BY

TBD at Time of Award

H. DATE

17 OCT 2022

I. APPROVED BY

CHRISTOPHER MOY

J. DATE

XX XXX 2023

DD FORM 1423-1, FEB 2001

PREVIOUS EDITION MAY BE USED.

Page 1 of 5 Pages 5

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MGMT

D. SYSTEM/ITEM

AIML

E. CONTRACT/PR NO.

TBD / PR 0011875197

F. CONTRACTOR

To Be Determined

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

RESEARCH AND DEVELOPMENT (R&D) PROJECT SUMMARY

3. SUBTITLE

FINAL REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81466A

5. CONTRACT REFERENCE

PERFORMANCE WORK STATEMENT (PWS) C.4.2

6. REQUIRING OFFICE

FCDD-RLC-CT

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

C

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

DRAFT NO LATER THAN (NLT) TWO (2) WEEKS PRIOR TO THE END OF THE CONTRACT PERIOD OF PERFORMANCE (POP) 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 4: EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FTP (FILE TRANSFER PROTOCOL), CD-ROM, AND DVD-ROM.

BLK 13: THE CONTRACTOR SHALL SUBMIT A DRAFT REPORT TO THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) AND TECHNICAL MONITOR (TM) TWO (2) WEEKS PRIOR TO THE END OF THE CONTRACT PERIOD OF PERFORMANCE (POP). THE CONTRACTOR SHALL PROVIDE A FINAL REPORT NLT THE END OF THE CONTRACT POP.

FCDD-RLC-CT
1
1
1
15. TOTAL
1
1
1

G. PREPARED BY

TBD at Time of Award

H. DATE

17 OCT 2022

I. APPROVED BY

CHRISTOPHER MOY

J. DATE

Page 2 of 5 Pages 5

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MGMT

D. SYSTEM/ITEM

AIML

E. CONTRACT/PR NO.

TBD / PR 0011875197

F. CONTRACTOR

To Be Determined

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

CONTRACTOR’S PROGRESS, STATUS, AND MANAGEMENT REPORT

3. SUBTITLE

Administrative Reports & Documentation

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81466A

5. CONTRACT REFERENCE

PERFORMANCE WORK STATEMENT (PWS) C.4.3

6. REQUIRING OFFICE

FCDD-RLC-CT

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

C

10. FREQUENCY

Multiple

12. DATE OF FIRST SUBMISSION

As directed by the COR SEE BLK 16

14.

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 AND BLK 12: THE CONTRACTOR SHALL PROVIDE ADMINISTRATIVE REPORTS & DOCUMENTATION TO THE COR NLT THE END OF THE CONTRACT POP. EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FTP (FILE TRANSFER PROTOCOL), CD-ROM, AND DVD-ROM.

FCDD-RLC-CT
0
1
1
15. TOTAL
0
1
1

G. PREPARED BY

TBD at Time of Award

H. DATE

17 OCT 2022

I. APPROVED BY

CHRISTOPHER MOY

J. DATE

Page 3 of 5 Pages 5

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: SESS

D. SYSTEM/ITEM

AIML

E. CONTRACT/PR NO.

TBD / PR 0011875197

F. CONTRACTOR

To Be Determined

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS

3. SUBTITLE

Technical Assessments

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81002F

5. CONTRACT REFERENCE

PERFORMANCE WORK STATEMENT (PWS) C.3.1.1

6. REQUIRING OFFICE

FCDD-RLC-CT

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

C

10. FREQUENCY

multiple

12. DATE OF FIRST SUBMISSION

As the COR directs SEE BLK 16 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 AND BLK 12: THE CONTRACTOR SHALL PROVIDE TECHNICAL ASSESSMENTS TO THE COR NLT THE END OF THE CONTRACT POP. EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FTP (FILE TRANSFER PROTOCOL), CD-ROM, AND DVD-ROM.

FCDD-RLC-CT
0
1
1
15. TOTAL
0
1
1

G. PREPARED BY

TBD at Time of Award

H. DATE

17 OCT 2022

I. APPROVED BY

CHRISTOPHER MOY

J. DATE

Page 4 of 5 Pages 5

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-1088). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP_____ TM ______ OTHER: MGMT

D. SYSTEM/ITEM

AIML

E. CONTRACT/PR NO.

TBD / PR 0011875197

F. CONTRACTOR

To Be Determined

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

PROGRAM MANAGEMENT PLAN

3. SUBTITLE

Program MANAGEMENT PLAN

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80004A

5. CONTRACT REFERENCE

PERFORMANCE WORK STATEMENT (PWS) C.4.4

6. REQUIRING OFFICE

FCDD-RLC-CT

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

C

10. FREQUENCY

1TIME

12. DATE OF FIRST SUBMISSION

at the contract Kick-off 14.

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION N/A

Draft
Final
Reg
Repro

16. REMARKS

BLK 4: EACH REPORT SHALL BE DELIVERED ELECTRONICALLY IN A MEDIA SELECTED BY THE GOVERNMENT AT TIME OF DELIVERY. MEDIA TYPES WHICH CAN BE ACCEPTED INCLUDE: FTP (FILE TRANSFER PROTOCOL), CD-ROM, AND DVD-ROM.

BLK 11: THE CONTRACTOR SHALL SUBMIT THE PLAN TO THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) AND TECHNICAL MONITOR (TM) the contract kick-off

FCDD-RLC-CT
0
1
1
15. TOTAL
0
1
1

G. PREPARED BY

TBD at Time of Award

H. DATE

17 OCT 2022

I. APPROVED BY

CHRISTOPHER MOY

J. DATE

Page 5 of 5 Pages 5

EXHIBIT A – ATTACHMENT 1

ARMY RESEARCH LABORATORY

By Some Author and Another Author

Month XXXX

Prepared by

To Be Determined Under contract

W911QX-23-C- To Be Determined

DISTRIBUTION STATEMENT GOES HERE

EXHIBIT A – ATTACHMENT 2

The findings in this report are not to be construed as an official Department of the Army position unless so designated by other authorized documents.

Citation of manufacturer's or trade names does not constitute an official endorsement or approval of the use thereof.

DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual, Chapter 5, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

File details come from the government source that posted it. Updated .