This is a Quality Assurance Surveillance Plan (QASP) for Integrated Pest Management Services contract 36C256Q0152 at the G.V. Sonny Montgomery VA Medical Center in Jackson, MS. The QASP outlines how contractor performance will be monitored and evaluated, with Troy Davis serving as the Contracting Officer and Joe E. Yawn as the COR.
The plan establishes performance monitoring methods including direct observation (100% surveillance), periodic inspections, random sampling, and contractor documentation verification. Performance ratings range from Exceptional to Unsatisfactory, with specific metrics focused on Employment Eligibility Verification (E-Verify) compliance and Service Contract Reporting. The contract is being issued as an SDVOSB set-aside under NAICS code 561710 with a size standard of $17.5 million. Quotes are due by December 23, 2024 at 14:00 CST, with questions due by December 19, 2024 at 10:00 CST. The government anticipates making a firm-fixed price requirements contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25625Q0152.docx | DOCX document | |
| 36C25625Q0152_2.docx | DOCX document | |
| Final Invoice Memo.pdf | ||
| D.2 SAM.gov User Guide.pdf | ||
| WAGE DETERMINATION.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
Integrated Pest Management Services 36C256Q0152
The contractor shall be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Troy Davis Organization or Agency: Department of Veterans Affairs
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Joe E Yawn
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary:
Alternate:
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of contractor performance to these standards.
If any portion of the requirement is not met and/or the acceptable quality level in any of the elements in this section/subsection are not maintained, the contractor will be notified by the contracting officer for response outlining the contractor’s proposed remedy. The Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming services per FAR 52.212-4.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
DIRECT OBSERVATION. 100% surveillance: COR will observe day to day operations and activities to ensure compliance and contract performance.
PERIODIC INSPECTION. Inspections scheduled or ad hoc and reported as needed or directed per COR. Inspections of work performance and required documentation to remain in compliance with policies and regulations.
RANDOM SAMPLING. Quality and contract performance oversight by the COR to conduct on the spot compliance that applies to all contractor employees that are required to perform duties and provide documentation to the COR and other Federal Agencies as required by the Statement of Work.
VERIFICATION AND/OR DOCUMENTATION PROVIDED BY CONTRACTOR. Applies to all contractor employees that are required to provide documentation to the COR as required by the Statement of Work.
6. Measures
| METRIC |
| PWS Para |
| Performance Requirement |
| Standard |
| Acceptable Quality Level |
(tailor to meet your requirements) Method of Surveillance and frequency Met AQL/Did Not Meet AQL (Add comment)
REQUIRED REPORTING
| Employment Eligibility Verification (E-Verify) |
| PWS para. 4.14.5 |
| Contractor shall be enrolled and maintain compliance with the E-Verify program. |
| 100% Compliance |
| 100% Compliance, no deviations |
| Random |
| Service Contract Reporting |
| PWS para. 4.14.6 |
| Contractor shall report contract activity annually as prescribed. |
| 100% Compliance |
| 100% Compliance, no deviations |
| Annually |
7. Ratings:
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used:
| EXCEPTIONAL: |
| Performance meets contractual requirements and exceeds many to the |
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
| VERY GOOD: |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
| SATISFACTORY: |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
| MARGINAL: | |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. | |
| Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the | contractual deficiency (e.g., Management, Quality, Safety or Environmental Deficiency Report or letter). |
| UNSATISFACTORY: | |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. | |
| Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or | Environmental Deficiency Reports, or letters). |
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines, formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor must present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Reporting.
The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.
10. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
Joe Yawn, COR DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE