Dacula HS_00 11 19_G_Ad for Bid_20260908.pdf
PDF 118 KB Posted
- Attached to
- Dacula HS - HVAC Modifications
- Solicitation number
- PE-77021-NONST-2027-000000205
- Issued by
- Gwinnett County, Georgia
About this file
This is an Advertisement for Bid issued by the Gwinnett County Board of Education for HVAC modifications at Dacula High School, Building 5013, located at 123 Broad Street, Dacula, Georgia 30019. Sealed bids will be received until Thursday, October 15, 2026, at 3:00 p.m. at the Gwinnett County Board of Education offices, 53 Gwinnett Drive, Lawrenceville, Georgia 30046, Building "C" Conference Room. A mandatory pre-bid conference will be held on Wednesday, September 23, 2026, at 10:00 a.m. at Dacula High School, Building 5013, with attendance required for project managers or estimators directly responsible for bidding. All bidders must submit an AIA Document A305-2020 Contractor's Qualifications Statement prior to receiving plans and specifications. Bidding documents are available electronically from Lindsay Pope Brayfield & Associates, Inc., Architects, through their Dropbox link or from their office at 344 West Pike Street, Lawrenceville, Georgia 30046. Construction may begin during the school year on weekends and during student breaks as approved by the owner, with full building access beginning Thursday, May 27, 2027, and substantial completion required by Friday, July 23, 2027.
The contract will be awarded on a lump-sum basis. Bids must be accompanied by a bid bond payable to the Gwinnett County Board of Education equal to five percent of the base bid. The successful contractor must provide both a Performance Bond and Labor and Material Payment Bond, each equal to 100 percent of the contract sum, executed by a surety company licensed in Georgia, listed on Department of the Treasury Circular 570, and rated Class "A" or better by A.M. Best Company with a Financial Size of VI or better. The general contractor's main office must be a permanent office located in Georgia within seventy-five miles of the project site and must have been in existence for at least ten years. Bids may not be withdrawn for sixty days after the opening date. The contractor must mobilize within ten days of receiving the Notice to Proceed, which will be issued following the pre-construction meeting once all required documentation is complete. Retainage will be withheld as prescribed in the contract specifications and general conditions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LPB-226007 ADVERTISEMENT FOR BID 00 11 19-1
081926
SECTION 00 11 19
DACULA HIGH SCHOOL
HVAC MODIFICATIONS FOR BUILDING 5013
123 BROAD STREET
DACULA, GA 30019
GWINNETT COUNTY BOARD OF EDUCATION
GWINNETT COUNTY, GA
Sealed Bids will be received from bidders by the Gwinnett County Board of Education, 53 Gwinnett Drive, Lawrenceville, GA 30046, Bldg. "C" Conference Room: The furnishing of all labor, materials, and services necessary to perform the construction of the following projects: DACULA HIGH SCHOOL HVAC MODIFICATIONS BUILDING 5013, 123 BROAD STREET, DACULA, GA 30019 until Thursday, October 15, 2026, 3:00 p.m. Bids will be opened publicly and will be read aloud at the time and place stated above. Fax transmittals and E-mails of Bid Proposal Form shall not be accepted by the Owner. Bids received after the above time is called will not be accepted. No phones will be available.
All bidders must submit AIA Document A305-2020 Contractor’s Qualifications Statement to be evaluated by the Owner and Architect prior to being issued plans and specifications. Bidders who do not submit the A305 Statement will be subject to disqualification. The A305 must show the Contractor’s ability to complete the Contract in a satisfactory manner on projects of similar scope and complexity. References from past clients and projects must be included and will be verified. General Contractor’s main office where work for this project will be completed shall be a permanent office located in the state of Georgia within a seventy-five (75) mile radius of the project site.
This office shall have been in existence for no less than ten (10) years.
Bidding documents must be obtained from the office of Lindsay Pope Brayfield & Assocs., Inc., Architects, 344 West Pike Street, Lawrenceville, Georgia 30046. Upon qualification approval, Bidding Documents may be obtained electronically from the Architect by E-mail request to biddocs@lpbatlanta.com. Bidders will be given access to the Architect=s Dropbox Link where Drawings and Specifications may be downloaded at no charge. Plans may also be accessed by Subcontractors or Material Suppliers.
All bidders shall be required to attend a mandatory Pre-Bid Conference to begin at Dacula High School in the Building 5013, 123 Broad Street, Dacula, GA 3001 on Wednesday, September 23, 2026, @ 10:00 a.m. Attendees should be Project Manager or Estimator directly responsible for the bidding of this project.
Any bidder may be required, at the discretion of the Owner, to furnish evidence satisfactory to the Owner that his proposed subcontractors have sufficient means and experience in the types of work called for to assure completion of the contract in a satisfactory manner. Any bidder that is disqualified may respond to the Owner in writing within 20 days of the Notice of Disqualification as to why the bidder feels that the disqualification is unfounded. The written appeal from the disqualified bidder will not change the decision already made on this project. However, a favorable appeal may open the way for the bidder in question to bid on future Gwinnett County Public School System projects.
LPB-226007 ADVERTISEMENT FOR BID 00 11 19-2
081926
A copy of the bidding documents, including drawings and project manuals shall be available at the Architect=s office and the Owner=s office for viewing only, and the following plans rooms:
A.
Applied Images www.appliedimages.com
B. ConstructConnect www.ConstructConnect.com
C.
iSqFt www.iSqFt.com
D. LDI
buford@ldiprintingcenters.com
Contract, if awarded, will be on a lump sum basis. The bid may not be withdrawn for a period of sixty (60) days after date of opening. Bids must be accompanied by a bid bond payable to the Gwinnett County Board of Education, in an amount equal to five percent (5%) of the Base Bid.
Performance Bond and Labor and Material Payment Bond, each equal to 100% of the Contract Sum will be required of the successful bidder and from successful Grading/Site Utilities, Mechanical/HVAC, Plumbing, Electrical, Fire Protection, Steel Erection and Roofing Subcontractors. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia, be listed on "Department of the Treasury Circular 570" and have an A.M. Best Company rating of at least Class "A", with a Financial Size of VI or better. Bonds must be accompanied by letter stating company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement.
Time is of the essence to the Contract performance. Notice to Proceed will be issued after the Pre-Construction meeting as soon as all required paper work such as Contracts, Bonds, Insurance, etc. are in order. Contractor shall mobilize within ten
(10) days of Notice to Proceed. Construction may begin during the school year on weekends and during student breaks as approved by the Owner. Full access to the building will begin on Thursday, May 27, 2027. All construction must be substantially complete by Friday, July 23, 2027.
The Owner will make payments to the successful Contractor upon receipt of requests for payments, having been certified by the Architect, as fully covered and shown in the plans and specifications. Retainage as prescribed in the specifications and General Conditions of the Contract will be withheld.
The above description is an advertisement for the submission of bids which are to be considered as offers for performance of work by the submitting party. The Owner reserves the right to accept or reject any or all bids and to waive technicalities.
ARCHITECT: LINDSAY POPE BRAYFIELD & ASSOCS., INC.
BY: _______________________________________
OWNER: GWINNETT COUNTY BOARD OF EDUCATION
DR. ALEXANDRA ESTRELLA, SUPERINTENDENT
http://www.appliedimages.com/ http://www.constructconnect.com/ http://www.isqft.com/ mailto:buford@ldiprintingcenters.com
Contract, if awarded, will be on a lump sum basis. The bid may not be withdrawn for a period of sixty (60) days after date of opening. Bids must be accompanied by a bid bond payable to the Gwinnett County Board of Education, in an amount equal to five...