This is a Project Scope document prepared by the City of Daytona Beach, Florida, IT Department for the installation of exterior camera infrastructure at Cypress Aquatic Park. The project requires the winning contractor to install six camera poles with associated electrical and fiber-optic connectivity systems. The scope of work includes pole installation with proper structural stability and 160 mph wind rating, mounting of camera systems and equipment enclosures at each location, installation of 120V power outlets with indicator LEDs inside each enclosure, and routing of fiber-optic cabling to all pole locations. Additionally, the contractor must install two underground conduits at each of the six poles—one for fiber-optic cabling and one for 120V power—with pull strings left in place for future cable installation. The project is considered complete upon full installation and operational status of all six poles, cameras, enclosures, fiber connectivity, electrical service, media converters, and cameras with proper licensing and verified streaming capabilities. The document references a related solicitation titled "2652ITB - Midtown Cypress Park Exterior Cameras" which indicates online bid submission through the City's procurement platform at https://procurement.opengov.com/portal/codb, with a non-mandatory pre-bid conference to be held via Microsoft Teams.
The file does not contain specific pricing information, contract award dates, timeline deadlines, or funding source details. The document includes reference information for the City of Daytona Beach IT Department (phone: 386-671-7900) and notes a revision by Hossam Reziqa, CIO. The project summary includes an AutoCAD drawing with a notation of "Feb 2026" and a scale of 1" = 40', suggesting the project timeline or design date. Bidders are directed to participate through the City's online procurement platform to access complete specifications, ask questions, receive addenda, and submit offers, with participation recommended as soon as possible to remain informed of all announcements and revisions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S T
H S E E
E H E T of
S
Phone: (386) 671-7900 301 S. Ridgewood Ave. Daytona Beach, Florida 32114
Name Revision: Date:
Hossam Reziqa CIO
1AOR
NCI
POR
ET D JU
8 76
Y 1L
D
TY OIC
TH
E
F NA BEACH
OTAY
Installation of Six (6) Camera Poles with Electrical and Fiber Connectivity
1.
This Scope of Work outlines the installation of six (6) new camera poles, associated equipment, electrical service, and fiber‑optic connectivity Work to Be Performed by Winning Contractor
1.1 Pole Installation
Contractor will install six (6) poles in the designated field locations as identified by the customer. Work includes:
• Setting and securing each pole to proper depth and alignment
• Ensuring poles are level and structurally stable and posses proper wind rating 160mph
• Mounting camera systems and enclosures on each pole
1.2
At each pole, Contractor Will:
• Install one (1) camera at the top of the pole
• Mount the corresponding equipment enclosure
• Provide internal cable routing within the pole and enclosure
• Install a 120V outlet inside each enclosure to power the media converters and supporting devices with an indicator LED visible from the ground
1.3
Contractor will:
• Pull all provided fiber-optic cabling to each pole location
• Terminate fiber at each enclosure
• Install and configure media converters for network communication
• Ensure all devices talk back to the main network switch
1.4
Contractor will:
• Program and configure all cameras
• Apply and activate required licenses
• Verify successful network communication and camera functionality
• Perform testing to ensure proper video streaming and recording
2.
• Contractor will:
• Install two (2) underground conduits to each of the six poles o o One (1) conduit for fiber-optic cabling
• Ensure all conduit routes follow designated paths and depths
• Leave pull strings in each conduit for cable installation
3.
This project will be considered complete when:
• All six poles are fully installed and secured
• Cameras, enclosures, fiber, and electrical service are in place and operational
• Media converters are installed, powered, and communicating with the main switch
• Cameras are licensed, programmed, and streaming correctly
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Survey Date:
AutoCAD SHX Text
DWG:
AutoCAD SHX Text Rotation
AutoCAD SHX Text
AutoCAD SHX Text Design Date:
AutoCAD SHX Text File Name:
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text
IT DEPARTMENT
AutoCAD SHX Text
THE CITY OF DAYTONA BEACH
AutoCAD SHX Text Plot Date:
AutoCAD SHX Text Contract No.:
AutoCAD SHX Text Scale:(HOR.)
AutoCAD SHX Text Project No.:
AutoCAD SHX Text (Vert.)
AutoCAD SHX Text xxx
AutoCAD SHX Text xxx
AutoCAD SHX Text xxxxxx xxxx xxxx.dwg
AutoCAD SHX Text 0d
AutoCAD SHX Text xxxx
AutoCAD SHX Text xx/20xx
AutoCAD SHX Text 1" = 40'
AutoCAD SHX Text
NA
AutoCAD SHX Text
BH
AutoCAD SHX Text
BH
AutoCAD SHX Text Feb 2026
AutoCAD SHX Text
NA
AutoCAD SHX Text xx/20xx
AutoCAD SHX Text camera layout detail
AutoCAD SHX Text Cypress Aquatic Park
AutoCAD SHX Text Fiber Installation
AutoCAD SHX Text Project Scope Project Overview Camera & Enclosure Installation Fiber & Media Converter Setup Camera Programming & Licensing Conduit Installation One (1) conduit for 120V power Completion Criteria
AutoCAD SHX Text 02/23/2026
AutoCAD SHX Text Electrical Installation
| Sheets and Views |
| Cypress Aquatic Park Proposal Project Summary-Cover Sheet - 11X17 |
File details come from the government source that posted it. Updated .