d - SWO23 Specs_5.5.23.pdf
PDF 15 MB Posted
- Attached to
- Maintenance Dredging of NY & NJ Channels, Seguine/Ward/Outerbridge Reaches, Federal Navigation Project
- Solicitation number
- W912DS23B0007
About this file
This solicitation is for maintenance dredging of navigation channels in New York and New Jersey. The U.S. Army Corps of Engineers Engineering District New York is seeking dredging services for the Seguine/Ward/Outerbridge Reaches Federal Navigation Project under solicitation number W912DS23B0007. Responses are due by the date listed in the SWO23 Specs_5.5.23.pdf file. Dredging will be required to maintain depths in channels leading to ports in New York and New Jersey to support maritime commerce. The services requested include dredging, transport, and disposal of dredged materials. The award date and any pricing or set-aside terms are not specified in the provided information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| W912DS23B0007 Amendment 00002.pdf | ||
| W912DS23B0007 Amendment 00001.pdf | ||
| c - SWO23 Plans_4.11.23.pdf | ||
| W912DS23B0007.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New York District THIS IS AN UNRESTRICTED PROCUREMENT AISC CODE 237990
SAFETY PAYS
MAINTENANCE DREDGING
of
NEW YORK & NEW JERSEY CHANNELS
- SEGUINE/WARD/OUTERBRIDGE
FEDERAL NAVIGATION PROJECT
Solicitation &
Specifications
IFB No. W912DS-23-B-0007
Maint. Dredging of NY&NJ Channels - Seguine/Ward/Outerbridge SWO23
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
a description of work covered in this contract and is required for use in all projects
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
payment instruction paragraphs required for use in all projects
01 22 00.00 10 MEASUREMENT AND PAYMENT
lump sum schedule payment items and unit price schedule payment items
01 30 00 ADMINISTRATIVE REQUIREMENTS
general administrative paragraphs
01 32 01.00 10 PROJECT SCHEDULE
the preparation and maintenance of the project schedule for construction projects or design-build construction projects
01 33 00 SUBMITTAL PROCEDURES
general procedures regarding submittals, data normally submitted for review to establish conformance with the design concept and contract documents
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
safety and occupational health requirements for the protection of Contractor and Government personnel, property, and resources
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
listing of organizations whose publications are referenced in other sections of the specifications.
01 45 00.00 20 QUALITY CONTROL
01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) use of the Resident Management System (RMS) for contract monitoring and administration.
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
environment protection during construction activities
01 58 00 PROJECT IDENTIFICATION
temporary signs for project identification
01 78 00 CLOSEOUT SUBMITTAL
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
PROJECT TABLE OF CONTENTS Page 1
35 20 23 DREDGING
dredging
35 20 23.10 18 DREDGED MATERIAL TRANSPORT, PLACEMENT AND MONITORING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION 00 00 01
COVER SHEET
PART 1 GENERAL
NEW YORK DISTRICT
CORPS OF ENGINEERS
NEW YORK, NEW YORK 10278-0090
INVITATION FOR BIDS
FOR
MAINTENANCE DREDGING
OF
NEW YORK AND NEW JERSEY CHANNELS - SEGUINE/WARD/OUTERBRIDGE
FEDERAL NAVIGATION PROJECT
1. Attached is INVITATION FOR BIDS (IFB) NO. W912DS-23-B-0007.
2. BIDS MUST SET FORTH full, accurate, and complete information as requested by this Invitation for Bids, including attachments. The penalty for making false statements in bids is prescribed in Title 18, United States Code, Section 1001.
3. SUBMISSION OF BIDS: Complete details concerning proper submission of bids are contained in the INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS (Section 00 21 16).
4. Note the REQUIREMENT FOR AFFIRMATIVE ACTION of the EQUAL OPPORTUNITY clause as it applies to the contract resulting from this solicitation. (See paragraph NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY in Section 00 72 00 of this IFB.)
5. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS
SOLICITATION. Bidders, Offerors, and applicants are cautioned to note the "Certification of Nonsegregated Facilities" in the solicitation.
Failure of bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitation involving awards of contracts exceeding $10,000, which are not exempt from the provisions of Equal Opportunity Clause. (1984 APR)
6. REPRESENTATIONS AND CERTIFICATIONS- SECTION 00 45 00
Bidders and Offerors are required to complete the REPRESENTATIONS AND CERTIFICATIONS and submit them with their bids.
7. THIS PROJECT IS NOT A SMALL BUSINESS SET-ASIDE.
DOCUMENT 00 00 01 Page 1
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section --
DOCUMENT 00 00 01 Page 2
SECTION 00 00 02
CHECK LIST FOR BIDDERS
PART 1 GENERAL
ATTACHED IS IFB FOR
MAINTENANCE DREDGING OF
NEW YORK AND NEW JERSEY CHANNELS - SEGUINE/WARD/OUTERBRIDGE
FEDERAL NAVIGATION PROJECT
ALL INFORMATION REQUIRED BY THE TERMS OF THIS SOLICITATION MUST BE
FURNISHED. MISTAKES OR OMISSIONS MAY RENDER YOUR BID INELIGIBLE FOR AWARD.
IMPORTANT ITEMS FOR YOU TO CHECK ARE INCLUDED IN BUT NOT LIMITED TO THOSE
LISTED BELOW. THIS INFORMATION IS FURNISHED ONLY TO ASSIST YOU IN
SUBMITTING A PROPER BID.
__ HAVE YOU ACKNOWLEDGED ALL AMENDMENTS?
__ HAVE YOU COMPLETED THE "REPRESENTATIONS AND CERTIFICATIONS" (SECTION 00
45 00) PORTION OF THE SOLICITATION?
__ IS YOUR DUNS NUMBER LISTED ON THE STANDARD FORM 1442?
__ IS YOUR BID PROPERLY SIGNED?
__ A BID BOND IS REQUIRED. HAS YOUR SURETY PROVIDED YOU WITH A BID BOND ON
STANDARD FORM 24 OR A SIMILAR FORM CONTAINING THE SAME LANGUAGE AS A
STANDARD FORM 24?
__ IS YOUR BID GUARANTEE IN THE PROPER AMOUNT?
__ IS YOUR BID GUARANTEE PROPERLY SIGNED BY BOTH THE BIDDER AND SURETY AND
ARE ALL REQUIRED SEALS AFFIXED?
__ IS THE NAME IN WHICH YOU SUBMITTED THE BID THE SAME ON YOUR BID AS ON
THE BID BOND?
__ IS YOUR BID BOND INCLUDED WITH YOUR BID? (A LATE BID GUARANTEE IS
TREATED THE SAME AS A LATE BID)
__ HAVE YOU ENSURED THAT YOU HAVE NOT RESTRICTED YOUR BID BY ALTERING THE
PROVISIONS OF THE SOLICITATION?
__ WHEN REQUIRED, HAVE YOU ENTERED A UNIT PRICE FOR EACH BID ITEM? (THE
SOLICITATION SPECIFICALLY STATES WHEN THIS IS NECESSARY.)
__ ARE DECIMALS IN YOUR PRICES IN THE PROPER PLACE? ARE YOUR FIGURES
LEGIBLE?
__ IF YOU HAVE MADE ERASURES OR CORRECTIONS ON YOUR BID, ARE THEY INITIALED
BY THE PERSON SIGNING THE BID?
__ DOES THE ENVELOPE CONTAINING YOUR BID PROPERLY IDENTIFY THAT IT IS A
SEALED BID AND DOES IT CONTAIN THE CORRECT SOLICITATION NUMBER AND BID
OPENING TIME?
DOCUMENT 00 00 02 Page 1
__ WILL YOUR BID ARRIVE ON TIME? (SEE PARAGRAPH ENTITLED "LATE SUBMISSIONS,
MODIFICATIONS, AND WITHDRAWALS OF BIDS" IN THE INSTRUCTIONS, CONDITIONS,
AND NOTICES TO BIDDERS, SECTION 00 21 16 OF THE SOLICITATION.)
BIDDER IS RESPOSIBLE TO ENSURE BID IS SUBMITTED ON TIME.
DOCUMENT 00 00 02 Page 2
SECTION 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS, MAPS, & SPECIFICATIONS
Contract drawings are as follows:
a. The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
b. The Contractor shall:
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
c. In general:
(1) Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications shall govern over similar information and data specified in contract drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
d. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
e. The work shall conform to the following contract drawings and maps, all of which form a part of these specifications and are available in the office of the District Engineer, U.S. Army Corps of
DOCUMENT 00 01 15 Page 1
Engineers, New York District, 26 Federal Plaza, New York, N.Y.
10278-0090:
FY 2023
Maintenance Dredging of New York and New Jersey Channels -
Seguine/Ward/Outerbridge Federal Navigation Project
SHEET NO. DESCRIPTION
Sheet 1 Index
Sheet 2 Location Map, Detail Sheet, and NOAA Chart
Sheet 3 Overview Sheet
Sheet 4 Dredging Limits
Sheet 5 Dredging Limits
Sheet 6 Dredging Limits
Sheet 7 Dredging Limits
Sheet 8 Dredging Limits
Sheet 9 Dredging Limits
Sheet 10 Dredging Limits
Sheet 11 Dredging Limits
f. The Contractor shall check all drawings furnished to him immediately upon their receipt and shall promptly notify the Contracting Officer or Contracting Officer's Representative of any discrepancies. Figures marked on drawings shall in general be followed in preference to scale measurements unless dimensions are specified.
Large-scale drawings shall in general govern over small-scale drawings. Information and data provided in contract specifications
DOCUMENT 00 01 15 Page 2 shall govern over similar information and data specified in contract drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have thereby been avoided (DOD FAR Suppl.
52.236-7002).
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 01 15 Page 3
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 01 15 Page 4
SECTION 00 10 00
SF 1442 AND BIDDING SCHEDULE
PART 1 GENERAL
1.1 SF 1442 SOLICITATION, OFFER, AND AWARD
To be provided by Contracting Division.
1.2 BID SCHEDULE
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 10 00 Page 1
DOCUMENT 00 10 00 Page 2
SECTION 00 21 16
INSTRUCTIONS, CONDITIONS, AND NOTICE TO BIDDERS
PART 1 GENERAL
To be provided by Contracting
DOCUMENT 00 21 16 Page 1
DOCUMENT 00 21 16 Page 2
SECTION 00 45 00
REPRESENTATION AND CERTIFICATION
PART 1 GENERAL
TO BE PROVIDED BY CONTRACTING DIVISION
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 45 00 Page 1
DOCUMENT 00 45 00 Page 2
SECTION 00 72 00
CONTRACT CLAUSES
PART 1 GENERAL
To be provided by Contracting Division.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 72 00 Page 1
DOCUMENT 00 72 00 Page 2
SECTION 00 90 00
WAGE RATES
PART 1 GENERAL
1.1 NOTE
A copy of the wage rate shall be displayed at a highly visible location on the dredge at all times for the duration of the project.
"General Decision Number: NY20230001 01/06/2023
Superseded General Decision Number: NY20220001
State: New York MY 03/31/2023
Construction Type: Heavy Dredging
Counties: New York Statewide.
STATEWIDE
New York
All dredging, except self-propelled hopper dredges, on the Atlantic Coast and tributary waters emptying into the Atlantic Ocean.
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the |
DOCUMENT 00 90 00 Page 1
| | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023
ENGI0025-001 10/01/2022
STATEWIDE
Rates Fringes
Dredging:
CLASS A1....................$ 43.94 14.49+a+b CLASS A2....................$ 39.16 14.20+a+b CLASS B1....................$ 38.00 14.13+a+b CLASS B2....................$ 35.77 14.00+a+b CLASS C1....................$ 34.79 13.69+a+b CLASS C2....................$ 33.67 13.62+a+b CLASS D.....................$ 27.97 13.28+a+b
CLASSIFICATIONS:
CLASS A1: Deck Captain; Mechanical Dredge Operator, Leverman, Licensed Tug Operator over 1000 HP.
CLASS A2: Crane Operator (360 swing).
CLASS B1: Derrick Operator (180 swing), Spider/Spill Barge Operator, Engineer, Electrician, Chief Welder, Chief Mate, Fill Placer, Operator II, Maintenance Engineer, Licensed Boat Operator, Licensed Crew Boat Operator.
CLASS B2: Certified Welder.
CLASS C1: Mate, Drag Barge Operator, Assistant Fill Placer, Welder, Steward.
CLASS C2: Boat Operator.
CLASS D: Oiler, Deckhand, Shoreman, Rodman, Scowman, Cook, Messman, Porter/Janitor.
INCENTIVE PAY: (Add to Hourly Rate) Operator (NCCCO License/Certification) $1.80 Licensed Tug Operator over 1000 HP (Assigned as Master) (USCG licensed Master of Towing Vessels (MOTV) $1.80; Licensed Boat Operator (Assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80
DOCUMENT 00 90 00 Page 2
Oiler (QMED and Tankerman endorsement (USCG) $1.80; All classifications (Tankerman endorsement only) USCG $1.55;
Deckhand or Mate (AB with Lifeboatman endorsement (USCG) $1.80; All classifications (lifeboatman endorsement only (USCG) $1.55; Welder (ABS certification) $1.55
FOOTNOTES APPLICABLE TO ABOVE CRAFTS:
a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s Birthday, Memorial Day, Good Friday, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day
b. VACATION: Eight percent (8%) of the straight time rate, multiplied by the total hours worked.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
DOCUMENT 00 90 00 Page 3
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
DOCUMENT 00 90 00 Page 4
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
DOCUMENT 00 90 00 Page 5
"General Decision Number: NJ20230003 01/06/2023
Superseded General Decision Number: NJ20220003
State: New Jersey MY 03/31/2023
Construction Type: Heavy Dredging
Counties: Atlantic, Bergen, Camden, Cape May, Cumberland, Essex, Gloucester, Hudson, Mercer, Middlesex, Monmouth, Ocean, Salem and Union Counties in New Jersey.
STATEWIDE
All dredging except self-propelled hopper dredging on the Atlantic Coast and tributary waters emptying into the Atlantic Ocean
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for
DOCUMENT 00 90 00 Page 6 performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023
ENGI0025-001 10/01/2022
STATEWIDE
Rates Fringes
Dredging:
CLASS A1....................$ 43.94 14.49+a+b CLASS A2....................$ 39.16 14.20+a+b CLASS B1....................$ 38.00 14.13+a+b CLASS B2....................$ 35.77 14.00+a+b CLASS C1....................$ 34.79 13.69+a+b CLASS C2....................$ 33.67 13.62+a+b CLASS D.....................$ 27.97 13.28+a+b
CLASSIFICATIONS:
CLASS A1: Deck Captain; Mechanical Dredge Operator, Leverman, Licensed Tug Operator over 1000 HP.
CLASS A2: Crane Operator (360 swing).
CLASS B1: Derrick Operator (180 swing), Spider/Spill Barge Operator, Engineer, Electrician, Chief Welder, Chief Mate, Fill Placer, Operator II, Maintenance Engineer, Licensed Boat Operator, Licensed Crew Boat Operator.
CLASS B2: Certified Welder.
CLASS C1: Mate, Drag Barge Operator, Assistant Fill Placer, Welder, Steward.
CLASS C2: Boat Operator.
CLASS D: Oiler, Deckhand, Shoreman, Rodman, Scowman, Cook, Messman, Porter/Janitor.
INCENTIVE PAY: (Add to Hourly Rate) Operator (NCCCO License/Certification) $1.80 Licensed Tug Operator over 1000 HP (Assigned as Master) (USCG licensed Master of Towing Vessels (MOTV) $1.80; Licensed Boat Operator (Assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80 Oiler (QMED and Tankerman endorsement (USCG) $1.80; All classifications (Tankerman endorsement only) USCG $1.55;
Deckhand or Mate (AB with Lifeboatman endorsement (USCG) $1.80; All classifications (lifeboatman endorsement only (USCG) $1.55; Welder (ABS certification) $1.55
FOOTNOTES APPLICABLE TO ABOVE CRAFTS:
a. PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr.'s Birthday, Memorial Day, Good Friday, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day
DOCUMENT 00 90 00 Page 7
b. VACATION: Eight percent (8%) of the straight time rate, multiplied by the total hours worked.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing
DOCUMENT 00 90 00 Page 8 the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
DOCUMENT 00 90 00 Page 9
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
DOCUMENT 00 90 00 Page 10
DOCUMENT 00 90 00 Page 11
DOCUMENT 00 90 00 Page 12
SECTION 00 90 01
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
PART 1 GENERAL
1.1 SUBMITTALS
Not Used
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 ATTACHMENTS
The following attachments have been provided for reference to the bidder for use in performing the contract requirements.
3.1.1 Attachment A New York & New Jersey Channels -
Seguine/Ward/Outerbridge Federal Navigation Project Reference Map
3.1.2 Attachment B Sample Daily Construction Quality Control Report
3.1.3 Attachment C Project Sign and Safety Sign
3.1.4 Attachment D Title 33 Oil and Hazardous Material Operations
3.1.5 Attachment E Guideline for Preparing the Accident Prevention Plan
3.1.6 Attachment F Daily Reports for Dredging
3.1.7 Attachment G USACE Transportation and Placement Log
3.1.8 Attachment H Daily Site Safety and Health Inspection Log
3.1.9 Attachment I Daily Whale and Turtle Report Logs
3.1.10 Attachment I2 Incident_Report-Sturgeon
3.1.11 Attachment J Sampling and Testing Results - March 2022
3.1.12 Attachment K Example Submittal Register
3.1.13 Attachment L XYZ Data of February 2023 Plans & Specifications Survey
- See attachments to this solicitation on beta.SAM.GOV for complete set of XYZ Data
3.1.14 Attachment M USCG Requirement Letter dated 13 December 2022
DOCUMENT 00 90 01 Page 1
DOCUMENT 00 90 01 Page 2
SECTION 00 90 01 A A
REFERENCE MAP
00 90 01 Att. A Page 3
Sample
CONTRACTOR’S DAILY CONSTRUCTION QUALITY CONTROL REPORT
CONTRACTOR’S NAME
(address)
DATE: REPORT NO:
Contract No.____________________________________
Description and Location of Work:
WEATHER:(clear)(Partly Cloudy)/(Cloudy)_____ Temperature: Max ___ Min___
CONTRACTOR/SUBONTRACTORS AND AREA OF RESPONSIBILITY
a._______________________________________________________________________ b._______________________________________________________________________ c._______________________________________________________________________ d._______________________________________________________________________
Equipment Data: (Indicate items of construction equipment, other than hand tools, at the job site, and whether or not used.)
1. Work Performed Today: (Indicate location and description of work performed. Refer to work performed by prime and/or subcontractor by letter in Table above.)
2. Results of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken.)
3. Tests Required by Plans and/or specifications performed and Results of Tests:
00 90 01 Att. B Page 4
4. Verbal Instructions Received: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc… With action to be taken.)
5. Job Safety: (Include deficiencies and corrective action taken.)
6. Indicate Equipment and materials Items arrivals at job site. Indicate the compliance or non-compliance of these items with approved shop drawings; the contract plans and specifications; and if storage of the item is required prior to the time of installation; indicate how this storage was provided and whether or not it is adequate.
7. Remarks: (cover any conflicts in plans, specifications, or instructions.)
8. CONTRACTOR’S VERIFICATION: the above report is complete and correct and all material and equipment used and word performed during this reporting period are in compliance with the contract pans and specifications except as noted above.
CONTRACTOR QUALITY CONTROL INSPECTOR
00 90 01 Att. B Page 5
CQC REPORT #___________ Date________________________
1. Project Title:_______________________________________________________________________________
Location: _____________________________Contract No.:____________________________________________
2. List Contractors and Subs Working This Day and Areas of responsibility of each
3. Weather:
4.Description and Location of Work of the Project (Also indicate days of no work and reasons for delay)
5. Labor and Equipment Breakdown by Trade (Attach Continuation)
6. Preparatory Phase Inspections Held (See Attached Minutes)
7. Initial Phase Inspections Held (See attached minutes)
00 90 01 Att. B Page 6
8. Follow-Up Phase Inspections Performed, Results and Corrective Actions Taken
9. Job Safety. Indicate What Was Checked, Results,Instructions Received and Corrective Actions
10. Additional Activities and Remarks (Check Appropriate Box) [ ] a. Testing Performed. Attach Results. [ ] d. Outstanding Deficiencies. See Attached List [ ] b. Verbal Instructions Received. [ ] e. Delivery of Equipment and Materials.
[ ] c. Submittal Actions. [ ] f. Misc/Remarks.
(Use Space Below To Discribe Checked Items)
11. Contractor's Verification: "The above report and attachments are complete and all supplies, Materials, Equipment and Workmanship incorporated into the work are in full compliance with the contract except as noted".
Signed_______________________________________________ Date____________ CQC Representative CENAN-CO 5/99
00 90 01 Att. B Page 7
R
EC
O R
D O
F
PR
EP
A
R A
TO
R
Y A
N D
IN
IT
IA
L
IN
SP
EC
TI
O N
S D
A
TE
O F
TY
P
E O
F D
E
FI
N A
B
LE
F E
A
TU
R E
O F
W O
R K
R E
P O
R T
N O
S P
E R
S O
N S
W A
S M
A
TL
/O
R
IN
S P
IN
S
P (D
E S
C R
IB
E
Q
A Q
C A
TT
E
N D
IN
G
E Q
U
IP
M E
N T
IN
S
P P
H Y
S
IC
A
LL
Y
IN
S
P E
C
TE
D
N A
D F
O R
M
N
O
TE
:T H
IS
F
O R
M S
H A
LL
B
E U
S E
D B
Y T
H E
C O
N
TR
A C
TO
R
T O
T R
A C
K P
R E
P
/IN
IT
IN
S P
'S
J U
LY
A
TT
A
C H
A D
D
IT
IO
N
A L
R E
S U
LT
S
O R
C O
M M
E N
TS
A
S R
E Q
U
IR
E D
A tt.
B P ag e
LI
S
T O
F O
U
TS
TA
N
D
IN
G D
E
FI
C
IE
N C
IE
S
S H
O F
D A
TE
P R
O
JE
C T
TI
TL
E
C O
N
TR
A C
TO
R
LO
C
A
TI
O N
_C
Q C
R E
P O
R T#
C
O N
TR
A
C T
S P
E C
R E
F
LO
C A
TI
O
N O
N
D E
S C
R
IP
TI
O
N O
F D
E
FI
C
IE
N C
Y D
A
TE
D
A
TE
T O
B E
D A
TE
R
E M
A R
K S
O R
D W
G
PR
O
JE
C
T
FO
U N
D C
O R
R
EC
TE
D
C O
R R
EC
TE
D
N O
TE
: T
H
IS
F O
R M
S H
AL
L
BE
U
SE
D
B Y
TH
E
C O
N
TR
AC
TO
R T
O T
R
AC
K O
U
TS
TA
N
D
IN
G C
O N
ST
R
U C
TI
O
N D
EF
IC
IE
N
C
IE
S
A tt.
B P ag
C Q
C T
E S
T R
E P
O R
T
LI
S T
C Q
C R
EP
O
R T#
SH
O F
D
AT
E:
C O
N
TR
AC
TO
R
C O
N
TR
AC
T
PR
O
JE
C
T
TI
TL
E:
LO
C
AT
IO
N
S
PE
C R
EF
TY
P E
O F
TE
S
T D
AT
E
R
ES
U
LT
S R
EM
AR
KS
O
R D
W G
P
E R
FO
R
M E
D
N O
TE
: T
H
IS
F O
R M
S H
A
LL
B E
U S
E D
B Y
T H
E C
O N
TR
A
C
TO
R T
O T
R A
C K
C Q
C T
E S
TI
N
G .P
R O
V
ID
E A
TT
A
C H
M E
N
TS
A S
R E
Q U
IR
E
D
A tt.
B P ag
The graphic format for this 4' x 6' sign panel follows the legend guidelines and layout as specified below. The large 4' x 4' section of the panel in the right is to be white with black legend. The 2' x 4' section of the sign on the left with the full corps Signature (reverse version) is to be screen printed Communications White on the Red background.
See attached sheet for fabrication and mounting guidelines.
PROJECT IDENTIFICATION SIGN
CIVIL PROJECT
00 90 01 Att. C Page 11
As Construction Project Identification signs Detailed specifications for and Safety Performance signs are to be HDD plywood panel preparation are pro-fabricated and installed as described vided in Appendix B.** below. The signs are to be erected at a Shown below the mounting diagram is location deignated by the contracting of- a panel layout grid with spaces provided ficer and shall conform to the size, format, for project information. Photocopy this and typographic standards. page and use as a worksheet when pre-apring sign legend orders.
The sign panels are to be fabri-cated from .75" High Density Over-lay Plywood. Panel preparation to follow HDD specifications.
Sign graphics to be prepared on a white non-reflective vinyl film with positionable adhesive backing.
All graphics except for the Com-munications Red background with Corps signature on the project sign are to be die-cut or computer-cut non-reflective vinyl, pre-spaced legends prepared in the sizes and typefaces specified and applied to the background panel following the graphic formats shown on the attached sheets.
The 2'x4' Communications Red panel (to match PMS-032) with full Corps signature (reverse ver-sion) is to be screen printed on the white background. Identifica-tion of the District or Division may be applied under the signature with white cut vinyl letters pre-pared to Corps standards. Large Construction Project Sign scale reproduction artwork for the Legend Group 1: Corps Relationship signature is provided on page 4.8
Drill and Insert six (6) .375" T-nuts from the front face of the HDD Legend Group 2: Divison/District Name
Apply graphic panel to prepared Legend Group 3: Project Title HDD plywood panel following better. Post to be 12" long. Drill six (6) .375" mounting holes in Legend Group 4: Facility Name uprights to align with T-nuts in sign
Assemble sign panel and uprights. Legend Group 5a: Contractor/A&E Legend Group 5b: Contractor /A&E Imbed assembled sign panel and
Safety Performance Sign Legend Group 1: Project Title
Legend Group 2: Contractor/A&E
Fabrication and Mounting Guidelines
48"
48"
(Dimensions in inches)
** Refers to the U.S. Army Corps of Engineers, "Sign Standards Manual", EP-310-1-6.
18"
(photographically enlarge from 1.6.875" to 10.5"). ** 2.
sign panel. Position holes as 1.shown. Flange of T-nut to be flush with sign face. 2.
manufacturers' instructions. 1.
2.Sign uprights to be structural grade 4"x4" treated Douglas Fir
3.or Southern Yellow Pine. No.1 or panel. Countersink (.5") back of 1.hole to accept socket head cap screw (4"x.375"). 2.
uprights in 4" hole. Local soil con- 1. 1.ditions and/or wind loading may require bolting additional 2"x4" 2. 2.struts on inside face of uprights to reinforce installation as shown. 3. 3.
4. 4.
1.
2.
00900 ATT. C-2
5. 5.
1.
2.
00 90 01 Att. C Page 12
The graphic format, color, size and type-faces used on the sign are to be reproduced exactly as specified below. The title with First Aid logo in the top section of the sign, and the performance record captions are standard for all signs of this type. Legend Group 2 and 3 below identify the project and the contractor and are to be placed on the sign as shown.
Safety record numbers are mounted on individual metal plates and are screw-mounted to the background to allow for daily revisions to posted safety performance record.
Legend Group1: Standard two-line title "safety is a Job Requirement", with (8" od.) Safety Green First Aid logo. Color: To match PMS 347 Typeface: 3" Helvetica Bold Color: Balck
Legend Group 2: One- to two-line project title legend describes the work being done under this contract and name of host project.
Color: Black 2.25" Typeface: 1.5" Helvetica Regular Maximum line length: 42"
2.25" Legend Group 3: One - to two-line identification: name of prime This project has Days without & contractor and city, state address. 1.875" operated: lost time injury 4.875" Color: Black Typeface: 1.5" Helvetica Regular Total days worked Maximum line length: 42" 1.875" on this contract 4.875"
Legend Group 4: Standard safety Lost time record captions as shown. 1.875" injuries 4.875" Color: Black
Typeface: 1.25" Helvetica Regular
Replaceable numbers are to be mounted on white .060: aluminum plates and screw-mounted to background.
Color: Black Typeface: 3" Helvetica Regular Plate size: 2.5"x.5"
All typography is flush left and rag right, upper and lower case with initial capitals only as shown.
Letter- and word-spacing to follow Corps standards.
* Refer to the U.S. Army Corps of Engineers, "Sign Standards Manual", EPS-310-1-6.
Sign Legend Post Specifications Mounting Color Type Size Size Code Height Bkg/Lgd CID-02 various HDO-3 48" WH/BK-GR
SAFETY PERFORMANCE SIGN
Safety is a Job R quirement
Contractor:
3" 3"8"
3"
3"
4"
3"
10.5"
3" 31"
Dimensions inches.
3" 2" 17"
6"
3.875"
4.5"
See attached sheet for fabrication and mounting guidelines.
Panel Size 4"x4" 4"x4"
2.5" 2.5"
.875"
3.125"
.975"
2.5"
00900 ATT. C-3
00 90 01 Att. C Page 13
[Code of Federal Regulations] [Title 33, Volume 2] [Revised as of July 1, 2005] From the U.S. Government Printing Office via GPO Access
[CITE: 33CFR154.105]
[Page 314-316]
TITLE 33--NAVIGATION AND NAVIGABLE WATERS
CHAPTER I--COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
(CONTINUED)
PART 154_FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
--Table of Contents
Subpart A_General
Sec. 154.105 Definitions.
As used in this part:
Barrel means a quantity of liquid equal to 42 U.S. gallons. Boundary Line means any of the lines described in 46 CFR part 7. Captain of the Port (COTP) means the U.S. Coast Guard officer commanding a Captain of the Port Zone described in Part 3 of this chapter, or that person's authorized representative.
Caretaker Status denotes a facility where all piping, hoses, loading arms, storage tanks, and related equipment in the marine transfer area are completely free of oil or hazardous materials, where these components have been certified as being gas free, where piping, hoses, and loading arms terminating near any body of water have been blanked, and where the facility operator has notified the COTP that the facility will be in caretaker status.
Commandant means the Commandant of the Coast Guard or an authorized representative.
Contiguous Zone means the entire zone established by the United States under Article 24 of the Convention on the Territorial Sea and the Contiguous Zone, but not extending beyond 12 miles from the baseline from which the breadth of the territorial sea is measured.
District Commander means the officer of the Coast Guard designated by the Commandant to command a Coast Guard District, as described in Part 3 of this chapter or an authorized representative.
Facility means either an onshore or offshore facility, except for an offshore facility operating under the jurisdiction of the Secretary of the Department of Interior, and includes, but is not limited to, structure, equipment, and appurtenances thereto, used or capable of being used to
00 90 01 Att. D Page 19 transfer oil or hazardous materials to or from a vessel or public vessel. Also included are facilities that tank clean or strip and any floating structure that is used to support an integral part of the facility's operation. A facility includes federal, state, municipal, and private facilities.
Facility operator means the person who owns, operates, or is responsible for the operation of the facility. Hazardous material means a liquid material or substance, other than oil or liquefied gases, listed under 46 CFR 153.40 (a), (b), (c), or (e).
Marine transfer area means that part of a waterfront facility handling oil or hazardous materials in bulk between the vessel, or where the vessel moors, and the first manifold or shutoff valve on the pipeline encountered after the pipeline enters the secondary containment required under 40 CFR 112.7 or 49 CFR 195.264 inland of the terminal manifold or loading arm, or, in the absence of secondary containment, to the valve or manifold adjacent to the bulk storage tank, including the entire pier or wharf to which a vessel transferring oil or hazardous materials is moored.
MARPOL 73/78 means the International Convention for the Prevention of Pollution from Ships, 1973 (done at London, November 2, 1973) as modified by the Protocol of 1978 relating to the International Convention for the Prevention of Pollution from Ships, 1973 (done at London, February 17, 1978).
Mobile facility means any facility that can readily change location, such as a tank truck or tank car, other than a vessel or public vessel.
Monitoring device means any fixed or portable sensing device used to monitor for a discharge of oil or hazardous material onto the water, within or around a facility, and designed to notify operating personnel of a discharge of oil or hazardous material.
Officer in Charge, Marine Inspection (OCMI) means the U.S. Coast Guard officer commanding a Marine Inspection Zone described in Part 3 of this chapter, or an authorized representative.
Offshore facility means any facility of any kind located in, on, or under, any of the navigable waters of the United States, and any facility of any kind which is subject to the jurisdiction of the United States and is located in, on, or under any other waters, other than a vessel or a public vessel.
Oil means oil of any kind or in any form, including but not limited to, petroleum, fuel oil, sludge, oil refuse, and oil mixed with wastes other than dredged spoil.
Onshore facility means any facility (including, but not limited to, motor vehicles and rolling stock) of any kind located in, on, or under any land within the United States other than submerged land.
Person in charge means an individual designated as a person in charge of transfer operations under Sec. 154.710 (for facilities) or Sec. 155.700 (for vessels) of this chapter.
00 90 01 Att. D Page 20
STCW means the International Convention on Standards of Training, Certification, and Watchkeeping for Seafarers, 1978.
Self-propelled tank vessel means a self-propelled tank vessel other than a tankship.
Tank barge means a non-self-propelled tank vessel.
Tankship means a self-propelled tank vessel constructed or adapted primarily to carry oil or hazardous material in bulk in the cargo spaces.
Tank vessel means a vessel that is constructed or adapted to carry, or that carries, oil or hazardous material in bulk as cargo or cargo residue, and that--
(a) Is a vessel of the United States;
(b) Operates on the navigable waters of the United States; or
(c) Transfers oil or hazardous material in a port or place subject to the jurisdiction of the
United States.
Transfer means any movement of oil or hazardous material to, from, or within a vessel by means of pumping, gravitation, or displacement. A transfer is considered to begin when the person in charge on the transferring vessel or facility and the person in charge on the receiving facility or vessel first meet to begin completing the declaration of inspection as required by Sec. 156.150 of this chapter. A transfer is considered to be complete when all the connections for the transfer have been uncoupled and secured with blanks or other closure devices and both of the persons in charge have completed the declaration of inspection to include the date and time the transfer was complete.
Vessel operator means a person who owns, operates, or is responsible for the operation of a vessel.
[CGD 75-124, 45 FR 7169, Jan. 31, 1980, as amended by CGD 86-034, 55 FR 36252, Sept. 4, 1990; CGD 79-116, 60 FR 17141, Apr. 4, 1995; CGD 93-056, 61 FR 41458, Aug. 8, 1996; 62 FR 3610, Jan. 24, 1997; CGD 79-116, 62 FR 25125, May 8, 1997]
TRANSFER OPERATIONS--Table of Contents
Subpart A_Oil and Hazardous Material Transfer Operations
Sec.
156.100 Applicability.
156.105 Definitions.
156.107 Alternatives.
156.110 Exemptions.
156.111 Incorporation by reference.
00 90 01 Att. D Page 21
156.112 Suspension order.
156.113 Compliance with suspension order.
156.115 Person in charge: Limitations.
156.118 Advance notice of transfer.
156.120 Requirements for transfer.
1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .