D01_Attachment_Performance_of_Work_To_Outfit_LE_Vehicle_.docx
DOCX document 48 KB Posted
- Attached to
- I624509 MLFO LE VEHICLE OUTFITTING
- Solicitation number
- 140L1223Q0097
About this file
This performance work statement outlines requirements for outfitting a Bureau of Land Management law enforcement vehicle. The contractor will install a variety of interior and exterior equipment on a 2023 Ford Expedition including a security partition system, firearm locks and mounts, center console, lighting equipment, decals, and a front vehicle winch. The performance period is expected to be completed by December 31, 2023. The contractor must install all indicated parts in a safe and neat manner and ensure added equipment lasts for the estimated six-year or 72,000-mile service life of the vehicle.
The related solicitation is for the outfitting services described above. Solicitation number 140L1223Q0097 was issued by the Department of the Interior Bureau of Land Management California Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Attachment_1_Updated_Performance_Work_Statement_0001.docx | DOCX document | |
| Sol_140L1223Q0097_Amd_0001.pdf | ||
| Sol_140L1223Q0097.pdf | ||
| B03_Attachment_2_Wage_Determination_2015-5631_Rev__19.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT TITLE: MLFO (I624509) Law Enforcement Vehicle Outfitting
Contents
| PWS 1.0 Background on the Government’s Requirement | 2 |
| PWS 2.0 General Scope of Work | 2 |
| PWS 3.0 Overall Objective(s) | 2 |
| PWS 4.0 Specific Tasks | 2 |
| PWS 5.0 Delivery / Performance Schedule | 6 |
| PWS 6.0 Government-Furnished Property, Materials, Services | 7 |
| PWS 7.0 Security and Administrative Matters | 7 |
| PWS 8.0 Technical Exhibits and Definitions | 8 |
| PERFORMANCE SUMMARY REQUIREMENTS (PRS) | 9 |
PWS 1.0 Background on the Government’s Requirement
The Bureau of Land Management (BLM), Mother Lode Field Office, has a need for some auto service since a stock vehicle as received does not contain any components necessary to conduct regular Law Enforcement duties, nor does it contain upgrades to meet Law Enforcement police standards of operation. The vehicle needs component modifications to the interior and the exterior structure of vehicle, as well as electronic installations as required to outfit vehicle to meet Law Enforcement standards for operation.
PWS 2.0 General Scope of Work
Services to include the installation of indicated parts on a BLM vehicle. If a piece of equipment is needed to complete the installation, the contractor must include price of equipment in contract costs. Government Furnished Property (GFP) will be indicated if BLM is providing them. Vendor will work collaboratively with the customer on the installation of specific parts. Installation of the parts will be done in a safe and neat manner. The new parts added to the vehicles will last for the estimated service life of the vehicle for 6 years and / or 72,000.00.
Place of Performance:
Repairs and Service of Equipment added to the vehicle must be done at the Contractor’s place of business.
The Government will transport the Vehicle and Government Furnished Equipment (GFE) to the Contractor’s place a business.
Period of Performance:
The period of performance is expected to be completed by December 31, 2023.
PWS 3.0 Overall Objective(s)
The objective of this work is to provide the Bureau of Land Management law enforcement officer assigned the vehicle to have vehicle that will enable them to perform their duties in a safe and reliable vehicle.
PWS 4.0 Specific Tasks
Vehicle will be: 2023 Ford Expedition (I624509) VIN: 1FMJU1G87PEA49473
Task 1: Installation of indicted parts. Items to be provided by Vendor will be Brand Name or Equal
A. Wiring System
Item A.1 Modular universal power distribution center: Provides connections to all emergency warning / lighting systems, radio communication, and auxiliary electrical components while providing full battery protection. The power center will have a deactivation timer set to two hours. Will include necessary wiring harnesses.
B. Communications
Item B.1 Mobile Radio Installation Government Furnished Property (GFP): Installation of one Motorola APX mobile radio system mounted behind front passenger seat mounted on prisoner cage. Radio must be on time delay to remain on for at least 30 minutes after ignition shut-off. (BLM Provided). Radio wiring harnesses will be provided by the BLM representative. The radio wiring harnesses shall be incorporated into the installer’s modular wiring harness assuring proper power delivery to unit and vehicle battery protection. Antennas for radios will be installed on the roof of the vehicle per BLM Representative specifications. Government Furnished radio speakers will be installed in the cab of the vehicle where they can be easily heard by the driver. Radio units not mounted in the console will be mounted in the cabinet in the rear cargo area.
C. Lighting and Siren Control
Item C.1 Siren and Light Control unit: Install contractor provided supplied unit (400 series button console control head). Control unit will have a timed audible alert to notify the user of any slide switch functions currently activated. Handheld PA microphone will be mounted on the passenger side of the console. Lighting control will also include a blackout function and renders all stock vehicle lighting and dash lights inoperable when button is activated. Contractor to program control head to BLM Representative’s desired settings.
Item C.2 Siren and PA speaker: Install contractor provided 100J siren 100-watt speaker with bracket will be mounted under the hood in the front portion of the engine compartment. The siren will be concealed and protected from dirt, mud, and snow. Motorola APX radio will be wired to allow radio broadcast to be heard at user’s option via the rotary knob on the siren control head. PA system operated by handheld microphone through the control head will also be wired to the siren speaker. Siren control will be wired to provide horn ring scroll to quickly change tones with the tap of the steering wheel horn button. Enable Park Shift kill feature where siren deactivates when the vehicle is shifted into park. Siren tones will be controlled by the rotary knob on the control head.
D. Interior Law Enforcement Equipment
Item D.1 Security Transport Partition System: Install contractor provided Setina Transportation Max system according to manufacturer’s specifications. System includes recessed partition, storage shelves, locking drawer, electronics cabinet, etc. Install Government Furnished Setina metal window guards on both rear doors. The installation of the window guards cannot interfere with the operation of the window. Contractor to render interior door handle and window control inoperative on the rear passenger door to prevent prisoner escape. Installation must utilize strong materials. Installation utilizing Velcro, snaps, etc. is unacceptable. The unit must be installed to maximize officer safety and prevent prisoner escape.
Item D.2 Firearms Locks and Mounts: Install contractor provided Setina firearms locks in the recessed portion of the partition between the front seats. One contractor furnished Blac-Rac rifle rack and one Setina handcuff style shotgun rack. Rifle rack will be on the passenger side and the shotgun rack will be on the driver’s side. Firearm racks must accommodate optics, lights, and tactical firearm accessories. Firearm racks must fit both weapons prior to leaving contractor. One switch on the lighting control head will control both locks. The delay timer in the control head will be set for eight seconds. The lock should not operate unless the vehicle ignition key is in the RUN position.
Item D.3 Center Console: Install contractor provided Troy Products 22” L shape console. Console must be of metal construction and include locking storage and internal cup holder. Console must have proper face plates for radios and lighting control heads. Console must have at least two 12-volt power outlets and at least two USB charging points. The console must also accommodate contractor furnished magnetic microphone mounts for radios and PA.
Item D.4 Engine Compartment/Vehicle Interior
The preferred product to accomplish the following is manufactured by 911circuits. (http://www.911circuits.com/ch15-1) or equivalent.
· 15 circuits
· 7 Hot circuits (redx4, yellowx3).
· 1 Bypass circuit.
· 1 Siren mute circuit (insert the siren mute resistor to this output to reduce 90% of siren volume when servicing the siren).
· 6 switched outputs (orangex6).
· Switched outputs can be set as timer controlled when a timer is present or defaulted to ignition controlled if no timer is present.
· Output rows are arranged according to color (redx4, yellowx3, bypassx1, siren mutex1, orangex6) for easy identification.
· Timer settings are easy to program with our ts1 timer.
1. Install - Charge guard system to prevent battery drain when minimum voltage is reached (minimum voltage has ability to start truck)
2. Install - Circuit breaker, with ability to disconnect emergency equipment from OEM electrical system.
3. Provide Master auxiliary power/fuse block or box for all aftermarket electronics to access fuses (all fuses labeled) that is easily accessible. (Can be mounted in vehicle interior if necessary)
E. Exterior Lighting
Item E.1 Roof Mounted Light Bar: Install contractor provided N Roads 48” Fleet light bar on roof of vehicle.
Item E.2 Pillar Mounted Spotlights: Install contractor provided Unity LED or equivalent spotlight mounted on the driver’s side A pillar.
Item E.3 Wig Wag headlights: Install contractor provided wig wag headlight controller. Wig wag function should be installed with a high beam override and switched to operate on the highest level of the control head slide switch.
Item E.4 Front Light Heads: Install two contractor provided Whelen Ion universal mount light heads on the front of the vehicle. The light heads are to be mounted on opposite sides of the center crossmember of the brush guard. One will be red / white and the other will be blue / white. The red / white light head will be on the driver’s side and a blue / white light on the passenger side. The light heads should alternately flash either red or blue when activated by the control head. The lights will have the ability to burn steady white when activated by a button on the control head plus will meet California vehicle code standard and burn steady red on driver’s side with ‘STOP RED’ button on console.
Item E.5 Front White Lights: Install contractor provided, Rigid brand white lights in front bumper. Install two Rigid light pods and one 10” Rigid light bar. Pods will be installed in the prefabricated location on brush guard and light bar will be mounted on middle crossmember of the brush guard. The pods will be wired together to one factory upfitter switch and the light bar will be wired to another factory upfitter switch.
Item E.6 Side Light Heads: Install four contractor provided flush mount red / blue Whelen Ion light heads that are visible from the side of the vehicle. One light head should be mounted between the window glass and the window guard toward the front of each rear door. The light head should not interfere with normal window operation. One light head will be mounted horizontally on each side of the brush guard.
Item E.7 Rear Taillight: Install contractor provided taillight flasher. Taillights should alternately flash with reverse lights. Rear flashing taillights should have a brake override where the vehicle brake lights illuminate when the brake pedal is depressed. Taillights should flash when other rear emergency lights flash.
Item E.8 Rear Emergency Lights: Install two contractor provided Whelen Ion light heads mounted on a government furnished license plate bracket. One will be red / white and the other will be blue / white. The red / white light head will be on the driver’s side and a blue / white light on the passenger side. The light heads should alternately flash red and blue when activated by the control head. The lights will have the ability to burn steady white to act as a hitch or reverse light when activated by a button on the control head.
F. Exterior Law Enforcement Marking
Item F.1 Law Enforcement Decals: Application of government furnished decal package. Decal package to be applied per BLM Law Enforcement General Order 17 (diagram will be provided upon award).
G. Accessories
Item G.1 Front Vehicle Winch: Install contractor provided Warn Zeon 12S Winch in front bumper. Bumper and winch combination require the installation of Contractor Furnished control box relocation kit.
Item G.2 Front Vehicle Bumper: Install contractor provided Setina winch push bumper.
PWS 5.0 Delivery / Performance Schedule
What: A vehicle that is equipped will all the indicated parts to be a fully functional law enforcement vehicle.
When: Must be operational on when vehicle is fully outfitted.
PWS 6.0 Government-Furnished Property, Materials, Services
General:
The Contractor shall furnish all personnel, materials, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the work tasks defined in this Performance Work Statement, except for those items specified as government furnished.
Materials:
The Government shall furnish materials to assist the Contractor in meeting the requirement of this contract, as listed above as BLM provided.
Services: The Government will provide a customer point of contact at the time of award to discuss the installation location of key items in the vehicle PWS 7.0 Security and Administrative Matters
Regular Work Hours:
The performance period established for this contract is based upon all work being conducted during regular working hours between 7:00am and 4:00pm, Monday through Friday, excluding government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made for access to the work site.
Communications:
“Time” for communications received after 3:00pm, after 12:00 pm locally on Fridays, or after 12:00 pm locally prior to a holiday will not start until the next business day. All times are local Pacific Standard Time.
Federal Holidays:
The following Federal Legal Holidays are observed:
| New Year’s Day | Martin Luther King, Jr. Day |
| President’s Day | Memorial Day |
| Independence Day | Labor Day |
| Columbus Day | Veterans Day |
| Thanksgiving Day | Christmas Day |
Fire Danger Season:
If the Contracting Officer Representative (COR) allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
PWS 8.0 Technical Exhibits and Definitions
Standard Definitions:
Physical Condition The Physical appearance of Federal equipment or facilities that considers cracks, chips, dents, abrasions, rust, corrosion, general cleanliness, vibration, operating temperature, and discoloration and other items as identified by the COR. Physical condition may be determined by visual as well as diagnostic means.
Contracting Officer (CO) The Secretary of the Interior or designated authorized representative who is the only agent capable of signing a federal award or obligating funds.
Contracting Officer’s Representative (COR) The Contracting Officer’s designated representative as indicated in a delegation of authority letter.
Quality Assurance (QA) Surveillance of Contractor performance to determine performance requirements are met.
Performance Requirements Summary (PRS) (see Technical Exhibit below) The PRS identifies the key performance indicators of the Contract that will be evaluated by the Government to assure Contract performance standards are met by the Contractor.
Quality Control Those actions taken by the Contractor to control the production of goods or services so that they meet the requirements of the performance work statement.
Performance Work Statement (PWS)
PWS Page 5
PERFORMANCE REQUIREMENTS SUMMARY (PRS)
| Work Tasks to be Performed |
| Acceptable Quality Level |
| Method of Surveillance |
| Consequences, Remedies, and/or Deduction(s) |
Task 1: Installation of indicated items including lights, radio, equipment, etc.
Electrical equipment will be installed in a safe and neat manner free of tangles and bundling up.
| The customer will inspect random installation sites to see that wiring was done in a safe manner |
| Vendor will be responsible for redoing the installation till the wires are done in a safe and neat manner. |
| Vendor will communicate the customer POC for the installation of previously indicated parts |
| Vendor will communicate with the customer prior to installation of the indicated parts. |
| Customer should receive a phone call or an email indicating desire to set meeting to a meeting to discuss the work |
| If three instances of non-communication prior to installation maybe result in a 10% deduction of contract price. |
| Parts will last 6 years or 72,000 miles |
| Parts added to the vehicle will last for the estimated service life of the vehicle (6 year or 72,000 miles) |
| Equipment will remain functional. |
| If the equipment does not remain functional the vendor will replace the parts that were not provided by BLM. |