DCSC-25-RFP-015 Dc Courts Fire Alarm servies Attachment K.1 Pricing Final -1-7-25.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
DCSC-25-RFP-015 DC Courts Fire Alarm Inspections, Preventative Maintenance, and Assessments
Solicitation number
DCSC-25-RFP-015
Issued by

About this file

This is a pricing template spreadsheet for solicitation DCSC-25-RFP-015 for DC Courts Fire Alarm Inspections, Preventive Maintenance and Assessments. The template includes two main sections: Unit Costs and Labor Rates. The Unit Costs section lists 16 specific inspection and testing requirements including annual fire alarm device testing, monthly NFPA 72 Chapter 14 visual inspections, semi-annual tamper switch and water flow testing, annual fire pump testing, five-year standpipe flow testing, and various other maintenance items. Vendors must provide pricing for a base year and four option years.

The Labor Rates section requires hourly rates for seven positions across the base and four option years: Project Manager, Superintendent, Lead Field Technician, Lead Technician, Master Electrician, Journey Electrician, and Administrative Support. The template is designed to capture comprehensive pricing for both routine maintenance activities and labor categories needed for the fire alarm system maintenance program at DC Courts facilities.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Costs

DCSC-25-RFP-015 DC Courts Fire Alarm Inspections, Preventive Maintenance and Assessments
UNIT RATES
The following test should be performed at all sites.Unit CostUnit CostUnit CostUnit CostUnit Cost
ItemsQuantiyDescriptionPeriod of PerformanceBase YearOption # 1Option #2Option #3Option #4
Line 11Test and Inspect Fire Alarm DevicesAnnually
Line 22
Line 31NFPA 72 Chapter 14 Inspection, Testing, and Maintenance 14.3.1 Visual InspectionsMonthly
Line 41Test Tamper switches and water flow per NNFPA 252X (January & July)
Line 51Test Fire PumpAnnually
Line 61Standpipe Flow Test(1) Five Year Test
Line 71Test Pressure GaugesAnnually
Line 81Trip TestAnnually
Line 91Operate Control ValveAnnually
Line 101Lubricate Operating StemsAnnually
Line 111Test and Inspect Pre-Action Sprinkler systemQuarterly
Line 121Test and Inspect tamper switchesSemi-Annually
Line 131Full-trip test and visual inspect entire fire alarm system and sprinkler headsAnnually
Line 141Generator Test with the Courts Generator Contractor to complete Inspection/Testing ChecklistAnnually

Line 15 1 Elevator Test with the Courts Elevator Contractor to complete Inspection/Testing Checklist Annually

Line 16 1 Air Handling Unit Shutdown with the Courts Mechanical Contractor to complete Inspection/Testing Checklist Annually

Total Per Year $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Hourly Rates

DCSC-25-RFP-015 DC Courts Fire Alarm Inspections, Preventive Maintenance and Assessments
LABOR RATES
Hourly RateHourly RateHourly RateHourly RateHourly Rate
PositionBase YearOption # 1Option #2Option #3Option #4
Project Manager
Superintendent
Lead Field Technician
Lead Technician
Master Electrician
Journey Electrician
Administrative Support

$0.00

File details come from the government source that posted it. Updated .