Attmt 0002 - Solicitation Tables 07282022.pdf
PDF 169 KB Posted
- Solicitation number
- CybersecurityServices_Solicitation_W56KGY22R0016
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104
Attachment 0002 – Solicitation Tables
Table 1 - Proposal Submission Requirements:
Volume Document File Name* Notes I. Executive Summary
Executive Summary xxxxEXSUMxxxx.docx (or PDF) No page limit.
II. Technical Technical Proposal (see II.1, II.2, and II.3 below)
Not to exceed 19 pages, including all subfactors (as listed below)
NOTE: Cover page, Table of Contents, glossary, summary, and supporting resumes not included in page count
II.1 Technical
Technical Subfactor 1- Management Staffing Plan xxxxTECH1xxxx.docx (or
PDF)
10 page limit.
Resumes as supporting documents will each have a 2 page limit, but will not count against the overall 10 page limit.
II.2 Technical Technical Subfactor 2 xxxxTECH2xxxx.docx (or PDF) 6 page limit
II.3Technical Technical Subfactor 3 xxxxTECH3xxxx.docx (or PDF) 3 page limit
III. Past Performance
Past Performance xxxxPastPerfXXXX.doc x (or PDF)
Limit 5 references, 3 pages each.
NOTE: Cover page, Table of Contents, glossary, Letters of Consent, and summary not included in page count
IV.1
Cost/Price
Summary Cost Proposal xxxCOSTxxx.xlsx No page limit
IV.2
Cost/Price
Sanitized Summary Cost Proposal xxxxSANITIZEDxxxx.xlsx No page limit
IV.3
Cost/Price
Pricing Methodology xxxxPRMETHxxxx.docx No page limit
IV.4
Cost/Price
Supporting Documentation xxxxSUPPORTDOCSxx xx.docx No page limit
V. GFP
Management Plan
GFP
Management Plan xxxxGFPMPxxxx.docx (or
PDF)
5 page limit.
NOTE: Cover page, Table of Contents, glossary, and summary not included in page count
K-3 Data Rights Data Rights Assertion List xxxxDATAxxxx.docx(or
PDF)
See Solicitation Section K, K3 DFARS 252.227-7017 for format
K-5 Entity Dashboard view
System for Award Management (SAM) Report wwwSAMxxx.pdf
Limit 1 Page Offerors shall submit a current copy of its record (entity dashboard view) with its proposal, printed directly from the System for Award Management (SAM), dated within five business days prior to proposal submission.
Any Offeror with active exclusion records will not be evaluated and will not be considered for award
*Offerors shall replace “xxxx” with the offeror’s name and the date of the proposal. For example: OfferorACOST090112.xlsx.
Table 2 - Cost/Price:
CLIN Description CLIN Type 0001 Phase-In CPFF 0002 Labor Services– Base Period CPFF 0003 Travel/ODC – Base Period Cost-$410,000 1001 Labor Services - Option Period 1 CPFF 1002 Travel/ODC – Option Period 1 Cost $410,000 2001 Labor Services– Option Period 2 CPFF 2002 Travel/ODC– Option Period 2 Cost $384,375 3001 Labor Services - Option Period 3 CPFF 3002 Travel/ODC - Option Period 3 Cost $333,125 A001 Contract Invoicing and Payment Report Not Separately Priced A002 Sexual Assault/Sexual Harassment and Awareness
Policy Not Separately Priced
A003 Technical and Management Work Plan Not Separately Priced A004 Contractor’s Progress and Status Report Not Separately Priced A005 Quality Control Plan (QCP) Not Separately Priced A006 OCI Mitigation Plan Not Separately Priced B001 Engineering Change Proposal Not Separately Priced B002 Risk Management Framework (RMF) Package
Deliverables Not Separately Priced
B003 Software/Firmware Change Request Not Separately Priced B004 Technical Report – Study/Services Not Separately Priced
Table 3 – Cost/Price Summary:
CLIN POP Description Cost Fee Total 0001 Phase In CPFF Services 0002 Base CPFF Services
Base
Cost Materials and ODCs
$ 410,000.00
1001 Option 1 CPFF Services
Option 1
2001 Option 2 CPFF Services
Option 2
$ 384,375.00
$ 384,375.00
3001 Option 3 CPFF Services
Option 3
$ 333,125.00
$ 333,125.00
Table 4 – Travel/Other Direct Cost (ODC) CLINs:
ODC/TRAVEL FULLY LOADED – NO FEE
Base (exclusive of Phase In) $410,000 Option Year 1 $410,000 Option Year 2 $384,375 Option Year 3 $333,125
Table 5 - Cost Element Worksheet Sample:
Contractor Fiscal Year
CLIN 000X DD MON YYYY- DD MON YYYY
Hours/Base Rate Dollars
Direct Labor
Labor Category 1 Hours Rate from Labor Rate Worksheet
Formula (Hours * Rate)
A
Labor Category 2 Hours Rate from Labor Rate Worksheet
Formula (Hours * Rate)
B
Labor Category 3 Hours Rate from Labor Rate Worksheet
Formula (Hours * Rate)
C
Subtotal Direct Sum Sum D=A+B+C
Fringe- if applicable
Formula Base (=D)
Rate from Indirect Rate Worksheet
Formula (Base * Rate)
E
Total Direct labor Sum F=D+E Labor Overhead Formula Base
(=F) Rate from Indirect Rate Worksheet
Formula (Base *Rate)
G
Subtotal Labor Sum H=F+G
S/IE
S/IE 1 From S/IE Cost proposal for applicable CLIN
K
S/IE 2 From S/IE Cost proposal for applicable CLIN
L
S/IE 3 From S/IE Cost proposal for applicable CLIN
M
Total S/IE Sum N=K+L+M Subcontractor Handling
Formula Base (=N)
Rate from Indirect Rate Worksheet
Formula (Base * Rate)
O
G&A Formula Base (=O+N+H)
Rate from Indirect Rate Worksheet
Formula (Base * Rate)
P
Total Cost Input Sum Q=P+O+N+H Fee Formula Base
(=Q) Rate from Indirect Rate Worksheet
Formula (Base * Rate)
R
COM
DL COM Formula Base (D)
Rate from Indirect Rate Worksheet
Formula (Base * Rate)
S
G&A COM Formula Base (=O+N+H)
Rate from Indirect Rate Worksheet
Formula (Base * Rate)
T
Total COM Sum U=S+T
Total Proposed Sum V=Q+R+U
File details come from the government source that posted it. Updated .