3a. Construction_Specifications_Bid_Proposal_Worksheet.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- DACA175260002000
About this file
This is a Construction Specifications Bid Proposal Worksheet template for the Recruiting Facilities Program, version dated October 15, 2021 (Revision 1). The worksheet is designed for lessors and contractors to submit comprehensive bid proposals for construction work associated with the Armed Forces Career Center lease in Altamonte Springs, Florida. All information supplied must align with construction specifications provided by the USACE Representative, and the entire worksheet must be completed in full or the overall offer may be rejected.
The worksheet itemizes over 100 line items organized by construction category, including HVAC/Mechanical, Plumbing, Electrical, Communications, Safety & Fire Equipment, Architectural Finishes, Signage, and Security Systems. Specific items span plumbing fixtures (water fountains, restrooms, janitorial closets), electrical work (interior/exterior lighting, emergency lighting, roller shades), communications infrastructure (conduit, CAT-6 wiring), and architectural finishes such as ceilings, walls, paint for various military branches (Army, Navy, Marines, Air Force/Space Force, and their reserve components), flooring (porcelain tile, vinyl composition tile, luxury vinyl tile, carpet), windows, doors, trim work, and security systems (video intercom entry control and CCTV). The worksheet also includes line items for permits, fees, and architectural/design costs, with space for additional undefined items. Each line item uses a quantity of 1 with placeholder pricing of $1.00, resulting in a grand total template of $116.00, which bidders must replace with actual pricing for their proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Recruiting Facilities Program |
| Construction Specifications Bid Proposal Worksheet |
| Version: 2021-10-15 (REV 1) |
| IMPORTANT NOTES: |
| 1) All information supplied by the lessor/contractor on this bid proposal worksheet MUST include ALL appropriate requirements from the construction specifications Appendix provided by the USACE Representative. |
| 2) The entire bid proposal worksheet MUST be filled out in its entirety. Failure to fill out this bid proposal worksheet may result in the overall offer being rejected by USACE. |
| Bid Category | Quantity | $ - Each | Sub-Total | Comments |
| HVAC / Mechanical | 1 | $ 1.00 | $ 1.00 | |
| Plumbing: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Water Fountain | 1 | $ 1.00 | $ 1.00 | |
| Restroom (1) | 1 | $ 1.00 | $ 1.00 | |
| Restroom (2) | 1 | $ 1.00 | $ 1.00 | |
| Janitorial Closet | 1 | $ 1.00 | $ 1.00 | |
| Wet Pantry (if applicable) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Electrical: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Interior Lighting | 1 | $ 1.00 | $ 1.00 | |
| Exterior Lighting | 1 | $ 1.00 | $ 1.00 | |
| Exterior Signage | 1 | $ 1.00 | $ 1.00 | |
| Emergency Lighting | 1 | $ 1.00 | $ 1.00 | |
| Roller Shades | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Communications: | ||||
| General | 1 | $ 1.00 | $ 1.00 | |
| Conduit | 1 | $ 1.00 | $ 1.00 | |
| CAT-6 Wiring | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Safety & Fire Equipment | 1 | $ 1.00 | $ 1.00 | |
| Architectural Finishes-Fixtures-Supplies: | ||||
| Ceilings | 1 | $ 1.00 | $ 1.00 | |
| Walls | 1 | $ 1.00 | $ 1.00 | |
| Soundproofing | 1 | $ 1.00 | $ 1.00 | |
| Paint: | ||||
| Common Area (Gov't Controlled) | 1 | $ 1.00 | $ 1.00 | |
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Porcelain Tile (wall / floor) | 1 | $ 1.00 | $ 1.00 | |
| Vinyl Composition Tile (VCT) | 1 | $ 1.00 | $ 1.00 | |
| Luxury Vinyl Tile (Air & Army Natl Guard) | 1 | $ 1.00 | $ 1.00 | |
| Carpet: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Base Cove (to include tiled areas) | 1 | $ 1.00 | $ 1.00 | |
| Fragment Retention Film | 1 | $ 1.00 | $ 1.00 | |
| Mini-Blinds | 1 | $ 1.00 | $ 1.00 | |
| Windows | 1 | $ 1.00 | $ 1.00 | |
| Doors | 1 | $ 1.00 | $ 1.00 | |
| Trim Work (chair rail, etc.) | 1 | $ 1.00 | $ 1.00 | |
| Roller Shades | 1 | $ 1.00 | $ 1.00 | |
| Fixed Panel Shade(s) | 1 | $ 1.00 | $ 1.00 | |
| Secondary Exit Door Security Hardware | 1 | $ 1.00 | $ 1.00 | |
| Restroom Fixtures | 1 | $ 1.00 | $ 1.00 | |
| Perforated Window Wrap(s): | ||||
| JRFC (Joint) Graphic | 1 | $ 1.00 | $ 1.00 | |
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Shelving | 1 | $ 1.00 | $ 1.00 | |
| Desk-Top(s) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Signage: | ||||
| Interior Signage: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Restroom(s) | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Exterior Signage: | ||||
| Army | 1 | $ 1.00 | $ 1.00 | |
| Navy | 1 | $ 1.00 | $ 1.00 | |
| Marines | 1 | $ 1.00 | $ 1.00 | |
| Air Force/Space Force | 1 | $ 1.00 | $ 1.00 | |
| Air Force Reserve | 1 | $ 1.00 | $ 1.00 | |
| Air National Guard | 1 | $ 1.00 | $ 1.00 | |
| Army National Guard | 1 | $ 1.00 | $ 1.00 | |
| Video Intercom Entry Control System | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Marquee / Pylon Signage | 1 | $ 1.00 | $ 1.00 | |
| Security Systems: | ||||
| Video Intercom Entry Control System: | ||||
| General/System (main parts/wiring/etc.) | 1 | $ 1.00 | $ 1.00 | |
| Door Station(s) | 1 | $ 1.00 | $ 1.00 | |
| Desk Stations (master + sub-masters) | 1 | $ 1.00 | $ 1.00 | |
| CCTV System: | ||||
| General/System (NVR /Wiring / Etc.) | 1 | $ 1.00 | $ 1.00 | |
| Cameras | 1 | $ 1.00 | $ 1.00 | |
| TV Monitor(s) - (office displays) | 1 | $ 1.00 | $ 1.00 | |
| Security Closet | 1 | $ 1.00 | $ 1.00 | |
| Other (define) | 1 | $ 1.00 | $ 1.00 | |
| Permits Fees (all necessary, including low voltage if applicable) | 1 | $ 1.00 | $ 1.00 | |
| Architectural / Design Costs | 1 | $ 1.00 | $ 1.00 | |
| Other Items (define): | ||||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| 1 | $ 1.00 | $ 1.00 | ||
| BID PROPOSAL - GRAND TOTAL | 1 | $ 1.00 | $ 116.00 |
File details come from the government source that posted it. Updated .