D1. Attachment 2 - Information Kiosk Drawing.pdf
PDF 676 KB Posted
- Attached to
- Museum Gallery Enhancement – Carpet and Kiosks
- Solicitation number
- M0026424Q0182
- Issued by
-
United States Marine Corps
About this file
The provided document is an attachment titled "D1. Attachment 2 - Information Kiosk Drawing.pdf" related to a federal contract opportunity for Museum Gallery Enhancement – Carpet and Kiosks, Solicitation Number M00264-24-Q-0182 issued by the United States Marine Corps.
The attachment contains design specifications for two information kiosks. The kiosks are to be fabricated with MDF painted "Bold Blue", have 3/8" x 2" hot rolled bar steel legs painted with a mixture of clear and 10% Tricorn Black, and feature a stainless steel panel with etched graphics and color infill to match existing kiosks. One kiosk is to be double-sided with an opening for a video monitor, while the other will be single-sided. The contractor is responsible for delivering the kiosks, but the video monitor hardware will be provided and installed by the customer, NMMC.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| E1. Amendment 0001 - Q&A.docx | DOCX document | |
| D1. RFQ M00264-24-Q-0182.docx | DOCX document | |
| D1. Attachment 1 - D-100 Legacy Walk Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MDF painted "Bold Blue" Benjamin Moore BM 2064-10 Eggshell
REAR ELEVATIONFRONT ELEVATION
Information Kiosk
3/8" x 2" hot rolled bar steel legs, painted with a mixture of clear with 10% Tricorn Black, Sherwin Williams SW 6258
Opening for video monitor. NMMC to specify monitor, contractor to size opening to accommodate
Stainless steel panel with etched graphics and color in-fill to match existing kiosk.
See reference photo above.
REFERENCE IMAGE
NOTES:
-Build (2) kiosks to match what currently exists in size and color.
-One kiosk will be double sided to match existing the other will be single sided (no monitor or etched steel panel on rear)
-Contractor to perform site visit to inspect existing kiosk and incorporate the details into their fabrication drawing
-Contractor will not provide AV hardware
-Contractor is only responsible for delivery, NMMC will install kiosks
D-100