This document is an Architectural Demolition Plan for a project at Fort Leavenworth, prepared by the Department of Public Works (DPW), with a project number of 300000241811 and an issue date of 25 July 2025. The detailed demolition plan provides comprehensive key notes for systematic removal of various architectural elements across multiple rooms, including toilets, urinals, lavatories, wall tiles, floor tiles, partitions, drinking fountains, and CMU (concrete masonry unit) walls. Specific demolition tasks include removing floor tiles in the lobby and men's room, ceramic wall tiles, restroom fixtures, trophy cases, and relocating existing plumbing. The plan emphasizes careful verification of structural implications before wall removals, with notes to ensure that load-bearing walls are properly addressed and new door frames and lintels are appropriately installed. The highlighted areas on the floor plan indicate zones for flooring removal and areas where specific demolition activities are to be conducted, focusing on transforming existing locker rooms, restrooms, and adjacent spaces into new storage and communication rooms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Storage, Area not in contract
Storage, Area not in contract
Women's Pool Locker Room not in contract
Men's Pool Locker Room not in contract
Admin. Office not in contractMen's Sauna not in contract
Men's Locker Room not in contract
Men's Locker Room not in contract
Stair not in contract
Storage, Area not in contract
Remove floor tile and 2" to 3" +/- thick "mud" cap on concrete floor in locker room to be new Storage and Comm. Rooms.
Re: Construction Plan.
D-13Existing lockers and attached bench to west of new wall to remain.
Re: Construction Floor PLan.
Re: Construction Floor plan for new closer pieces/trim to existing lockers and seat trim Contractor to be careful so as not to damage extra floor tile in existing locker room to remain
These portions of Women's Locker Room not in contract
Remove all finishes throughout Area of Work including but not limited to quarry tile with "mud "cap" setting bed, VCT, ceilings, etc.
Set Steel lintel in place before removal of masonry, Re: Structural
Structural Note: Shore-up, remove and replace structural masonry wall for door and frame installation with overhead matching masonry lintel. Tooth-in masonry at door jambs to match existing adjacent construction at door frames. Re: Construction Plan.
Re: Structural Drawings.
Structural Note: Remove concrete to make space for new windows. Re: Construction Plan.
Re: Structural Notes.
Remove 6" CMU wall 8" past new corners Re: Construction Plan for toothing in new bull-nosed half lap CMU outside corners to match existing nearby detail.
3'
- 8
8'
- 9
3'
- 8
3'
- 4
D-01
D-02
D-03
D-11
4' - 0" 3' - 4"
D-05
Structural wall to remain. DO
NOT REMOVE
Structural wall to remain.
DO NOT REMOVE
D-11
4'
- 0
7'
- 3
Structural Note: Remove concrete to make space for new window. Re: Construction Plan.
Re: Structural Notes.
D-04
D-11
D-21
D-21
D-21
D-06
D-06
D-21Existing doors and walls to remain unless noted otherwise
D-21
D-21D-21 Existing doors and walls to remain unless noted otherwise. Paint Mens alcove three walls P-6, except not 8" by corners
Existing doors and walls to remain unless noted otherwise Existing walls and doors to remain, unless noted otherwise
Existing walls to remain, unless noted otherwise
Existing walls to remain, unless noted otherwise
D-22
D-07
D-07
D-07
D-08
D-08
D-08
D-09
D-10
Paint Women's alcove three walls P-6, except not 8" by outside corners.
Verify all with COR
DEMOLITION PLAN - KEY NOTES
D-01 Remove toilets (Re: Plumbing) along with all related toilet partitions and related piping, toilet paper dispensers, etc.
D-02 Remove urinals (Re: Plumbing) along with all related toilet partitions and related piping.
D-03 Remove lavatories and related counter, faucets. Re: Plumbing.
D-04 Remove Trophy case and related CMU walls.
D-05 RE: STRUCTURAL DRAWINGS. Once lintel is in place, Remove Load- Bearing CMU wall.
D-06 Remove existing drinking fountain. Re: PLumbing.
D-07 Remove all 6" quarry floor tile in Lobby and 2" ceramic floor tile in Men's Room to be removed, along with all related 2" +/- setting mortar (Mud) bed throughout.
D-08 Remove all quarry wall tile, including wall base, in Lobby and 2" ceramic wall tile, including wall base, in Men's Room throught each.
D-09 Remove existing janitor's floor sink. Re: Plumbing.
D-10 Relocate existing plumbing behind CMU wall to be removed. Re: Plumbing D-11 Remove CMU wall, doors, frames and related finishes up to structural deck above. Verify wall is not a structural wall and is not supporting any other elements prior to removal. Re: Construction Plan. Re: Electrical.
D-21 Remove existing door, frame and all related hardware.
D-22 Remove restroom partitions at toilets and urinals, typical throughout room.
D-31 Remove 2x2 ceramic floor tiles, wall tiles and coved wall base tiles, including horizontal and vertical setting beds throughout room (Re: note on removal of "mud" mortar base below tile). Make smooth and prepare for new work. Re: Construction Plan and Finish Schedule.
D-32 Remove VCT flooring and related rubber base throughout space, including any transitions strips.
D-33 D-34 Remove orange-red quarry tile flooring and base where required for new walls for expanded Office. Salvage quarry tile to patch in where corriodor double door frame and jambs/wall removed.
D-35 Remove door threshold and related appurtenances.
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R A
TE
O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
A N
C H
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
M ar qu ar dt
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
C on str uc tio n D ra wi ng s
M cC
LE
LL
A N
A
VE
FO
R T
LE
A
VE
N
W O
R
TH
, K S
7-
A1
D em ol iti on
Fl oo r P la n
N ot es
H ar ne y
Sp or ts C om pl ex
Fo ut h
St re et Fo rt Le av en w or th , K an sa s
C O
M M
O N
A R
EA
S
D es ig ne r
Au th or
C he ck er
J ul y
3/16" = 1'-0"
A1 Floor 1 - Demolition - Architectural
DEMOLITION - General Notes:
1. Contractor to remove all 1 ½” to 2” (verify) thickset mortar bed throughout work area (approximately 3,000 SF), mostly under quarry and ceramic tile.
2. Carefully remove all toilet paper, paper towel and soap dispensors prior to work. Store a secure location for re-installation at end of project.
3. Replace floor drains and clean-outs, typical, unless noted otherwise.
Re: Plumbing.
Not to Scale Architectural Demolition - Key Notes
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
C4 jane.taylor Highlight D-07 jane.taylor Highlight D-07 jane.taylor Highlight D-07 jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Typewritten Text D-7 Flooring to be demo'ed jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Highlight jane.taylor Typewritten Text Advise on flooring type to be demo'ed