Curtis Cultural Center Boiler Replacement Project Summary
This is a mechanical and electrical demolition and new work drawing set for the City of Meriden, Connecticut's boiler replacement project at the Augusta Curtis Cultural Center located at 175 E. Main Street, Meriden, CT 06450. The project scope includes the decommissioning and removal of existing boiler systems and replacement with new gas-fired, hot water boilers to improve energy efficiency and facility reliability. The work encompasses complete mechanical demolition of two existing Lochinvar FTXL400 boilers, associated piping, valves, accessories, controls, and related infrastructure, along with installation of new boiler equipment, piping systems, insulation, and controls. The contractor is required to perform a mandatory site visit prior to bid submission to identify existing conditions and verify all visible site elements affecting the work. The drawings are dated June 15, 2026, and include detailed mechanical demolition and new work part plans at 1/4"=1'-0" scale, electrical demolition and new work plans, typical gas-fired boiler venting and condensate details, and a schematic hot water piping diagram. The project design is prepared by Bemis Associates, LLC, a consulting engineering firm located in Farmington, Connecticut.
The contractor shall be responsible for all temporary work required to maintain building occupancy during construction and for coordinating and scheduling all work with the building owner to minimize inconvenience to occupants. The contractor must field verify the location and size of all existing piping, utilities, and equipment prior to performing demolition work and is responsible for all demolition activities whether or not explicitly shown on the plans, including removal and capping of existing gas, hot water supply, cold water make-up supply, and return piping. All demolition materials must be removed from the job site unless otherwise designated by the owner, with retained equipment stored in the building at a location selected by the owner. The contractor must measure, record, and restore existing hot water flows to match pre-demolition values when the new boiler system is operational and shall provide new insulation for all new and existing pipes with color-coded PVC jackets and labeling. Mechanical work coordination with electrical systems includes provisions for new wiring with carbon monoxide detectors interlocked with the fire alarm system, new 30-amp circuit breaker connections, and emergency off switches with fire alarm activation capabilities.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4 - CONTRACTOR IS RESPONSIBLE FOR ANY TEMPORARY WORK REQUIRED TO KEEP THE BUILDING OCCUPIED
DURING CONSTRUCTION.
7 - CONTRACTOR SHALL FIELD VERIFY LOCATION AND SIZE OF ALL EXISTING PIPING IN THE BOILER ROOM PRIOR
OBSERVERS. INCLUDE IN THE BID ALL DEMOLITION WORK REQUIRED.
WORK OF THIS CONTRACT.
1 - PRIOR TO SUBMITTING BID, VISIT THE SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT WORK TO BE PERFORMED. NO COMPENSATION WILL BE GRANTED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY EXPERIENCED
2 - THE DEMOLITION DRAWINGS ARE INTENDED ONLY TO DEFINE THE GENERAL SCOPE OF DEMOLITION WORK AND TO ASSIST THE CONTRACTOR DURING BIDDING. THE DEMOLITION DRAWINGS MAY NOT SHOW EVERY ITEM WHICH MUST BE DISCONNECTED, REMOVED, OR RELOCATED IN ORDER TO FACILITATE NEW WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEMOLITION WORK REQUIRED WHETHER OR NOT SHOWN ON THE PLANS.
3 - COORDINATE AND SCHEDULE ALL WORK WITH THE OWNER TO MINIMIZE INCONVENIENCE TO THE BUILDING OCCUPANTS. ALL SERVICES AND SYSTEMS SERVING OCCUPIED AREAS OF THE BUILDING SHALL BE MAINTAINED
IN OPERATION DURING WORKING SHIFTS.
6 - REMOVE ALL DEMOLITION MATERIAL FROM THE JOB SITE UNLESS NOTED DIFFERENTLY.
5 - REMOVE AND/OR RELOCATE ALL EXISTING MECHANICAL WORK AS NECESSARY FOR THE PERFORMANCE OF THE
TO ANY DEMOLITION.
8 - CONTRACTOR SHALL REMOVE AND REPLACE EXISTING BOILERS
9 - CONTRACTOR SHALL MEASURE AND RECORD EXISTING HW FLOWS PRIIOR TO ANY DEMOLITION.
10 - CONTRACTOR SHALL REMOVE AND REPLACE ALL EXISTING PIPE INSULATION IN THE BOILER ROOM.
WHEN STARTING THE NEW BOILER, CONTRACTOR SHALL RESTORE THE HW FLOWS TO THE RECORDED VALUES
CONTRACTOR SHALL PROVIDE NEW PIPE INSULATION FOR ALL NEW AND EXISTING PIPES AND CIRCULATING PUMPS
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITY LINES INCLUDING ELECTRICAL, SEWER, WATER, GAS, TELEPHONE, ETC. THE DRAWINGS SHOW DIAGRAMMATICALLY THE APPROXIMATE LOCATION OF UTILITIES WHERE INFORMATION IS AVAILABLE, BUT THE DRAWINGS ARE NOT EXACT AS TO THE QUANTITY, EXTENT OR LOCATION. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION DURING ALL PHASES OF THE WORK TO LOCATE, IDENTIFY, AND PROTECT EXISTING UTILITIES. THE CONTRACTOR SHALL RECORD LOCATION OF AND REPAIR DAMAGE TO EXISTING UTILITIES WHICH ARE ENCOUNTERED AS
A RESULT OF WORK UNDER THIS CONTRACT.
ANY EQUIPMENT REMOVED DURING DEMOLITION WORK MAY BE RETAINED BY THE OWNER AT HIS OPTION. ANY SUCH MATERIAL SHALL BE STORED IN THE BUILDING AT A LOCATION DESIGNATED BY THE OWNER. REMOVAL OF SUCH MATERIAL FROM THE JOB SITE SHALL BE
THE OWNER'S RESPONSIBILITY.
REMOVE AND REPLACE ALL EXISTING PIPE INSULATION FOR ALL THE PIPES THAT WILL REMAIN IN THE BOILER ROOM.
ALL PIPES (NEW AND EXISTING) SHALL BE LABELED. CONTRACTOR SHALL MEASURE, RECORD AND SUBMIT REPORT FOR ALL THE
EXISTING PUMPS PRIOR TO ANY DEMOLITION. MEASURE AND RECORD FLOW AND PRESSURE.
11 - PROVIDE COLOR CODED PVC JACKET FOR ALL THE PIPES IN THE BOILER ROOM
TAG ACTION
EXISTING HEATING BOILER AND ASSOCIATED PIPES, VALVES & ACCESSORIES SHALL BE REMOVED. CAP REMAINING GAS, HOT WATER SUPPLY, CW MAKE-UP SUPPLY & RETURN PIPING FOR FUTURE CONNECTION. EXISTING BOILER CONCRETE PAD SHALL
BE REMOVED AND REMAINING FLOOR SHALL BE PATCHED TO MATCH EXISTING FLOOR.
EXISTING AIR SEPARATOR AND ASSOCIATED PIPING SHALL REMAIN
EXISTING COLD WATER MAKE-UP PIPE SHALL REMAIN
REMOVE AND REPLACE ALL PIPE INSULATION IN THE BOILER ROOM. PROVIDE NEW INSULATION FOR ALL NEW AND EXISTING
PIPES IN THE BOILER ROOM. CONTRACTOR SHALL FIELD VERIFY PIPE SIZES AND LENGTH.
EXISTING BOILER CONTROLS AND ASSOCIATED ACCESSORIES SHALL BE REMOVED.
EXISTING PUMPS SHALL REMAIN. REPLACE ISOLATION VALVES.
EXISTING COMBUSTION AIR LOUVER SHALL REMAIN.REMOVE DAMPERS, ACTUATORS AND DUCTWORK.
EXISTING MAIN GAS PIPE SHALL REMAIN
EXISTING BOILER FLUE EXHAUST SHALL BE REMOVED. PATCH REMAINING CHIMNEY OPENING TO MATCH EXISTING.
EXISTING EXPANSION TANK AND ASSOCIATED PIPING SHALL REMAIN
9 EXISTING UNIT HEATER SHALL REMAIN.
EXISTING THERMOSTAT SHALL REMAIN.
ROOM
MECHANICAL
ELEV.
MACH.
CORR.
ENTRY
3/4"S&R UP
3/4"3/4" CD UP
UH-1
1 1/4"COND
1" CD UP
CO
1"S&R UP
2 1/2"S&R
1" CD DN
TO FLOOR DRAIN
3/4" CD UP
1"S&R
CW Make-up water
To HW System
From HW System
POT FEEDER
3"R
3"S
1 1/4"S&R
1 1/4"S&R 1 1/2"
2 1/2"S
3/4"S&R TO UH-1
CO
1 1/4"COND. DN
3/4"CD DN
1"S&R
1"
BOILER
BREECHING
BOILERFOR PIPING LAYOUT IN
THIS AREA SEE PIPING
DIAGRAM
3/4"COND. TO TERMINATE
12"ABOVE GRADE.
EXISTING FLOOR DRAINFD
RISE OR DROP
RISER DOWN
BRANCH-TOP CONNECTION
RISER UP
SHUTOFF VALVE
G
COLD WATER
GAS VENT
NATURAL GASG
CW
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURNHWR
HWS
GAS SHUTOFF VALVE
POINT OF CONNECTIONPOC
G EXISTING NATURAL GASG
C CND CONDENSATE DRAIN
OF ALL SYSTEMS TO AVOID CONFLICTS.
THE CONTRACTOR SHALL COORDINATE THE ROUTING AND INSTALLATION
DRAWINGS ARE DIAGRAMMATIC AND SHOW GENERAL INTENT OF WORK,
ALL CONTRACTORS MUST COORDINATE WITH OTHER TRADES OTHER
TRADES BEFORE PROCEEDING WITH ANY WORK.
2.
1.
THE EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID.
THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH3.
REQUIRED TO KEEP THE BUILDING OCCUPIED DURING THE CONSTRUCTION.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY TEMPORARY WORK
7. BRANCH TAKE-OFFS FOR FLUE AND COMBUSTION AIR SHALL BE
5. INSTALL PIPES TO ALLOW EASY ACCESS TO VALVES.
AT 45° ANGLES.
6. INSULATE ALL HOT WATER HEATING SUPPLY AND RETURN PIPING.
AND SIZES.
THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING PIPE LOCATIONS4.
22x10
14x6
COMBUSTION AIR LOUVER
OUTSIDE AIR LOUVER EXHAUST AIR LOUVERMOTORIZED DAMPER INTERLOCKED WITH BURNER
EXISTING TWO DUCT OPENINGS:
1-HIGH 28"x8" (12"FROM CLG.)
2-LOW 28"x8" (12"FROM FLOOR)
3. DISCONNECT, MOTOR STARTERS AND CONTROLS BY DIVISION 23
1. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. POWER WIRING AND RACEWAY BY DIVISION 26
LOCATION
BOILER RM
REMARKS:
TAG
B-1 LOCHINVAR
MANUF. MODEL
FTXL400 GAS
FUEL INPUT (MIN/MAX)
39.9/399
(MBH)
GAS
THERMAL
98.0%
EFFICIENCY
PRESSURE
4"WC MIN/
(MIN/MAX)
4"
(DIA)
1,2,3,4,5
REMARKS
(MBH)VOLTAGE PHASE
ELECTRICAL
FLA
120 1 4
14"WC MAX
4"
4. UNIT MANUFACTURER SHALL PROVIDE LOCK-UP STYLE REGULATOR.
REGULATOR SHALL BE INDEPENDENTLY VENTED TO OUTSIDE.
WATER FLOW
10-105
(MIN/MAX)
(GPM) (Gal)
(NATURAL GAS min. PRESSURE 4"w.c.)
5. BOILER MANUFACTURER SHALL SELECT, FURNISHED AND INSTALL HI/LOW GAS PRESSURE SWITCH, LOW WATER CUT OFF-MANUAL RESET, HIGH LIMIT-MANUAL RESET, OEM PUMP KIT IN ECM OR STANDARD, BMS AND CONDENSATE NEUTRALIZATION TANK.
SIZE
VENT
(DIA)
INTAKE
AIRHEX
WATER
VOLUME
GROSS OUTPUT
BOILER RMB-2 LOCHINVAR FTXL400 GAS 39.9/399 98.0% 4" 1,2,3,4,5392120 1 4 4"10-105 13
4"Ø FLUE (TYP.)
PRESSURE RELIEF VALVE
PIPE DN TO FLOOR.
(TYP.)
6" HIGH HOUSEKEEPING PAD,
(TYP.)
1 1/2" DRAIN VALVE (TYP.)
4"PVC
COMBUSTION
AIR (TYP.)
4" Ø
TO DRAIN, (TYP.)
BOILER MANUFACTURERS SHALL FURNISH CONDENSATE NEUTRALIZATION
KIT WITH PROVIDED NEUTRALIZING AGENT AND CONDENSATE TRAPS.
MECHANICAL CONTRACTOR SHALL INSTALL CONDENSATE
NEUTRALIZATION KIT AND TRAPS IN STRICT ACCORDANCE WITH UNIT
MANUFACTURER'S WRITTEN RECOMMENDATIONS. MECHANICAL
CONTRACTOR SHALL PROVIDE ALL PIPING AND SUPPORTS.
NEUTRALIZATION TANK INLET AND DISCHARGE MUST BE AT A LOWER
ELEVATION THAN THE CONDENSATE DRAIN FROM THE APPLIANCE (TYP.).
CONDENSATE CORROSION RESISTANT
PIPE PITCHED 1/4" PER FT. OF LENGTH
TOWARD THE NEUTRALIZATION TANK
AND FLOOR DRAIN (TYP.)
CONDENSATE DRAIN
PIPING, (TYP.)
make up water
P
TO
SYSTEM
FROM
SYSTEM
AIR SEPARATOR
CIRCULATION
PUMP
FLOW CHECK
VALVE
PRESSURE GAUGE
P
TEMPERATURE &
PRESSURE GAUGE
T P
SYSTEM SUPPLY
SENSOR
BACKFLOW
PREVENTER
MAGNETIC
SEPARATOR
WATER
METER
STRAINER / FILTERPRESSURE
REDUCING VALVE
PRESSURE RELIEF
VALVE
BALL VALVE
EXPANSION
TANK
PIPING
DRAIN PORT
DIFFERENTIAL
PRESSURE
BYPASS VALVE
2 WAY
MOTORIZED
VALVE
MIXING VALVE
ANTI SCALD
FLOW SWITCH
WIRING
P P
MAY SUBTITUTE
LOW LOSS HEADER
not to exceed 4 pipe dia or max of 12” apart
BOILER 1BOILER 2
PRIMARY PUMP (by boiler manuf. typ.)
3" HEADER3"HWS
3" 3"
3"
3" 3" 3"
THERMOMETER
ROOM
MECHANICAL
ELEV.
MACH.
CORR.
ENTRY
EXIST. 3/4"S&R UP
EXIST. 3/4"EXIST. 3/4" CD UP
UH-1
EXIST. 1 1/4"COND
EXIST. 1" CD UP
CO
EXIST. 1"S&R UP
EXIST. 2 1/2"S&R
EXIST.EXPANSION TANK
EXIST. 3/4" CD UP
EXIST. 1"S&R
CW Make-up water
To HW System
From HW System
EXIST. POT FEEDER
EXIST. AIR SEPARATOR
EXIST. 3"R
EXIST. 3"S
EXIST. 1 1/4"S&R
EXIST. 1 1/2"
EXIST. 2 1/2"S
EXIST. 3/4"S&R TO UH-1
CO
EXIST. 1 1/4"COND. DN
EXIST. 3/4"CD DN
EXIST. 1"S&R
EXIST. 1"
B-2
FOR BOILERS PIPING LAYOUT
SEE SCHEMATIC PIPING
DIAGRAM ON THIS SHEET
EXIST. 3/4"COND.
12"ABOVE GRADE.
22x10
14x6
EXIST. OUTSIDE AIR LOUVER EXIST. EXH. AIR LOUVER
EXIST. 1 1/4"COND.
12"ABOVE GRADE
1 1/4"COND. TO TERMINATE
12"ABOVE GRADE
G
G
CO
EXIST. 1" CD TO
FLOOR DRAIN
B-1
THE CONTRACTOR SHALL
FIELD VERIFY ALL EXISTING PIPE
LOCATIONS AND SIZES.
G
4"Ø VENT PIPE UP INSIDE THE CHIMNEY
(TYP. OF 2)
COMBUSTION AIR LOUVER
PROVIDE SHEET METAL
PLENUM SPLIT IN TWO
NEW 1"GAS LINE DN
TO BOILER
(typ. for B-1 & B-2)
CONNECT NEW GAS PIPE TO
EXISTING. CONTRACTOR TO
FIELD VERIFY SIZE AND
LOCATION.
NEW GAS LINE TO MATCH
EXISTING SIZE.
NEUTRALIZATION TANK
PIPE TO DRAIN (typ. of 2)
4"Ø VENT PIPE
BOILERS
CLEARANCE
BOILERS CONTROLS BY BOILER MANUFACTURER. CONTROLS SHALL COMMUNICATE SEAMLESSLY WITH BUILDING CONTROL SYSTEM
IN THE BOILER ROOM.
CLEAN INSIDE OF THE CHIMNEY. PROVIDE STAINLESS STEEL CAP AT TOP.
4Ø
4Ø 4Ø
NEW DEVIDER
1"GAS VENT (typ. of 2)
REGULATOR VENT SHALL
TERMINATE 3'-0" ABOVE
GROUND. ELBOW DOWN AND
PROVIDE INSECT SCREEN.
SEAL AT WALL PENETRATION.
(typ. of 2)
EXIST. 3"S
EXIST. 3"S
EXISTING VALVES SHALL BE REPLACED IN KIND.
EXIST.
1 1/4"S&R
TOTAL FILTER BY FERNOX.
INSTALL PER MANUF.
RECOMMENDATIONS
M1.1
BOILER ROOM
MECHANICAL
DEMOLITION AND
NEW WORK
PART PLANS
06/15/2026
C O
PY
R
IG
H
T C
Th is d ra w in g is a n in st ru m en t o f s er vi ce a nd sh al l r em ai n th e pr op er ty of B em is
A ss oc ia te s L
LC
, w he th er th e pr oj ec t f or w hi ch it is in te nd ed is c on st ru ct ed o r n ot
Th is d ra w in g, a nd th e co nc ep ts a nd id ea s co nt ai ne d he re in
, s ha ll no t b e us ed
, c op ie d or re ta in ed w ith ou t t he ex pr es s w rit te n ap pr ov al o f B em is
A ss oc ia te s L
LC
Su bm is si on o r d is tri bu tio n of th is d ra w in g to m ee t o ff ic ia l r eg ul at or y re qu ire m en ts o r f or o th er p ur po se s i n co nn ec tio n w ith th e pr oj ec t i s n ot to b e co ns tru ed a s p ub lic at io n in d er og at io n of a ny o f t he ri gh ts o f
B em is A ss oc ia te s L
LC
A ny a br id ge m en t o r v io la tio n of th e rig ht s o f B em is A ss oc ia te s L
LC
sh al l b e pr os ec ut ed to th e fu lle st e xt en t p os si bl e un de r t he la w
E.
M
A
IN
S
TR
EE
T
B O
IL
ER
R
EP
LA
C
EM
EN
T C
U R
TI
S
C U
LT
U
R A
L C
EN
TE
R
M
ER
ID
EN
C T
NORTH
AutoCAD SHX Text
GENERAL MECHANICAL DEMOLITION WORK NOTES
AutoCAD SHX Text
GENERAL DEMOLITION NOTES
AutoCAD SHX Text
- MECHANICAL DEMOLITION WORK SYMBOLS -
AutoCAD SHX Text
%%ULOWER LEVEL - BOILER RM. PART PLAN - MECHANICAL DEMOLITION
AutoCAD SHX Text
SCALE: 1/4"=1'-0"
AutoCAD SHX Text
%%ULOWER LEVEL - BOILER RM. PART PLAN - MECHANICAL PIPING DEMOLITION
AutoCAD SHX Text
SCALE: 1/4"=1'-0"
AutoCAD SHX Text T
AutoCAD SHX Text
AHU-3
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text P-1
AutoCAD SHX Text P-2
AutoCAD SHX Text
UH-1
AutoCAD SHX Text
FU_TOTAL
AutoCAD SHX Text
FU_WASTE
AutoCAD SHX Text
FU_HOT
AutoCAD SHX Text
FU_COLD
AutoCAD SHX Text
FIXT_CODE
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
ABBREV.
AutoCAD SHX Text
MECHANICAL SYMBOL LIST
AutoCAD SHX Text
GENERAL NEW WORK NOTES :
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
GAS FIRED, HOT WATER BOILER SCHEDULE
AutoCAD SHX Text
%%UTYPICAL GAS FIRED BOILER VENTING AND CONDENSATE DETAIL
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
%%UBOILER
AutoCAD SHX Text
%%USCHEMATIC HOT WATER PIPING DIAGRAM
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text T
AutoCAD SHX Text
AHU-3
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text P-1
AutoCAD SHX Text P-2
AutoCAD SHX Text
UH-1
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
NOTE: THE CONTRACTOR SHALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
TITLE
AutoCAD SHX Text Consulting Engineers
AutoCAD SHX Text
BEMIS ASSOCIATES, L.L.C.
AutoCAD SHX Text www.bemisassociates.com
AutoCAD SHX Text Fax: (860) 321-7070
AutoCAD SHX Text
(860) 667-3233
AutoCAD SHX Text Farmington, CT 06032
AutoCAD SHX Text 185 Main Street
LOWER LEVEL - BOILER RM. PART PLAN - ELECTRICAL NEW WORK
SCALE: 1/4"=1'-0"
LOWER LEVEL - BOILER RM. PART PLAN - ELECTRICAL DEMOLITION
SCALE: 1/4"=1'-0"
ROOM
MECHANICAL
ELEV.
MACH.
CORR.
ENTRY
ROOM
MECHANICAL
ELEV.
MACH.
CORR.
ENTRY
EXISTING
PANEL 'ME'
DHU-1
AHU-1
P-1
P-2
AHU-3
P-4 (E)
UH-1 (E)
P-5
J
SE
J
P-3 (E)
EXISTING
PANEL 'LL2'
F A
C P
V O
IC
E
(E)
(E) (E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)
(E)
(E)
(E)
(E)
H (E)
EXISTING
PANEL 'ME'
DHU-1
AHU-1
P-1
P-2
AHU-3
P-4 (E)
UH-1 (E)
P-5
P-3 (E)
EXISTING
PANEL 'LL2'
F A
C P
V O
IC
E
(E)
(E) (E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)
(E)
(E)
(E)
(E)
H (E)
DISCONNECT AND REMOVE EXISTING
BOILER ELECTRICAL AND ALL OBSOLETE
WIRING BACK TO SOURCE (PANEL ME)
EXISTING CONDUIT MAY BE RE-USED,
VERIFY WITH FIELD CONDITIONS.
DISCONNECT AND REMOVE EXISTING
EMERGENCY OFF SWITCH AND ALL
ASSOCIATED OBSOLETE WIRING, EXISTING
BOX AND CONDUIT MAY BE RE-USED,
VERIFY WITH FIELD CONDITIONS.
ST
SEO
J
ST
EXISTING CONDUIT
MAY BE RE-USED
VERIFY WITH FIELD
CONDITIONS (TYP)
CO
MMCM
EMERGENCY OFF SWITCH.
BRANCH CIRCUIT WIRING IN CONDUIT. CROSS LINES INDICATE NUMBER OF CONDUCTORS.
AFF ABOVE FINISHED FLOOR.
DESCRIPTIONSYMBOL
DRAWING LEGEND
GND. GROUND.
COMBINATION MOTOR STARTER / DISCONNECT SWITCH.
MOTOR POWER CONNECTION, EQUIPMENT AS DESIGNATED.
C
CM
SPECIAL EQUIPMENT POWER CONNECTION, EQUIPMENT AS DESIGNATED.
4 POLE CONTACTOR WITH 30A CONTACTS, 120V COIL, AND NEMA 1 ENCLOSURE.
MM
JUNCTION BOX.
A AMPS
C CONDUIT.
C/B CIRCUIT BREAKER.
FACP FIRE ALARM CONTROL PANEL.
P POLE.
VAC VOLTS ALTERNATING CURRENT.
ELECTRICAL WORK NOTES
TAG DESCRIPTION OF WORK
EXISTING BOILERS TO BE REPLACED. DISCONNECT AND REMOVE EXISTING
BRANCH CIRCUITS WIRING (ALONG WITH THE BOILER MOUNTED EMERGENCY OFF
SWITCHES) BACK TO SOURCE AND PREP FOR REUSE. PROVIDE NEW WIRING
(INTERLOCKED WITH CARBON MONOXIDE DETECTOR) AND RECONNECT TO THE
1P-20A CIRCUIT BREAKER IN EXISTING PANEL ME, AND THE NEW BOILERS.
PROVIDE NEW CARBON MONOXIDE DETECTOR, FIRE ALARM DEVICES, WIRING, AND
FIRE ALARM SYSTEM PROGRAMMING AS REQUIRED TO SHUT DOWN THE BOILERS
AND ACTIVATE THE FIRE ALARM SYSTEM UPON ACTIVATION OF THE CARBON
MONOXIDE DETECTOR. CO DETECTOR FIRE ALARM ACTIVATION SHALL SOUND A
SUPERVISORY SIGNAL AT THE FACP AND SHALL ACTIVE THE EMERGENCY FORCES
NOTIFICATION ONLY.
SEO
J
C
2 PROVIDE 30A RATED 4 POLE CONTACTOR WITH 120V COIL AND NEMA 1 ENCLOSURE.
3 120 VAC CONTACTOR COIL CIRCUIT.
4 CONNECT TO EXISTING FIRE ALARM ADDRESSABLE LOOP
NEW 120 VAC CARBON MONOXIDE DETECTOR WITH ALARM OUTPUT CONTACTS.
THE DETECTOR IS TO INITIATE A SUPERVISORY SIGNAL AT THE FIRE ALARM
CONTROL PANEL UPON ACTIVATION. THE SUPERVISORY ALARM SHALL NOTIFY
THE MONITORING COMPANY OR DISPATCH.
6 EXTEND 2#12, 1#12G IN 3/4"C TO NEW 1P-20A CIRCUIT BREAKER IN EXISTING
PANEL ME AND CONNECT AS REQUIRED.
7 EXTEND 2#12, 1#12G IN 3/4"C TO EXISTING 1P-20A CIRCUIT BREAKER IN
EXISTING PANEL ME AND CONNECT AS REQUIRED.
8 PROVIDE NEW 1P-20A CIRCUIT BREAKER IN EXISTING PANEL ME AN CONNECT
AS REQUIRED. NEW C/B SHALL MATCH EXISTING PANEL MANUFACTURER AND
BE LISTED FOR USE IN PANEL (VERIFY WITH FIELD CONDITIONS).
GENERAL ELECTRICAL DEMOLITION WORK NOTES
A - PRIOR TO SUBMITTING BID, VISIT THE SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL
AFFECT WORK TO BE PERFORMED. NO COMPENSATION WILL BE GRANTED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY EXPERIENCED OBSERVERS.
INCLUDE IN THE BID ALL DEMOLITION WORK REQUIRED.
B - THE DEMOLITION DRAWINGS ARE INTENDED ONLY TO DEFINE THE GENERAL SCOPE OF DEMOLITION WORK AND TO ASSIST THE CONTRACTOR DURING BIDDING. THE DEMOLITION DRAWINGS MAY NOT SHOW EVERY ITEM WHICH MUST BE DISCONNECTED, REMOVED, OR RELOCATED IN ORDER TO FACILITATE NEW WORK. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL DEMOLITION WORK REQUIRED WHETHER OR NOT SHOWN ON THE PLANS.
C - DEMOLITION WORK SHALL BE COORDINATED WITH CONSTRUCTION PHASING SO THAT EXISTING PORTIONS OF THE BUILDING REMAIN FULLY ACTIVE AND FUNCTIONAL UP UNTIL THE TIME SUCH AREAS ARE TURNED OVER TO THE
CONTRACTOR FOR RENOVATION WORK.
D - COORDINATE AND SCHEDULE ALL WORK WITH THE OWNER TO MINIMIZE INCONVENIENCE TO THE BUILDING OCCUPANTS. ALL LIFE SAFETY SYSTEMS SHALL BE MAINTAINED IN FULLY OPERATIONAL CONDITION.
E - REMOVE AND/OR RELOCATE ALL EXISTING ELECTRICAL WORK AS NECESSARY FOR COORDINATION WITH THE
WORK OF OTHER TRADES.
F - MECHANICAL EQUIPMENT SHALL BE REMOVED UNDER OTHER DIVISIONS OF THIS CONTRACT. EQUIPMENT SHALL BE
DISCONNECTED UNDER THIS DIVISION.
G - EXISTING ELECTRICAL EQUIPMENT, WIRING, AND RACEWAYS SHALL NOT BE REUSED UNLESS SPECIFICALLY NOTED
OTHERWISE.
H - PROVIDE WIRING AS REQUIRED AND RECONNECT EXISTING FIXTURES, DEVICES, OR EQUIPMENT THAT ARE TO REMAIN ACTIVE, BUT HAVE BEEN DISCONNECTED DURING DEMOLITION OF OTHER FIXTURES, DEVICES, OR
EQUIPMENT.
I - REMOVE ALL DEMOLITION MATERIAL FROM THE JOB SITE UNLESS THE OWNER WANTS TO RETAIN ANY SUCH MATERIAL FOR HIS USE. MATERIAL REQUESTED BY THE OWNER FOR SALVAGE SHALL BE DELIVERED TO THE
OWNER'S DESIGNATED MATERIAL STORAGE AREA.
MOTOR RATED SINGLE POLE SWITCH.ST
DUPLEX RECEPTACLE.
QUAD RECEPTACLE.
H FIRE ALARM SYSTEM HEAT DETECTOR.
(E) EXISTING TO REMAIN (MAINTAIN CONTINUITY).
FIRE ALARM MONITOR MODULE. DEVICE MANUFACTURE SHALL MATCH EXISTING BUILDING
STANDARD AND SHALL BE FULLY COMPATIBLE WITH THE EXISTING SYSTEM.
FIRE ALARM CONTROL MODULE. DEVICE MANUFACTURE SHALL MATCH EXISTING BUILDING
STANDARD AND SHALL BE FULLY COMPATIBLE WITH THE EXISTING SYSTEM.
9 PROVIDE NEW EMERGENCY OFF SWITCH, INSTALL IN EXISTING LOCATION
AND CONNECT TO NEW WIRING AS REQUIRED.
10 PROVIDE FIELD WIRING OF NEW BOILER CIRCULATOR PUMP, VERIFY EXACT
WIRING REQUIREMENTS WITH EQUIPMENT SUPPLIER AND WIRE AS REQUIRED.
06/15/2026
C O
PY
R
IG
H
T C
Th is d ra w in g is a n in st ru m en t o f s er vi ce a nd sh al l r em ai n th e pr op er ty of B em is
A ss oc ia te s L
LC
, w he th er th e pr oj ec t f or w hi ch it is in te nd ed is c on st ru ct ed o r n ot
Th is d ra w in g, a nd th e co nc ep ts a nd id ea s co nt ai ne d he re in
, s ha ll no t b e us ed
, c op ie d or re ta in ed w ith ou t t he ex pr es s w rit te n ap pr ov al o f B em is
A ss oc ia te s L
LC
Su bm is si on o r d is tri bu tio n of th is d ra w in g to m ee t o ff ic ia l r eg ul at or y re qu ire m en ts o r f or o th er p ur po se s i n co nn ec tio n w ith th e pr oj ec t i s n ot to b e co ns tru ed a s p ub lic at io n in d er og at io n of a ny o f t he ri gh ts o f
B em is A ss oc ia te s L
LC
A ny a br id ge m en t o r v io la tio n of th e rig ht s o f B em is A ss oc ia te s L
LC
sh al l b e pr os ec ut ed to th e fu lle st e xt en t p os si bl e un de r t he la w
E.
M
A
IN
S
TR
EE
T
B O
IL
ER
R
EP
LA
C
EM
EN
T
NORTH
C U
R
TI
S C
U
LT
U R
A L
C
EN
TE
R
M
ER
ID
EN
C T
E1.1
BOILER ROOM
ELECTRICAL
DEMOLITION AND
NEW WORK
PART PLANS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
TITLE
AutoCAD SHX Text Consulting Engineers
AutoCAD SHX Text
BEMIS ASSOCIATES, L.L.C.
AutoCAD SHX Text www.bemisassociates.com
AutoCAD SHX Text Fax: (860) 321-7070
AutoCAD SHX Text
(860) 667-3233
AutoCAD SHX Text Farmington, CT 06032
AutoCAD SHX Text 185 Main Street
File details come from the government source that posted it. Updated .