CVIA Trailer SON.pdf
PDF 157 KB Posted
- Attached to
- CVIA Office Trailer
- Solicitation number
- FA468624Q0016
About this file
This document is a Statement of Need (SON) from the 9th Security Forces Squadron (9 SFS) at Beale Air Force Base, requesting a work trailer to support commercial vehicle inspection operations while the main inspection area is being renovated. The required trailer must be 8x40 feet, with heating, ventilation, air conditioning, security solar lights, mini blinds, and door locks. It must have doorways on both ends to allow separate entry and exit for customers and workers, and be ground level. Failure to obtain the trailer will prevent the security forces from accomplishing required vehicle vetting, resulting in immediate mission impact across the installation. The SON is related to Solicitation FA468624Q0016 for a CVIA Office Trailer, with a required delivery date of no later than May 31st.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ - CVIA Trailer.pdf | ||
| Questions and Answers for CVIA Office Trailer.docx | DOCX document | |
| Questions and Answers for CVIA Office Trailer.docx | DOCX document | |
| RFQ - CVIA Trailer.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
9TH SECURITY FORCES SQUADRON (ACC)
BEALE AIR FORCE BASE, CALIFORNIA
17 Janurary 2024
MEMORANDUM FOR 9 CONS
FROM: 9 SFS/S5X
SUBJECT: Statement of Need for Work Trailer for Temporary CVIA
1. PURPOSE: The 9 SFS is in need of a work trailer to support commercial vehicle inspection operations while the main Commercial Vehicle Inspection Area (CVIA) is being renovated. The required minimum dimensions of the trailer is 8x40 feet. The trailer requires the following:
Heating, Ventilation, and Air-Conditioning, security solar lights (one outside each door, total of 2), mini blinds for each window (2 windows) and door locks (deadbolt not required). Trailer must have doorways located at both ends to allow separate entry/exit for customers and workers. Trailer also needs to be ground level.
2. IMPACT: Failing to procure a work trailer will prevent security forces from accomplishing the required vetting process for all commercial vehicles entering the installation. This will result in immediate mission impact to multiple agencies across the installation.
3. DELIVERY DATE: Requested by NLT 31 May.
File details come from the government source that posted it. Updated .