Danz Park Site Photos.pdf

PDF 2 MB Posted

Attached to
Danz Park Playground Equipment
Solicitation number
2023-25
Issued by
Wisconsin

About this file

This is a site documentation file containing photographs and equipment specifications for Danz Park playground renovation. The file documents existing playground equipment at the site, including overhead power lines in the vicinity of the equipment. The project involves salvaging and reusing existing playground infrastructure, specifically identifying one 10-foot tall bay swing set frame with a 2.5-inch diameter top rail that will be repurposed and relocated to another location within or associated with the park. The scope includes provision of new swings, chains, and hardware as detailed in the accompanying Request for Proposal (RFP).

The file serves as a visual reference and equipment inventory for bidders responding to the playground renovation opportunity. No pricing information, set-asides, incumbent details, funding sources, or contract term information is contained within this site documentation file. The photographs and specifications provide contractors with on-site conditions and equipment specifications necessary to develop accurate proposals for the equipment salvage, repurposing, and relocation work.

View the file

Other files

File Type Posted
Danz Park Existing Conditions.pdf PDF
2023-25 Addendum (1).pdf PDF
Danz Park Proposed Area Map.pdf PDF
2023-25 RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DANZ PARK - EXISITING PLAYGROUND EQUIPMENT

DANZ PARK - EXISITING PLAYGROUND EQUIPMENT WITH OVERHEAD POWER LINE

DANZ PARK - PLAYGROUND EQUIPMENT TO BE SALVAGED AND REUSED

(1) 10’ tall (2) Bay swing set frame with 2.5” diamter top rail to be repurposed and relocated. (New swings, chains and hardware listed in RFP)

File details come from the government source that posted it. Updated .