DCKA-2021-B-0025_Amd1.pdf

PDF 183 KB Posted

Attached to
Cleveland Park Streetscape and Drainage Improvement Project
Solicitation number
DCKA-2021-B-0025
Issued by
District of Columbia

About this file

This document is an Amendment to Solicitation DCKA-2021-B-0025 for the Cleveland Park Streetscape and Drainage Improvement Project issued by the District Department of Transportation (DDOT) Office of Contracting and Procurement. The amendment provides responses to questions regarding insurance requirements, including acceptable forms and exceptions, as well as specifications for finishes on bollards, stone seating, and cobblestone edging. The project includes roadway, streetscape, and drainage improvements within the Cleveland Park neighborhood from Macomb Street to Porter Street. The solicitation originally issued on June 10, 2021 and this amendment is effective as of July 6, 2021.

The insurance requirements include Commercial General Liability using specific ISO endorsement forms, as well as potential requirements for Railroad Protective Liability, Cyber Liability, Environmental Liability/Contractors Pollution Liability, and Employment Practices Liability for subcontractors. The amendment also clarifies acceptable finishes for project elements such as a "four-cut" finish for bollards and stone work, and a split-face finish for cobblestone edging. Contractors must acknowledge receipt of this amendment prior to the established bid deadline.

View the file

Other files

File Type Posted
DCKA-2021-B-0025_Amd3.pdf PDF
DCKA-2021-B-0025_Att1.xlsx XLSX spreadsheet
DCKA-2021-B-0025_Amd2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

1. Solicitation Number Page of Pages

DCKA-2021-B-0025 1 3

2. Amendment/Modification Number

Amendment No. 1

3. Effective Date

See Box 16C

4. Requisition/Purchase Request No. 5. Solicitation Caption

Cleveland Park Streetscape and Drainage Improvement Project

6. Issued by: Code 7. Administered by (If other than line 6) District Department of Transportation Office of Contracting and Procurement 250 M Street, SE, 7th Floor Washington, DC 20003

8. Name and Address of Contractor (No. street, city, county, state and zip code)

X

9A. Amendment of Solicitation No.

DCKA-2021-B-0025

9B. Dated (See Item 11) 06/10/2021 10A. Modification of Contractor/Order No.

10B. Dated (See Item 13) Code Facility

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning _____1_____ copies of the amendment: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or

(c) BY separate letter or fax which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such may be made by letter or fax, provided each letter or telegram makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (If Required):

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTORS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14

A. This change order is issued pursuant to (Specify Authority):

The changes set forth in Item 14 are made in the contract/order no. in item 10A.

B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data etc.) set forth in item 14, pursuant to the authority of 27 DCMR, Chapter 36, Section 3601.2.

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority) 27 DCMR 1517 Amendment of Invitation for Bids

E. IMPORTANT: Contractor is not is required to sign this document and return ____ copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF Section headings, including solicitation/contract subject matter where feasible.)

IFB No.: DCKA-2021-B-0025 hereby includes the following responses to questions submitted:

Q1: Section I.8 of the IFB document most the insurance form is not the recent edition (for Example Form CG 00 01 04 13 is not the most recent edition). Please confirm all the insurance form that are mentioned in the IFB document should be the most recent edition of the ISO.

Q1 Response: General Requirement state Commercial General Liability insurance policies shall be effected using the ISO Additional Insured Endorsement form CG 20 10 11 85 (or CG 20 10 07 04 and CG 20 37 07 04) or such other endorsement or combination of endorsements providing coverage at least as broad and approved by the CO in writing.

15A. Name and Title of Signer (Type or print) 16A. Name of Contracting Officer

Margaret Platek Contracting Officer

15B. Name of Contractor 15C. Date Signed 16B. District of Columbia 16C. Date Signed

(Signature) (Signature of Contracting Officer)

July 6, 2021

1.Solicitation Number

DCKA-2021-B-0025

Page of Pages 2 3

2.Amendment Modification No.

Amendment No. 1

3. Effective Date

See Box 16

4.Requisition/Purchase Request No. 5. Solicitation/Contract Caption

Cleveland Park Streetscape and Drainage Improvement Project

Q2: IFB document (page 37 of 63 paragraph 3) states, “The Government of the District of Columbia shall be included in all policies required hereunder to be maintained by the Contractor and its subcontractors (except for workers’ compensation and professional liability insurance).” Should the employer’s liability, cyber liability, employment practice liability, and professional liability insurance are also included in the exception?

Q2 Response: Employers Liability is part of Worker’s Compensation so is included in the exception. Cyber, Employment Practices and Professional Liability are not included in the exception because in some cases additional insured status is available. The contractor is required to carry the required lines of coverage.

Q3: Should subcontractors required to have cyber-Liability insurance, Environmental Liability/Contractors Pollution liability Insurance, and employment practices liability?

Q3 Response: General Requirement state The Contractor must provide proof of the subcontractor's required insurance prior to commencement of work by the subcontractor. If the Contractor engage a subcontractor without requesting subcontractor specific insurance requirements for the subcontractor, such subcontractor shall have the same insurance requirements as the Contractor. Attachment 1 to the Amendment 1 is the Subcontractors Insurance Requirements Form. It must be completed and provide brief the Statement of Work in designated column. Please submit prior to bid, prior to award or after award at Prime Contractor’s discretion for review and District’s response.

Q4: Section I.8 of the IFB document states that “the Contractor shall provide evidence satisfactory to the Contracting Officer of a RPL policy with respect to activities Contractor, or any of its officers, agents, employees, members, successors and assigns, or subcontractors, perform within fifty (50) feet vertically or horizontally of railroad tracks, but only prior to the initiation of any such activity, Contractor shall provide Railroad Protective Liability Insurance (ISO CG 00 35 or equivalent), in the name of the applicable railroad. However, is railroad insurance is required for this project because most of the work will be done not horizontally from the railroad track rather than we will be working on vertically from the railroad track?

Q4 Response: Requirement no. 7 states (50) feet vertically or horizontally. Please note this requirement if on an “if applicable” basis. The permit process may involve a nearby railroad in which case the contractor’s broker will need to place coverage at the Railroad’s direction as any applicable policy will require that the Railroad is the named insured.

Q5: Special provision called for ‘4-cut finish’ that is being called out for the bollard vertical sides. According to the supplier specified in the special provision, the company doesn’t supply the for ‘4-cut finish’. Is thermal cut for the vertical face is acceptable.

Q5 Response: Thermal finish for vertical sides is not acceptable for bollards, stone seating, and any other stonework called out in the project as Four Cut Finish. See below the description from the DDOT Standard Spec 2013 for this type of finish. Companies have different names for same finish. Comparable finishes are acceptable provided a thermal finish (for the top) and a four cut replacement finish are presented for approval.

708.07 FINISH FOR EXPOSED FACES

The kind of finish for the exposed faces of the masonry shall be as specified in the Contract Documents. Face stones shall be pitched to line along all beds and joints, with no depressions below the pitch line. Each stone shall be out of wind, i.e.

the 4 corners are in the same plane. No drill or quarry marks shall show on the face of any stone. The specified finish shall be in accordance with the following definitions:

1.Solicitation Number

DCKA-2021-B-0025

Page of Pages 3 3

2.Amendment Modification No.

Amendment No. 1

3. Effective Date

See Box 16

4.Requisition/Purchase Request No. 5. Solicitation/Contract Caption

Cleveland Park Streetscape and Drainage Improvement Project

A. EIGHT CUT - Fine hammered. Interrupted parallel markings not over 3/32 inch apart. A corrugated finish.

Smoother near arris lines and on small surfaces.

B. SIX CUT - Medium hammered. Interrupted parallel markings not over 1/8 inch apart. A corrugated finish.

C. FOUR CUT - Coarse hammered. Interrupted parallel markings not over 7/32 inch apart. A corrugated finish.

D. SAWN - Fairly plane surface. Varying texture ranging from close approximation to sand rubbed to scorings 3/32 inch in depth. When so specified, scorings shall be vertical or horizontal as produced by gang saws. All exposed surfaces thoroughly sand blasted to remove rust stains and iron particles.

Q6: In reference to the Cobblestone Edging – the specified supplier standard finish is thermal with Split edges and not a ‘Split Face’ as called in special provision. Please confirm thermal split edges is acceptable as it is the only supplier standard finish.

Q6 Response: Cobblestone edging pavers (6”x6”x4”) will need to be split face finish on all sides. A thermal split edge finish will not be acceptable. Furthermore, the Cobblestone Edging size shall match the plan sheets which indicate a 6”x6”x4” and not the 12”x12”x4” size provided in the Cobblestone Edging (Item 600017) Specification.