Data Item Description (DID).pdf

PDF 20 KB Posted

Attached to
TUBE ASSEMBLY, METALLIC Federal contract opportunity
Solicitation number
FD20302501058
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This Data Item Description (DID) provides standardized guidance for creating a First Article Qualification Test Plan and Procedures, dated 21 NOV 2006. The document outlines specific requirements for contractors to develop a comprehensive test plan that includes a purpose of test, applicable documents, description of units to be tested, and detailed test descriptions. Key content requirements include step-by-step test procedures, specification of test equipment and settings, drawings or schematics of non-commercial testing fixtures, and inspection criteria defining minimum performance requirements for government acceptance, with a focus on evaluating worst-case scenarios for power input, signal levels, and timing inputs and outputs.

View the file

Other files for this federal contract opportunity

Other files attached to TUBE ASSEMBLY, METALLIC, newest first.
File Type Posted
3504128_SAW_REPORT.pdf PDF
Synopsis .docx DOCX document
Item Description Report.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: First Article Qualification Test Plan and Procedures

Number: DI-NDTI-81307A Approval Date: 21 NOV 2006 AMSC Number: 7649 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/I522 Applicable Forms: N/A

Use/relationship:

To establish test procedures, test equipment, and the inspection criteria that will be used by the contractor for first article qualification.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID supercedes DI-NDTI-81307.

Requirements:

1. Reference documents. None.

2. Format:

The plan shall be in the contractor’s format.

3. Content:

This test plan shall include the following:

a. Purpose of test.

b. Applicable documents.

c. Description of units to be tested.

d. Test description to include the following:

(1) Step-by-step procedures which are to be followed by the operator when performing each test.

(2) Define readings to be taken, settings to be used, and description of the test equipment, including commercial identification.

DI-NDTI-81307A

(3) Drawings, schematics, photographs, etc, of noncommercial fixtures and testers necessary for test evaluation.

e. Inspection criteria that defines the minimum performance requirements that the unit under test must meet in order to be considered acceptable to the Government. This shall include, as a minimum, worst case prime power input, worst case signal level and timing inputs, and signal level and timing outputs.

4. END OF DI-NDTI-81307A