Design-Builder Qualification Statement Summary

This is a Design-Builder Qualification Statement form issued by the City of Pasadena for the Hydrogen Fueling Station Project. The document establishes eligibility requirements and evaluation criteria for design-build-operate-maintain (DBOM) services for a hydrogen fueling facility located at 159 South Kinneloa Avenue, Pasadena, California. The project encompasses design, construction, operation, and maintenance of a stand-alone hydrogen fueling station utilizing delivered liquid hydrogen as the primary storage medium to support the city's planned fleet of fuel cell electric buses. The facility will include an 18,000-gallon gross capacity liquid hydrogen storage tank, two hydrogen product pumps, two gaseous hydrogen dispensers, vaporizers, chillers, storage vessels, site improvements including paving and landscaping, masonry fencing with automated gates, a fueling canopy, utility building with restrooms, backup generator, bus-parking canopy, and surveillance systems. The mandatory pre-proposal meeting is scheduled for April 23, 2026, at 10:00 AM, with questions due by May 22, 2026, at 2:00 PM, and proposals due June 8, 2026, at 2:00 PM. The design phase will commence in July 2026 for six months, construction will begin in February 2027 and last approximately 20 months, with substantial completion required by September 2028 and full commissioning by December 2028.

Essential qualification requirements mandate that proposers hold an active California Contractors State License Board Class A or B license; maintain an Experience Modification Rate (EMR) of 1.25 or less; demonstrate a minimum of five years in business; complete at least three prevailing wage public contracts in California and three similar projects valued at more than $8 million each within the past seven years; possess bonding capacity exceeding the estimated direct cost of work; obtain workers' compensation insurance; and maintain a satisfactory safety record with no license revocations, default terminations, debarments, or criminal convictions related to government contracts in the past five years. Proposals are evaluated on a best-value basis using multiple criteria including experience and references (20 points), organization and key personnel qualifications (20 points), proposed approach and methodology (30 points), financial strength and stability (5 points), safety record/Experience Modification Rate (5 points), local Pasadena business preference (5 points), small or micro-business certification (5 points), price proposal using a ratio method (10 points), and interview scores (up to 50 points). The project is funded in part by the California Energy Commission's Clean Transportation Program, EnergIIZe, and the California State Transportation Agency's Transit and Intercity Rail Capital Program (TIRCP), with an estimated design-build scope of work cost of $16,000,000. Proposers must disclose all subcontractors whose work exceeds 0.5% of the total base bid or $10,000 and identify any Disadvantaged Business Enterprise (DBE) or Small Business Enterprise (SBE) certifications. Technical proposals are limited to 75 total pages, with submission via the City's eProcurement Portal and six bound copies plus one unbound original delivered to the Department of Public Works within three business days of electronic submission.

View the file

Other files

File Type Posted
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#11_Revision).pdf PDF
Hydrogen_Fueling_Agreement_General_Conditions_Exhibits_and_Appendices.pdf PDF
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#9_Revision).pdf PDF
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#8_Revision).pdf PDF
AA_Price_Proposal.xlsx XLSX spreadsheet
Design-Build_Services_for_a_Hydrogen_Fueling_Station_(Addendum_#3_Revision).pdf PDF
Insurance_Requirements.pdf PDF
Design-Build_Services_for_a_Hydrogen_Fueling_Station.pdf PDF
[I]_-_Insurance_Requirements.pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
Civil_Litigation_History_Certification_ver02.pdf PDF
Indemnity_Agreement_Form.pdf PDF
Price_Proposal.xlsx XLSX spreadsheet
Subcontractor_Listing.pdf PDF
Public_Contract_Code_Disclosure.pdf PDF
DB_Qualificiation_Statement_FINAL.docx DOCX document
Proof_of_Authority.pdf PDF
Declaration_of_Elibility_to_Contract_(not_debarred).pdf PDF
AFFIDAVIT_OF_JOINT_VENTURE.pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
Health_and_Safety_Plan.pdf PDF
City's_Standard_Form_(Traditional)_Design-Build_Agreement.pdf PDF
Soil_Management_Plan.pdf PDF
Geotechnical_Report.pdf PDF
Conceptual_Drawings.pdf PDF
Project_Manual.pdf PDF
Emergency_FEMA_TC.pdf PDF
AR_7_-_Alternative_Delivery_Method_Approval.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
Exclusive_Negotiation_Agreement__TEMPLATE.pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
Federal_Required_Certification_(4).pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN-BUILDER QUALIFICATION STATEMENT

GENERAL

To be considered, all information requested must be submitted on this Design-Builder Qualification Statement form or, to the extent this form does not provide sufficient space to fully respond, Proposers should attach additional sheets as necessary referencing the appropriate paragraph number and subparagraph.

All questions must be answered, and the data must be clear and complete. Line items that do not require a response shall be noted with a “N/A” referencing items that are not applicable.

PART I ESSENTIAL REQUIREMENTS FOR QUALIFICATION

Contractor’s Proposal will be rejected if the answer to any of questions 1 through 6 is “no,” or if the answer to any of questions 7, through 12 is “yes.”

1.Design-Builder can obtain insurance for the RFP submittal with the minimum scope and limits specified in “The Scope of Work” of the Agreement.
|_|Yes|_|No
2.Design-Builder has current workers’ compensation insurance policy as required by the Labor Code or is legally self-insured pursuant to Labor Code section 3700 et seq.
|_|Yes|_|No
|_|Design-Builder is exempt from this requirement, because it has no employees
3.Are you prepared to submit a notarized statement from a California Admitted Surety Insurer (approved by the California Department of Insurance) and authorized to issue bonds in the State of California with your Price Proposal, which states that your total bonding capacity and your total available bonding capacity is in excess of City’s estimate of the Direct Cost of the Work, which must be confirmed with your Price prior to contract City authorization to proceed?
|_|Yes|_|No

NOTE: Notarized statement must be from the surety company, not an agent or broker.

4.Are you prepared to submit documentation from your insurance carriers (Experience Rating Forms, not summaries) establishing that your Experience Modification Rate (“EMR”) for the most recent three-year period is an average of 1.25 or less.
|_|Yes|_|No
5.Have you (or if Proposer is a joint venture, each of your joint venture members) been in business for a minimum of five (5) years under the contractor’s license used for the Proposal you are submitting?
|_|Yes|_|No
6.Have you satisfactorily completed: 1) at least three (3) prevailing wage public contract in California; and 2) at least three (3) similar projects comparable in scope and scale to this Project, successfully completed within seven (7) years prior to the Proposal Submission Deadline and with the dollar value of Proposer’s portion of each such project more than $8M? (See Part II of this Design-Builder Qualification Statement, item 22.)
|_|Yes|_|No
7.Has your California contractor’s license been revoked at any time in the last five (5) years?
|_|Yes|_|No
8.Has a surety firm completed a contract on your behalf, or paid for completion because your firm was default terminated by the project owner within the last five (5) years?
|_|Yes|_|No
9.At the time of submitting this form, is your firm ineligible to bid on or be awarded a public works contract, or perform as a subcontractor on a public works contract, pursuant to either Labor Code section 1725.5, 1777.1 or Labor Code section 1777.7?
|_|Yes|_|No
If the answer is “Yes,” state the beginning and ending dates of the period of debarment:
10.At any time during the last five years, has your firm, or any of its owners or officers, been convicted of a crime involving the awarding of a contract of a government construction project, or the bidding or performance of a government contract?
|_| Yes|_| No
11.Has your prior performance on a project for the City within the last five (5) years has been unsatisfactory?
|_| Yes|_| No
12.Have you filed a Government Code claim or lawsuit against the City within the last five (5) years?
|_| Yes|_| No

3323790.2 3323790.2

March 2026

DESIGN-BUILDER QUALIFICATION STATEMENT

PASADENA HYDROGEN FUELING STATION PROJECT

DESIGN-BUILDER QUALIFICATION STATEMENT

PART IIQUESTIONNAIRE
1.Name of Firm:
(a)Type of Entity: ( ) Corporation( ) Partnership( ) Individual( ) Joint venture( ) Limited Liability Company ( ) Other

(b) Address:

City:State:Zip:
(c)Telephone No: ( )

Facsimile No: ( )

(d)E-mail address:
(e)California Contractors License Number:

(Attach documentation from the Contractors State Licensing Board (e.g. printed from website) establishing this license number is valid.)

(f)Identify years in business for the contractor’s license identified in (e).
2.Complete the following information for all bonding companies utilized by your organization in the last five (5) years. (Attach separate sheets for each bonding company.)
(a)Name of Bonding Company:
(b)Address:
(c)City:State:Zip:
(d)Contact Name/Title:
(e)Telephone No: ( )
(f)Facsimile No: ( )

(g) E-mail address:

(h) Type of bonds issued (license, performance, payment, etc.):

(i) Period of bonding (insert dates):

3.Complete the following information for each project for which a bonding company has had to complete any part of your work during the last five (5) years. (Attach additional sheets as necessary.)
(a)Project:
(b)Amount Bonded:
(c)Bonding Company:
(d)Percent of Project Completed:
(e)Name of Contractor Completing Project:
4.Provide the following information for each type of insurance coverage required for the Project (attach additional sheets as necessary):
(a)Name of Insurance Company:
(b)Address:
(c)City:State:Zip:
(d)Contact Name/Title:
(e)Telephone No: ( )
(f)Facsimile No: ( )
5.Attach copies of your Experience Rating Forms (not summaries) from your insurance carrier(s) establishing that your Experience Modification Rate (“EMR”) for the most recent three-year period is an average of 1.25 or less.
6.Complete the following Bank Reference information: (List at least two references, attach additional sheets)
(a)Name of Institution:
(b)Address:
(c)City:State:Zip:
(d)Contact Name/Title:
(e)Telephone No: ( )
(f)Email:
7.Complete the following information regarding your business volume:
(a)Average annual billable volume (past 5 years): $
(b)Estimated billable volume this year: $
(c)Estimated volume to carry over next year. $
8.Attach a reviewed or audited financial statement for the past three (3) years, including the contractor's latest balance sheet and income statement showing the following items:
(a)Current assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses).
(b)Net fixed assets.
(c)Other assets.
(d)Current assets (e.g., accounts payable, notes payable, accrued expenses, revisions for income taxes, advances, accrued salaries and accrued payroll taxes).
(e)Other liabilities (e.g., capital, capital stock, authorized and outstanding share par values, earned surplus and related earnings).
(f)Names of firm preparing financial statement and date thereof.
(g)Is this financial statement for the identical organization named on Page 1 of this Contractor’s Qualification statement?

If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent-subsidiary).

(h)Will this organization act as guarantor of the contractor for construction?
9.How many years has your organization been in business?
10.What year was your organization established?
11.Identify total number of permanent employees:
(a)Construction
(b)Administration
(c)Engineering
(d)Type of Engineering Performed:
(e)Highest Manpower Level in Past Five Years:
(f)Lowest Manpower Level in Past Five Years:
12.How many years has your organization been in business under its present business name?

13. Under what other or former names has your organization operated?

14.Identify parent company if applicable:
15.List affiliates, divisions and subsidiaries if applicable:
(a)Name:

Address:

City: State: Zip:

Telephone No: ( ) Facsimile No: ( )

16.If a corporation, complete the following:
(a)Date of Incorporation:
(b)Name of Sate(s) in which incorporated:
(c)President's Name:
(d)Vice President's Name:
(e)Secretary's Name:
(f)Treasurer's Name:
17.If a partnership, complete the following:
(a)Date of Organization:
(b)Is the Partnership:( ) General( ) Limited( ) Association
18.List names and addresses of all partners:

(a) Name:

Address:

City: State: Zip:

Telephone No: ( ) Facsimile No: ( )

19.If other than a Corporation or Partnership, describe type of organization and name of principals:
OwnerPercentage of Ownership
20.Have you ever been licensed under a different name or different license number?
|_|Yes|_|No

If the answer is yes, give name and license number.

21.NOT USED
22.Provide the name of the designated Project Manager and Project Superintendent and provide the following information for each project which qualifies that individual for this position.

(a) Name of Project Manager/Superintendent:

(b) Name of Project:

(c) Client:

(d) Project Address:

City:State:Zip:
(d)Contact Name:
(e)Contact Phone and email: ( )
(f)Architect Name:
(g)Architect Phone: ( )
(h)Type of Facility:
(i)Contract Type:
(j)Contract Amount:
(k)Percent Change Orders to Base Contract:
(l)Percent Complete:
(m)Percent Work Performed With Own Forces:
(n)Scheduled Completion Date:
(o)Actual Completion Date:

(p) Explain any differences between scheduled and actual completion dates:

(q) Explain any differences between the original contract price and the actual cost to complete:

23.NOT USED
24.List any projects in which your organization has been involved in any claim for defective work, delay, extra work, or equitable contract adjustment in the last five years in which the amount in controversy exceeded $25,000. Identify claims by project name, parties involved, description of claim and ultimate resolution (attach additional sheets as necessary):
(a)Project Name:

(b) Project Location:

(c) Date of Claim:

(a) Parties Involved:

(b) Description of Claim:

(c) Result:

25.Complete the following information for each project in which your organization has been involved in litigation or arbitration with a public agency. Identify lawsuits by name, court, case number and parties. Briefly describe the nature of the claim, the amount of any judgment or settlement and in whose favor. (Attach additional sheets as necessary.)
(a)Project Name:
(b)Project Location:
(c)Lawsuit Name:
(d)Court/Case Number:
(e)Date of Lawsuit:
(f)Parties Involved:
(g)Description of Claim:
(h)Result:
26.List any projects in which your organization has been involved in any claim for defective work, delay, extra work or equitable contract adjustment with the Owner or another entity. Identify claims by project name, parties involved, description of claim and ultimate resolution (attach additional sheets as necessary):
(a)Project Name:
(b)Project Location:
(c)Date of Claim:
(d)Parties Involved:
(e)Description of Claim:
(f)Results:
27.Has your organization ever been terminated from a project, either for convenience and or default, before completion? If so, provide the following information: (List five projects maximum, attach additional sheets as necessary.)
(a)Project Name:
(b)Project Location:
(c)Client Name:
(d)Client Contact:
(e)Client Telephone No:
(f)Architect Name:
(g)Architect Telephone No:
(h)Date of Termination:
(i)Reason for Termination:
28.Has the Proposer, any officer of the Proposer, or any employee of the Proposer who has a proprietary interest in the Proposer, ever been disqualified, removed, or otherwise prevented from bidding on, competing for, or completing a federal, state or local government project because of a violation of law or a safety regulation?
|_|Yes|_|No

If the answer is yes, explain the circumstances in the following space. Attach additional sheets if necessary.

I, the undersigned, certify and declare that I have read all the foregoing answers to the questionnaire and know their contents. The matters stated in the questionnaire answers are true of my own knowledge and belief, except as to those matters stated on information and belief, and as to those matters, I believe them to be true. I declare under penalty of perjury under the laws of the State of California, that the foregoing is correct.

Executed in:

(County), (State) on (Date)

(Signature)

(Title)

END OF DOCUMENT