D. SOW.pdf
PDF 64 KB Posted
- Attached to
- PPSC DQ 27-006 Operable Wall Partitions
- Solicitation number
- DQ1 GJJA 2027000129 4
- Issued by
- El Paso County, Colorado
About this file
This is a Scope of Work document for Pikes Peak State College regarding the replacement of an operable wall partition system at the Downtown Studio Campus. The project scope requires the contractor to furnish and install one completely operated operable partition system as a turnkey installation, including removal and disposal of the existing system, delivery of all materials and equipment, installation of track and operating components, and provision of all necessary hardware and accessories. The work encompasses testing, adjustment, and commissioning of the new system to ensure full operational capability, with the contractor responsible for providing manufacturer warranties, closeout documentation, and final inspection to verify compliance with manufacturer specifications, applicable building codes, and college requirements.
The project will be executed as a complete turnkey installation beginning with site review and coordination with college staff, followed by removal of the existing operable wall system, material delivery, and installation of the new partition system. Upon completion, the contractor shall perform testing and adjustments to verify proper operation and provide warranty documentation, required training, and final inspection. No specific pricing terms, set-asides, response dates, award dates, or contract term information is contained within this scope of work document. The document does not identify funding sources, amounts, or additional financial requirements beyond the materials and labor necessary to complete the replacement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| E. Personal Services Contract.pdf | ||
| PPSC DQ 27-006 Operable Wall Partitions Amendment #1.docx | DOCX document | |
| A. Quote Response Sheet v2.docx | DOCX document | |
| C. PERA.pdf | ||
| B. Tax Payer Identification Number.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The contractor shall provide all labor, materials, equipment, supervision, and services necessary to complete the replacement of the existing operable wall at the Downtown Studio Campus The project includes furnishing and installing a new operated operable partition system, removal and disposal of the existing partition, delivery of all required materials, installation of track and operating components, testing, adjustment, commissioning, and final inspection. The contractor shall provide a complete turnkey installation, including all hardware, accessories, electrical components, warranties, and manufacturer documentation necessary for a fully functional system. The completed installation must comply with manufacturer specifications, applicable building codes, and Pikes Peak State
College requirements.
Specifications:
• Furnish and install one completely operated operable partition system.
• Remove and dispose of the existing operable wall system.
• Provide all labor, materials, equipment, hardware, and accessories required for installation.
• Perform testing, adjustment, and commissioning of the new partition system.
• Provide manufacturer warranty and closeout documentation.
• Ensure the system is fully operational and ready for use upon project completion.
Why Is This Project Being Done?
The existing operable wall at the Downtown Studio Campus requires replacement to ensure reliable operation and continued support of the college's instructional and simulation spaces. The new operated operable partition system will provide improved functionality, dependability, and flexibility for room configuration and space utilization.
How Will the Job Be Carried Out?
The project will be completed as a turnkey installation by the contractor. Work will begin with a site review and coordination with Pikes Peak State College staff. The contractor will then remove and dispose of the existing operable wall system, deliver all required materials and equipment, and install the new operated operable partition system. Following installation, the contractor will perform testing, adjustments, and commissioning to verify proper operation. Upon successful completion, the contractor will provide warranty documentation, any required training, and a final inspection to ensure the system is fully functional and ready for use
Scope of Work/Specifications for the project
Exhibit D