Dallas VA Campus Building 9 Instructions.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25723B0064
About this file
This document provides driving instructions to Engineering Building 9 at the Dallas VA Campus as well as details for a related federal contract opportunity to renovate multi-functional observation units. The driving instructions note to take Lancaster Road north, turn right on Ann Arbor Avenue, then turn right on Liberty Loop which is the second entrance to the campus. Building 9 is indicated as the first building on the right hand side, with parking available in the parking garage of Building 79 or in Lot 7 outside of Building 9. Arrows and cloud sections on the provided map further clarify the driving route.
The related federal contract opportunity, solicitation number 36C25723B0064, seeks proposals to renovate multi-functional observation units under Phase II of the project. The requirement is identified as solicitation number Z2DA--549-20-132 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. No further details on required products or services, pricing terms, response dates or other contract details are provided in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25723B0064 0008.docx | DOCX document | |
| 36C25723B0064 0007.docx | DOCX document | |
| 36C25723B0064 0006.docx | DOCX document | |
| S05 Vendor Questions-2-AE and VA Answers.pdf | ||
| S06 Asbestos Report.pdf | ||
| S06 Index Drawings.pdf | ||
| 36C25723B0064 0005.docx | DOCX document | |
| 36C25723B0064 0004.docx | DOCX document | |
| S04 549-20-132 Pre-Bid Sign in Sheet 10-16-23.pdf | ||
| S05 Vendor Questions-1-AE and VA Answers.pdf | ||
| 36C25723B0064 0003.docx | DOCX document | |
| S04 549-20-132 Pre-Bid Signing Sheet.pdf | ||
| 36C25723B0064 0002.docx | DOCX document | |
| Attachment 5 549-20-132 Drawings 10-6-23.pdf | ||
| 36C25723B0064 0001.docx | DOCX document | |
| Attachment 5 549-20-132 Drawings.pdf | ||
| Attachment 3 Specifications Vol. 2.pdf | ||
| 36C25723B0064_1.docx | DOCX document | |
| Attachment 6 Wage Determination Dallas County.pdf | ||
| Attachment 1 SOW 549-20-132.pdf | ||
| Attachment 4 Specifications Vol. 3.pdf | ||
| Attachment 2 Specifications Vol. 1.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHANTXMulleA Text Box
DRIVING INSTRUCTIONS TO ENGINEERING BUILDING 9:
- GOING NORTH ON LANCASTER ROAD, MAKE A RIGHT HAND TURN ON ANN ARBOR AVENUE
- MAKE A RIGHT ON LIBERTY LOOP ( SECOND ENTRANCE INTO THE DALLAS CAMPUS )
- BUILDING 9 IS THE FIRST BUILDING ON THE RIGHT HAND SIDE.
- PARK EITHER IN THE PARKING GARAGE LABLED BUILDING 79 OR IN LOT 7 OUTSIDE OF BUILDING 9.
FOLLOW ARROWS AND CLOUDED SECTIONS ON THE MAP.
VHANTXMulleA Arrow
VHANTXMulleA Arrow
VHANTXMulleA Arrow
VHANTXMulleA Arrow
VHANTXMulleA Arrow
VHANTXMulleA Arrow
VHANTXMulleA Cloud
VHANTXMulleA Cloud
VHANTXMulleA Cloud
File details come from the government source that posted it. Updated .