DD Sewer Emergency Purchase Statement Signed R96469.pdf
PDF 644 KB Posted
- Attached to
- Logan CC EMERGENCY NOTICE Ash Pump
- Solicitation number
- 21-426DOC-LOGAN-B-22646
- Issued by
- Livingston County, Illinois
About this file
This document is an Emergency Purchase Statement issued by the Illinois Department of Corrections for Logan Correctional Center. The statement details the need for emergency ash pump services from the vendor American Environmental Waste Company D/B/A D&D Sewer. The current ash pump at the center's power plant is disabled and needs to be replaced as soon as possible to prevent damage and loss of state property. The vendor was selected due to their possession of the necessary equipment and training to pump the ash from the power plant and prevent it from entering the boiler, which would cause the boiler system to fail and leave the facility without hot water, creating safety and sanitation issues for staff and offenders. The expected start date is May 17, 2021, and the estimated end date is May 26, 2021, with a total estimated expenditure of $35,000.
The statement indicates there is no existing state contract available for these emergency services. The funding will be provided through state appropriated funds. No option for extension or renewal is noted in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Forms A V.18.1~21.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EMERGENCY PURCHASE STATEMENT
Statement Page 1 of 1 State of Illinois Chief Procurement Office Emergency Purchase Statement Version 20.1
Zip: 62656State: ILCity: LincolnAddress: 620 Keouk Street
Vendor: American Environmental Waste Company D/B/A D&D Sewer
Zip: 62656State: ILCity: LincolnAddress: 1096 1350th Street
Division: Logan Correctional CenterAgency: Illinois Department of Corrections
Emergency Purchase Details Reference #: R-96469
Emergency Category (select the appropriate option from the drop-down menu below):
Involving threat to public health or public safety
Reason for selection of this particular vendor:
The current ash pump is totally disabled and will need replaced as soon as possible to prevent damage and loss to state property. There is not time to complete a competitive solicitation for the emergent need to have the ash pumped. The vendor was selected to pump and remove the ash due to possessing the equipment and training necessary to pump the ash from the power plant . The ash removal is needed to prevent ash from being distributed to the boiler which would cause the boiler to fail and the facility would be without hot water causing safety and sanitation issues for staff and offenders
Description of supplies or services to be provided:
The ash pump at the power plant has failed. The vendor will pump ash from the power plant to alleviate the ash from entering the boiler at the power plant. Ash build up will cause the boiler system to fail and there will be no hot water at the facility causing safety and sanitation issues for offenders and staff.
Is there an existing State contract available for the required supplies or services? Yes No
Expected Start Date: May 17, 2021 Estimated End Date*: May 26, 2021
Amount of this expenditure is: $35,000.00 Actual or Estimated*: Estimated *
*Actual end date and cost will be reported later.
Select the type of funding to be used: Federal Funds State Appropriated Funds State Grant Funds Other
Signatures
I am making this statement and providing it to the CPO Office, the Auditor General, and the Procurement Policy Board in compliance with the Illinois Procurement Code and within 10 days after award of the contract.
I have authorized the emergency procurement in accordance with the requirements of the Illinois Procurement Code (30 ILCS 500) and the applicable administrative rule. I know and understand the contents of this statement and all statements herein are true and correct to the best of my knowledge.
Agency Signature: Title: APO
Printed Name: Jacenta Wilson Date: 5/24/2020
EMERGENCY PURCHASE EXTENSION
Extension Page 1 of 2 State of Illinois Chief Procurement Office Emergency Purchase Statement Version 20.1
Zip: 62656State: ILCity: LincolnAddress: 620 Keouk Street
Vendor: American Environmental Waste Company D/B/A D&D Sewer
Zip: 62656State: ILCity: LincolnAddress: 1096 1350th Street
Division: Logan Correctional CenterAgency: Illinois Department of Corrections
Extension Justification Reference #:
Original Emergency Term Start Date: Original Emergency Term End Date:
Amount of original: Actual or Estimated*:
Expected Extension Start Date: Expected Extension End Date*:
Amount of extension expenditure: Actual or Estimated*:
Select the type of funding to be used: Federal Funds State Appropriated Funds State Grant Funds Other
Describe the scope of the original emergency (supply, service, etc.):
Describe the scope of the extension (supply, service, etc.). Show justification for extending the original emergency contract, and explain why the extension need cannot be met through a competitive process:
Was authorization to proceed verbally given? No Yes NA
Term of emergency procurement shall not exceed 90 days. Contract may be extended beyond 90 days if CPO determines additional time is necessary; however, prior to execution of extension, CPO must hold a public hearing and provide written determination
*Actual end date and cost will be reported later.
EMERGENCY PURCHASE EXTENSION
Extension Page 2 of 2 State of Illinois Chief Procurement Office Emergency Purchase Statement Version 20.1
Zip: 62656State: ILCity: LincolnAddress: 620 Keouk Street
Vendor: American Environmental Waste Company D/B/A D&D Sewer
Zip: 62656State: ILCity: LincolnAddress: 1096 1350th Street
Division: Logan Correctional CenterAgency: Illinois Department of Corrections
Signatures Reference #:
I am requesting an extension of the requested emergency contract. I know and understand the contents of this statement and all statements herein are true and correct to the best of my knowledge.
Agency Signature: Title:
Printed Name: Date:
Approved CPO/SPO Signature: Date:
EMERGENCY PURCHASE FINAL COST AND TERM
Final Cost and Term Page 1 of 1 State of Illinois Chief Procurement Office Emergency Purchase Statement Version 20.1
Zip: 62656State: ILCity: LincolnAddress: 620 Keouk Street
Vendor: American Environmental Waste Company D/B/A D&D Sewer
Zip: 62656State: ILCity: LincolnAddress: 1096 1350th Street
Division: Logan Correctional CenterAgency: Illinois Department of Corrections
Final Costs and Term Reference #:
Final total cost of supplies and services: Final total term of contract:
I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.
Agency Signature: Title:
Printed Name: Date:
Page of
EMERGENCY PURCHASE STATEMENT
State of Illinois Chief Procurement Office Emergency Purchase Statement Version 20.1 .\CPO Letterhead\CPO Letterhead.png
EMERGENCY PURCHASE STATEMENT
Statement Page of State of Illinois Chief Procurement Office Emergency Purchase Statement Version 20.1 .\CPO Letterhead\CPO Letterhead.png Emergency Purchase Details Emergency Category (select the appropriate option from the drop-down menu below):
Reason for selection of this particular vendor:
Description of supplies or services to be provided:
Is there an existing State contract available for the required supplies or services?
If Yes is checked above, explain why the existing contract does not meet the need:
Actual or Estimated*:
*Actual end date and cost will be reported later.
Select the type of funding to be used:
Signatures I am making this statement and providing it to the CPO Office, the Auditor General, and the Procurement Policy Board in compliance with the Illinois Procurement Code and within 10 days after award of the contract.
I have authorized the emergency procurement in accordance with the requirements of the Illinois Procurement Code (30 ILCS 500) and the applicable administrative rule. I know and understand the contents of this statement and all statements herein are true and correct to the best of my knowledge.
EMERGENCY PURCHASE EXTENSION
Extension Page of State of Illinois Chief Procurement Office Emergency Purchase Statement Version 20.1 .\CPO Letterhead\CPO Letterhead.png Extension Justification Actual or Estimated*:
Actual or Estimated*:
Select the type of funding to be used:
Describe the scope of the original emergency (supply, service, etc.):
Describe the scope of the extension (supply, service, etc.). Show justification for extending the original emergency contract, and explain why the extension need cannot be met through a competitive process:
Was authorization to proceed verbally given?
Term of emergency procurement shall not exceed 90 days. Contract may be extended beyond 90 days if CPO determines additional time is necessary; however, prior to execution of extension, CPO must hold a public hearing and provide written determination *Actual end date and cost will be reported later.
Signatures I am requesting an extension of the requested emergency contract. I know and understand the contents of this statement and all statements herein are true and correct to the best of my knowledge.
EMERGENCY PURCHASE FINAL COST AND TERM
Final Cost and Term Page of State of Illinois Chief Procurement Office Emergency Purchase Statement Version 20.1 .\CPO Letterhead\CPO Letterhead.png Final Costs and Term I am reporting the final costs and term for the referenced emergency contract to the CPO and the Auditor General.
11.0.0.20130303.1.892433.887364
| PageCount: |
| CurrentPage: |
| VendorZip: 62656 |
| VendorState: IL |
| VendorCity: Lincoln |
| VendorAddress: 620 Keouk Street |
| Vendor: American Environmental Waste Company D/B/A D&D Sewer |
| AgencyZip: 62656 |
| AgencyState: IL |
| AgencyCity: Lincoln |
| AgencyAddress: 1096 1350th Street |
| AgencyDivision: Logan Correctional Center |
| AgencyUniversity: Illinois Department of Corrections |
| CurrentMasterPage: |
| MasterPageCount: |
| ReferenceNo: R-96469 |
| DropDownListQuickPurchase: Involving threat to public health or public safety |
| CheckBox1ProtectingHealth: 0 |
| CheckBox2DiscountedPrice: 0 |
| CheckBox3RareItems: 0 |
| CheckBox4Entertainment: 0 |
| CheckBox5AvoidLapsing: 0 |
| ExplanationForSelectingVendor: The current ash pump is totally disabled and will need replaced as soon as possible to prevent damage and loss to state property. There is not time to complete a competitive solicitation for the emergent need to have the ash pumped. The vendor was selected to pump and remove the ash due to possessing the equipment and training necessary to pump the ash from the power plant . The ash removal is needed to prevent ash from being distributed to the boiler which would cause the boiler to fail and the facility would be without hot water causing safety and sanitation issues for staff and offenders |
| ExplanationSuppliesServices: The ash pump at the power plant has failed. The vendor will pump ash from the power plant to alleviate the ash from entering the boiler at the power plant. Ash build up will cause the boiler system to fail and there will be no hot water at the facility causing safety and sanitation issues for offenders and staff. |
| CheckBoxYes: 0 |
| CheckBoxYes: 0 |
| CheckBoxNo: 1 |
| CheckBoxNo: 0 |
| ExplanationDoesNotMeetNeed: |
| TextFieldExpectedStartDate: 2021-05-17 |
| TextFieldExpectedEndDate: 2021-05-26 |
| TextFieldAmountExpenditure: $35,000.00 |
| ActualOrEstimated1: Estimated * |
| CheckboxFederalFunds: 0 |
| CheckboxFederalFunds: 0 |
| CheckboxStateAppFunds: 1 |
| CheckboxStateAppFunds: 0 |
| CheckBoxStateGrantFunds: 0 |
| CheckBoxStateGrantFunds: 0 |
| CheckBoxOther: 0 |
| IfOtherExplainTextField: |
| AuthorizedSignature: |
| TitleField: APO |
| PrintedNameField: Jacenta Wilson |
| AuthorizedDateField: 5/24/2020 |
| Start: |
| End: |
| AmountOfOriginal: |
| ActualOrEstimated2: |
| ExpectedExtensionStartDate: |
| ExpectedExtensionEnd: |
| AmtExtensionExpenditure: |
| ActualOrEstimated3: |
| CheckBoxOther22: 0 |
| IfOtherExplainTextField22: |
| TextField1: |
| TextField2: |
| CheckBoxNA: 0 |
| WhoAuthorizedWork: |
| TextField3: |
| FinalTotalCost: |
| FinalTotalTerm: |
| PrintedName: |
| Date: |
File details come from the government source that posted it. Updated .