This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract to provide outpatient services at the Granbury Community-Based Outpatient Clinic (CBOC). The QASP defines the performance standards, methods of surveillance, and the government's roles and responsibilities for overseeing the contractor's performance.
The key performance measures cover access to care (e.g. new and established patient appointment wait times, same-day appointments), quality of care (e.g. behavioral health screenings, preventive care), panel management (e.g. core staffing ratios, women's health), veteran satisfaction, care coordination, and environment of care. The government will conduct quarterly surveillance and reporting on the contractor's performance against the defined standards and acceptable quality levels. The QASP describes the process for documenting and addressing any performance deficiencies. This QASP supports the federal contract opportunity "Q201--Granbury, Texas CBOC 1 APRIL 2025 - 31 MARCH 2035" issued by the Department of Veterans Affairs Veterans Health Administration.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) Outpatient Site of Care Service
Granbury CBOC
The contractor shall be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored?
How will monitoring take place?
Who will conduct the monitoring?
How will monitoring efforts and results be documented?
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis.
However, the Government shall coordinate changes with the contractor through contract modification.
Copies of the original QASP and revisions shall be provided to the contractor and government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Noel E. Ramirez
Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Teri Stewart
3. CONTRACTOR REPRESENTATIVES
The following staff of the contractor serve as the contractor’s program manager(s) for this contract.
Primary:
Alternate:
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of contractor performance to these standards.
If any portion of the requirement is not met and/or the acceptable quality level in any of the elements in this section/subsection are not maintained, the contractor will be notified by the contracting officer for response outlining the contractor’s proposed remedy. The Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming services per FAR 52.212-4.
The performance requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
DASHBOARDS. Reports as specified in the table below from VSSC, Power Analytics and other sources will be used to monitor performance on a quarterly basis.
PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed. Environment of Care (EOC) rounds will be performed by the VA EOC rounding team at least two times per year. Results are included in the quarterly QASP measures report prepared by the COR.
VALIDATED USER/CUSTOMER COMPLAINTS. V-Signals and PATS-R will be used to monitor and validate customer complaints. PATS-R cases are reviewed daily by the service level advocate. The SHEP and Press Ganey patient experience results will be reviewed monthly with a quarterly report prepared by the COR.
6. MEASURES
VHA Contracted Outpatient Clinics Quality Assurance Surveillance Plan (QASP) – Granbury CBOC
As of: June 3, 2024
Measure PWS Refere nce
Performance Requirement
Standard Acceptable Quality Level
(AQL)
Method of surveillance and frequency
Met AQL/Did Not
Meet AQL (Add comment)
DOMAIN: ACCESS
New PC Appointments
Completed within 20 Calendar Days of Reference Date
(RD)
New primary care appointments completed within 20 calendar days of the
RD.
(See the Appointments Cube in Pyramid Analytics for more information. Note:
Pyramid Analytics information, access, and training can be found here.)
15.5.1 Contractor shall
provide completed appointments for new PC patients within 20 calendar days of the RD.
Contractor shall provide completed appointments for new PC patients within 20 calendar days of the RD no less than 53% of the time.
Contractor shall provide completed appointments for new PC patients within 20 calendar days of the RD no less than 75% of the time.
COR will monitor progress quarterly using data from the Appointments Cube. COR will send reports to the contractor and
CO quarterly to notify them of current performance.
Established PC Patient
Appointments Completed within
20 calendar days of Patient Indicated
Date (PID)
Established primary care appointments completed within 20 calendar days of
PID (patient desired date) or the clinically indicated date.
(See the
Appointments Cube
15.5.2 Contractor shall
provide completed appointments for established PC patients within 20 calendar days of the PID.
Contractor shall provide completed appointments for established
PC patients within 20 calendar days of the PID no less than 93% of the time.
Contractor shall provide completed appointments for established PC patients within 20 calendar days of the PID no less than 93% of the time.
progress quarterly using data from the Appointments
Cube. COR will send reports to the contractor and CO quarterly to notify them of in Pyramid Analytics for more information. Note:
Pyramid Analytics information, access, and training can be found here.)
PCMHI
Penetration
(PACT21)
The percent of assigned Primary Care patients seen in
Primary Care- Mental Health
Integration
(PCMHI)
(See PACT
Compass for more information)
15.5.3 Contractor shall
involve PCMHI staff in the care of patients with mental health needs.
Contractor’s
PCMHI
penetration rate shall meet or exceed 9%.
Contractor’s
PCMHI
penetration rate meets or exceeds
9%.
progress quarterly using data from the
PACT
Compass. COR will send reports to the contractor and
CO quarterly to notify them of
PCMH SHEP
Access Composite
Composite % based on 3 questions from the SHEP/PCMH report: 1) Get an urgent care appointment as soon as needed, 2) Get a routine care appointment as soon as needed, and 3) Get same day answer to your medical question.
(See SHEP/PCMH
Report for more information)
15.5.4 Contractor shall
provide: 1) urgent care appointments as soon as needed,
2) routine care appointments as soon as needed, and 3) same day answers to patients’ medical questions.
Contractor’s SHEP access composite score shall meet or exceed 49%.
Contractor’s SHEP access composite score shall meet or exceed 49%.
progress quarterly using data from
SHEP/PCMH
report. COR will send reports to the contractor and
CO quarterly to notify them of
SHEP Question 7
In the last 6 months, how many days did you usually have to wait for an appointment when you needed care right away? (Less is better)
15.5.5 Contractor shall
provide timely appointments when patients need care right away.
Contractor’s SHEP question
7 score shall meet or exceed
33%.
Contractor’s SHEP question 7 score shall meet or exceed 50%.
progress quarterly using data from
SHEP/PCMH
report. COR will send reports to the contractor and
CO quarterly to information) notify them of current performance.
Same-Day
Appts w/ PCP
Measures the percent of requested same day appointments with
PCP.
information)
15.5.6 Contractor shall
provide same day appointments with primary care provider.
Contractor’s same day appointments with PCP rate shall meet or exceed 43%.
Contractor’s same day appointments with PCP rate exceed 43%.
progress quarterly using data from the
PACT
Compass. COR will send reports to the contractor and
CO quarterly to notify them of
Appointment Cancellations
(MOP 13)
Cancelled by clinic rate for all active clinic stop codes
(mop13) (Lower is better)
(See Performance Measure Report for more information)
15.5.7 Contractor shall
not unnecessarily cancel patient appointments.
Contractor’s rate of appointments cancelled by clinic shall not exceed 9%.
Contractor’s rate of appointments cancelled by clinic shall not exceed
9%.
progress quarterly using data from the
PACT
Compass. COR will send reports to the contractor and
CO quarterly to notify them of
DOMAIN: QUALITY OF CARE
Composite – BH90 Behavioral Health
Screening
Composite of mdd40 -- Vets screened annually for major depression dx.
ptsd51 -- PTSD screening using the PC-PTSD at required times sa17 -- Vets screened for alcohol misuse w/ score GE
5 w/ timely brief counselling.
15.5.8 Contractor shall
complete all behavioral health screenings and follow-up evaluations.
Contractor shall maintain a behavioral health composite score of at least 96%.
Contractor shall maintain a behavioral health composite score of at least 96%.
progress quarterly using data from the
Outpatient Sites of Care Report.
COR will send reports to the contractor and
CO quarterly to notify them of sa7 -- Vets screened annually for alcohol misuse.
CSSRS1--Annual
Suicide Risk Screen
(See the Outpatient Sites of Care Report for more information) Composite –
CVRM90_EC
Cardiovascular/Di abetes Risk Management
(EQM)
dmg27h_ec (DM:
BP LT 140/90
(eMeasure)) ihd53h_ec
(Controlling High Blood Pressure
(eMeasure)) statn1_ec (Statin
Therapy for patients with cardiovascular disease (eMeasure)) statn7_ec (Statin therapy for patients with diabetes (eMeasure)) for more information)
15.5.9 Contractor shall
manage patients with diabetes and cardiovascular disease in accordance with VA standards.
Contractor shall maintain a cardiovascular risk management composite score of at least 73%.
Contractor shall maintain a cardiovascular risk management composite score of at least 73%.
COR will monitor progress quarterly using data from the
Outpatient Sites of Care Report.
COR will send reports to the contractor and
CO quarterly to notify them of
Composite –
PRV90_EC
Prevention bcs01_ec (Breast Cancer Screening for Women 50-74y (Electronic)) ccs01_ec (Cervical Cancer Screening
(eMeasure)) col01_ec
(Colorectal Cancer Screening Ages 45-
15.5.10 Contractor shall
provide preventive health care in accordance with VA standards.
Contractor shall maintain a prevention composite score of at least 63%.
Contractor shall maintain a prevention at least 63%.
progress quarterly using data from the
Outpatient Sites of Care Report.
COR will send reports to the contractor and
CO quarterly to notify them of
75 (eMeasure)) psa1_ec (Non- Recommended
PSA-Based Screening for more information) Composite –
SMG90_1 Tobacco Use and Cessation
Composite of p7 (Tobacco Use -
Screened for Use - NEXUS (Outpt)) smg10 (Tobacco Use Cessation -
Discussed Cessation Medications
(Outpt)) smg8 (Tobacco Use
Cessation - Advised to Quit (Outpt)) smg9 (Tobacco Use Cessation -
Discussed Cessation Strategies (Outpt)) for more information)
15.5.11 Contractor shall
provide tobacco counseling and care in accordance with VA standards.
Contractor shall maintain a tobacco composite score of at least 96%.
Contractor shall maintain a tobacco at least 96%.
progress quarterly using data from the
Outpatient Sites of Care Report.
COR will send reports to the contractor and
CO quarterly to notify them of
Composite -
FLU90_EC
Outpatient Influenza
Immunization p28h_ec (Influenza Immunizations 66 years of age and older (eMeasure)) p29h_ec (Influenza Immunization 19-65 years of age
15.5.12 Contractor shall
provide flu immunizations in accordance with VA standards.
Contractor shall maintain an influenza immunization composite score of at least 40%.
Contractor shall maintain an influenza immunization at least 40%.
progress quarterly using data from the
Outpatient Sites of Care Report.
COR will send reports to the contractor and
CO quarterly to notify them of for more information)
AIS90_EC Adult
Status ais01_ec
Pneumococcal Immunization
(eMeasure) ais10td_ec Tdap Immunization
(eMeasure) ais20zos_ec Zoster
(eMeasure) for more information)
15.5.13 Contractor shall
provide adult immunizations in accordance with VA standards.
Contractor shall maintain an adult immunization status composite score of at least 58%.
Contractor shall maintain an adult immunization status composite score of at least
58%.
progress quarterly using data from the
Outpatient Sites of Care Report.
COR will send reports to the contractor and
CO quarterly to notify them of
DMG91_EC
Diabetes dmg23h_ec (DM:
HbA1c poor control (eMeasure)) dmg31h_ec
(Diabetes Mellitus - Outpatient - Retinal exam, timely by disease (eMeasure)) ked01_ec (Kidney Health Evaluation for Patients With
Diabetes for more information)
15.5.14 Contractor shall
provide diabetes care in accordance with VA standards.
Contractor shall maintain a diabetes composite score of at least 70%.
Contractor shall maintain a diabetes composite score of at least
70%.
progress quarterly using data from the
Outpatient Sites of Care Report.
COR will send reports to the contractor and
CO quarterly to notify them of
Clinical Reminders 15.5.15 Contractor shall complete all clinical reminders
Contractor shall complete no less than 90% of all clinical
Contractor shall complete no less than 90% of all clinical reminders
COR will monitor performance quarterly by as indicated in the
VA EHR.
reminders as indicated in the as indicated in the reviewing data from the
External Peer Review and monitor ad hoc through note reviews.
Progress Notes and
Patient Care Encounter (PCE)
Module Documentation
15.5.16 Contractor shall
complete workload and encounter documentation as defined in the PWS within 2 business days.
Progress notes shall be connected to the correct visit/encounter and location, entered into the VA EHR on the same day as the visit/encounter, meet CMS guidelines, and include content as defined in PWS.
Contractor shall properly complete documentation for each patient encounter within 2 business days 100% of the time.
Contractor shall properly complete documentation for each patient encounter within 2 business days
100% of the time.
progress quarterly using the VSSC Encounter Workload report. COR will send quarterly reports to the contractor and the CO to notify them of current
DOMAIN: PANEL MANAGEMENT
Percent of Teams with Core Teamlet Staffing Ratio 3 or More (PACT 22)
The total Core Primary Care Support Staff
(administrative associate, RN care manager, and clinical associate)
FTE divided by the total Primary Care
Provider FTE entered in the PCMM Web Application.
information)
15.5.17 Contractor shall
provide core teamlet staffing at a ratio of 3 or more. FTE core teamlet members
(RN care manager, clinical associate, administrative associate) for each PCP FTE.
100% of contractor’s primary care teams shall have a core teamlet staffing ratio of 3 or more.
99% of contractor’s primary care teams shall have a core teamlet staffing ratio of 3 or more.
COR will monitor progress quarterly using data from the
PACT
Compass. COR will send reports quarterly to the contractor and CO to notify them of current
Percent of Women Assigned to
Women’s Health PACT or
Designated Women’s Health
Provider
(WH1)
The total number of female patients assigned to a
Women’s Health PACT (identified by having *WH* in the team name or a primary or secondary team focus of Women’s
Health) OR to a provider with a team role of designated WH provider (WH- PCP) divided by the total number of unique female patients assigned to Primary Care Teams information)
15.5.18 Contractor shall
ensure that an appropriate number of WH- PACTs or WH-
PCPs are available at site of care to ensure that all VHA access goals are met for women patients who choose to be seen by a designated WH provider.
Contractor’s percent of women assigned to
WH-PACT or designated WH provider shall meet or exceed 88%.
Contractor’s percent of women assigned to WH-
PACT or designated WH provider shall meet or exceed 88%.
progress quarterly using data from the
PACT
Compass. COR will send reports to the contractor and
CO quarterly to notify them of
Ratio of Non- Traditional Encounters
This is the sum of all PC Telephone encounters added to the sum of all PC Group Encounters (including Shared
Medical Appointments for Primary Care and Shared Medical
Appointments for Primary Care- Mental Health
Integration) added to the sum of all Virtual Video
Connect encounters
15.5.19 Contractor shall
provide telephone encounters, group encounters, and secure messaging.
Contractor shall exceed 53% ratio of non-traditional encounters.
Contractor shall exceed 53% ratio of non-traditional encounters.
progress quarterly using data from the
PACT
Compass. COR will send reports to the contractor and
CO quarterly to notify them of added to the sum of all incoming and outgoing secure messages as the numerator.
The denominator is the total number of team assignments for the reporting period.
information)
DOMAIN: VETERAN SATISFACTION
Veteran Satisfaction
Overall rating of
Primary Care Provider on question 32 of the
SHEP/PCMH
survey information)
15.5.20 The contractor’s
PCPs shall provide care that patients rate as a 9 or 10 on question
32 of the
SHEP/PCMH
survey.
Contractor’s SHEP question 32 score shall meet or exceed 73%.
Contractor’s SHEP question 32 score shall meet or exceed 73%.
progress quarterly using data from
SHEP/PCMH
report. COR will send reports to the contractor and
CO quarterly to notify them of
DOMAIN: COORDINATION OF CARE
Post Discharge Contact by PACT
Teamlet
The percent of assigned primary care patients discharged from any
VA facility who have been contacted by PACT teamlet within two business days.
information)
15.5.21 The contractor’s
PACT teamlets shall contact their assigned patients within 2 business days of discharge from any VA facility.
Contractor’s rate of post discharge contact by
PACT teamlet shall meet or exceed 61%.
Contractor’s rate of post discharge contact by PACT teamlet shall meet or exceed 61%.
progress quarterly using data from the
PACT
Compass. COR will send reports to the contractor and
CO quarterly to notify them of
DOMAIN: ENVIRONMENT OF CARE
7. CPARS RATINGS ASSIGNED TO QASP ITEMS:
Percentage of Deficiencies
Identified During EOC Rounds that are Closed Timely
(e5eoc1)
Percentage of deficiencies identified during EOC rounds that are closed within 14-business days or have a documented Plan for Action
(PFA)
(See Performance Measure Report for more information)
15.5.22 Contractor shall
address deficiencies identified in EOC rounds within 14 business days or have a documented PFA.
Contractor’s rate of EOC deficiencies that are closed within 14 business days or have a PFA shall meet or exceed 93%.
Contractor’s rate of EOC deficiencies that are closed within 14 business days or have a PFA exceed 93%.
progress quarterly using data from the Performance
Measure Report. COR will send reports to the contractor and
CO quarterly to notify them of
DOMAIN: PHARMACY
Medication Storage Area Inspections
15.5.24 Contractor shall
inspect medication storage areas monthly.
The contractor shall ensure that 100% of medication storage areas are inspected monthly and documented on VA Form 10- 0053 (or VA parent facility form).
Inspection documentation will be sent to the COR within 10 calendar days of the end of each month.
Any issues discovered shall be resolved by the contractor and reported to the COR within
15 calendar days of the inspection date.
The contractor shall ensure that
99% of medication storage areas are inspected monthly and documented on VA Form 10-
0053 (or VA parent facility form). Inspection documentation will be sent to the COR within 10 calendar days of the end of each month. Any issues discovered are resolved by the contractor and reported to the COR within 15 calendar days of the inspection date.
COR will monitor performance via receipt of VA Form 10-0053 (or VA parent facility form) and documented resolution of any issues discovered during inspections.
COR will send reports to the contractor and
CO quarterly to notify them of
Measures and methods are designed to determine rating for a given standard and AQL.
The following ratings shall be used (Reference: CPARS User Manual: https://www.cpars.gov/documents/CPARS- Guidance.pdf.
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the Government. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the Government. Also, there should have been NO significant weaknesses identified.
SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY:
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., Management, Quality, Safety or Environmental Deficiency Reports, or letters).
8. DOCUMENTING PERFORMANCE
The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using Contractor Performance Assessment Reporting System (CPARS).
If contractor performance does not meet the AQL, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines, formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor must present this corrective action plan to the CO.
The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the contractor’s corrective action plan.
Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
See sample on following page.
9. FREQUENCY OF MEASUREMENT
The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
10. FREQUENCY OF PERFORMANCE REPORTING
The COR shall communicate with the contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review contractor performance.
11. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
Teri Stewart, Chief of Outpatient Services and COR
COR NAME/TITLE
SIGNED:
CONTRACTOR NAME/TITLE
CONTRACT REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CR PREPARED
b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION.
13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER