DD FORM 1423-1-CDRL.pdf
DoD Form PDF 99 KB Posted
- Solicitation number
- SPRWA1-24-Q-0007
- Issued by
-
Defense Logistics Agency Aviation
About this file
This document is a Contract Data Requirements List (CDRL) that specifies two data items required for a federal contract for the TH-1H Helicopter.
The first data item is an Item Unique Identification (IUID) Marking Plan, which the contractor must submit within 30 calendar days after contract award. The government will review and provide a decision within 10 calendar days of receipt. The second data item is an IUID Marking Activity and Verification Report, which the contractor must submit quarterly. The government will provide written acceptance, comments, or rejection within 10 working days of receipt. Both data items are subject to Distribution Statement C, authorizing distribution to U.S. Government agencies and their contractors for administrative or operational use.
The related federal contract opportunity is a sole source solicitation for a C-5000 Radio (NSN 5821-01-474-2548) in support of the TH-1H Helicopter program. The government intends to award a sole source contract to the original equipment manufacturer, Chelton Avionics, Inc. d.b.a. Canyon AeroConnect, as they are the only known source with the required technical data and capabilities.
View the file
Other versions and copies of DD Form 1423-1
Show all 20
Who attaches DD Form 1423-1
Other files
| File | Type | Posted |
|---|---|---|
| DD Form 1653-Transportation.pdf | ||
| SPRWA1-24-Q-0007.pdf | ||
| AFMC 158-Packaging.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
TH-1H HELICOPTER
E. CONTRACT / PR NO.
FD20602400032
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Item Unique Identification (IUID) Marking Plan
3. SUBTITLE
Item Unique Identification
4. AUTHORITY
DI-MGMT-81803A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
FD20602400032 IAW MIL-STD-129 and MIL-STD-130
6. REQUIRING OFFICE
411 SCMS/GULBA
7. DD 250 REQ
LT
8. APP CODE
See Block 16
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
See Block 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Parton, Jessica NNAME: 05 DEC 2023DATE:
Exhibit Data Item No. Performance Period
A A001 Basic Year Pd
BLK 9: "C" Distribution authorized to U.S. Government Agencies and their contractors (Administrative or Operational Use, 28 April 16) Other requests shall be referred to the contract management team, AFSCC/PZAAA 460 Richard Ray BLvd, Suite 221, Robins AFB, GA 31098
BLKS 10-13: The contractor shall submit a complete IUID Marking Plan within 30 calendar days after contract award.
The Government will review and determine acceptance or rejection and notify contractor within 10 calendar days of receipt. If rejected, the contractor shall have 10 calendar days to correct any error and return a corrected IUID Marking Plan to the Government for review.
BLK 7, 14: Forward one electronic copy in PDF format to the following email address:
Program Manager: Micah Tapp (E-mail: micah.tapp.2@us.af.mil)
Engineer: Johnny Mangum (E-mail: johnny.mangum@us.af.mil)
COORDINATORS:
Email:
411 SCMS/GULBA Program Manager (PM) micah.tapp.2@us.af.mil
0 1 0
Email:
AFLCMC/WIUE Engineer johnny.mangum@us.af.mil
0 1 0
0 2 015. TOTAL
G. PREPARED BY
Parton, Jessica N
411 SCMS / GULBB
478-926-7035
H. DATE
06 DEC 2023
I. APPROVED BY
//ELECTRONICALLY SIGNED//
Palumbo, Lindsay J
411 SCMS / GULBA 478-327-2774 / 497-2774
J. DATE
06-DEC-23
Page 1 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 20 Feb 2024
PREVIOUS EDITION MAY BE USED.
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
TH-1H HELICOPTER
E. CONTRACT / PR NO.
FD20602400032
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
IUID Marking Activity and Verification Report
3. SUBTITLE
Item Unique Identification
4. AUTHORITY
DI-MGMT-81804A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
FD20602400032 IAW MIL-STD-129 and MIL-STD-130
6. REQUIRING OFFICE
411 SCMS/GULBA
7. DD 250 REQ
LT
8. APP CODE
See Block 16
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
QRTLY
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Parton, Jessica NNAME: 05 DEC 2023DATE:
EXHIBIT DATA ITEM NO. PERFORMANCE PERIOD
A A002 BASIC YEAR
BLK 4: IUID Marking Activity and Verification Report can be combined with the monthly status report.
BLK 7: Applicable code as listed in DOD 5010.12-M, Chapter 3. (LT for Letter of Transmittal if not separately priced or DD if separately priced) WAWF E-DD FORM 250 shall be required for separately priced data. E-DD FORM 250 shall be submitted to SPRWA1 (PM: micah.tapp.2@us.af.mil) for acceptance.
BLK 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected based on its conforming to the requirements of the DID, and within the review time specified in Block 16, items 10-12.
BLK 9: "C" Distribution authorized to U.S. Government Agencies and their contractors (Administrative or Operational Use,28 April 16) Other requests shall be referred to the contract management team, BLKS 10-13: Contractor shall submit an IUID Marking Activity and Verification Report to the Engineer AFLCMC/WIUEE, every three months (quarterly). Written Government acceptance/comments/rejection will be within 10 working days after receipt of Plan from the Contractor. Contractor final submission shall be submitted within 10 working days of receiving Government comments. Acceptance by the Government is required prior to formal distribution
BLK 14: Forward one electronic copy in PDF format to the following email address:
DLA Procuring Contract Officer (PCO), DCMA/ACO, Program Manager (PM) 411 SCMS/GULAA and Engineer
AFLCMC/WIUEC.
COORDINATORS:
Email:
411 SCMS/GULBA Program Manager (PM) micah.tapp.2@us.af.mil
0 1 0
Email:
AFLCMC/WIUE Engineer johnny.mangum@us.af.mil
0 1 0
Email:
DCMA/ACO
0 1 0
Email:
DLA Procuring Contract Officer (PCO) jimmy.hicks@us.af.mil
0 1 0
0 4 015. TOTAL
G. PREPARED BY
Parton, Jessica N
411 SCMS / GULBB
478-926-7035
H. DATE
06 DEC 2023
I. APPROVED BY
//ELECTRONICALLY SIGNED//
Palumbo, Lindsay J
411 SCMS / GULBA 478-327-2774 / 497-2774
J. DATE
06-DEC-23
Page 2 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 20 Feb 2024
PREVIOUS EDITION MAY BE USED.
File details come from the government source that posted it. Updated .