d. Typical Drawings.pdf

PDF 501 KB Posted

Attached to
FY25 Bonners Ferry Ranger District Road Maintenance and Repair
Solicitation number
1284LL25Q0033
Issued by

About this file

The document contains three technical drawings (Exhibits A, B, and C) providing detailed road maintenance and repair specifications for the Bonners Ferry Ranger District.

Exhibit A illustrates road grading typical sections, showing variable roadway and turnout configurations with specific grading details including surface course slopes (1.5H:1V), subgrade specifications, and different road section types with and without ditches. Exhibit B provides a broader roadway cross-section diagram depicting right-of-way, clearing limits, ground line, traveled way, and road bed components. Exhibit C details a shoulder repair typical section, specifying a 16-18 foot minimum width, 2%-4% grade, and instructions for using excavated materials for backfill, with a requirement to repair shoulders using 12" minus angular pit run material and constructing embankments in one-foot lifts. The drawings provide precise technical guidance for road maintenance and repair work, supporting the Forest Service's solicitation for road maintenance services in the Northern Region.

View the file

Other files

File Type Posted
1284LL25Q0033_CSS_Amended.docx DOCX document
a. Road Grading--Road Information Sheet-Amended.docx DOCX document
1284LL25Q0033_CSS_Extended.docx DOCX document
a. Road Grading--Road Information Sheet.docx DOCX document
c. Road Repair Map.docx DOCX document
e. Fire Control.docx DOCX document
f. IPNF Food Storage Order.pdf PDF
g. State of Idaho-Certificate-of-Verification of Workers Compensation Insurance-Form.pdf PDF
1284LL25Q0033_CSS.docx DOCX document
b. Grading Map.docx DOCX document
h. WD 1995-0228 Rev 63 Dated 12232024.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VARIABLE

ROADWAY

Ii.

2%-4% I

10'

TURNOUT

VARIABLE 10'

TURNOUT

ROADBED

TYPI CAL SECTI ON W ITHOUT DITC H

NOTTO SCALE

VARIABLE 10'

SURFACE

COURSE

1.5H:1V

SUBGRADE

1.5H:1V

INSLOPE OR OUTSLOPE (OUTSLOPE

SHOWN)

BACKSLOPE

1V:1H UNLESS

OTHERWISE

DIRECTED

ROADWAY TURNOUT SURFACE

COURSE

1.5H:1V Ii.

2%-4%

1'MIN VARIABLE 10'

TURNOUT

2' MIN-----------------------

TOL = TURNOUT LEFT

VAR VAR VAR 10'

10'

ROADBED

TYP I CAL SECTI ON WITH DITC H

NOTTO SCALE

EDGE OF ROAD

ROAD CENTERLINE

VAR VAR VAR

TOR = TURNOUT RIGHT

TURNOUT DETAIL

NOTTO SCALE

EXHIBIT A - ROAD GRADING TYPICAL

5'

VAR

SUBGRADE

1.5H:1V

VAR VAR

STO = SPLIT TURNOUT

EXHIBIT B - ROADWAY TYPICAL PAGE 2 OF 3

EXHIBIT C SHOULDER REPAIR TYPICAL PAGE 3 OF 3

16 - 18' MINIMUM

FINISH GRADE

2% - 4%

VA

R

IE

S

4 ft min.

USE MATERIAL FROM EXCAVATION AND FROM

SLIDE MATERIAL,

DITHCLINE AND FROM TRAVELWAY.

WORK ITEM INCLUDE SBACKFILL, COMPACTION

AND EMBANKMENT. CONSTRUCTED IN ONE FOOT

LIFTS

EXCAVATE BENCH TO PLACE PIT RUN, CO/

COR APPROVAL PRIOR

TO PLACING PIT RUN

SLO

PE 1.1:1

M

ATCH EXISTING

EXISTING GROUND

LINE

TYPICAL SECTION

REPAIR SHOULDER WITH 12" MINUS ANGULAR

PIT RUN

Exhibit A - Road Grading Typical
Exhibit B - Roadway Typical
Exhibit C - Turnpike_ThroughFIll Typical

File details come from the government source that posted it. Updated .