DEA_Scope_Summary_Shoot_House.pdf

PDF 41 KB Posted

Attached to
Shoot House Build Out Federal contract opportunity
Solicitation number
D-18-LA-0148
Issued by
Department of Justice Drug Enforcement Administration

View the file

Other files for this federal contract opportunity

Other files attached to Shoot House Build Out, newest first.
File Type Posted
D-18-LA-0148_Amendment_0001_SF30.pdf PDF
D-18-LA-0148_Amendment_0001_Q&A.pdf PDF
FBO_Notice_Description_D-18-LA-0148.pdf PDF
DEA_Provision_and_Clause_Matrix_-_Commercial_Items_D-18-LA-0148.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

1. The Drug Enforcement Administration (DEA), Los Angeles Field Division (LAFD), has a requirement for the build out of the “shoot house” required to conduct onsite tactical training.

The Offeror shall provide an estimate and floor plan to construct a shoot house. The first floor shall have the flexibility to change the layout scenes as necessary. The facility, or place of performance, is located at the DEA, LAFD Warehouse, 2200 Flotilla Street, Montebello, California 90640.

2. Project Description

2.1 Build Out Requirements

A. 40’ width x40’ length (1,600 sq. ft.), 2-story construction with two stair cases B. Walls to be 2x4 construction with 8’ ceiling height covered with ½” plywood C. Ramset pins to secure construction to concrete D. 2x10 floor joists and 5/8” subfloor construction with wood stairs E. Up to ten vinyl 4’x4’ windows throughout F. Up to eight steel doors to be used for breach G. Provide catwalk on the second floor. Catwalk shall be directly above hallway and will need viewing accessibility throughout H. Concrete nails may be used however, it may not be bolted to the concrete

2.2 Electrical

A. Tie into existing wiring and panel for at least two circuits to new construction B. Install up to ten dome lights on the first floor

2.3 Painting

A. All walls and joists to be sprayed with two coats of primer/paint (one color)

3. The Offeror shall provide schematic with the base proposal.