This document is an Amendment of Solicitation / Modification of Contract for the Cleveland Park Streetscape and Drainage Improvement Project (DCKA-2021-B-0025) issued by the District of Columbia Department of Transportation (DDOT). The amendment extends the bid due date from July 12, 2021 to July 29, 2021 at 1:00 PM EST, with a public bid reading scheduled for July 29, 2021 at 2:30 PM EST via WebEx. The amendment also modifies the insurance requirements, provides responses to submitted questions, and includes a new pay item for clearing and grubbing along with other clarifications to the project scope.
The contract will be awarded by the District of Columbia to the successful bidder. The amendment includes details on accessing the WebEx bid opening, as well as information on how to update the electronic pricing schedule with the new pay items. The project is funded by the District of Columbia and the modifications aim to provide greater clarity to bidders on the scope of work and contract requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCKA-2021-B-0025_Amd1.pdf | ||
| DCKA-2021-B-0025_Att1.xlsx | XLSX spreadsheet | |
| DCKA-2021-B-0025_Amd2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
1. Solicitation Number Page of Pages
DCKA-2021-B-0025 1 6
2. Amendment/Modification Number
Amendment No. 3
3. Effective Date
See Box 16C
4. Requisition/Purchase Request No. 5. Solicitation Caption
Cleveland Park Streetscape and Drainage Improvement Project
6. Issued by: Code 7. Administered by (If other than line 6) District Department of Transportation Office of Contracting and Procurement 250 M Street, SE, 7th Floor Washington, DC 20003
8. Name and Address of Contractor (No. street, city, county, state and zip code)
X
9A. Amendment of Solicitation No.
DCKA-2021-B-0025
9B. Dated (See Item 11) 06/10/2021
10A. Modification of Contractor/Order No.
10B. Dated (See Item 13) Code Facility
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _____1_____ copies of the amendment: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) BY separate letter or fax which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such may be made by letter or fax, provided each letter or telegram makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (If Required):
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTORS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14
A. This change order is issued pursuant to (Specify Authority):
The changes set forth in Item 14 are made in the contract/order no. in item 10A.
B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data etc.) set forth in item 14, pursuant to the authority of 27 DCMR, Chapter 36, Section 3601.2.
C. This supplemental agreement is entered into pursuant to authority of:
☒ D. Other (Specify type of modification and authority) 27 DCMR 1517 Amendment of Invitation for Bids
E. IMPORTANT: Contractor is not is required to sign this document and return ____ copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF Section headings, including solicitation/contract subject matter where feasible.)
IFB No.: DCKA-2021-B-0025 hereby is Amended as follows:
After issuance of this Amendment the District will not accept any more questions for this project.
1. Bid due date and time is extended from July 12, 2021 to July 29, 2021 at 1:00PM EST. Bid submission instructions are included in solicitation section L. Public Bid reading is scheduled for July 29, 2021 at 2:30PM EST via WebEx.
15A. Name and Title of Signer (Type or print) 16A. Name of Contracting Officer
Margaret Platek Contracting Officer
15B. Name of Contractor 15C. Date Signed 16B. District of Columbia 16C. Date Signed
(Signature)
(Signature of Contracting Officer)
07/19/2021
1.Solicitation Number
DCKA-2021-B-0025
Page of Pages 2 6
2.Amendment Modification No.
Amendment No. 3
3. Effective Date
See Box 16
4.Requisition/Purchase Request No.
5. Solicitation/Contract Caption
Cleveland Park Streetscape and Drainage Improvement Project
WebEx Bid Opening Link:
https://dcnet.webex.com/dcnet/j.php?MTID=mfbb10f8312d5bc490fb17c974b0f7714
WebEx Bid Opening number: 172 893 0080
WebEx Bid Opening password: rdADUuGJ323
WebEx Bid Opening phone number is 1-650-479-3208 Call-in number (US/Canada). Access code: 172 893 0080.
Each participant must provide name, company name, and an e-mail for their attendance to be properly recorded on an Attendance Roster.
2. I.8 Insurance (Amendment 2)
Paragraph 4. Environmental Liability/Contractors Pollution Liability Insurance last sentence to shall be modified as follows: If such coverage is written on a claims-made basis, the Contractor warrants that any retroactive date applicable to coverages under the policy precedes the Contractor’s performance of any work under the Contract and that continuous completed operations coverage will be maintained for at least ten (10) five (5) years or an extended reporting period shall be purchased for no less than ten (10) five
(5) years after completion.
3. Amendment includes the following response to question submitted. The highlighted sections are responses that include new pay items (in RED) that are added to the Price Schedule via addendum to pricing schedule file name KA20210069.001x.
Search for Electronic Price Schedule Amendment on DTAP for the subject project and upload Electronic Price Schedule Amendment KA20210069.001X to your Electronic Pricing Schedule in Project Bids. After downloading the price schedule amendment file from DTAP, open your existing Electronic Pricing Schedule for the project in Project Bids, go to File, on the drop down menu select “Load Amendment” and select “Electronic Price Schedule Amendment” (Make sure the “Files of type” drop down box is changed to “All Files” in order to see the downloaded file). The file extension for Electronic Price Schedule Amendment is KA20210069.001x.
Q8: Plan Sheet 9, Pavement Detail Sheet, Note 1 states .”…the limit of common excavation shall be at the bottom of bound materials in the existing pavement or at the top of subgrade whichever is lower.” Please confirm all areas of existing pavement removal, that the bound materials are being paid under Hard Surface Pavement Excavation.
Q8 Response: All areas of existing pavement removal to the bottom of bound materials will be paid under Hard surface Pavement Excavation.
Q.9: et 65, a note at structure EX-I 5 states to replace top of structure and close curb opening with concrete for both Ex I-5 and Ex I-6. Where is Ex I-6 located on the plans?
Q.9 Response: EX-I-6 is located at station 1002+50.61, 36.7’ RT as stated on the structure schedule on sheet 75. The opening is along the Service Lane on the back side of EX-I-5.
Q10: Plan Sheet 65, a note at structure EX-I 5 states to replace top of structure and close curb opening with concrete for both Ex I-5 and Ex I-6. Under what line item(s) does this work get measured and paid?
https://dcnet.webex.com/dcnet/j.php?MTID=mfbb10f8312d5bc490fb17c974b0f7714
DCKA-2021-B-0025
Page of Pages 3 6
Q10 Response: EX-I-5 is to remain open in proposed conditions. Item Number 3023, Category Code 313008 Abandon Storm Inlet will need to increase by 1 EA to account for the abandonment of the opening along EX-I-6 using brick, PCC and mortar. Only the curb opening along EX-I-6 is to be abandoned since the vault will still be utilized by EX-I-5. A line item is added for Category Code 311010 Adjust Standard Basin Top. Based on photographs and street view the existing top slab of EX-I-5 is in good conditions and does not need to be replaced. Adjusting the standard basin top will ensure the standard basin top matches proposed grade. Please see below for the standard information needed for the adjustment:
Proposal Line Number
Item ID Description
Approximate Quantity and Units
Unit Price Dollars Cents
Bid Amount Dollars Cents
311010 Adjust Standard Basin Top
Each
Q11: Special Provisions Page 10 J.12.8 Utility Status states that Verizon facilities and Level 3/Zayo facilities will be relocated during construction. Please provide plan of relocation. Will the utility companies be relocating their lines into new duct banks the Prime contractor builds as part of the project or a different path?
Q11 Response: The contractor shall coordinate with the utility owners during construction. Portions of the proposed utility relocations may be completed prior to the DDOT construction work. Below is a list of areas that will require additional coordination with the utility owners during the construction of the Cleveland Park Streetscape and Drainage Improvement Project. Additional coordination may be required during construction.
• Verizon facilities will be relocated by Verizon during construction o Southwest corner of Connecticut Avenue and Newark Street NW – adjust manhole frame and cover during construction o Ordway Street NW - Relocation to accommodate drainage construction (west side) o Ordway Street NW - Relocation to accommodate drainage construction (east side) o Porter Street NW - Lift and lay to accommodate drainage construction (west side) o Northeast corner of Connecticut Avenue and Porter Street NW – adjust manhole frame and cover during construction
• Comcast will be coordinating with Verizon to relocate facilities to new Verizon facilities
• Level 3 facilities will be relocated by Level 3 during construction o Porter Street NW - Lift and lay to accommodate drainage construction (west side) o Porter Street NW - Lift and lay to accommodate drainage construction (east side)
• Zayo facilities will be relocated by Zayo during construction o Northwest corner of Connecticut Avenue and Ordway Street NW - Vault cover will be replaced
Q12: Special Provisions Page 10 J.12.8 Utility Status states that Verizon facilities and Level 3/Zayo facilities will be relocated during construction. Will the utility companies be relocating their lines into new duct banks the Prime contractor builds as part of the project or a different path?
Q12 Response: The duct banks will be constructed by utility owners.
Q13: Special Provisions page 12, J.12.12 Pedestrian Access Requirement General states “in high pedestrian use areas, the DDOT engineer may request temporary hard-surface walkways, such as plywood sheets, to be installed at no
DCKA-2021-B-0025
Page of Pages 4 6 additional cost”. This statement is very open ended and undefined. Please identify on the plans where the “high pedestrian use area” are located.
Q13 Response: In the special provisions, page 12, delete the last sentence of J.12.12 Description of Work which states “In high pedestrian use areas, the DDOT Engineer may request temporary hard-surface walkways, such as plywood sheets, to be installed at no additional cost to the District.”
Q14: Special Provisions page 12, J.12.12 Pedestrian Access Requirement General states “in high pedestrian use areas, the DDOT engineer may request temporary hard-surface walkways, such as plywood sheets, to be installed at no additional cost.” This statement is very open ended and undefined. If plywood sheets are requested, is contractor just laying them on the ground? Please provide detail of what DDOT requires.
Q14 Response: See response for question #13.
Q15: Special Provisions page 12, J.12.12 Pedestrian Access Requirement General states “in high pedestrian use areas, the DDOT engineer may request temporary hard-surface walkways, such as plywood sheets, to be installed at no additional cost.” This statement is very open ended and undefined. What other hard surface walkways could be requested? If plywood sheets is requested, is contractor just laying them on the ground? Please provide detail of temporary hard surface that may be required.
Q15 Response: See response for question #13.
Q16: Storm Drain Plans sheet 69 and 72 show pipe run MH5-2 to MH8-1 that is adjacent existing buildings and is over 20 feet deep and runs as close as 3 feet to exterior wall of building. Is there any as-built information available about the buildings?
Q16 Response: Building as-builts are not available.
Q17: Storm Drain Plans sheet 69 and 72 show pipe run MH5-2 to MH8-1 that is adjacent existing buildings. There are several existing features that would need to be removed to excavate and install the storm drain. These items are stairs, ramps, dumpsters, etc.
Q17 Response: A Clearing and Grubbing item has been added to the project for the removal, storage, and reinstallation of the incidental structures along the alley. Add CLIN Below
Proposal Line Number
Item ID Description
Approximate Quantity and Units
Unit Price Dollars Cents
Bid Amount Dollars Cents
201004 Clear and Grubbing
2.6 Acres
Q18: Storm Drain Plans sheet 69 and 72 show pipe run MH5-2 to MH8-1. There are existing overhead utility lines in same area. Existing poles would conflict with pipe near MH8-1 and structure MH5-2. Are these overhead lines being removed?
Q18 Response: DDOT has coordinated with the utility owners to relocate the overhead lines to underground facilities, which will be completed prior to the start of construction. The contractor shall coordinate with utility owners prior to construction in this area.
Q19: Special Provisions J.16 DC Water Specification Details towards end of section prior to DC Water Green Infrastructure, there is one detail provided showing grade beams and pile caps being constructed over existing sewers. Is the contractor required to install something similar to this detail on the project? If so, please identify location(s).
Q19 Response: During construction, the DC Water inspector may request the use of this detail. This is dependent on the clearance between proposed utility and the existing utility.
DCKA-2021-B-0025
Page of Pages 5 6
Q20: Plan Sheet 118, general note #5 states to install 4” PVC pipe under sidewalk connecting electrical manholes/light pole/signal to planting areas will be paid under line items 601002 and 601018. We could not find these bid items. Does the pipe need to be encased in concrete?
Q20 Response: Plan Sheet 118, general note #5, the last sentence shall be revised to say “See line items 614150 – F&I 1- 4” Schedule 40 Rigid PVC Conduit and 614150 – F&I 1-4” Schedule 40 Rigid PVC Conduit – Vertical Riser”. Both items are included as bid items.
Q21: Plan sheet 147 along right hand side of page has the statement “Up to 50% of the traffic drums can be substituted with cones as channelizing devices as directed by Engineer.” Please confirm the contractor will be measured and paid under line item 612034 Traffic Drums for the Traffic Cones that are used.
Q21 Response: The substituted traffic drums will be measured and paid for under pay item no. 612034 Traffic Drums at no additional cost to the contract.
Q22: Plan sheet 145 MOT General Notes and Sequence of construction states in note 3 “no work shall be performed during weekday peak periods are defined as 5:30AM to 9:30AM and 3:30PM to 7:00PM.” Please confirm this is in reference to working in the travel lanes.
Q22 Response: Yes, no lane closures during weekday peak periods. However, since the project site is located at high pedestrian’s metro station area, no crosswalk closures shall be performed during rush hours unless it is a safety concern and approved by the Engineer. Contractor can continue working on the sidewalk areas with minimum of 4’ pedestrian walkway/pathway provided during the rush hours.
Q23: Plan sheet 145 MOT General Notes and Sequence under note 34 states “all cracks shall be cleaned of debris after milling and sealed with crack sealant.” Please provide the line item that this work will be measured and paid.
Q23 Response: As directed by the engineer upon field inspection/verification, Crack Sealing shall be applied in accordance to DDOT Specifications Section 807.02 for joint sealing. The crack sealing will be incidental to the item 410002 Pavement Profiling (Milling) pay item.
Q24: Plan Sheet 165 for MOT Phase 3H and plan sheet 146 MOT Sequence of Construction Note 7 under Phase 3 states to use “For flagging operation shown on sheet M21 Contractor shall utilize traffic control officers to direct traffic at intersection…” This language for flaggers is different wording than other phases. Is the contractor required to use Police officers to perform flagging operations for this phase?
Q24 Response: Contractor shall use traffic control officers (TCO) for flagging operation at all signalized intersections.
Q25: Plan Sheet 144 detail 2 shows the Art Installation Foundation. There is a note that states “Concrete is a temporary installation to be removed for art installation.” The detail shows a twin 20 ground mounted pole concrete foundation with a movable planter. Are we to install the pole foundation under a lighting line item, or does it get measured and paid under Art Installation Foundation (600011). What concrete are we demolishing for the art?
Q25 Response: The line item to be used is Art Installation Foundation (600011). The foundation includes anchor bolts which would typically receive the light pole. The anchor bolts will serve as the connection between the future artwork and the foundation. These anchor bolts should not be visible and therefore the contractor shall pour a layer of concrete on top of the foundation to encase the anchor bolts and therefor provide a concrete pad for the planter to sit on. Once the artwork is ready for installation, the concrete pad is demolished, and the anchor bolts are exposed for the art installation. Protect anchor bolts prior to pouring concrete. Unless the art installation is performed as part of this project, there is no demolition to be done.
Q26: Please advise or confirm pay items:
a. Stone facing: 1085-70806 pay item, how is the unit CF measured? Does it include just the stone or the stone and setting bed behind?
DCKA-2021-B-0025
Page of Pages 6 6
Q26 a. Response: Follow 708.12 Measure and Payment section in DDOT Standard Specification
b. Also, assuming this 1085-708006 pay item is for the vertical wall stone, even though coping is in the description. The quantities don’t match up with the next item 1090-708991 granite coping, but the quantities on most don’t. Please advise.
Q26 b. Response: The pay item 708006 shall be used for details on LD-7. CF is the unit of measurement for vertical stone masonry. The pay item 708991 shall be used for the stone sitting on the top of the concrete. See details on LD-7.
It’s width is 1 foot and the measurement is LF.
Q27: ST-14 is listed as granite curb 6” reveal on L-2, the curbs around the metro vents. What stone is this and what pay item should we use?
Q27 Response: The Items for this work are covered in 606064 FURNISH & SET 8”X12” GRANITE STRAIGHT CURB and
606066 FURNISH & SET 8”X12” GRANITE CIRCULAR CURB RADIUS UNDER 10 FT
| AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT |
| IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14 |
| 2021-07-19T17:05:44-0400 | |
| Margaret J. Platek |
File details come from the government source that posted it. Updated .