Damaged Stormwater Drain SOW Specs.pdf
PDF 2 MB Posted
- Attached to
- Y1DZ--Repair Damaged Stormwater Drain at Main Clinic Front Entrance - Urgent (VA-23-00014888)
- Solicitation number
- 36C25723Q0071
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25723Q0071 0001.docx | DOCX document | |
| Past Performance Questionnaire.docx | DOCX document | |
| RFI Responses.pdf | ||
| Utility Line Layout.pdf | ||
| 36C25723Q0071_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EL PASO VA HEALTH CARE SYSTEM
5001 NORTH PIEDRAS
EL PASO, TX 79930
Repair Damaged Stormwater Drain Line at Main Facility Entrance - Construction
Statement of Work
VA PROJECT NO.: 756-22-229
September 9, 2022
DEPARTMENT OF VETERANS AFFAIRS EL PASO, TX
Repair Damaged Stormwater Drain Line at Main Facility
Entrance - Construction
VA Project Number: 756-22-229
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS
00 01 10 Table of Contents
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 01 00 00 1.36 Statement of Work (SOW) 01 32 16 15 Project Schedules 01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements 01 42 19 Reference Standards 01 45 00 Quality Control 01 45 29 Testing and Laboratory Services 01 74 19 Construction Waste Management
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 02 41 00 Demolition
DIVISION 03 – CONCRETE
03 11 00 Concrete Formwork 03 15 00 Construction Joints 03 21 00 Reinforcing Steel 03 30 00 Cast In Place Concrete
DIVISION 04 – MASONRY
DIVISION 05 – METALS
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping
DIVISION 08 - OPENINGS
DIVISION 09 – FINISHES
09 91 00 Painting
DIVISION 13 – 20 RESERVED
DIVISION 21- FIRE SUPPRESSION
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
DIVISION 27 – COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
DIVISION 31 – EARTHWORK
31 20 00 Earthwork
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 16 Asphalt Paving
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS…………………………………………………………………6
1.2 GENERAL INTENTION……………………………………………………………………..6
1.3 STATEMENT OF BID ITEM(S) ……………………………………………………………..6
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR……………………………...6
1.5 CONSTRUCTION SECURITY REQUIREMENTS…………………………………………7
1.6 OPERATIONS AND STORAGE AREAS…………………………………………………...8
1.7 ALTERATIONS……………………………………………………………………………..11
1.8 DISPOSAL AND RETENTION…………………………………………………………….12
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS………………………………………………………….12
1.10 RESTORATION……………………………………………………………………………13
1.11 PHYSICAL DATA…………………………………………………………………………14
1.12 PROFESSIONAL SURVEYING SERVICES……………………………………………..14
1.13 LAYOUT OF WORK………………………………………………………………………14
1.14 AS-BUILT DRAWINGS…………………………………………………………………...14
1.15 WARRANTY MANAGEMENT…………………………………………………………...14
1.16 USE OF ROADWAYS……………………………………………………………………..19
1.17 RESIDENT ENGINEER'S FIELD OFFICE……………………………………………….19
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT………….19
1.19 TEMPORARY USE OF EXISTING ELEVATORS………………………………………20
1.20 TEMPORARY USE OF NEW ELEVATORS……………………………………………..20
1.21 TEMPORARY TOILETS…………………………………………………………………..20
1.22 AVAILABILITY AND USE OF UTILITY SERVICES…………………………………..21
1.23 NEW TELEPHONE EQUIPMENT………………………………………………………..21
1.24 TESTS………………………………………………………………………………………21
1.25 INSTRUCTIONS…………………………………………………………………………...22
1.26 GOVERNMENT FURNISHED PROPERTY……………………………………………...23
1.27 RELOCATED // EQUIPMENT // ITEMS //……………………………………………….24
1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT….24
1.29 CONSTRUCTION SIGN…………………………………………………………………..24
1.30 SAFETY SIGN……………………………………………………………………………..24
1.31 PHOTOGRAPHIC DOCUMENTATION………………………………………………….25
1.32 FINAL ELEVATION Digital Images……………………………………………………...25
1.33 HISTORIC PRESERVATION……………………………………………………………..25
1.34 VA TRIRIGA CPMS……………………………………………………………………….25
1.35 RECORDS MANAGEMENT
LANGUAGE…………………………………………………………………………………….26
1.36 Statement of Work………………………………………………………………………….27
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for replacing existing room finishes, electrical, structural unit strut, mechanical, plumbing, etc. as required by drawings and specifications.
B. Visits to the site by Bidders may be approve with Contracting office.
C. All employees of general contractor and subcontractors shall comply with VA security management program, records management language (if applicable) and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, structural unit struts, as necessary to support the required electrical work identified in ITEM II below.
ITEM II, Electrical Work includes all labor, material, equipment, and supervision to perform the required electrical construction work on this project as identified in the Siemens Final Shop Drawings and
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge.
They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security escort arrangements can be provided for the employees.
This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Guards: NOT USED
D. Key Control: NOT USED
2. NOT USED
E. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for General Contractor and its employees for parking in designated areas only.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the Resident Engineer.
E. Workers are subject to rules of El Paso VA Health Care System, applicable to their conduct.
F. Execute work as to interfere as little as possible with normal functioning of El Paso VA Health Care System as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by Contracting Officer’s Representative (COR) where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to VA El Paso Health Care System areas required to remain in operation.
3. Where access by the VA El Paso Health Care System personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Phasing:
The Medical Center must maintain its operation 12 hours a day 5 days a week.
Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To ensure such executions, Contractor shall furnish the Contracting Officer’s Representative (COR) with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the Contracting Officers Representative (COR) two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.
H. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
I. Utilities Services: always Maintain existing utility services for VA El Paso Health Care System. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by Contracting Officer’s Representative (COR).
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of Contracting Officer’s Representative (COR). Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
2. Contractor shall submit a request to interrupt any such services to Contracting Officers Representative (COR), in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of El Paso VA Health Care System. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the Contracting Officer’s Representative (COR).
5. In case of a contract construction emergency, service will be interrupted on approval of Contracting Officer’s Representative (COR). Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from.
The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the Resident Contracting Officer’s Representative (COR)
N. Coordinate the work for this contract with other construction operations as directed by Contracting Officer’s Representative (COR). This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of Contracting Officer’s Representative (COR) and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and Contracting Officer’s Representative (COR) together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags as items to be stored – this is to be coordinated by the COR. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re installation and reuse. Store such items where directed by Contracting Officer’s Representative (COR).
2. Items not reserved shall become property of the Contractor and be removed by Contractor from the VA El Paso Health Care System.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
4. NOT USED
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and "Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge Elimination System (NPDES) permit is required for this project. The Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
- Designating areas for equipment maintenance and repair;
- Providing waste receptacles at convenient locations and provide regular collection of wastes;
- Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
- Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and
- Providing adequately maintained sanitary facilities.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the Contracting Officer’s Representative (COR). Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the Contracting Officers Representative (COR) before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
1.11 PHYSICAL DATA - NOT USED
1.12 PROFESSIONAL SURVEYING SERVICES – NOT USED
1.13 LAYOUT OF WORK – NOT USED
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain one full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings.
To ensure compliance, as-built drawings shall be made available for the Contracting Officers Representative (COR) review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the Resident Contracting Officers Representative (COR) within 15 calendar days after each completed phase and after the acceptance of the project by the Contracting Officers Representative (COR).
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.15 WARRANTY MANAGEMENT – NOT USED
1.16 USE OF ROADWAYS
A. For hauling, use only established public roads and road on the El Paso VA Health Care System property and, when authorized by the Contracting Officers Representative (COR) such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor’s expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
B. NOT USED
C. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof.
1.17 RESIDENT ENGINEER'S FIELD OFFICE – NOT USED
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, lighting and power will be permitted subject to written approval and compliance with the following provisions:
1. Permission to use each unit or system must be given by Contracting Officer’s Representative (COR)in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the Contracting Officer’s Representative (COR) will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e.
transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014 Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.
3. Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated.
4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze up damage.
5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.
6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained, and inspected prior to acceptance by the Government.
B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.
C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.
D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
1.19 TEMPORARY USE OF EXISTING ELEVATORS - NOT USED
1.20 TEMPORARY USE OF NEW ELEVATORS – NOT USED
1.21 TEMPORARY TOILETS
A. Provide where directed, (for use of all Contractor's workers) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by Contracting Officers Representative (COR), provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.
1.22 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.
C. Contractor shall install meters at Contractor's expense and furnish the VA El Paso Health Care System a monthly record of the Contractor's usage of electricity as hereinafter specified.
D. Heat: NOT USED
E. Electricity (for Construction and Testing): Furnish all temporary electric services.
1. Obtain electricity by connecting to the VA El Paso Health Care System electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.
F. Water (for Construction and Testing): Furnish temporary water service.
1. Obtain water by connecting to the VA El Paso Health Care System water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the Contractor.
2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at Contracting Officer’s Representative (COR)’s discretion) of use of water from VA El Paso Health Care System.
G. Fuel: Natural and LP gas and burner fuel oil required for boiler cleaning, normal initial boiler-burner setup and adjusting, and for performing the specified boiler tests will be furnished by the Government. Fuel required for prolonged boiler-burner setup, adjustments, or modifications due to improper design or operation of boiler, burner, or control devices shall be furnished and paid by the Contractor at Contractor's expense.
1.23 NEW TELEPHONE EQUIPMENT – NOT USED
1.24 TESTS
A. As per specification section 23 05 93 the contractor shall provide a written testing and commissioning plan (if applicable) complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.
B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.
C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building.
Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.
E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.
F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.
1.25 INSTRUCTIONS – NOT USED
1.26 GOVERNMENT-FURNISHED PROPERTY
A. NOT USED.
B. NOT USED.
C. Storage space for equipment will be provided by the Government and the Contractor shall be prepared to unload and store such equipment therein upon its receipt at the VA El Paso Health Care System.
D. Notify Contracting Officer in writing, 60 days in advance, of date on which Contractor will be prepared to receive equipment furnished by Government. Arrangements will then be made by the Government for delivery of equipment.
1. Immediately upon delivery of equipment, Contractor shall arrange for a joint inspection thereof with a representative of the Government. At such time the Contractor shall acknowledge receipt of equipment described, make notations, and immediately furnish the Government representative with a written statement as to its condition or shortages.
2. Contractor thereafter is responsible for such equipment until such time as acceptance of contract work is made by the Government.
E. Equipment furnished by the Government will be delivered in a partially assembled (knock down) condition in accordance with existing standard commercial practices, complete with all fittings, fastenings, and appliances necessary for connections to respective services installed under contract. All fittings and appliances (i.e., couplings, ells, tees, nipples, piping, conduits, cables, and the like) necessary to make the connection between the Government furnished equipment item and the utility stub up shall be furnished and installed by the contractor at no additional cost to the Government.
F. Completely assemble and install the Government furnished equipment in place ready for proper operation in accordance with specifications and drawings.
G. Furnish supervision of installation of equipment at construction site by qualified factory trained technicians regularly employed by the equipment manufacturer.
1.27 RELOCATED EQUIPMENT ITEMS - NOT USED
1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT
1.29 CONSTRUCTION SIGN
A. Construction sign and copy of IC permit, provided by the COR shall be posted at project site at all times. All IC and dust control measures shall be implemented at all times.
B. All fire and smoke wall penetrations shall be fireproofed according to corresponding wall rating. These shall be through a sleeve and sealed with fire barrier compound to be approved by VA.
C. Paint all surfaces of sign and posts two coats of white gloss paint. Border and letters shall be of black gloss paint, except project title which shall be blue gloss paint.
D. Maintain sign and remove it when directed by the Contracting Officer’s Representative
(COR).
1.30 SAFETY SIGN – NOT USED
1.31 PHOTOGRAPHIC DOCUMENTATION – NOT USED
1.32 FINAL ELEVATION DIGITAL IMAGES – NOT USED
1.33 HISTORIC PRESERVATION – NOT USED
1.34 VA TRIRIGA CPMS – NOT USED
1.35 RECORDS MANAGEMENT LANGUAGE
1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law.
Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
4. El Paso Veteran Affairs Health Care System (EPVAHCS) and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of EPVAHCS or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.
In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to EPVAHCS. The agency must report promptly to NARA in accordance with 36 CFR 1230.
5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting
Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to EPVAHCS control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts.
The Contractor (and any sub-contractor) is required to abide by Government and EPVAHCS guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with EPVAHCS policy.
8. The Contractor shall not create or maintain any records containing any non-public EPVAHCS information that are not specifically tied to or authorized by the contract.
9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
10. The EPVAHCS owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which EPVAHCS shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training, Talent Management System (TMS) Item #10176, Privacy and Information Security, Rules of Behavior. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
1.36 Statement of Work (SOW)
Part I. PROJECT OVERVIEW
1.1 PURPOSE
The purpose of this project is to repair the damaged stormwater drain lines at the front entrance of the El Paso VA main clinic, located at 5001 N. Piedras Street, El Paso, Texas 79930.
1.2 BACKGROUND
In this year’s (Summer 2022) recent monsoon season rains, the El Paso VA Health Care System (EPVAHCS) Facility Support Service (FSS) discovered one drain (east of entrance) leaked causing the water to flow out of the concrete sidewalk and other locations within the entrance of the building.
Part II. SCOPE OF WORK
2.1 GENERAL
It is the intent of this Scope of Work that a Contractor shall provide construction services to repair the damaged stormwater drain line at the main entrance of the El Paso VA main clinic.
This project will provide for construction of utilities services and finishes necessary in the designated locations for concrete demolition with excavation to locate & repair the existing damaged drain line. A site survey is to be conducted to obtain the estimated horizontal and vertical location of the existing drain line. The work shall include, but not limited to, all labor, transportation, materials, apparatus, tools, equipment and permits necessary to provide for the removal of the existing concrete, rebar, soil, repair existing drain line, reattaching repaired drain line to existing stormwater system, backfill soil with proper compaction, patching & painting of concrete including the concrete curve. Also, if necessary, repair the existing asphalt road affected by this project.
Strict noise and infection control measures shall be followed. Existing life safety systems within the Main VA Clinic, third floor shall not be impaired at any time during the performance of the work. Contractor must abide to the Ft. Bliss Directorate of Public Works (Ft. Bliss DPW) and the El Paso VA permits including but not limited to Ft. Bliss Site Clearance and Line Marking Request (SCLM AR 420-1), EPVA Infection Control Risk Assessment (ICRA), EPVA Interim
Life Safety Measures (ILSM), and EPVA Pre-Construction Risk Assessment and Exposure Control Checklist (PCRA).
WORK SHALL INCLUDE, BUT NOT LIMITED TO:
Contractor to become fully acquainted with existing site conditions of the repair damaged stormwater drain line at the main facility entrance and the scope of work. This area is considered a high vehicle, high pedestrian area. Contractor to submit traffic control plan to COR and EPVA Safety for approval. Contractor to obtain excavation permit from Ft. Bliss DPW prior to beginning any excavation. Performed site survey of the damaged stormwater drain line prior to concrete demolition and excavation. Once drain line is repair, fill out existing backfill with engineering soil as necessary and place a 12-inch top layer of 2-sack backfill in the drain line area. Concrete formwork to be approved by COR prior to concrete placement. There will be at least one site visit for the project, and attendance is highly encouraged.
The contractor shall furnish all labor, materials, equipment, tools, excavation equipment, lifting equipment, infection control, supervision, and all other necessary provisions to repair damaged stormwater drain line at the El Paso VA Main Clinic front entrance.
The buildings and the surrounding site areas will be occupied, and Government operations to continue as normal, for the duration of the contract. Contractor shall take all precautions to ensure that operations are conducted in a manner so as not to interfere with the normal operations of all buildings and the surrounding site areas. Contractor shall execute work in a safe manner and shall not subject public & personnel to unsafe conditions. The Contractor shall provide safety barricades, devices, and equipment to protect personnel and property and repair damage caused by construction operations. Take all precautions to protect the building and its occupants during the construction period.
Disposal of materials removed under this contract will be disposed at an approved disposal site in accordance with all local, state, and federal laws, regulations, and guidelines, and are the contractor’s sole responsibility. The contractor shall adhere to all OSHA requirements concerning removal, transporting, and disposal of the material. Exterior on-site staging WILL NOT be provided on the VA premises except where noted in the drawings or specified by VA COR. Only dumpsters will be allowed for debris removal. Use a covered lock dumpster and label it with the project name and prime contractor information on it. Leaving the dumpster open, the contractor will risk having other contractors or VA staff throwing items into it.
The contractor shall be responsible for obtaining and coordinating the services of all third-party contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely delivery, and documented final product.
O&M Manuals, As-Built drawings in PDF, as well as in AutoCAD, applicable permits, installation, testing, are also required.
Normal hours of operation for VA sites are 7:00 AM to 5:00 PM Monday through Friday except for Federal Holidays.
Due to the nature of EPVAHCS operations, contractor hours of operation are 7:00 AM to 4:45 PM Monday through Friday for minor construction operations such as field measurements, pipe tracing, etc. For major construction operations such as demolition, mechanical excavation, concrete placement, backfilling etc. the contractor hours are from 4:00 PM to 11:30 PM Monday thru Friday and Weekend (Saturday) from 7:00 AM to 3:30 PM except for Federal Holidays. If the Contractor desires to work on Sundays and/or holidays, or outside the project site’s normal working hours the contractor must submit a written request for approval to the VA- COR at least five (5) working days prior to the proposed start of such work.
Division 01: General Requirements
• Attend a pre-construction meeting and periodic progress meetings. EPVA Safety Department may conduct the pre-construction risk assessment at that meeting.
• Coordinate a kickoff meeting at the Site or on a conference call to review the scope of work content and finalize the schedule for the duration of the work.
• Contractor to obtain excavation permit from Ft. Bliss Directorate of Public Works (Ft.
Bliss DPW)
• Full-time construction supervision services at the Site during production of the scope of work.
• EPVAHCS is a tobacco free medical campus.
• EPVAHCS is a 100% asbestos free facility.
• Contractor must abide by safety and environmental requirements for VA ambulatory & health care operations including but not limited to specification 01 35 26 for temporary walls, barricading, dust control, fire prevention, etc.
• Maintain the Site clean and safe condition in compliance with applicable OSHA and VA regulations.
• Coordinate the delivery and storage of the Work materials with VA COR.
• Provide field density soil test reports at minimum of 95% compaction.
• Provide concrete test reports for slump and compressive strength for 7- and…