D - Offeror Proposal Compliance Matrix.docx

DOCX document 57 KB Posted

Attached to
X1DB--Santa Cruz CA for Medical Space
Solicitation number
36C24W24R0070
Issued by

About this file

This is an Offeror Proposal Compliance Matrix for RLP No. 36C24W24R0070, related to a Department of Veterans Affairs Community Based Outpatient Clinic (CBOC) lease procurement in Santa Cruz, CA. The matrix outlines the required proposal submission components that offerors must complete and submit.

The matrix is organized into two main volumes: Volume I (Technical Proposal) and Volume II (Price Proposal). Volume I requires submissions related to technical quality (including architectural plans, building narratives, site plans, and security requirements), past performance documentation, financial information, project management plans, operations and maintenance plans, and SAM registration details. Volume II requires pricing documentation including GSA Form 1364 (Proposal to Lease Space), GSA Form 1217 (Lessor's Annual Cost Statement), and related pricing attachments. Additional required submissions include building/site documentation, environmental compliance evidence, seismic safety forms, fire protection documentation, and various signed RLP documents including the lease template L100, Agency Specific Requirements, and facility security requirements for FSL II.

View the file

Other files

File Type Posted
Santa Cruz CA 36C24W25L0021 Amd 06.pdf PDF
36C24W24R0070 0005.docx DOCX document
Santa Cruz CA 36C24W25L0021 Amd 05.pdf PDF
36C24W24R0070 0004.docx DOCX document
Amd 4.zip ZIP file
Santa Cruz CA 36C24W25L0021 Amd 03.pdf PDF
36C24W24R0070 0003.docx DOCX document
Santa Cruz CA 36C24W25L0021 Amd 02.pdf PDF
36C24W24R0070 0002.docx DOCX document
Santa Cruz CA Questions and Answers.pdf PDF
36C24W24R0070 0001.docx DOCX document
Santa Cruz CA 36C24W25L0021 Amd 01.pdf PDF
N - FAR 52204-24 Representation Digital_ Nov 2021.pdf PDF
J - Form 1217 - Lessor_s Annual Cost Statement_ Nov 2016.pdf PDF
F - 3516 Solicitation Provisions_ Dec 2023.pdf PDF
R - Pre-Bid Registration Form.pdf PDF
P - SF-330 - Architect Engineer Qualifications.pdf PDF
L - Seismic Forms A - F with Instructions.pdf PDF
C - Offering Entity Acknowledgement Form.pdf PDF
0 - Santa Cruz CA - RLP 36C24W24R0070.pdf PDF
M - DOL Wage Determination GDN CA20250018 01-03-2025.pdf PDF
K - Prelease FPLS Evaluation Form 12000_ Part A - Part B_ May 2015.pdf PDF
I - Attachment 1 to GSA Form 1364.xlsx XLSX spreadsheet
H - Form 1364 Proposal to Lease Space_ Jan 2023.pdf PDF
G - 3517B General Clauses_ Dec 2023.pdf PDF
A - Santa Cruz CA - Lease 36C24W25L0021.pdf PDF
O - Past Performance Questionnaire Form for VA_ REV Nov 23.pdf PDF
E - VA Security Requirements_ FSL Level II_ Oct 2024.pdf PDF
36C24W24R0070_1.docx DOCX document
Q - GSA527 Contractors Qualifications.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offeror Proposal Compliance Matrix RLP No.: 36C24W24R0070 Community Based Outpatient Clinic (CBOC) - Santa Cruz, CA

Instructions: Offerors are required to adequately address each line item in the table provided below, provide a “check” in either the Yes or No box/column, and provide comments as necessary. In addition to the Technical and Price Proposal submissions, Offerors shall also provide Offering Entity Submittals, additional Building/Site Submittals, and additional RLP Document Submittals, as applicable, and as further indicated below. RLP paragraphs to each line item have been provided for reference.

General Information

Offeror Name:

Offeror Unique Entity Identifier:

Offered Building/Site Name & Address:

Date Offer Submitted:

Requirements
Provided
Proposal Submittal Requirement
Yes
No
Volume I – Technical Proposal
|_|
|_|
Offeror addressed all required submittals/items outlines below and RLP references
|_|
|_|
Offeror referenced RLP 3.02, Receipt of Lease Proposals, and provided submittals accordingly (Titled Volume I)
Volume II – Price Proposal
|_|
|_|
Offeror addressed all required submittals/items outlines below and RLP references
|_|
|_|
Offeror referenced RLP 3.02, Receipt of Lease Proposals, and provided submittals accordingly (Titled Volume II)
Proposal Section Header
Item
Solicitation Reference
Provided
Offeror Proposal Location
Offeror Comments

Volume

Yes
No
Volume
No. of Page(s)
I
Offeror Proposal Compliance Matrix
Complete this form and provide in Microsoft Word format
RLP 1.06
|_|
|_|

VOLUME I

I
Technical Proposal

(Technical Quality)

Evidence Building/Site will meet all RLP Requirements
RLP 1.02 / 1.04 / 4.05
|_|
|_|
Architectural Plans for Modernization, if applicable
RLP 1.02 / 3.06 / 4.05
|_|
|_|
Proposed Building Narratives/Drawings: Demonstrate VA’s mission, Requirements, Calculations, etc.
RLP 1.05 / 4.05
|_|
|_|
Proposed Site Narratives/Plans: Parking, Landscaping, Quality of Site Development, etc.
RLP 1.02 / 1.05 / 3.06 / 4.05
|_|
|_|
Proposed Security Narratives/Plans (Reference FSL Requirements)
RLP 1.06 / 1.11 / 4.05
|_|
|_|
Proposed Narratives for Sustainable Design and Energy Efficiencies
RLP 3.06 / 4.05
|_|
|_|
Provide Computer Generated Plans
RLP 3.06 / 4.05
|_|
|_|
I
Technical Proposal

(Past Performance)

Record of Relevant Past Performance Statement
RLP 4.05
|_|
|_|
Key Personnel (Dedicated to the Project) Resumes
RLP 4.05
|_|
|_|
Past Performance Questionnaires
RLP 4.05
|_|
|_|
Emailed via RLP 4.05.B
Evidence of Relevant Contracts (Table Format)
RLP 4.05
|_|
|_|
Teaming Agreements/Commitment of Teaming Arrangements
RLP 4.05
|_|
|_|
A/E Firm Experience Narrative
RLP 4.05
|_|
|_|
Design Team Key Personnel Experience
RLP 4.05
|_|
|_|
SF-330 – Architect-Engineer Qualifications
RLP 1.06 / 4.05
|_|
|_|
A/E State Licensure/Certification
RLP 4.05
|_|
|_|
GC Experience Narrative
RLP 4.05
|_|
|_|
GC Key Personnel Resumes
RLP 4.05
|_|
|_|
GSA Form 527 – Contractor’s Qualifications and Financial Information
RLP 1.06 / 4.05
|_|
|_|
General Contractor State Licensure
RLP 4.05
|_|
|_|
I
Technical Proposal

(Financial Information)

Financial Resources Plans
RLP 4.05
|_|
|_|
Conditional Commitment of Funds
RLP 3.06 / 4.05
|_|
|_|
Financial Statements
RLP 4.05
|_|
|_|
I
Technical Proposal

(Project Management Plan)

Project Management Plan: Workload, Additional Project Information, Staffing Plan, Risk Mitigation, Project Schedule
RLP 4.05
|_|
|_|
I
Technical Proposal

(Operations & Maintenance Plan)

Staffing Plans
RLP 4.05
|_|
|_|
Evidence of Janitorial Services Compliance
RLP 4.05
|_|
|_|
Operations and Maintenance Plan & Schedule
RLP 4.05
Interior Maintenance Plan/Chart/Narrative
RLP 4.05
|_|
|_|
Exterior Maintenance Plan/Chart/Narrative
RLP 4.05
|_|
|_|
Emergency and Routine Service Calls
RLP 4.05
|_|
|_|
I
Technical Proposal

(SAM Registration)

Unique Entity Identifier Registration
RLP 1.15 / 3.06
|_|
|_|
SAM Registration: Active Entity
RLP 1.15 / 3.06
|_|
|_|
SAM Registration: Representation and Certifications
RLP 1.15 / 3.06
|_|
|_|
I
Offering Entity Submittals
Authorization to Submit on Behalf of Offer, if applicable
RLP 3.06
|_|
|_|
Compliance with Local Zoning
RLP 3.06
|_|
|_|
Evidence of Ownership/Control
RLP 3.06
|_|
|_|
Written Agreement to Acquire Interest, if applicable
RLP 3.06
|_|
|_|
Proof of Signing Authority
RLP 3.06
|_|
|_|
Conflict of Interest, if applicable
RLP 3.06
|_|
|_|
Legal Description, Tax ID Number, Copies of Prior Year Taxes
RLP 3.06
|_|
|_|
Evidence of Vending Facilities Compliance, if applicable
RLP 1.02 / 3.06
|_|
|_|
I
Building/Site Submittals
Evidence Site is within Area of Consideration
RLP 1.03
|_|
|_|
Evidence of Neighborhood/Location Amenities/Transit Accessibility
RLP 1.05 / 3.06
|_|
|_|
Efficiency of Layout/Test Fit
RLP 2.01
|_|
|_|
Evidence Flood Plain Compliance
RLP 1.04 / 2.02
|_|
|_|
Seismic Safety Forms
RLP 1.06 / 2.04 / 3.06
|_|
|_|
Evidence Space Contains No Asbestos
RLP 2.06 / 3.06
|_|
|_|
Evidence of Accessibility Compliance
RLP 2.07 / 3.06
|_|
|_|
Evidence of Fire Protection and Life Safety Compliance, GSA Form 12000, Additional FPLS Documentation, as applicable
RLP 1.06 / 2.08 / 3.06.J
|_|
|_|
Evidence of EISA Compliance (ENERGY STAR®), Certification of Building Energy Performance
RLP 1.06 / 2.09 /3.06.R
|_|
|_|
Evidence of Environmental Compliance
RLP 2.10
|_|
|_|
Phase I Environmental Site Assessment, if applicable
RLP 2.11
|_|
|_|
Any additional applicable technical submittal requirements listed in Sections 1.06 and 3.06
RLP 1.06, 3.06
|_|
|_|
I
Additional RLP Submittals: Complete, Initial, and/or Sign as indicated on the document
Lease No. 36C24W25L0021 (GSA Template L100 for VA)
RLP 1.06 / 1.08
|_|
|_|
Agency Specific Requirements (ASR)
RLP 1.06
|_|
|_|
Facility Security Level Requirements for FSL II
RLP 1.06, 1.11
|_|
|_|
GSA Form 3516 – Solicitation Provisions
RLP 1.06
|_|
|_|
GSA Form 3517B – General Clauses
RLP 1.06, 1.08
|_|
|_|
DOL Wage Determination
RLP 1.06
|_|
|_|
FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
RLP 1.06, 3.06
|_|
|_|
RLP Amendments, if applicable
RLP 1.06
|_|
|_|

VOLUME II

II
Price Proposal
Offering Entity Acknowledgement Form
RLP 1.06
|_|
|_|
GSA Form 1364 – Proposal to Lease Space
RLP 1.01 / 1.06 / 3.03
|_|
|_|
Attachment #1 to GSA Form 1364 (provide in Excel and PDF formats)
RLP 1.01 / 1.06 / 3.03
|_|
|_|
GSA Form 1217 – Lessor’s Annual Cost Statement
RLP 1.06 / 3.03
|_|
|_|
Evidence of Historical Preference, if applicable
RLP 2.05 / 2.12 / 3.06
|_|
|_|

LESSOR: _______ GOVERNMENT: _______ Page 1 of 3

File details come from the government source that posted it. Updated .