Cypress Hills National Cemetery FY26 Grounds Maintenance Price Schedule.docx

DOCX document 32 KB Posted

Attached to
The Cypress Hill National Cemetery is in need of Grounds Maintenance Services for a period of a Base plus Four (4) option years. The POP: 4/5/2026 through 4/4/2027. -- S208
Solicitation number
QSE--36C78626Q50022
Issued by

About this file

This is a Price Schedule for grounds maintenance services at Cypress Hills National Cemetery in Brooklyn, New York, and adjacent Union & Mount of Victory plots within the private Cypress Hills Cemetery. The contract requires a mandatory site visit coordinated with the Long Island National Cemetery Director at (631) 454-4949 or Jefferey.Tavares@va.gov, with appointments scheduled during the second week of the solicitation period. The period of performance runs from the date of award through one year, with four one-year renewal options, with a base year commencing 4/5/2026 through 4/4/2027.

The scope encompasses nine primary service line items: (1) mowing 18 acres of turf including debris removal and cleaning of sidewalks, driveways, and parking areas (33 jobs annually); (2) trimming approximately 18,590 headstones concurrent with mowing (33 jobs); (3) edging curbs and walkways biweekly (16 jobs); (4) cleaning all headstones before Memorial Day using D2 biological solution (18,590 units); (5) fall leaf cleanup commencing October 15 through December 30 and March 15 cleanup (12 jobs); (6) repairing sunken graves with backfill, tamping, and topsoil (100 units); (7) tree pruning, trimming, and removal with debris removal and stump grinding (200 hours); (8) snow removal from roads, sidewalks, steps, and building entrances with calcium chloride and rock salt application (10 jobs); and (9) raising and lowering the United States flag as needed per presidential proclamation or state governor direction (12 jobs). The price schedule requires unit pricing for all line items across the base year and four option years. The government reserves the right to adjust quantities based on extreme weather conditions without providing equitable price adjustments. Applicable wage determination is 2015-4187, Revision 34, dated 12-03-2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLIES OR SERVICES AND PRICES / COSTS

PRICE SCHEDULE: The Contractor shall furnish all labor, supervision, equipment, materials and supplies necessary to provide grounds maintenance services at the Cypress Hills National Cemetery, located at 625 Jamaica Ave. Brooklyn, NY and the Union & Mount of Victory plots within the Cypress Hills Cemetery which is a private cemetery located next to Cypress Hills National Cemetery.

SITE VISIT: ALL INTERESTED OFFERORS MUST CONTACT Long Island National Cemetery Director at (631) 454-4949 or via email at Jefferey.Tavares@va.gov at the Long Island National Cemetery to set up a site visit appointment. Site visits will be scheduled during the second week of the solicitation period. An appointment must be made in advance prior to visit. No exceptions.

All services described in the Work Statement, including technical specifications, schedules, addenda, clauses, terms and conditions of the contract shall form the complete scope of work. The period of performance is from date of award through one year with four (4) one (1) year renewal options.

ESTIMATED QUANTITIES: The quantities indicated in the Price Schedule are estimated and not purchased by this contract. Should extreme weather conditions (extreme dry period / drought, or excessive rainfall) result in excessive or minimal turf growth, the Government reserves the right to increase or decrease the quantity of mowing and trimmings required by this contract. Changes in quantity shall not constitute an equitable price adjustment.

CYPRESS HILLS NATIONAL CEMETERY and UNION & MOUNT OF VICTORY PLOTS BASE YEAR: From Date of Award through One Year

CLIN
Description
Est. Qty
Unit
Unit Cost
Total Cost
0001
Mow 18 acres of turf to include collection & removal of leaves, debris / trash and cleaning of sidewalks, driveways & parking areas.
33
Job
$ __________
$ _____________
0002
Trim approximately 18,590 Headstones (in conjunction with every mowing)
33
Job
$ __________
$ _____________
0003
Edge curbs & walkways (every other week)
16
Job
$ __________
$ _____________
0004
Clean all headstones (18,590) before Memorial Day using D2 biological solution headstone cleaner
18,590
Ea.
$ __________
$ _____________
0005
Fall Leaf Cleanup: Cleanup and removal of leaves, leaf debris & branches. This leaf cleanup will commence October 15th and occur weekly through December 30th (weather permitting) with all leaves being removed from the cemetery. One additional weekly cleanup will commence March 15th and be completed before the start of the mowing season.
12
Job
$ __________
$ _____________
0006
Repair Sunken Graves: Sunken graves will be filled with approved select backfill and tamped with a power / pneumatic tamper within 2” of established grade of the surrounding gravesites. The tamping process will occur both before and after the topsoil is added. Clean topsoil will be added to bring the gravesite to established grade. Sufficient excess soil shall also be provided to account for forced settling and compacting of the filled gravesites. Sunken graves to be repaired will be identified by the COR
100
Ea.
$ __________
$ _____________
0007
Tree Pruning / Trimming / Removal: Pruning of trees identified by the COR with all debris being chipped or removed from cemetery premises by the Contractor. Removal of trees identified by the COR will include grinding of stump, removal of grindings, backfilling stump cavity with clean topsoil, tamping and seeding.
200
Hrs.
$ __________
$ _____________
0008
Snow Removal of Roads, Sidewalks, Steps, Building Entrances & Walkways: Snow removal from all roads, steps, sidewalks (including sidewalk along the entire front of the cemetery that borders Jamaica Avenue), including areas around the cemetery lodge. Removal process will include the application of calcium chloride to all sidewalks and steps and rock salt on all asphalt roads which will be provided by the cemetery. (Material will be provided by the cemetery)
10
Job
$ __________
$ _____________
0009
Raising & Lowering of United States Flag (On An As Needed Basis) : Upon Presidential proclamation or by direction of the New York State Governor for any specific occasion or occurrence calling for the flag to be lowered at half-staff, the Contractor will lower the flag for the specified time determined and then raise it to full staff upon completion of the designated time.
12
Job
$ __________
$ _____________
Total Estimated Cost:
$ ____________

OPTION YEAR I: FROM DATE OF AWARD THROUGH ONE YEAR

CLIN
Description
Est. Qty
Unit
Unit Cost
Total Cost
1001
Mow 18 acres of turf to include collection & removal of leaves, debris / trash and cleaning of sidewalks, driveways & parking areas.
33
Job
$ __________
$ _____________
1002
Trim approximately 18,590 Headstones (in conjunction with every mowing)
33
Job
$ __________
$ _____________
1003
Edge curbs & walkways (every other week)
16
Job
$ __________
$ _____________
1004
Clean all headstones (18,590) before Memorial Day using D2 biological solution headstone cleaner
18,590
Ea.
$ __________
$ _____________
1005
Fall Leaf Cleanup: Cleanup and removal of leaves, leaf debris & branches. This leaf cleanup will commence October 15th and occur weekly through December 30th (weather permitting) with all leaves being removed from the cemetery. One additional weekly cleanup will commence March 15th and be completed before the start of the mowing season.
12
Job
$ __________
$ _____________
1006
Repair Sunken Graves: Sunken graves will be filled with approved select backfill and tamped with a power / pneumatic tamper within 2” of established grade of the surrounding gravesites. The tamping process will occur both before and after the topsoil is added. Clean topsoil will be added to bring the gravesite to established grade. Sufficient excess soil shall also be provided to account for forced settling and compacting of the filled gravesites. Sunken graves to be repaired will be identified by the COR
100
Ea.
$ __________
$ _____________
1007
Tree Pruning / Trimming / Removal: Pruning of trees identified by the COR with all debris being chipped or removed from cemetery premises by the Contractor. Removal of trees identified by the COR will include grinding of stump, removal of grindings, backfilling stump cavity with clean topsoil, tamping and seeding.
200
Hrs.
$ __________
$ _____________
1008
Snow Removal of Roads, Sidewalks, Steps, Building Entrances & Walkways: Snow removal from all roads, steps, sidewalks (including sidewalk along the entire front of the cemetery that borders Jamaica Avenue), including areas around the cemetery lodge. Removal process will include the application of calcium chloride to all sidewalks and steps and rock salt on all asphalt roads which will be provided by the cemetery. (Material will be provided by the cemetery)
10
Job
$ __________
$ _____________
1009
Raising & Lowering of United States Flag (On An As Needed Basis) : Upon Presidential proclamation or by direction of the New York State Governor for any specific occasion or occurrence calling for the flag to be lowered at half-staff, the Contractor will lower the flag for the specified time determined and then raise it to full staff upon completion of the designated time.
12
Job
$ __________
$ _____________
Total Estimated Cost:
$ ____________

OPTION YEAR II: FROM DATE OF AWARD THROUGH ONE YEAR

CLIN
Description
Est. Qty
Unit
Unit Cost
Total Cost
2001
Mow 18 acres of turf to include collection & removal of leaves, debris / trash and cleaning of sidewalks, driveways & parking areas.
33
Job
$ __________
$ _____________
2002
Trim approximately 18,590 Headstones (in conjunction with every mowing)
33
Job
$ __________
$ _____________
2003
Edge curbs & walkways (every other week)
16
Job
$ __________
$ _____________
2004
Clean all headstones (18,590) before Memorial Day using D2 biological solution headstone cleaner
18,590
Ea.
$ __________
$ _____________
2005
Fall Leaf Cleanup: Cleanup and removal of leaves, leaf debris & branches. This leaf cleanup will commence October 15th and occur weekly through December 30th (weather permitting) with all leaves being removed from the cemetery. One additional weekly cleanup will commence March 15th and be completed before the start of the mowing season.
12
Job
$ __________
$ _____________
2006
Repair Sunken Graves: Sunken graves will be filled with approved select backfill and tamped with a power / pneumatic tamper within 2” of established grade of the surrounding gravesites. The tamping process will occur both before and after the topsoil is added. Clean topsoil will be added to bring the gravesite to established grade. Sufficient excess soil shall also be provided to account for forced settling and compacting of the filled gravesites. Sunken graves to be repaired will be identified by the COR
100
Ea.
$ __________
$ _____________
2007
Tree Pruning / Trimming / Removal: Pruning of trees identified by the COR with all debris being chipped or removed from cemetery premises by the Contractor. Removal of trees identified by the COR will include grinding of stump, removal of grindings, backfilling stump cavity with clean topsoil, tamping and seeding.
200
Hrs.
$ __________
$ _____________
2008
Snow Removal of Roads, Sidewalks, Steps, Building Entrances & Walkways: Snow removal from all roads, steps, sidewalks (including sidewalk along the entire front of the cemetery that borders Jamaica Avenue), including areas around the cemetery lodge. Removal process will include the application of calcium chloride to all sidewalks and steps and rock salt on all asphalt roads which will be provided by the cemetery. (Material will be provided by the cemetery)
10
Job
$ __________
$ _____________
2009
Raising & Lowering of United States Flag (On An As Needed Basis) : Upon Presidential proclamation or by direction of the New York State Governor for any specific occasion or occurrence calling for the flag to be lowered at half-staff, the Contractor will lower the flag for the specified time determined and then raise it to full staff upon completion of the designated time.
12
Job
$ __________
$ _____________
Total Estimated Cost:
$ ____________

OPTION YEAR III: FROM DATE OF AWARD THROUGH ONE YEAR

CLIN
Description
Est. Qty
Unit
Unit Cost
Total Cost
3001
Mow 18 acres of turf to include collection & removal of leaves, debris / trash and cleaning of sidewalks, driveways & parking areas.
33
Job
$ __________
$ _____________
3002
Trim approximately 18,590 Headstones (in conjunction with every mowing)
33
Job
$ __________
$ _____________
3003
Edge curbs & walkways (every other week)
16
Job
$ __________
$ _____________
3004
Clean all headstones (18,590) before Memorial Day using D2 biological solution headstone cleaner
18,590
Ea.
$ __________
$ _____________
3005
Fall Leaf Cleanup: Cleanup and removal of leaves, leaf debris & branches. This leaf cleanup will commence October 15th and occur weekly through December 30th (weather permitting) with all leaves being removed from the cemetery. One additional weekly cleanup will commence March 15th and be completed before the start of the mowing season.
12
Job
$ __________
$ _____________
3006
Repair Sunken Graves: Sunken graves will be filled with approved select backfill and tamped with a power / pneumatic tamper within 2” of established grade of the surrounding gravesites. The tamping process will occur both before and after the topsoil is added. Clean topsoil will be added to bring the gravesite to established grade. Sufficient excess soil shall also be provided to account for forced settling and compacting of the filled gravesites. Sunken graves to be repaired will be identified by the COR
100
Ea.
$ __________
$ _____________
3007
Tree Pruning / Trimming / Removal: Pruning of trees identified by the COR with all debris being chipped or removed from cemetery premises by the Contractor. Removal of trees identified by the COR will include grinding of stump, removal of grindings, backfilling stump cavity with clean topsoil, tamping and seeding.
200
Hrs.
$ __________
$ _____________
3008
Snow Removal of Roads, Sidewalks, Steps, Building Entrances & Walkways: Snow removal from all roads, steps, sidewalks (including sidewalk along the entire front of the cemetery that borders Jamaica Avenue), including areas around the cemetery lodge. Removal process will include the application of calcium chloride to all sidewalks and steps and rock salt on all asphalt roads which will be provided by the cemetery. (Material will be provided by the cemetery)
10
Job
$ __________
$ _____________
3009
Raising & Lowering of United States Flag (On An As Needed Basis) : Upon Presidential proclamation or by direction of the New York State Governor for any specific occasion or occurrence calling for the flag to be lowered at half-staff, the Contractor will lower the flag for the specified time determined and then raise it to full staff upon completion of the designated time.
12
Job
$ __________
$ _____________
Total Estimated Cost:
$ ____________

OPTION YEAR IV: FROM DATE OF AWARD THROUGH ONE YEAR

CLIN
Description
Est. Qty
Unit
Unit Cost
Total Cost
4001
Mow 18 acres of turf to include collection & removal of leaves, debris / trash and cleaning of sidewalks, driveways & parking areas.
33
Job
$ __________
$ _____________
4002
Trim approximately 18,590 Headstones (in conjunction with every mowing)
33
Job
$ __________
$ _____________
4003
Edge curbs & walkways (every other week)
16
Job
$ __________
$ _____________
4004
Clean all headstones (18,590) before Memorial Day using D2 biological solution headstone cleaner
18,590
Ea.
$ __________
$ _____________
4005
Fall Leaf Cleanup: Cleanup and removal of leaves, leaf debris & branches. This leaf cleanup will commence October 15th and occur weekly through December 30th (weather permitting) with all leaves being removed from the cemetery. One additional weekly cleanup will commence March 15th and be completed before the start of the mowing season.
12
Job
$ __________
$ _____________
4006
Repair Sunken Graves: Sunken graves will be filled with approved select backfill and tamped with a power / pneumatic tamper within 2” of established grade of the surrounding gravesites. The tamping process will occur both before and after the topsoil is added. Clean topsoil will be added to bring the gravesite to established grade. Sufficient excess soil shall also be provided to account for forced settling and compacting of the filled gravesites. Sunken graves to be repaired will be identified by the COR
100
Ea.
$ __________
$ _____________
4007
Tree Pruning / Trimming / Removal: Pruning of trees identified by the COR with all debris being chipped or removed from cemetery premises by the Contractor. Removal of trees identified by the COR will include grinding of stump, removal of grindings, backfilling stump cavity with clean topsoil, tamping and seeding.
200
Hrs.
$ __________
$ _____________
4008
Snow Removal of Roads, Sidewalks, Steps, Building Entrances & Walkways: Snow removal from all roads, steps, sidewalks (including sidewalk along the entire front of the cemetery that borders Jamaica Avenue), including areas around the cemetery lodge. Removal process will include the application of calcium chloride to all sidewalks and steps and rock salt on all asphalt roads which will be provided by the cemetery. (Material will be provided by the cemetery)
10
Job
$ __________
$ _____________
4009
Raising & Lowering of United States Flag (On An As Needed Basis): Upon Presidential proclamation or by direction of the New York State Governor for any specific occasion or occurrence calling for the flag to be lowered at half-staff, the Contractor will lower the flag for the specified time determined and then raise it to full staff upon completion of the designated time.
12
Job
$ __________
$ _____________
Total Estimated Cost:
$ ____________

SUMMARY GRAND TOTAL COST (BASE + OPTION YEARS): $ ________________________

File details come from the government source that posted it. Updated .