Attachment_2_-_Schedule_of_Materials.pdf
PDF 150 KB Posted
- Solicitation number
- CZQZ-16-0003
About this file
Schedule of Materials Submittal Demo 1801
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawing_1-B.pdf | ||
| 1801_Utility_Map.pdf | ||
| Contractor_Questions.docx | DOCX document | |
| B1801_Asbestos_data.pdf | ||
| VisualAid.jpg | JPG image | |
| B1801_HARDWARE.pdf | ||
| FA485518R008001.pdf | ||
| Drawing_1-A.pdf | ||
| Attachment_4_-_Base_Pass_Request.pdf | ||
| FA4855-18-R-0008_Solicitation_(Amend_1).pdf | ||
| FA4855-18-R-0008_Solicitation.pdf | ||
| Attachment_3_-_Specifications.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Draft_SOW_1801_Deconstruct.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
L
I
N
E
N
U
M
B
E
R
ITEM, DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE
OF SUBMITTAL
C E
R T
IF
O
F C
O M
P L
IA
N
C E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S C
O L
O R
S E
L E
C T
T E
S T
R E
S U
L T
S
M A
N F
'R R
E C
O M
M E
N D
A T
IO
N
S
M A
N F
'R W
A R
R A
N T
Y
L
IC
E N
S E
D A
P P
L
IC
A T
O R
M A
N U
F 'S
T E
C H
N
IC
A L
D A
T A
IN
S
P E
C T
O R
S F
IL
E
S O
N L
Y
O T
H E
R
R E
Q U
IR
D
S U
B M
IS
S
IO
N
D A
T E
D A
T E
R E
C E
IV
IN
C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
C O
N T
R A
C T
O R
N O
T
IF
IE
A p p ro v a l D a te
C O
N T
R A
C T
O R
N O
T
IF
IE
D
D is
A p p ro v a l D a te
C O
N T
R A
C T
O R
R
-S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
R E
M A
R K
S
AF Form 103 - Work Clearance Request &
Temporary Construction Waiver 4 10 days prior to NTP
2 Project Schedule - AF3064 3 7 days after NTP
3 Meeting Minutes from Kick-Off Meeting 3 10 days after NTP
4 Site Survey Analysis Meeting Minutes 3 30 days after NTP
Government/Shop SME/Data Gathering
Meeting Minutes 3 NLT 3 days after event
5 01 01 00 Utility Outage Request 4
10 working days in advance when outage is needed
6 01 01 00 1.1 Welding Permits 4 10 days prior to planned welding operations
7 01 33 00 Certificates of Insurance 4 Pre demolition meeting
8 01 33 00 Surety Bonds 4 Pre demoliton meeting
9 01 33 00 List of Proposed Subcontractors 4 Pre demolition meeting
10 01 33 00 Submittal Register 4 Pre demolition meeting
11 01 33 00 Health and Safety Plan 4 Pre demolion meeting
12 01 33 00 Work Plan 4 Pre demoliton meeting
13 01 33 00 CQC Daily Plan 4 Pre demoliton meeting
14 01 33 00Environmental Protection Plan 4 Pre demoliton meeting
15 01 74 19 Waste Management Plan 4
15 Calendar days after contract award; NLT 10 days before pre demoliton meeting
16 01 01 00 Accident Prevention Plan (APP) 4
15 Calendar days prior to preconstruction conference
17 01 01 00 Activity Hazard Analysis (AHA) 4 15 Calendar days prior to each phase
18 01 01 00 Lift Plan 4 15 Calendar days prior to on site work
01 01 00 Proof of Qualifications of Crane
Lift Operators
15 Calendar days prior to on site work
20 02 41 00 Existing Conditions 4 10 days before demoliton meeting
21 02 41 00 Demolion Plan 4 10 days before Demoliton meeting
02 41 00 Notificaton of Demolition and
Renovation forms
10 days prior to commencement of work
02 82 13.00 10 Asbsestos Waste Shipment
Records
15 Calendar days prior to preconstruction conference
02 82 13.00 10Weight Bills and Delivery
Tickets
15 Calendar days prior to preconstruction conference
02 82 13.00 10Respiratory Protection
Program
15 Calendar days prior to preconstruction conference
28 02 82 13.00 10Clean up and Disposal 4
15 Calendar days prior to preconstruction conference
30 02 82 13.00 10Training Program 4
15 Calendar days prior to preconstruction conference
02 82 13.00 10 Licesnse, Permits, &
Notifications
15 Calendar days prior to preconstruction conference
32 02 82 13.00 10Asbestos Management Plan 4
15 Calendar days prior to preconstruction conference
02 82 13.00 10Exposure Assesments & Air
Monitoring System
15 Calendar days prior to preconstruction conference
02 82 13.00 10Local Exhaust System
Encapsulants
15 Calendar days prior to preconstruction conference
02 82 13.00 10Medical Surveillance
Requirements
15 Calendar days prior to preconstruction conference
36 31 00 00 Test Results for Borrow Material 4 One Week prior to bringing borrow material on base
37 32 92 19 State Certificate for Grass Seed 4 10 days prior to placing seed
38 32 92 19 Seed Mixture 4 10 days prior to placing seed
39 Accident Notification 4 As Incident Occurs
40 Accident Report 4 As Incident Occurs
41 Interim DD form 1354 4 30 days prior to turnover
NUMBER OF COPIES REQUIRED
AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALS
PROJECT # PROJECT TITLE SOLICITATION/CONTRACT NO.
CZQZ16-0003
Demo B1801 Caprock
Inn Office
TO BE COMPLETED BY PROJECT ENGINEER
File details come from the government source that posted it.