D9 Various Routes WLS Jan 2025.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
RoW Mow and Trim D9
Solicitation number
RFB 605 2500000435 1
Issued by
Boyd County, Kentucky

About this file

This is a Mowing Work Location Sheet for the Kentucky Department of Transportation (KDOT) District 9, detailing various highway maintenance routes across Boyd, Carter, and Greenup counties. The document outlines mowing and litter removal services for multiple state and US routes, including US 23, US 60, KY 67, KY 180, KY 10, KY 8, KY 1, KY 2, and KY 7. The project encompasses a total of 166.172 miles of roadway with 1,136.30 acres requiring maintenance. Mowing cycles are standardized at 3 cycles per year across all routes, with litter removal operations requiring 5 cycles per year. The maximum time allowed to complete one mowing cycle is 15 working days. Individual route segments vary in length from 0.335 miles (KY 67 at I-64 Interchange) to 35.036 miles (US 60 in Carter County), with corresponding acreage ranging from 1 acre to 409 acres. Routes designated with asterisks—including US 23, KY 67, and KY 180—are approved for batwing mower equipment.

The spreadsheet provides specific project identification numbers, route designations, milepost locations for project boundaries, and corresponding acreage and cycle requirements for each segment. No pricing information, contract award dates, bid deadlines, or other financial terms are included in this work location reference document. This appears to be a planning or specification sheet used to define the scope and geographical parameters of maintenance operations rather than a solicitation or bid opportunity document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

D-9 Various RoutesSheet 1 of 2
Mowing Work Location SheetLitter
Limits of ProjectProjectType 3NumberRemovalNumber
RouteProjectLengthMowingofCntrlnof
NumberSystemCountyNumberBeginEnd(Miles)AcresCyclesMilesCycles
US 23*MPBoydFE01 010 0023Lawrence Co. LineCatlettsburg15.400160315.45
000-016(MP 0.000)(MP 15.400)
US 23*MPBoydFE01 010 0023AshlandGreenup Co. Line2.165732.25
018-021(MP 18.710)(MP 20.875)
US 60MPBoydFE01 010 0060Carter Co. LineAshland10.0206436.05
000-011(MP 0.000)(MP 10.020)
KY 67*MPBoydFE01 010 0067Greenup Co. LineGreenup Co. Line0.8451030.95
000-001(MP 0.000)(MP 0.845)
KY 180*MPBoydFE01 010 0180I-64US 601.5181631.55
001-003(MP 1.000)(MP 2.518)
US 60MPCarterFE01 022 0060Rowan Co. LineBoyd Co. Line35.03669335.05
000-036(MP 0.000)(MP 35.036)
KY 67*MPCarterFE01 022 0067I-64 InterchangeGreenup Co. Line0.335130.45
000-001(MP 0.000)(MP 0.335)
US 23*MPGreenupFE01 045 0023Boyd Co. LineSouth End of
000-029(MP 0.000)US Grant Bridge28.936409328.95
(MP 28.936)
KY 67*MPGreenupFE01 045 0067Carter Co. LineBoyd Co. Line1.1051331.25
000-002(MP 0.000)(MP 1.105)
KY 67*MPGreenupFE01 045 0067Boyd Co. LineKY 310511.934171312.05
001-014(MP 1.105)(MP 13.039)
D-9 Various RoutesSheet 2 of 2
Mowing Work Location SheetLitter
Limits of ProjectProjectType 3NumberRemovalNumber
RouteProjectLengthMowingofCntrlnof
NumberSystemCountyNumberBeginEnd(Miles)AcresCyclesMilesCycles
KY 10*MPGreenupFE01 045 0010US 23Greenup Dam Bridge0.396330.45
011-012(MP 11.555)(MP 11.951)
KY 8*MPGreenupFE01 045 0008S. Portsmith BridgeUS 231.423331.45
001-004(MP 1.600)(MP 3.023)
KY 1MPCarterFE01 022 0001Lawrence Co. LineGreenup Co. Line16.52077.93
000-017(MP 0.000)(MP 16.520)
KY 2MPCarterFE01 022 0002US 60Greenup Co. Line19.42464.73
000-020(MP 0.000)(MP 19.424)
KY 7MPCarterFE01 022 0007Elliott Co. LineKY 221.11567.73
000-022(MP 0.000)(MP 21.115)
Total MP166.1721,136.30105.3
* A batwing mower will be allowed on this route(s).

Maximum time to complete a cycle: 15 working days.

File details come from the government source that posted it. Updated .