This is an Addendum #1 issued by the New York State Office of Parks, Recreation and Historic Preservation for the selective demolition of a fire-damaged Recreation Hall at Lake Taghkanic State Park in the Taconic Region. The project (Contract D006551, Project ID TA-LT-2026-004) involves comprehensive demolition work including removal of the recreation hall interior and roof structure while preserving specific elements such as the existing stone chimney, fireplace, interior plaster walls, masonry hearth, and portions of the existing building to remain. Key revisions in this addendum address revised insurance requirements per General Conditions Article 21.3, clarification that NYS OPRHP will handle fence disassembly and site furnishing protection, contractor responsibility for paver salvage and stacking on contractor-provided pallets with specified weight limitations, protection of existing utilities, and detailed specifications for chimney demolition requiring hand tools and controlled methods to prevent damage. A pre-bid meeting was held on July 14, 2026, with the request for information (RFI) deadline of July 21, 2026 at 4:00 PM now passed. The bid opening is scheduled for August 4, 2026, with contract mobilization permitted only after October 26, 2026, and an approximate contract duration of 50 days (approximately 7 weeks from Office of the State Comptroller approval).
The contract does not include alternates or unit pricing and is subject to liquidated damages per General Conditions. Bidders must submit electronically via PDF with bid security, acknowledge receipt of all addenda on the bid form, and comply with New York State Department of Labor registration and Gender-Based Violence in the Workplace Certification requirements. The apparent low bidder must submit a completed New York State Vendor Responsibility Questionnaire (Form CCA-2) within 24 hours of bid opening. Minority and Women Business Enterprise (MWBE) contracting goals are established at 9.00% for Minority Business Enterprises (MBE) and 8.00% for Women Business Enterprises (WBE). Bidders are required to identify New York State businesses that will be used in contract performance. The contract requires compliance with Workers' Compensation Insurance and Disability Benefits coverage, with the contractor required to enroll in electronic payment through the State Comptroller's ePayments Program for all compensation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D006551 - NTB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HUDSON VALLEY DISTRICT ADDENDUM # 1
New York State Office of Parks, Recreation and Historic Preservation Taconic Region • 9 Old Post Road, Staatsburg, New York 12580 • (845) 889-4100
Palisades Region • Palisades Interstate Parkway, Bear Mountain, NY 10911 • (845) 786-2701 Saratoga Region • 19 Roosevelt Drive, Saratoga Springs, NY 12866 • (518) 584-2535
22 TOTAL PAGES
(WITH ATTACHMENTS)
Lake Taghkanic State Park
D006551 Demolition of Recreation Hall 7/28/2026
Project ID #: TA-LT-2026-004
Contract Number(s): D006551 General Construction
General Information:
• Read All Plans, Specifications, and Addenda Carefully.
• IMPORTANT: Acknowledge receipt of all addenda on the bid form when submitting your bid.
• This Addendum is part of the Contract Documents in accordance with the “Instructions to Bidders.”
• The Request for Information (RFI) due date specified in the “Notice to Bidders” has passed. No other RFI’s may be processed.
Updates:
1. Insurance requirements in the Instructions to Bidders has been revised. Revised Instructions to Bidders is attached. Refer to General Conditions Article 21.3 for insurance requirements.
2. NYS OPRHP will be responsible for disassembly and removal of the existing fence currently on site. NYS OPRHP will coordinate with the GC prior to their construction activities to ensure site is always protected.
3. NYS OPRHP will be responsible for protecting the existing site furnishings such as water fountain, interpretive signage, etc.
4. General Contractor is responsible for providing all pallets for stacking pavers. See
Revised AD100 attached.
5. Pallet weight limitations – See Revised AD100 for instructions.
HUDSON VALLEY DISTRICT ADDENDUM # 1
New York State Office of Parks, Recreation and Historic Preservation Taconic Region • 9 Old Post Road, Staatsburg, New York 12580 • (845) 889-4100
Palisades Region • Palisades Interstate Parkway, Bear Mountain, NY 10911 • (845) 786-2701 Saratoga Region • 19 Roosevelt Drive, Saratoga Springs, NY 12866 • (518) 584-2535
6. Protect above ground and buried existing utilities within the construction boundary.
Existing utilities information is attached.
Attachments:
• ATTACHMENT #1: Revised AD100
• ATTACHMENT #2: Pre-Bid Meeting Sign-In Sheet & Agenda
• ATTACHMENT #3: Revised Instructions to Bidders
• ATTACHMENT #4: Existing Utilities Information
• ATTACHMENT #5: Photos of Existing Conditions
Contractor Questions and Answers:
• Question #1: Is Builders Risk Insurance and Professional Liability Insurance going to be waived, or is it a requirement?
o Answer #1: Builder’s Risk Insurance is required. Please see General Conditions Article 21.3 for
Insurance Requirements relating to the project. Professional Liability Insurance is not required.
• Question #2: Please confirm that although the existing building materials do not contain lead waste, we should assume that the entire building will be acceptable to be disposed of as Non-friable C&D waste as per the Variance with the exception of the interior debris pile that is scheduled to be disposed of as Friable waster per the variance.
o Answer #2: Refer to “Hazardous Material Survey” in Appendix A: Information Available to Bidders in the Project Manual for information regarding lead paint. There are no mounds of unidentifiable debris piles inside the building. The interior does not need to be cleaned up separately and disposed of as Regulated Asbestos-Containing Material (RACM). The building shall be demolished and disposed of as non-friable ACM. The landfill shall be permitted to accept non-friable asbestos waste.
(5) c 60W
INC.
REMOVE EXISTING FLOOR FINISH IN ITS ENTIRETY DOWN
TO EXISTING CONCRETE SLAB, TYP.
1. ALL REMOVED ITEMS TO BE DISPOSED OF PROPERLY UNLESS
NOTED OTHERWISE.
2. PATCH AND REPAIR ANY OPENINGS CAUSED BY THE
REMOVALS WITH MATCHING MATERIALS
3. ALL REMOVALS SHALL INCLUDE REMOVAL OF ANY AND ALL
ANCHORING SYSTEMS INCLUDING OBJECTS EMBEDDED INTO
EXISTING WALLS.
4. PROVIDE TEMPORARY SHORING AS NECESSARY AT ALL AREAS
OF WALL REMOVAL.
5. DRILL CORNERS OF ALL NEW SAWCUT OPENINGS PRIOR TO
CUTTING.
6. REFER TO HAZARDOUS MATERIALS AND STRUCTURAL
DRAWINGS FOR ADDITIONAL REMOVAL INFORMATION.
7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR
DEMOLITION AS INDICATED ON AD, SD, AND HD PLANS IN A
CONSECUTIVE MANNER TO MINIMIZE THE EXPOSURE TO THE
ELEMENTS FOR THE BUILDING AREAS THAT ARE TO REMAIN.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL
BUILDING WEATHER TIGHTNESS AND WATERPROOFING TO
KEEP THE ELEMENTS OUT OF THE BUILDING AREAS THAT ARE
TO REMAIN.
8. ALL DEMOLITION TO BE DONE VIA SITE-SPECIFIC ABATEMENT
VARIANCE, WITH THE EXCEPTION OF PAVER REMOVALS. SEE
HD DRAWINGS AND SITE-SPECIFIC VARIANCE.
9. GENERAL CONTRACTOR RESPONSIBLE FOR REMOVAL OF ALL
ELECTRICAL FOR BUILDING TO BE DEMOLISHED. SEE GENERAL
ELECTRICAL DEMOLITION NOTES.
10. WHERE EXCAVATOR IS REQUIRED, IT SHALL BE ROAD-RATED
WITHOUT THE USE OF A TRAILER WITH THE INTENTION OF
NOT DAMAGING THE CONNECTOR ROAD TO THE SITE FROM
THE PARKING AREA. CONTRACTOR SHALL PROVIDE ALL
REQUIRED EQUIPMENT, PERMITS, AND SAFETY DEVICES
NECESSARY FOR ROADWAY TRAVEL.
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
PHASING LEGEND
EXISTING TO BE
DEMOLISHED
EXISTING TO REMAIN
NEW CONSTRUCTION
EXISTING WOOD DOORS TO BE REMOVED IN THEIR
ENTIRETY
REMOVE EXISTING WINDOW SYSTEM IN ITS ENTIRETY,
UTILIZING ABATEMENT PROCEDURES, SEE HD
DRAWINGS
REMOVE EXISTING BUILT-IN BENCH SEATING IN ITS
ENTIRETY
REMOVE EXISTING DISPLAY SCREEN AND SURROUND
SYSTEM IN THEIR ENTIRETY
REMOVE OF EXISTING WALL AND FINISHES IN ITS
ENTIRETY
REMOVE EXISTING ROOF AND DECKING BACK TO
STRUCTURE IN ITS ENTIRETY, SEE STRUCTURAL
DRAWINGS
REMOVE EXISTING PORTICO AND COLUMNS IN ITS
ENTIRETY
REMOVE EXISTING WALL SCONCES IN THEIR ENTIRETY,
TYP.
REMOVE EXISTING CHANDELIER AND SALVAGE FOR
REINSTALLATION BY ABATEMENT PROCESS, SEE HD
DRAWINGS
REMOVE EXISTING REC HALL INTERIOR WALL FINISH IN
ITS ENTIRETY AND CLAD WALL AND SURROUND
CHIMNEY WITH NEW ZIP-R-SHEATHING AFTER
ABATEMENT PROCEDURES TO PROTECT THE BUILDING
AND CHIMNEY AFTER REMOVALS. GENERAL
CONTRACTOR TO ENSURE THAT ROOF FLASHING TO
REMAIN AT ROOF TO CHIMNEY INTERSECTION IS
SECURELY FASTENED.
REMOVE EXISTING HEARTH TILE SURROUND IN ITS
ENTIRETY DOWN TO EXISTING CONCRETE SLAB.
EXISTING FIRE PLACE TO REMAIN IN ITS ENTIRETY, CLEAN
AND PREP FOR NEW WORK
1. PERFORM ALL ELECTRICAL DEMOLITION WORK IN
ACCORDANCE WITH THE NEW YORK STATE ELECTRICAL CODE
(NEC AS ADOPTED) AND ALL APPLICABLE LOCAL CODES.
2. ELECTRICAL DEMOLITION IS LIMITED TO AREAS INDICATED.
MAINTAIN ELECTRICAL SERVICES TO ALL AREAS OF THE
BUILDING TO REMAIN.
3. DE-ENERGIZE AND SAFELY DISCONNECT ALL ELECTRICAL
CIRCUITS SERVING DEMOLITION AREAS PRIOR TO REMOVAL.
4. REMOVE ALL ELECTRICAL DEVICES, FIXTURES, CONDUIT, AND
WIRING SERVING DEMOLITION AREAS.
5. REMOVE BRANCH CIRCUIT WIRING AND CONDUIT BACK TO
THE MAIN PANEL OR SOURCE LOCATED IN THE PORTION OF
THE BUILDING TO REMAIN.
6. DISCONNECT CONDUCTERS AT THE PANELBOARD; REMOVE
BREAKERS OR FUSES WHERE CIRCUITS ARE NO LONGER
REQUIRED AND UPDATE PANEL SCHEDULES ACCORDINGLY.
7. PROTECT ELECTRICAL EQUIPMENT AND SYSTEMS SERVING
REMAINING AREAS FROM DAMAGE DURING DEMOLITION
GENERAL ELECTRICAL DEMOLITION NOTES
SITE DEMOLITION PLAN NOTES
1. REMOVE EXISTING PAVERS IN AREAS INDICATED ON THE
DRAWINGS AND STACK FOR SALVAGE. CAREFULLY REMOVE
AND LEGALLY DISPOSE OF ALL ASSOCIATED BASE MATERIALS,
EDGING, AND APPURTENANCES NOT DESIGNATED TO REMAIN.
2. FOLLOWING COMPLETION OF HAZARDOUS MATERIALS
ABATEMENT AND BUILDING DEMOLITION, CONTRACTOR
SHALL CLEAR THE SITE OF ALL DEMOLITION DEBRIS, AND
UNSUITABLE MATERIALS UNLESS OTHERWISE NOTED TO
REMAIN.
3. CONTRACTOR IS RESPONSIBLE FOR GRADING AND
SMOOTHING THE DISTURBED AREAS WITHIN A MINIMUM OF
20 FEET FROM THE BUILDING FOOTPRINT TO ACHIEVE A
UNIFORM, STABLE SURFACE THAT POSITIVELY DRAINS AWAY
FROM ADJACENT IMPROVEMENTS AND DOES NOT CREATE
PONDING.
4. PROVIDE NECESSARY FILL, GRADING, AND COMPACTION TO
ELIMINATE VOIDS, ABRUPT GRADE CHANGES, AND UNSAFE
CONDITIONS RESULTING FROM DEMOLITION ACTIVITIES.
IMPORTED FILL SHALL BE CLEAN, FREE OF DEBRIS, AND
SUITABLE FOR COMPACTION.
5. REMOVE AND PROPERLY DISPOSE OF ALL DEMOLITION-
RELATED WASTE, EXCESS MATERIALS, AND CONSTRUCTION
DEBRIS FROM THE SITE. NO STOCKPILING WILL BE PERMITTED
UNLESS SPECIFICALLY AUTHORIZED.
6. UPON COMPLETION OF WORK, LEAVE THE AREA IN A
GENERALLY SAFE, CLEAN, AND STABLE CONDITION SUITABLE
FOR PEDESTRIAN SAFETY AND FUTURE SITE WORK
OPERATIONS.
7. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL,
STATE, AND FEDERAL REGULATIONS REGARDING DISPOSAL,
EROSION CONTROL, AND SITE SAFETY DURING AND AFTER
DEMOLITION OPERATIONS.
8. PROTECT ADJACENT STRUCTURES, UTILITIES, PAVEMENTS,
AND LANDSCAPING TO REMAIN. REPAIR ANY DAMAGE CAUSED
BY DEMOLITION OR GRADING ACTIVITIES AT NO ADDITIONAL
COST TO THE OWNER
DEMOLITION NOTES – REMOVAL OF ROOF AND STRUCTURE
AT EXISTING CHIMNEY
1. SCOPE OF WORK:
REMOVE THE EXISTING ROOF ASSEMBLY AND ASSOCIATED
STRUCTURAL FRAMING THAT ABUTS AND SURROUNDS THE
EXISTING STONE CHIMNEY. THE FOLLOWING ELEMENTS ARE
TO REMAIN IN PLACE:
• EXTERIOR STONE CHIMNEY.
• INTERIOR PLASTER WALLS AT CHIMNEY ENCLOSURE.
• INTERIOR MASONRY HEARTH AND FIREBOX.
• INTERIOR EXPOSED STONEWORK AND FINISHES.
2.)PROTECTION OF EXISTING CONSTRUCTION:
• PROVIDE TEMPORARY PROTECTION PRIOR TO
COMMENCEMENT OF DEMOLITION TO PREVENT DAMAGE
FROM VIBRATION, IMPACT, WEATHER EXPOSURE, OR DEBRIS.
• INSTALL RIGID BARRIERS, PADDED PROTECTION, AND DUST
PARTITIONS AS REQUIRED TO SAFEGUARD INTERIOR PLASTER
AND STONE FINISHES.
• NO DEMOLITION EQUIPMENT OR LOADS SHALL BEAR ON OR
BE BRACED FROM THE EXISTING CHIMNEY STRUCTURE.
3.)SEQUENCING AND METHOD:
• PERFORM DEMOLITION IN A CONTROLLED MANNER USING
HAND TOOLS IN THE IMMEDIATE VICINITY OF THE CHIMNEY.
• SAW-CUT AND DISCONNECT FRAMING MEMBERS TO AVOID
TRANSMITTING SHOCK OR LATERAL LOADS TO THE REMAINING
MASONRY.
• DO NOT PRY, PULL, OR MECHANICALLY SEPARATE MEMBERS
ATTACHED TO THE CHIMNEY; CAREFULLY CUT FASTENERS AND
REMOVE IN SECTIONS.
• CUT METAL FLASHING INCLUDING STEP-FLASHING BACK
TIGHT TO STONEWORK WHERE ROOFING INTERSECTIONS ARE
REMOVED.
4.)STRUCTURAL STABILITY:
• CONTRACTOR SHALL ENSURE THE CHIMNEY REMAINS FULLY
STABLE AND LATERALLY SUPPORTED THROUGHOUT
DEMOLITION.
• PROVIDE TEMPORARY SHORING OR BRACING IF REQUIRED TO
MAINTAIN STABILITY UNTIL PERMANENT CONDITIONS ARE
ESTABLISHED.
5.)WEATHER PROTECTION (IMMEDIATELY FOLLOWING
DEMOLITION):
• AT THE END OF EACH WORKDAY, AND UPON FULL REMOVAL
OF THE SURROUNDING STRUCTURE, PROVIDE A TEMPORARY
WATERTIGHT ENCLOSURE AROUND THE CHIMNEY.
• INSTALL REINFORCED SHEATHING, WATERPROOF
MEMBRANE, AND SECURE FLASHING TO SHED WATER AWAY
FROM MASONRY.
• PROVIDE A TEMPORARY ROOF OR RIGID COVER AS
NECESSARY TO PREVENT PRECIPITATION FROM ENTERING THE
FIREBOX, HEARTH, OR WALL CAVITIES.
6.)MOISTURE AND TEMPERATURE CONTROL:
• PROTECT REMAINING PLASTER, MASONRY, AND STONE
FINISHES FROM SATURATION, FREEZE–THAW EXPOSURE, AND
RAPID TEMPERATURE CHANGES.
7.)DEBRIS REMOVAL:
• REMOVE DEMOLITION DEBRIS CONTINUOUSLY. DO NOT
ALLOW MATERIALS TO ACCUMULATE AGAINST THE CHIMNEY
OR INTERIOR FINISHES.
8.)VIBRATION CONTROL:
• USE DEMOLITION TECHNIQUES THAT MINIMIZE VIBRATION.
IMPACT DEMOLITION (JACKHAMMERS, HEAVY MECHANICAL
EQUIPMENT) SHALL NOT BE USED WITHIN CLOSE PROXIMITY
TO THE CHIMNEY WITHOUT APPROVAL.
9.)INSPECTION:
• NOTIFY DIRECTOR’S REPRESENTATIVE IMMEDIATELY IF
CRACKING, DISPLACEMENT, OR DETERIORATION OF THE
CHIMNEY OR INTERIOR FINISHES IS OBSERVED.
• REPAIR ANY DAMAGE CAUSED BY DEMOLITION OPERATIONS
AT NO COST TO THE OWNER.
10.) FINAL CONDITION:
• LEAVE THE REMAINING CHIMNEY, HEARTH, AND INTERIOR
CONSTRUCTION CLEAN, DRY, STRUCTURALLY SOUND, AND
FULLY PROTECTED FROM THE ELEMENTS UNTIL SUBSEQUENT
CONSTRUCTION BEGINS.
AD200
AD200
AD200
4AD600
AD600 3AD600
AD6004
3 3 3
3 3 3
CONTRACTOR RESPONSIBLE FOR REMOVAL OF ALL PAVERS NOTED.
SALVAGE + STACK ON PALLETS PROVIDED BY GENERAL CONTRACTOR
WHERE DESIGNATED BY DIRECTORS REPRESENTATIVE ON SITE.
FOLLOW PALLET MANUFACTURERS WEIGHT LIMITATIONS FOR
MAXIMUM AMOUNT OF WEIGHT PER PALLET.
EXISTING CHANDELIER
ON FLOOR
EXISTING BUILDING
TO REMAIN
EXTENT OF BUILDING
TO BE DEMOLISHED
EXISTING BUILDING
TO REMAIN
EXTENT OF BUILDING
TO BE DEMOLISHED
EXISTING PAVERS
TO REMAIN
EXISTING PAVERS
TO REMAIN
AD200
EXISTING
MECHANICAL SPACE
EXISTING RESTROOM
EXISTING RESTROOM
EXISTING ADA
RESTROOM
EXISTING ADA
RESTROOM
EXISTING RESTROOM
EXISTING RESTROOM
EXISTING REC HALL
CONTRACTOR TO
PROTECT EXISTING
BUILDING AND PAVERS
DURING CONSTRUCTION
CONTRACTOR TO
PROTECT EXISTING
BUILDING AND PAVERS
DURING CONSTRUCTION
SITE TO BE STABILIZED AFTER PAVER
REMOVAL. PREP GRADE FOR NEXT PHASE
AFTER DEMO. LEAVE THE GROUND LEVEL
AND COMPACTED AND ENTIRE SITE AREA IN
A GENERALLY SAFE, CLEAN, AND STABLE CONDITION
SUITABLE FOR PEDESTRIAN SAFETY AND FUTURE
SITE WORK OPERATIONS, INCLUDING FUTURE FENCING
BY OWNER.
GENERAL CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE EXISTING
UNDERGROUND UTILITY PLAN PROVIDED BY NYS PARKS TO ENSURE
THAT EXISTING UNDERGROUND UTILITIES ARE PROTECTED FROM
DAMAGE DURING THE REMOVAL OF PAVERS AND SITE REGRADING.
1 2 40 8
24 x 36:
12 x 18:
1/4" = 1'
1/8" = 1'
Project Location:
Sheet Title:
Project Title:
Drawing Number:
Project Number:
Revision:
Drawn By:
Design By:
Checked By:
Date:
Scale:
Sheet:
Architect:
PHINNEY DESIGN GROUP
142 GRAND AVENUE
SARATOGA SPRINGS, NY 12866
(518) 587-7120
Professional Seal:
Unauthorized alteration or addition to this document is a violation or Section 7209 of
New York State Education Law
©PHINNEY DESIGN GROUP 2026
3/16" = 1'-0"
1528 NY-82, Ancram, NY 12502
LAKE TAGHKANIC STATE PARK
DEMOLITION PLAN
NE
NE
TAB, AZ
04/27/2026
25212
AD100
100% CONSTRUCTION
DOCUMENTS
SCALE: 3/16" = 1'-0"
AD100 - LEVEL 1 - DEMO PLAN 1
3 of
No. Date Description
1 07/27/2026 Revision 1, Bid Addendum 1 hlak Text Box ATTACHMENT #1: Pre-Bid Meeting Sign-In Sheet & Agenda
PRE-BID MEETING
Rev 9/25
ANNOUNCEMENTS
� Sign in Sheet
� Welcome
� Introductions
� Only questions and answers put into writing are binding.
� Can’t Answer Specific Questions
PROJECT INFORMATION
� Project Description: Brief Overview of Scope by Consultant or DR
� Director’s Representative: K Zinzin Hla
� Contacts: As stated on the project manual
� Bid Advertisement: July 7, 2026 in the morning
� Last Day for Questions: July 21, 2026 at 4:00pm
� Bid Opening: August 4, 2026
� Contract Duration: 50 days, apprx 7 weeks from OSC approval
� Alternates No Alternates
� Unit Prices No unit prices
� Liquidated Damages: Per General Conditions
� MWBE SDVOB Goals: Per Notice to Bidders
� Engineer’s Estimate Range: Per Notice to Bidders
� Start Date Restrictions: Mobilization only after 10/26
� Wicks Law: Does not apply to this contract
WALK THE JOBSITE
END OF MEETING
Notice to Bidders / July 2027 11
NEW YORK STATE OFFICE OF PARKS, RECREATION AND HISTORIC
PRESERVATION
INSTRUCTIONS TO BIDDERS
EXAMINATION OF DOCUMENTS
Carefully examine and be familiar with the Bidding and Contract Documents.
Examine the information concerning subsurface or other latent physical conditions. It is presented in good faith but is not intended as a substitute for personal investigation, interpretations or judgment of the Contractor.
VISIT TO THE SITE
Visit the site of the work prior to submitting bid. Phone Designated Contact listed on the Notice to Bidders for appointment 24 hours in advance of visit. For further information on site visit instructions, please refer to the Notice To Bidders.
Become familiar with restrictions and regulations relating to the Facility. Existing restrictions and regulations will not be considered as grounds for any additional cost over the Contract sum.
Assume the risk of encountering any subsurface or other latent physical condition which can be reasonably anticipated on the basis of documentary information provided by the Office of Parks, Recreation and Historic Preservation (the Office) and from inspection and examination of the site.
Interpretations of Contract Documents by Facility personnel are not binding.
RESOLUTION OF DISCREPANCIES AND AMBIGUITIES
Direct all questions regarding the intent or meaning of the drawings or specifications to the contact person identified on the cover of the Contract Documents. Such an inquiry may be telephoned or submitted in writing using provided RFI form. The reply to such an inquiry, when deemed necessary, will be communicated by Addendum to all persons who have obtained drawings and specifications.
Pre-bid inquiries answered by means other than Addenda will not be binding.
PREPARATION OF BIDS
Bidders shall submit bids on the official form furnished by the Office. Make no changes of any kind in the bid form phraseology, or anywhere on the bid form. Fill in all blank spaces legibly and in ink. Once the form has been completed in ink, bidders shall scan and email the bid form and hlak
ATTACHMENT #2: Updated Instructions to Bidders
Notice to Bidders / July 2027 12 bid security to the email address listed on the Notice to Bidders. The document must be in PDF format – any hyperlink to the file will not be accepted. Please note, there is a 20MB limit when submitting attachments via email. If email is not available to the bidder, an address for hard copies can be obtained from the designated contact identified on the Notice to Bidders. All amounts shall be given in full in both writing and also in figures. In case of a discrepancy between the amount written in words and that given in figures, the amount written in words is binding. Make no erasures on the bid form. If a mistake is made, use a new bid form. New forms may be obtained at the email address shown on the Notice to Bidders.
When the Contract Documents require alternate price quotations, indicate the amounts to be added to or deducted from the base bid. If the work is to be performed at no change in cost, indicate the word "NONE". Any bid which fails to indicate a sum or the word "NONE", shall be considered informal and may be rejected.
Sign the bid form in the space provided. An officer or a principal of a corporation or a partnership signing for the bidder shall print or type the legal name of the person, partnership or corporation on the line provided and place his or her signature after "SIGN BID HERE". The same procedure shall apply to the bid of a joint venture by two or more firms, except that the signature and title of an officer or a principal of each member firm of the joint venture shall be required.
Note in the spaces provided on the bid form, the Addenda, by numbers and dates, which have been received. If no Addenda have been received, insert the word "NONE".
ADDRESS OF PROSPECTIVE BIDDER
Use street address in addition to a Post Office Box address (if any).
BID SECURITY INFORMATION
Bid Security, in the amount shown on the Notice to Bidders, is required to be submitted with the bid as a guarantee that the bidder will enter into the Contract if awarded, and that the bidder will furnish all required information to enter into the Contract within ten days after receipt of notice of award. All bidders are required to scan their bid security and include the copy with their electronically submitted bid. The document must be in PDF format – any hyperlink to the file will not be accepted. Please note, there is a 20MB limit when submitting attachments via email. Bid Security shall consist of a bid bond or a certified check or a bank check drawn upon a legally incorporated bank or trust company and payable to the Office of Parks, Recreation and Historic Preservation. The bid bond must be from a Surety company approved by the State. The form of any bid bond and the surety issuing it shall be subject to the approval of the Office. The original hardcopy bid bonds for the two lowest bidders must be postmarked and sent via certified mail within 48 hours of receiving the bid summary from the Office. The Bid Security of the two lowest bidders will be returned upon the acceptance of the Performance and the Labor and Material Bonds and the execution of the Contract by the lowest bidder. The Bid Security of all other bidders will be returned as soon as possible after the low bidder is determined.
Notice to Bidders / July 2027 13
NEW YORK STATE BUSINESSES INFORMATION
Contractors are encouraged to use and work with New York State Businesses. Accordingly, bidders are required to complete and submit the form which will allow us to track this information. Please complete and include the form “Encouraging Use of New York State Businesses in Contract Performance” with your bid. The apparent low bidder will be asked to identify the New York State businesses that will be used.
SUBMISSION OF BID
Submit Bid Form and Bid Security, if required in the Notice to Bidders, via scanned hard copies to the email listed in the notice to bidders.
The Contract D number and Company Name should be clearly marked in the subject line of the email, along with the words “BID SUBMISSIONS”.
All bids must be received at or before the time specified on the Notice to Bidders, whether to the email address or the physical mailing address designated for bid opening. Failure to include an electronic copy of your DOL registration certificate AND a completed/signed copy of the Gender-Based Violence and the Workplace Certification with your bid by the bid opening date and time WILL result in disqualification.
A late bid will be considered if (1) its arrival at the place designated after the time specified can be shown by documentary or other proofs to be due to the mishandling by employees of the Office and
(2) that absent such mishandling, the bid would have arrived timely. Delays in the U.S. Mail or any other means of transmittal, including by couriers or agents of the State of New York (State), other than employees of the Office will not suffice to excuse late arrival.
A late bid not eligible for consideration will be returned unopened with notification of the reason for its refusal.
MODIFICATION OF BID
Bid modifications by amendment may be considered on condition that:
1. The amendment arrives before the time set for the bid opening.
2. The amendment is in writing and signed by the bidder.
3. The bid, as amended, conforms in all respects with the Contract Documents.
Notice to Bidders / July 2027 14
WITHDRAWAL OF BID
A bid may be withdrawn at any time prior to the time specified for opening.
After the bid opening, a bidder may request the withdrawal of its bid by a written application on the grounds of a demonstrable mistake. Such written application must be made within seven days after the bid opening unless the Office, at its sole discretion, grants a time extension. Upon receiving such written application, the Office will review and decide the bidder’s withdrawal request based on the three elements below. A bid may be withdrawn if, before any detrimental change of position by the State has occurred, the bidder establishes that:
1. a verifiable error occurred in the computation of the bid, and
2. absent the mistake the bid would have been substantially higher, and
3. if directed to proceed with the Contract at the price set forth in the bid, the bidder would suffer a substantial loss on the contract.
Each element must be proven by clear and convincing evidence in order to justify withdrawal.
The judgment of the Office shall be final and conclusive. Should the judgment be against allowing withdrawal, then the failure of the bidder to proceed would be cause for forfeiture of its bid bond.
DISQUALIFICATION OF BIDDERS
The State reserves the right to disqualify bids, before or after opening, upon evidence of collusion with intent to defraud or other illegal practices upon the part of the bidder.
OPENING OF BIDS
Bids shall be opened as announced in the Notice to Bidders. Bidders or their authorized agents are invited to attend via Webex.
AWARD OF CONTRACT
The Contract may be awarded to the lowest responsible and reliable bidder as will best promote public interest.
If alternates are included in the bidding documents, the Office reserves the right to accept or reject any or all alternates. The lowest bid will be determined by the sum of the base bid and, where applicable, the accepted alternates and/or unit pricing in the manner prescribed on the Bid Form.
If alternate base bids are indicated in the bidding documents, the low bid will be determined by the lowest amount bid for any of the alternate base bids.
Notice to Bidders / July 2027 15
The Office reserves the right to reject any or all bids, and advertise for new bids, if in its opinion the best interest of the Office will hereby be promoted. In the event that all bids are rejected, each bidder will be so notified.
No later than 45 days after the bid opening, the Office shall accept bids or reject all bids. Written notification of acceptance with the final Contract shall be emailed or delivered to the selected bidder. If the selected bidder fails to execute and return the Contract with the bidder's Performance Bond, Labor and Material Bond, and Certificate of Insurance, within ten days of receipt of notification, the Office shall have the right to reject the bid and select next lowest bidder. In this case, the Bid Security of the first bidder shall be forfeit.
INFORMALITIES
Any bid which fails to conform to the requirements of the Bidding and Contract Documents may be rejected.
The Commissioner or Commissioner’s Representative reserves the right to waive as an informality any irregularity contained in any bid or afford the bidder an opportunity to remedy any deficiency resulting from a minor irregularity.
EQUAL EMPLOYMENT OPPORTUNITY
If the value of this contract exceeds $25,000, no later than seven days after being notified of the award of the contract, the Bidder shall submit an Equal Employment Opportunity Policy Statement on a form to be provided by the Office.
DETERMINATION OF CONTRACTOR'S RESPONSIBILITY
1. The State Finance Law requires that contracts for public work in the State of New York be awarded to the lowest responsible and reliable bidders as will best promote the public interest.
2. In order to assist the State in determining the responsibility and reliability of the apparent low bidder for any competitively bid contract of $100,000 or more, and any proposed subcontract work valued at $100,000 or more, each apparent low bidder and all proposed subcontractors will be required to submit a “New York State Vendor Responsibility Questionnaire For-Profit Construction” (Form CCA-2) prior to contract award or subcontractor approval.
3. The apparent low bidder must submit a completed “New York State Vendor
Responsibility Questionnaire For-Profit Construction” (Form CCA-2) to the foregoing address within 24 hours after the bids are opened.
4. The Office recommends that vendors file the required Vendor Responsibility
Questionnaire online via the New York State VendRep System, however, vendors may
Notice to Bidders / July 2027 16 choose to complete and submit a paper questionnaire. To enroll in and use the New York State VendRep System, see the VendRep System Instructions available at :
http://www.osc.state.ny.us/vendrep/vendor_index.htm or go directly to the VendRep System online at https://portal.osc.state.ny.us. For direct VendRep System user assistance, the Office of the State Comptroller’s Help Desk may be reached at 866-370-4672 or 518- 408-4672 or by email at ciohelpdesk@osc.state.ny.us. Vendors opting to file a paper questionnaire can obtain the appropriate questionnaire from the VendRep website www.osc.state.ny.us/vendrep or may contact the Office of Parks Recreation and Historic Preservation (if not included already in these documents).
5. ADDITIONAL CONTRACTOR RESPONSIBILITY
(A) Contractor shall at all times during the Contract term remain a responsible vendor.
Contractor agrees, if requested by the Office, to present evidence of its continuing legal authority to do business in New York State, its integrity, experience, ability, prior performance, and organizational and financial capacity to carry out the terms of this Contract.
(B) The Office reserves the right to suspend any or all activities under this Contract, at any time, when the Office discovers information that calls into question the responsibility of Contractor. In the event of such suspension, Contractor will be given written notice outlining the particulars of such suspension. Upon issuance of such notice, Contractor must comply with the terms of the suspension order. Contractual activities may resume at such time as the Office issues a written notice authorizing resumption of contractual activities.
(C) Notwithstanding the provision of Article 15 of the General Conditions of the Contract pertaining to Termination and Revocation, upon written notice to Contractor and a reasonable opportunity to be heard with appropriate Office staff, this Contract may be terminated by the Office at Contractor’s expense where Contractor is determined by the Offices to be non-responsible. In such event, State Parks may pursue available legal or equitable remedies for breach.
OMNIBUS PROCUREMENT ACT OF 1992
1. It is the policy of the New York State Office of Parks, Recreation and Historic
Preservation to maximize opportunities for the participation of New York State business enterprises, including minority and women-owned enterprises, as bidders, subcontractors and suppliers on its procurement contracts.
2. Information on the availability of New York State subcontractors and suppliers is available from:
NYS Department of Economic Development Division for Small Business One Commerce Plaza, 9th Floor http://www.osc.state.ny.us/vendrep/vendor_index.htm https://portal.osc.state.ny.us/ mailto:ciohelpdesk@osc.state.ny.us http://www.osc.state.ny.us/vendrep
Notice to Bidders / July 2027 17
Albany, NY 12245 Telephone: (212) 803-3149 E-mail: nylovessmbiz@esd.ny.gov
NOTE: Companies requesting lists of potential subcontractors and suppliers are encouraged to identify the NAICS code, size and location of vendors.
3. A directory of certified minority and women-owned business enterprises is available online at https://ny.newnycontracts.com/FrontEnd/searchcertifieddirectory.asp or from:
NYS Department of Economic Development Division of Minority and Women's Business Development 625 Broadway Albany, New York 12207 Telephone: (646) 846-7364 E-mail: MWBEBusinessDev@esd.ny.gov
4. Bidders located in foreign countries are hereby notified that New York State may seek to obtain and assign or otherwise transfer offset credits created by this procurement contract to third parties located in New York State. The successful contractor shall agree to cooperate with the State in efforts to get foreign countries to recognize offset credits created by the procurement contract.
5. When the bid amount is equal to or greater than $1,000,000, the bidder is required to certify compliance with the Omnibus Procurement Act of 1992 to the Office in its bid proposal.
6. The apparent low bidder will be required to submit documentation of such compliance with the requested documents.
WORKERS’ COMPENSATION INSURANCE AND DISABILITY
BENEFITS REQUIREMENTS
A policy covering the obligations of the Contractor in accordance with the Workers’ Compensation Law and the Disability Benefits Law covering all operations under the contract, whether performed by the contractor or the subcontractor is required for all contracts. See Article
21.3 of the General Conditions.
ELECTRONIC PAYMENTS
Per the General Conditions article 23 section 12, the Office requires all Contractors and Vendors doing business with New York State to enroll in and receive payments electronically.
mailto:%20nylovessmbiz@esd.ny.gov https://ny.newnycontracts.com/FrontEnd/searchcertifieddirectory.asp https://ny.newnycontracts.com/FrontEnd/searchcertifieddirectory.asp mailto:MWBEBusinessDev@esd.ny.gov
Notice to Bidders / July 2027 18
Visit the State Comptroller's website: http://www.osc.state.ny.us/vendors/index.htm#epayment to enroll in the ePayments Program.
FORMS
Various provisions of the bidding and contract documents may require a bidder or contractor to submit certain forms. Not all forms will be required of all bidders, and some forms, such as Bid Bonds, Performance Bonds and Labor and Material Bonds will generally be provided by others(e.g., the American Institute of Architects - AIA). However, samples and/or copies of all forms are available from the Contact Person(s) designated on the first page of the Bidding and Contract documents. Forms available from the Contact Person include but are not limited to:
Reporting forms for State and Federal programs which provide for participation by minority group members and women as suppliers, subcontractors and employees; Contractor's Monthly Activity Report and Application for Payment; Certificate of Acceptance (final payment); Prime Contractor's Certification; Subcontractor's Certification; Workers Compensation and Payroll Forms.
http://www.osc.state.ny.us/vendors/index.htm#epayment http://www.osc.state.ny.us/vendors/index.htm#epayment
FIG-2_ENLARGEDOUTFALLLOCATION.DWG
SHEET OF
SHEET TITLE
PROJECT NO:
CAD DWG FILE:
DRAWN BY:
CHK'D BY:
DESCRIPTIONDATEMARK
CONSULTANTS
2019-01-08ISSUE DATE:
An dr ew M
. C uo mo Go ve rn or
Ro se
H arv ey Co mm iss ion er
TA
CO
NI
C
RE
GI
ON
PO
B ox
8, Ol d P os t R oa d St aa tsb urg , N
Y
Ph : 8
.88
9.4
- F ax : 8
.88
9.8 ww w.
ny sp ark s.c om
LA
KE
TA
GH
KA
NI
C
ST
AT
E
PA
RK
SP
DE
S D
OC
UM
EN
TA
TIO
N
TO
W
N
OF
G
AL
LA
TIN
, C
OL
UM
BI
A
CO
UN
TY
Chazen
JAR
DRAFT - FOR CLIENT DISCUSSION ONLY OUTFALL 7
EXISTING SEWER
OUTFALL LOCATIONS
SCALE:1" = 60'
hlak
ATTACHMENT #3: Existing Utilities Information
ATTACHMENT #4: Photos of Existing Conditions hlak
| DRAFT D006551 - Addendum 1 |
| Attach1_Revised AD100 |
| Sheets |
| AD100 - DEMOLITION PLAN |
| Attach2 Pre-bid Meeting Agenda and Sign in 7.14.2026 |
| DOC071426-07142026133542 |
| Attach3 Updated ITB |
| EXAMINATION OF DOCUMENTS |
| VISIT TO THE SITE |
| ADDRESS OF PROSPECTIVE BIDDER |
| NEW YORK STATE BUSINESSES INFORMATION |
| MODIFICATION OF BID |
| WITHDRAWAL OF BID |
| DISQUALIFICATION OF BIDDERS |
| OPENING OF BIDS |
| AWARD OF CONTRACT |
| INFORMALITIES |
| EQUAL EMPLOYMENT OPPORTUNITY |
| DETERMINATION OF CONTRACTOR'S RESPONSIBILITY |
| 5. ADDITIONAL CONTRACTOR RESPONSIBILITY |
| WORKERS’ COMPENSATION INSURANCE AND DISABILITY BENEFITS REQUIREMENTS |
| ELECTRONIC PAYMENTS |
| FORMS |
| Attach4 Existing Utilities |
| Attach5 Existing Photos |
File details come from the government source that posted it. Updated .