Culvert Thawer with Trailer.docx
DOCX document 118 KB Posted
- Attached to
- Culvert Steamer Trailer
- Solicitation number
- RFQ - 17D - 18012200000000000384
- Issued by
- Kennebec County, Maine
About this file
This is a Request for Quotation (RFQ) issued by the State of Maine Department of Administrative and Financial Services Division of Procurement Services on behalf of MaineDOT Fleet Services for the purchase of one trailer-mounted, self-contained culvert thawer unit capable of generating 3,500 PSI of hot water at a minimum of five gallons per minute. The equipment must be fully assembled, delivered, and ready for operation, with comprehensive technical specifications including a heavy-duty diesel engine meeting Tier IV emission standards, a minimum 560,000 BTU heating unit, a 300-gallon water tank, and an enclosed trailer measuring 14'8" long by 84" wide by 80" high with side-flow vents and a 24-inch aluminum stone guard. The unit must include a hose reel with 100 feet of 4,000 PSI rated rubber hose, three thawing nozzles, and 60 feet of black iron pipe sections. A pre-bidders conference was held on February 8, 2018, at 9:00 a.m. at MaineDOT Fleet Services Conference Room in Augusta, Maine. Requests for approved equals and specification clarifications were due by 5:00 p.m. on February 12, 2018. Quotations were due no later than 4:00 p.m. EST on February 20, 2018, submitted through the State of Maine's AdvantageME electronic procurement system. The resulting contract has an initial term from February 26, 2018, to February 25, 2019, with two optional one-year renewal periods extending through February 25, 2021.
All bid responses must include detailed equipment specifications, warranty information, service facility locations within 75 miles of each MaineDOT region headquarters, preventative maintenance schedules, proof of in-state service capabilities, and operator and shop manuals. Quotations must cover all costs including manufacturing, delivery to MaineDOT Fleet Services in Augusta, shipping, and labor necessary for complete delivery of conforming equipment; bids should not include Federal, State, and local taxes. The evaluation will be made on a best-value basis considering conformity to specifications, equipment quality, delivery dates, and lifecycle costs, with lowest price determining the award among conforming bids. Maine businesses proposing costs within 5 percent of the lowest non-Maine business bid with equivalent specifications receive preferential consideration. The vendor must provide a one-year manufacturer's warranty covering all parts and workmanship, with the warranty period beginning upon in-service date. Liquidated damages of $100 per unit per calendar day will be assessed for delivery delays. Delivery is restricted to Monday through Friday between 8:00 a.m. and 4:00 p.m., with the vendor providing 24 hours' notice prior to delivery and assuming all transportation risks and delivery costs.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MAINE
DEPARTMENT OF ADMINISTRATIVE AND FINANCIAL SERVICES
BUREAU OF BUSINESS MANAGEMENT
DIVISION OF PROCUREMENT SERVICES
RFQ # 17D 18012200000000000384
CULVERT THAWER WITH TRAILER
Quotations/Responses Due: 02/20/18 not later than 4:00 p.m. local time
Note: All questions and responses must be provided via the State of Maine’s e-Procurement system: AdvantageME / Vendor Self Service (VSS).
· GENERAL INSTRUCTIONS ON BIDDER QUESTIONS
It is the responsibility of each Bidder to examine the entire Request for Quotations (“RFQ”) and to seek clarification by submitting questions through the Q & A List tab on the Solicitation page. Any answers to questions will appear there as well. It is the Bidder's responsibility to log in to view all questions and answers posted. Additional information obtained any other way will not be valid.
In the event that you must contact us for any other reasons than the Q & A previously mentioned, only the Buyer listed on the Solicitation page may be contacted from the time this RFQ is issued until award notification is made. No other person/State employee is empowered to make binding statements regarding this RFQ. Violation of this provision may lead to disqualification from the bidding process, at the State’s discretion.
SUMMARY
For this competitive Request for Quotations (RFQ) process, the State of Maine Division of Procurement Services (“Division”) is acting on behalf of MaineDOT (“Requesting Department”). The Division and the Requesting Department seek quotations (also referred to as “bids” or “responses” herein) to provide the goods/services listed above. This document provides instructions and descriptions of requirements for this competitive process.
KEY DATES
· PRE-BIDDERS CONFERENCE: The Department will hold a Pre-Bidders’ Conference 02/08/18 at 9:00 am in Augusta, Maine at the MaineDOT Fleet Services Conference Room, located at 66 Industrial Drive Augusta, Maine 04330.
· APPROVED EQUALS REQUEST: Requests for “approved equals” to specifications, protests of specifications, and requests for clarification must be submitted in writing to, and received by the Division no later than 5:00 pm on 02/12/18 by e-mail to Terry.L.DeMerchant@maine.gov.
· RESPONSE TO APPROVED EQUALS REQUESTS: Department responses will be posted as a file attached to the quote on the Advantage ME electronic bid document by 5:00 pm on 02/15/18.
· QUOTATION DUE DATE: Quotations must be received no later than 4:00 p.m. Eastern Standard Time (EST), on 02/20/18. Quotations received after the 4:00 p.m. deadline will not be accepted.
IT WILL BE THE BIDDER’S RESPONSIBILITY TO CHECK ADVANTAGEME FOR RESPONSES TO THE ABOVE AND ANY NEW AMENDMENTS TO THE RFQ.
It is the responsibility of each Bidder to examine the entire RFQ and to seek clarification by submitting questions through the Q & A List tab on the Solicitation page. Any answers to questions will appear there as well. It is the vendor's responsibility to log in to view all questions and answers posted. Additional information obtained any other way will not be valid.
In the event that you must contact us for any other reasons than the Q & A previously mentioned, only the Buyer listed on the Solicitation page may be contacted from the time this RFQ is issued until award notification is made. No other person/State employee is empowered to make binding statements regarding this RFQ. Violation of this provision may lead to disqualification from the bidding process, at the State’s discretion.
Summary For this competitive Request for Quotations (RFQ) process, the State of Maine Division of Procurement Services (“Division”) is acting on behalf of MaineDOT Fleet Services (“Requesting Department”). The Division and the Requesting Department seek quotations (also referred to as “bids” or “responses” herein) to provide the goods/services listed above. This document provides instructions and descriptions of requirements for this competitive process.
Master Agreement Term In addition to any mutually agreed upon delivery dates for purchases of goods, the contract resulting from this RFQ will have a term, or “Period of Performance”, during which the contract is considered to be in effect. The anticipated contract term is defined in the table below. Please note that the dates below are estimated and may be adjusted as necessary in order to comply with all procedural requirements associated with this RFQ and the contracting process. The actual contract start date will be established by the completed and approved contract.
Contract Renewal: Following the initial term of the contract, the Division may opt to renew the contract for two renewal periods of one year each, subject to continued availability of funding and satisfactory delivery/performance.
The term of the anticipated contract, resulting from this RFQ, is defined as follows:
| Period |
| Start Date |
| End Date |
| Initial Period of Performance |
| 02/26/18 |
| 02/25/19 |
| Renewal Period #1 |
| 02/26/19 |
| 02/25/20 |
| Renewal Period #2 |
| 02/26/20 |
| 02/25/21 |
RFQ REQUIREMENTS
1. Description of Requirements The following is a description of the goods and/or services sought by the State of Maine under this RFQ.
· Please see Appendix B
2. Bid Contents Requirements In addition to the cost, delivery, and other information required in VSS, all bids should contain the following information as attachments, in the Appendices listed below:
· Appendix A: Bid Cover Page
· Appendix B: Detailed Specifications
· Appendix C: Cost Response
· Appendix D: Certifications
· Appendix E: MaineDOT Terms and Conditions
3. Submitting a Quotation
a. Quotations Due: Quotations must be received no later than 4:00 p.m. Eastern Standard Time (EST), on the date listed in VSS. Quotations received after the 4:00 p.m. deadline will not be accepted.
b. Submission Instructions: Bidders must submit their bids in the State of Maine’s electronic procurement system: Advantage “Vendor Self Service” (VSS). More information on this system can be found at the following internet link: http://www.maine.gov/purchases/venbid/rfq.shtml.
c. Multiple Quotations: Unless specifically prohibited in Section 1 of this RFQ, Bidders are permitted to submit multiple quotations for this RFQ, offering alternative items or pricing for the State of Maine to consider in its best value determination.
d. Withdrawal of a Quotation: Bidders are permitted to withdraw their own quotations up until the due date and time for receipt of quotations. To do so, a Bidder must enter the VSS system (as referenced above), identify and open their submitted quotation located in the Solicitation Responses tab, and click the “Withdraw” button found at the bottom of the screen. Quotations cannot be withdrawn after the due date and time for receipt of quotations.
e. Attachments: Any attachments provided with the Advantage VSS bid submission must be in MS Word, MS Excel, or Adobe (.pdf) format, unless otherwise specified in Section 1 of this RFQ. Vendors are encouraged to submit supporting documentation that aid the requesting department in understanding how the bid conforms to the requirements. The VSS attachment file size limit is 2Mb. Please contact the buyer for this RFQ if you must submit attachment files larger than this.
f. Vendor specifications: Unless otherwise stated in this RFQ document, limited specification information will be required upon submission of a bid in response to this RFQ. However, a Bidder’s response should include an affirmative statement that their bid complies with all requirements of this RFQ, unless the Bidder specifically addresses how its bid differs from the specifications, and why the differences should be deemed acceptable by the State.
4. General Instructions
a. The Bidder must submit a cost quotation response that covers the goods and term of the contract, including any optional renewal.
b. The cost quotation shall include the costs necessary for the Bidder to fully comply with the contract terms and conditions and RFQ requirements.
c. Failure to provide the requested information may result in the exclusion of the quotation from consideration, at the discretion of the Division.
d. No costs related to the preparation of the quotation for this RFQ or to the negotiation of the contract with the Department may be included in the quotation.
e. The State is exempt from the payment of Federal, State and local Taxes on articles not for resale. Please provide quotations that do not include these taxes. Upon application, an exemption certificate can be furnished by the State at the point of contract finalization.
5. Quotation Evaluation and Selection Evaluation of the submitted quotations shall be accomplished as detailed below:
a. State of Maine RFQ documents are evaluated on a Best Value basis. The term “Best Value” may take into consideration the qualities of the goods or services to be supplied, their conformity with the specifications listed in the RFQ, the purposes for which they are required, the date of delivery, and the best interest of the State. Once the goods or services have been determined to conform to the specifications then the Division will make its award decision based on the lowest price among the Bidders.
b. At the discretion of the Division, if a Bidder’s submission is deemed to not conform to the specifications listed in the RFQ, or otherwise not conform to the requirements of the RFQ, then that Bidder’s submission may not be considered for contract award.
c. In the event that no Bidder submission conforms to the specifications of this RFQ, then the Division may choose not to make any award. Alternatively, the Division may make an award to the Best Value Bidder whose specifications most closely meet the specifications of this RFQ. For example, if there are five specification requirements, and two responses are received with one Bidder meeting four requirements, and one bidder meeting three requirements, then the Division, at its discretion, may make a contract award to the Bidder meeting four requirements.
d. If the specifications provided with this RFQ are of a technical nature, then the Division’s RFQ Coordinator, at his or her discretion, may seek to use an evaluation team comprised of subject matter experts, end-users from the Requesting Department, or other State Department representatives. In such a case, the evaluation team will judge the merits of the quotations received in accordance with the best value criteria defined in the RFQ.
e. Maine Business Consideration for commodities or services valued at $50,000 or more
i. Award will be made to Maine Businesses who propose a cost within 5% of the low cost bid submitted by a non-Maine Business, if they have an equivalent specification. Best value considerations may affect the outcome of the bid evaluation.
ii. Equivalent specification means that bids being considered meet or exceed specifications provided in the RFQ document including any best value considerations, or are equal in specification as described above in section c.
iii. Definition of a Maine Business
1. A Maine business is one that can certify and show proof of each of the following:
a. Physical location within the borders of Maine
b. Employment of at least one Maine resident
c. Subject to State of Maine taxes such as the following:
i. Business Income, or Corporate Income
ii. Property
iii. Employment – Unemployment, worker’s compensation
iv. Bidders, who want to be considered a Maine Business for evaluation and award purposes, must certify by their signature on the Proposal Cover page that they meet the definition of a Maine Business. Upon the award of a contract on the basis of this consideration, additional proof may be required from an awarded Maine Business.
v. The use of this information in making contract award decisions is required in accordance with Executive Order 2017-003, which states “Evaluators of competitive bids for goods and services shall give consideration to the investment in the State by business enterprises as a best-value criterion. Consideration for Maine business enterprises may result in low cost or top scoring bids not being considered as the best-value for the State of Maine.”
6. Negotiations
a. No Best and Final Offers: The State of Maine will not seek a best and final offer (BAFO) from any Bidder in this procurement process. All Bidders are expected to provide their Best Value pricing with the submission of their quotation.
b. The Division reserves the right to negotiate with the successful Bidder to finalize a contract at the same rate or cost of goods and services as presented in the selected quotation. Such negotiations may not significantly vary the content, nature or requirements of the quotation or the RFQ to an extent that may affect the price of goods or services requested. The Division reserves the right to terminate contract negotiations with a selected Bidder who submits a proposed contract significantly different from the quotation submitted in response to the RFQ.
c. In the event that an acceptable contract cannot be negotiated with the highest ranked Bidder, the Division may withdraw its award and negotiate with the next-highest ranked Bidder, and so on, until an acceptable contract has been finalized. Alternatively, the Division may cancel the RFQ, at its sole discretion.
TERMS AND CONDITIONS FOR RFQ AND CONTRACT
PART I GENERAL INFORMATION ON RFQs A. Purpose and Background The State of Maine (“State”) Department of Administrative and Financial Services (“Department”), Bureau of Business Management (“Bureau”), Division of Procurement Services (“Division”) acts as the purchasing agent on behalf of all Executive Departments and other agencies within State Government. For this competitive Request for Quotations (RFQ) process, the Division is acting on behalf of the Requesting Department listed on the cover page. The Division and the Requesting Department seek quotations (also referred to as “bids” or “responses” herein) to provide the goods/services as defined above in Section 1 of this document. This document provides instructions for submitting quotations, the procedure and criteria by which the Bidder(s) will be selected, and the contractual terms which will govern the relationship between the State and the awarded Bidder(s). Following Bidder selection and upon reaching a mutual agreement, the State and the selected Bidder will enter into a contract – taking the form of a State of Maine Master Agreement or Buyer Purchase Order (all generally referred to as “contract” herein), as applicable.
B. General Provisions
| 1. | Issuance of this RFQ does not commit the Division or the Requesting Department to issue an award or to pay expenses incurred by a Bidder in the preparation of a response to this RFQ. This includes attendance at personal interviews or other meetings and software or system demonstrations, where applicable. |
| 2. | All responses to this RFQ should adhere to the instructions and format requirements outlined in this RFQ and all written supplements and amendments (such as the Division’s answers to the Bidders’ questions submitted through the VSS), as issued by the Division. Responses are to follow the format and respond to all questions and instructions specified above in the “Submitting a Quotation” section of this RFQ. |
| 3. | Bidders shall take careful note that in evaluating a quotation submitted in response to this RFQ, the Department may consider materials provided in the quotation, information obtained through interviews/presentations (if any), and internal information of previous contract history between the Division and the Bidder (if any). The Division also reserves the right to consider other reliable references and publicly available information available in evaluating a Bidder’s experience and capabilities, if needed. All responses to this RFQ shall be considered to be authorized to legally bind the Bidder, and if selected for award, shall contain or be considered to contain a statement that the quotation and the pricing contained therein will remain valid and binding for a period of at least 180 days from the date and time of the bid opening. |
| 4. | The RFQ and the selected Bidder’s quotation, including all appendices or attachments, may be incorporated in the final contract. |
| 5. | Following announcement of an award decision, all submissions in response to this RFQ will be considered public records available for public inspection pursuant to the State of Maine Freedom of Access Act (FOAA) (1 M.R.S. §§ 401 et seq.). |
| 6. | The Division, at its sole discretion, reserves the right to recognize and waive minor informalities and irregularities found in quotations received in response to this RFQ. |
| 7. | The Division reserves the right to authorize other State Departments to use the contract(s) resulting from this RFQ, if it is deemed to be beneficial for the State to do so. |
| 8. | All applicable laws, whether or not herein contained, shall be included by this reference. It shall be Bidder’s responsibility to determine the applicability and requirements of any such laws and to abide by them. |
C. Eligibility to Submit Bids Public agencies, private for-profit companies, and non-profit companies and institutions are invited to submit bids in response to State of Maine Requests for Quotations.
D. Delivery Terms For the purchase of goods, the Division and selected Bidder will decide upon a delivery date in accordance with the State’s requirements and the terms offered in the Bidder’s quotation. Unless stated otherwise in Section 1 of this RFQ, all deliveries are expected with shipping terms of “Free on Board (FOB) – Destination”. The State intends for this to mean that all goods shall be priced in the bid response to include shipping charges, if any, to the State’s desired location. The “FOB – Destination” shipping term is also intended to mean that the State shall not bear any responsibility for the goods in question until the State takes possession of them at the destination point of delivery.
E. Alternate Bids and Approved Equals When, in bid forms and specifications, an article or material is identified by using a trade name and catalog number of a manufacturer or vendor, the term “or approved equal,” if not inserted with the identification, is implied. Any Bidder that seeks to propose an alternate item from what is specified in this RFQ should refer to State of Maine Statute 5 MRSA §1825-B, for “Bids, awards and contracts”, found here: http://www.mainelegislature.org/legis/statutes/5/title5sec1825-B.html F. Appeal of Contract Awards Any person aggrieved by the award decision that results from this RFQ may appeal the decision to the Director of the Bureau of Business Management in the manner prescribed in 5 MRSA § 1825-E and 18-554 Code of Maine Rules, Chapter 120 (found here: http://www.maine.gov/purchases/policies/120.shtml). The appeal must be in writing and filed with the Director of the Bureau of Business Management, 9 State House Station, Augusta, Maine, 04333-0009 within 15 calendar days of receipt of notification of contract award.
If this RFQ results in the creation of a pre-qualified or pre-approved list of vendors, then the appeal procedures mentioned above are available upon the original determination of that vendor list, but not during subsequent competitive procedures involving only the pre-qualified or pre-approved list participants.
PART II CONTRACT ADMINISTRATION AND CONDITIONS
A. Contract Document
| The successful Bidder will be required to execute a contract in the form of a State of Maine Buyer Purchase Order, Contract Agreement to Purchase Services or State of Maine Master Agreement. |
| The Standard Terms and Conditions used with the aforementioned contract types may be found on the Division of Procurement Services website at the following link: |
| http://www.maine.gov/purchases/info/forms/BPO_General_Terms.doc |
| In the event that the State of Maine’s Standard Terms and Conditions or RFQ provisions do not otherwise cover contractual scenarios that are specific to the goods or services being purchased under this RFQ, then the State is willing to consider a Bidder’s standard terms and conditions. Consideration or use of a Bidder’s standard terms and conditions shall only occur under the general agreement that in the event of a conflict, the State of Maine’s Standard Terms and Conditions and RFQ provisions shall take precedence. |
| Other forms and contract documents commonly used by the State can be found on the Division of Procurement Services website at the following link: http://www.maine.gov/purchases/info/forms.shtml |
B. Independent Capacity In providing services and performing under the contract, the successful Bidder shall act independently and not as an agent of the State of Maine.
C. Payments and Other Provisions The State anticipates paying the selected Bidder for goods and services received, on the basis of net 30 payment terms, upon the receipt of an accurate and acceptable invoice. An invoice will be considered accurate and acceptable if it contains a reference to the State of Maine contract number, contains correct pricing information relative to the contract, and provides any required supporting documents, as applicable, and any other specific and agreed-upon requirements listed within the contract that results from this RFQ.
The State of Maine reserves the right to pay for goods purchased through this solicitation by any of several available means, which include but may not be limited to check, EFT, and/or procurement card. Bidders are advised that state statute precludes sellers from imposing a surcharge on credit or debit card purchases (text follows):
“9-A MRSA §8-303 (2): A seller in a sales transaction may not impose a surcharge on a cardholder who elects to use a credit card or debit card in lieu of payment by cash, check or similar means.”
1.0 MaineDOT GENERAL REQUIREMENTS
The following requirements and conditions shall be considered an essential part of the specifications and proposal.
1. Purchase of the Culvert Thawer with Trailer is subject to a Financial Assistance Agreement between the Department and the U.S. Department of Transportation.
2. All vehicle bids must conform to the final approved specifications and all Federal and State laws, regulations and standards. Where these specifications and Federal and/or State laws conflict, the requirements of the Federal and/or State laws shall prevail.
APPLICABLE REGULATIONS: SEE CERTIFICATIONS REQUIRED
3. Vehicle and component parts must be of the highest quality and workmanship available in the various trades and of substantial, durable, and safe construction. In all cases materials and construction of the vehicle must be furnished as specified but when brand names are used in the specifications, the term “approved equal” is implied and will be considered.
4. No advantage shall be taken by the vehicle manufacturer or bidder in the omission of parts or details required to make the vehicle complete and ready for service even though such parts or details may not be mentioned in these specifications. All units or parts not herein contained or specified shall be manufacturer’s standard. All parts shall be new. In no case will used, reconditioned, or obsolete parts be accepted. Insofar as possible, parts and equipment in any one vehicle shall be a duplicate in manufacture, design and construction and shall be interchangeable with parts and equipment in any other vehicle in the proposal.
5. The bidder shall furnish descriptive literature for the vehicle(s) being bid. This material shall be mailed along with completed documents (certifications).
6. The price quoted in any proposal shall include all items of labor, material, tools, equipment, delivery and other costs necessary to fully complete the delivery of vehicles pursuant to these specifications.
7. The Division of Procurement Services/MaineDOT reserves the right to accept any quote or reject any or all quotes for any reason, including, but not limited to, the following reasons:
Quotes which take exception to the specifications without approval pursuant to Appendix D - Section 3.0 Specification Compliance of the Invitation to Quote.
High lifecycle operating and maintenance costs based on evaluation of vehicle performance, warranty data, and local availability of service and parts pursuant to Appendix D - Section 2.0 Equipment Performance & Warranty Data of the Invitation to Quote.
Quotes considered not responsive due to lack of required certificates and information required in Appendix D - Certifications of the Invitation to Quote.
The Division of Procurement Services/MaineDOT reserves the right to award the Contract to the lowest responsible bidder, best value consideration, and however is in the best interest of the State of Maine.
The Division of Procurement Services and the Department reserves the right to evaluate specifications and alternates and determine equivalency.
8. Bidder shall submit the earliest possible delivery date with this Quote.
Earlier delivery dates will be given consideration during the quote selection process. In addition, penalties may be assessed for late delivery pursuant to Section F of Appendix E.
Appendix A
DEPARTMENT OF ADMINISTRATIVE AND FINANCIAL SERVICES
DIVISION OF PROCUREMENT SERVICES
BID COVER PAGE and DEBARMENT FORM
Bidder’s Organization Name:
Chief Executive - Name/Title:
| Tel: |
| Fax: |
| E-mail: |
Headquarters Street Address:
Headquarters City/State/Zip:
(provide information requested below if different from above)
Lead Point of Contact for Bid - Name/Title:
| Tel: |
| Fax: |
| E-mail: |
Street Address:
City/State/Zip:
| Are you a Maine Business as defined in this RFQ under RFQ Requirements, Section 6. Quotation Evaluation and Selection? |
| ☐ Yes ☐ No |
By signing below Bidder affirms:
· Their bid complies with all requirements of this RFQ; and
· This bid and the pricing structure contained herein will remain firm for a period of 180 days from the date and time of the bid opening; and
· That no personnel currently employed by the Department or any other State agency participated, either directly or indirectly, in any activities relating to the preparation of the Bidder’s proposal; and
· That no attempt has been made or will be made by the Bidder to induce any other person or firm to submit or not to submit a proposal; and
· The undersigned is authorized to enter into contractual obligations on behalf of the above-named organization.
Name:
Title:
Authorized Signature:
Date:
State of Maine RFQ # 17D 18012200000000000384 Rev. 5/9/17 Debarment, Performance, and Non-Collusion Certification
By signing this document I certify to the best of my knowledge and belief that the aforementioned organization, its principals, and any subcontractors named in this proposal:
1. Are not presently debarred, suspended, proposed for debarment, and declared ineligible or voluntarily excluded from bidding or working on contracts issued by any governmental agency.
1. Have not within three years of submitting the proposal for this contract been convicted of or had a civil judgment rendered against them for:
0. fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a federal, state or local government transaction or contract.
0. violating Federal or State antitrust statutes or committing embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property;
0. are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or Local) with commission of any of the offenses enumerated in paragraph (b) of this certification; and
0. have not within a three (3) year period preceding this proposal had one or more federal, state or local government transactions terminated for cause or default.
1. Have not entered into a prior understanding, agreement, or connection with any corporation, firm, or person submitting a response for the same materials, supplies, equipment, or services and this proposal is in all respects fair and without collusion or fraud. The above mentioned entities understand and agree that collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards.
· Failure to provide this certification may result in the disqualification of the Bidder’s proposal, at the discretion of the Department.
To the best of my knowledge all information provided in the enclosed proposal, both programmatic and financial, is complete and accurate at the time of submission.
Name:
Title:
Authorized Signature:
Date:
Appendix B
DEPARTMENT OF ADMINISTRATIVE AND FINANCIAL SERVICES
DIVISION OF PROCUREMENT SERVICES
DETAILED SPECIFICATIONS
RFQ # 17D 18012200000000000384
CULVERT THAWER WITH TRAILER
Technical Specifications For The Purchase and Installation of Culvert Thawer with Trailer
INTENT
It is the purpose and intent of these specifications to describe a new trailer mounted, self-contained high pressure, hot water culvert thawer, capable of generating 3,500 PSI of hot water at a minimum of five (5) gallons per minute and at sufficient temperature to melt ice in a solidly frozen culvert. The washer shall be mounted in an enclosed trailer which shall also include a minimum 300 gallon tank and anti-freeze kit. The unit must be designed and constructed for extreme, heavy-duty use. All standard features as advertised shall be included on this entire unit whether asked for or not within these specifications. This unit must meet or exceed all applicable OSHA, Federal and State codes, laws, and requirements.
COMPLETENESS
The price quoted in any proposal submitted shall include all items of labor, materials, tools, equipment, and other costs necessary to fully complete the manufacture and delivery of the Enclosed Trailer and Culvert Thawer pursuant to these specifications.
Any part or detail which makes the Enclosed Trailer and Culvert Thawer complete and ready for service shall not be omitted, even though such part or detail is not mentioned in these specifications.
CONFORMITY
All parts not specified shall be manufacturer’s best quality and shall conform in materials, design, or zworkmanship to the best practice known in the Enclosed Trailer and Culvert Thawer industry. All parts shall be new and in no case will used, reconditioned, or obsolete parts be accepted. The parts on the Enclosed Trailer and Culvert Thawer provided by the manufacturer should be interchangeable.
INSTRUCTIONS FOR COMPLETING TECHNICAL SPECIFICATION SHEET
Please complete the checklist for technical specifications set forth below. Electronically enter responses directly into the text-enabled fields next to each specification, including actual dimensions when applicable. Each Bidder must indicate whether it can meet the technical specifications by inserting an “X” next to each specification. The “X” will demonstrate that the Bidder’s offering meets the technical specification. If a Bidder cannot meet a technical specification, then the Bidder must give an explanation for each exception and for equipment that is not available or that will be dealer installed. All explanations must be provided in detail on separate pages along with the justification as to why the alternative equipment or deliverables will be as good as the equipment or deliverables described in the detailed specifications for desired items. A copy of the vendor specification proposal must be provided. Following these instructions is essential for proper bid evaluation.
If a Bidder fails to provide requested information or if information on a quote is found to be false or misleading, the quote will be rejected as unresponsive.
The award will be made on a best value basis to the vendor that either meets or most closely meets the specifications, while taking price and delivery into consideration.
| The following abbreviations must be used: |
| X |
| Standard or as specified |
| N/A |
| Not Available |
| DI |
| Dealer Installed |
| AE |
| Approved Equal |
| 2.0 Engine Requirement |
| Abbreviation |
| Actual Dimension |
| Notes |
| 2.1 |
| Heavy-duty four (4) cycle, liquid cooled, electric start diesel engine. Engine shall meet Tier IV emission standards in accordance with 40CFR Part 1039. |
| 2.2 |
| The diesel engine shall have a minimum of twenty-six (26) horsepower per SAE J 1349. |
| 2.3 |
| Exhaust emissions and noise levels shall comply with all applicable Federal and State of Maine standards. |
| 2.4 |
| The engine shall be equipped with a spark arrestor muffler. |
| 2.5 |
| The engine shall have an automated shut-down feature that is regulated by low oil pressure. |
| 2.6 |
| The engine shall be equipped with an easily accessible spin on extreme duty oil filter, and a water separating type fuel filter. |
| 2.7 |
| Engine shall be designed to use diesel fuel or blended diesel fuel in cold weather. |
| 2.8 |
| Engine shall come equipped with a dry type, dual element system air cleaner with a restriction indicator. |
| 2.9 |
| Engine gauge cluster shall include (volt/amp meter, oil pressure, temperature, and a Hobbs preferred brand hour meter). Hour meter shall be wired as such to accumulate hours only when engine is running. |
| 2.10 |
| Engine shall have a cold weather starting aid (glow plug design). |
| 2.11 |
| Engine shall have a minimum twelve (12) volt electrical system with a minimum forty (40) amp alternator. |
| 2.12 |
| Engine shall have a minimum one thousand (1000) CCA (cold cranking amps) battery. |
| 2.13 |
| Engine liquid cooling system shall have protection to minus thirty (30) degrees Fahrenheit with extended life anti-freeze. This shall be documented on anti-freeze tank. |
| 2.14 |
| Manually operated lockable master battery disconnect switch must be mounted in a place readily accessible to operator for (Lock-Out Tag Out). Cole Hersee switch will be 75908-BX battery switch, with a 240505- BX shackle lock is preferred brand. |
| 3.0 Heating Unit Requirements |
| Abbreviation |
| Actual Dimension |
| Notes |
| 3.1 |
| The heating unit shall be designed to use diesel fuel, or use blended fuel in cold weather. A minimum of 560,000 BTU’s shall be required. |
| 3.2 |
| Heating unit shall have a heavy-duty metal frame that is able to withstand the stress and vibration of traveling on the road. |
| 3.3 |
| Heating unit coil shall consist of a minimum one hundred sixty- eight (168)’ of schedule eighty (80) steel pipe (1/2) inch ID, capable of maintaining a minimum of one hundred forty (140) degrees Fahrenheit temperature rise and shall be equipped with a stainless steel coil wrap. |
| 3.4 |
| Heating unit shall be equipped with all proper safety devices and controls required by Federal and Maine state laws, rules, and regulations. |
| 3.5 |
| A metalbestos stack shall be used to vent both the diesel engine, and the heating unit. One stack shall be installed to collect the exhaust from both units. This stack shall be at rear of trailer, through the roof, and properly supported. Any exposed exhaust pipes shall have proper safety protection for personnel in case contact is made. |
| 3.6 |
| Any and all combustible materials must be protected from the burner exhaust. |
| 3.7 |
| Burner shall operate on 115 volts AC. |
| 3.8 |
| The burner generator shall be sized a minimum of twenty-five hundred (2,500) watt to accommodate both a minimum twenty (20) amp battery charger and two (2) 115 volt work lights mounted on the inside of the trailer. |
| 3.9 |
| All operating controls and gauges shall be readily accessible when operator is standing on the ground facing the rear of trailer with rear doors open. |
| 3.10 |
| One (1) four-thousand (4,000) PSI manual shutoff valve for the discharge hose shall be provided mounted between the burner unit and the hose reel. |
| 3.11 |
| This unit shall be equipped with an anti-freeze kit for protection in case unit is exposed to below thirty-two (32) degree temperature. |
| 3.12 |
| This self-contained unit shall be capable of generating three-thousand five-hundred (3,500) PSI of hot water at a minimum of five (5) gallons per minute. |
| 4.0 Fuel Tank Requirements |
| Abbreviation |
| Actual Dimension |
| Notes |
| 4.1 |
| A common fuel tank to supply both the engine and burner shall be provided. The tank shall be sized to provide the continuous operation of both the engine and burner for a minimum of four (4) hours. A minimum of sixteen (16) gallons shall be the fuel tank capacity. |
| 4.2 |
| The fuel tank shall be properly vented, and an automotive style diesel nozzle must fit into the fill opening. |
| 4.3 |
| The fuel tank shall be mounted in such a location for ease of filling, and be of durable construction. |
| 5.0 Transport Trailer Requirements |
| Abbreviation |
| Actual Dimension |
| Notes |
| 5.1 |
| The flat nose trailer shall be totally enclosed and allow the mounting of all equipment, easy access to all components, and proper weight distribution of all components inside the trailer, with minimum payload capacity of 4,725 lbs. The unit shall have side flow thru vents on each side of trailer, and a twenty-four (24) inch tall aluminum stone guard on outside front of trailer. |
| 5.2 |
| Trailer size shall be a minimum of fourteen (14)’ eight (8)” long excluding the tongue x eighty-four (84) inches wide x eighty (80) inches high. Overall interior height shall be a minimum of 75 inches. Overall interior width shall be a minimum of 77 inches. |
| 5.3 |
| Trailer shall be equipped with a tongue mounted to front of trailer. At the front of the tongue a bolt-on three (3)” ID pintle eye shall be mounted with vertical adjustments of 18” to 25” measured from ground level. The tongue frame shall extend a minimum of four (4) feet into the bottom of the frame of the chassis (i.e. not welded only to the front floor crossmember). |
| 5.4 |
| Platform height shall be a maximum of nineteen (19) inches. |
| 5.5 |
| Trailer shall have two (2) rear doors, with a minimum opening of seventy-two (72)” wide x seventy-five (75)” high with latches to hold doors fully open against the sides of the trailer. |
| 5.6 |
| Trailer shall have a personnel door mounted on curb side front corner of trailer. Thirty-two (32)” wide x seventy-two (72)” high. This door shall also have a latch to hold it open against the trailer. |
| 5.7 |
| All doors shall have cam type bar lock, and locking hasps. |
| 5.8 |
| Trailer shall be of adequate structural steel, with all necessary reinforcements, made from a minimum of 2” x 4” tubing or 6” I beam. |
| 5.9 |
| Trailer structural floor supports shall be a minimum of sixteen (16)” on center and constructed of three (3)” steel channel stock. Wall supports shall be a minimum of sixteen (16)” on center. |
| 5.10 |
| Trailer floor shall be a minimum of ¾” exterior grade plywood. Walls shall be a minimum of 3/8” plywood. Exterior skin shall be a minimum of 0.30 aluminum. Roof shall be constructed of 0.80 aluminum, and be one (1) piece construction Galvalume or equivalent material. |
| 5.11 |
| Trailer shall have a minimum gross vehicle weight rating of 6,000 lbs. The trailer shall have two (2) axles, each with 3,500 lb. rating, electric brakes, and breakaway system. Axles shall be Torflex design suspension (preferred) or leaf springs with 4” drop axles with EZ lube hubs or equivalent. |
| 5.12 |
| Radial trailer tires shall be a minimum size of ST205/75R15, minimum load range C. Shall have a minimum of five (5) bolt automotive type pressed steel wheels mounted on high capacity hubs with roller bearings, dust seals, and bearing buddy caps. |
| 5.13 |
| Trailer shall be equipped with two manufacturer’s regulation Grade 30 safety chains, minimum of three (3) feet long. Chains shall have a 3/8” safety hook with OSHA approved spring safety latch. |
| 5.14 |
| Trailer shall come equipped with an adjustable jack with a foot, mounted on the tongue, with a minimum rated capacity of two-thousand (2,000) lbs. |
| 5.15 |
| The trailer shall have aluminum exterior fenders that covers both tires. These fenders can be rolled form or Jeep style. |
| 5.16 |
| Trailer shall come with one (1) spare tire and wheel that matches what is on the trailer. |
| 5.17 |
| Trailer shall have one (1) Class 1 strobe light mounted at rear of unit centered on roof, (Whelan L32 Super-LED, Amber, Low Dome with aluminum base shall be the preferred model). This strobe shall be wired into trailer’s marker light circuit. This strobe assembly shall be mounted solidly to the roof, with an extra mounting plate, not mounted only on trailer roof skin. |
| 5.18 |
| Exterior lighting on trailer to include marker lamps, stop and turn signals, license plate light, and bracket for plate. All lights shall be rubber mounted LED. Exterior lights shall conform to ICC wiring and have stop/tail lights independent of directional lights (see attached wiring diagram for details). |
| Circuits | |
| Code # | |
| Marking | |
| Color Code |
| Ground |
| 1 |
| W |
| White |
| Clearance, Side Marker & Identification Lamps |
| 2 |
| BK |
| Black |
| Left Turn & Hazard Signal |
| 3 |
| Y |
| Yellow |
| Top Lamps & Anti-Lock Devices |
| 4 |
| R |
| Red |
| Right Turn Signal & Hazard Signal |
| 5 |
| G |
| Green |
| Tail, Rear Clearance Marker, & Plate Lamps |
| 6 |
| BR |
| Brown |
| Auxiliary Circuit |
| 7 |
| BL |
| Blue |
| 5.19 |
| All exterior trailer wiring to be run in suitable weather resistant loom or conduit which terminates in a weatherproof junction box on the tongue of the trailer. |
| 5.20 |
| The trailer umbilical which leads to the truck light socket shall terminate with a seven (7) prong male plug. This plug shall have round pins not the flat RV type and begin at the weather tight junction box. |
| 5.21 |
| All wire splices shall be either soldered or barrel connected and covered with automotive type shrink tubing (Scotch type wire connections and/or electrical tape are not acceptable in any application). |
| 5.22 |
| All wiring shall be mounted, routed, and fastened in a professional manner to prevent chafing, rubbing, etc. All wiring shall be protected by wire loom and be weatherproof. |
| 5.23 |
| Trailer shall be equipped with two (2) interior dome lights, one in front, and one in rear of trailer centered on ceiling. A switch for these lights shall be mounted on wall next to side door. |
| 5.24 |
| One (1) ten (10)’ foot length of four (4)” minimum diameter PVC pipe capped on one (1) end shall be mounted on centerline side of trailer for thawing pipe storage opposite entry door. The end of this pipe storage shall be accessible by an employee standing on ground at rear of trailer. |
| 5.25 |
| The trailer shall have corrosion preventative compound undercoating. |
| 5.26 |
| Trailer tongue weight shall be between ten (10) and fifteen (15)%. This percentage is determined from total weight of the loaded trailer. |
| 6.0 Water Tank Requirements |
| Abbreviation |
| Actual Dimension |
| Notes |
| 6.1 |
| One approximately three-hundred (300) gallon PVC horizontal leg tank shall be securely mounted over the trailer axles. Tank shall have molded-in baffles to reduce sloshing when tank is in motion, and have a sixteen (16)” round fill opening (with cover) on top of tank. Tank shall be fastened to the floor in such a manner as to prevent a full tank from breaking free and causing damage. |
| 6.2 |
| An easily accessible drain valve with a shutoff shall be installed at bottom of water tank. This valve shall be sized for a common 5/8” garden hose. |
| 6.3 |
| A connection for a common garden hose shall be provided for tank filling, at top of tank, and be easily accessible and clearly marked. |
| 7.0 Paint Requirement |
| Abbreviation |
| Actual Dimension |
| Notes |
| 7.1 |
| All metal shall be free of rust and mill scale and prepared (blasted) for primer and finish paint coat. |
| 7.2 |
| A two (2) part epoxy primer shall be applied to prepared metal surfaces to the minimum thickness of 3-5 mils dry. |
| 7.3 |
| Paint shall be applied to a thickness of 5-7 mils dry. |
| 7.4 |
| All paint and primers must be lead free. |
| 7.5 |
| Unit paint code required. |
| 7.6 |
| Preferred color to be Cat Highway Yellow (Dupont Imron 3.5 HG). Please state the added cost for Cat Yellow (if any), list your basic no charge colors, and list your standard upcharge colors and costs. |
| 8.0 Hose Reel, Wand, Nozzles, and Pipe Requirement |
| Abbreviation |
| Actual Dimension |
| Notes |
| 8.1 |
| One (1) manual rewind hose reel of sufficient size to contain one-hundred (100) feet of R1 four-thousand (4,000) PSI rated rubber hose. Reel is to be mounted on the floor at the rear of the trailer, and be readily accessible for hose to be unreeled. |
| 8.2 |
| A standard wand design for washing equipment shall be included with three (3) tips. |
| 8.3 |
| Attachment of either pipe or wand to the high pressure hose shall be accomplished with a stainless steel quick coupler connection. |
| 8.4 |
| Three (3) nozzles specifically designed for thawing culverts shall be provided. Corrosion resistant stainless steel nozzles with one (1) forward port and a minimum of three (3) backward ports shall be the preferred nozzle. |
| 8.5 |
| Unit shall be equipped with six (6) ten (10)’ foot sections for a total of sixty (60)’ of ½” black iron pipe. Five (5) sections of pipe shall be threaded on each end, and come equipped with one (1) coupler per length of pipe. One (1) length of pipe on one (1) end shall have a quick disconnect coupler that mates to the high-pressure hose, the other end shall be threaded. Please provide a price option for sixty (60)’ stainless pipe. This pipe shall be in ten (10)’ foot sections as well. |
| 9.0 Warranty Requirement |
| Abbreviation |
| Actual Dimension |
| Notes |
| 9.1 |
| Manufacturer’s standard warranty shall apply. |
| 9.2 |
| Terms and conditions of warranty shall be provided with bid proposal, (Warranty must be clearly defined and all components covered shall be clearly listed and identified). |
| 9.3 |
| Manufacturer’s warranty will start with MDOT in-service date. |
| 9.4 |
| In-Service Date: Warranty on Enclosed Trailer and Culvert Thawer (not placed in service immediately because of time lag due to installation of components, special equipment, seasonal usage or other delays) shall be warranted from the date the units are actually placed in service. MDOT Fleet Services Augusta shall notify the vendor in writing of “in-service” date. |
| 9.5 |
| During the term of the manufacturer’s warranty Fleet Services reserves the right to perform any and or all warranty “in house” to meet operational needs or demands with the pre-authorization of the vendor. Fleet Services will recover all parts and labor costs as allowed by manufacturer’s flat rate manual. O.E.M. parts may be supplied at no cost by the manufacturer, and or dealer, or may be purchased by Fleet Services on the open market to meet operational demands. Any and all defective parts shall be returned to the manufacturer or dealer upon request. |
| 9.6 |
| Vendor shall be (100%) responsible for all repair costs to include parts, and labor during the warranty period. |
| 10.0 Manuals & Software Requirement |
| Abbreviation |
| Actual Dimension |
| Notes |
| 10.1 |
| There shall be two (2) operators manuals per unit. |
| 10.2 |
| There shall be two (2) Shop repair manuals or CD’s per unit. |
| 10.3 |
| There shall be two (2) parts manuals or CD’s per unit. |
| 11.0 Training Requirement |
| Abbreviation |
| Actual Dimension |
| Notes |
| 11.1 |
| Training for Maintenance and Operation personnel shall be provided by the Trailer Mounted Culvert Thawer manufacturer, to include a minimum of four (4) hours of training and may take place within each of Maine DOT Regions ( Augusta, Scarborough, Dixfield, Bangor, and Presque Isle). This training may be videotaped by Maine DOT for future use by Maine DOT trainers. |
| 11.2 |
| Any and all training shall be performed by factory certified trainers and not by sales personnel. |
| 11.3 |
| All manufacturer’s training programs being offered need to be defined in detail and a written proposal of what those programs will entail, and submitted with the bid packet. |
| 12.0 General Requirement |
| Abbreviation |
| Actual Dimension |
| Notes |
| 12.1 |
| All pinch points and danger shall be clearly marked. |
| 12.2 |
| Equipment shall be fully inspected, serviced, fully assembled, and ready to operate upon delivery. |
| 12.3 |
| Be it known that these specifications are a minimum and that the bid will be evaluated based on price, warranty, manufacturer’s performance data, delivery schedule, parts availability, and other items deemed appropriate. |
| 12.4 |
| Bidders shall supply a detailed specification sheet with their proposals listing exactly what is being offered (not a reference to a web site) and to certify that they have service facilities in Maine, staffed with trained service technicians, and stocked with repair parts for the equipment which is being bid on. Failure to provide this information may cause the bid to be rejected. The Maine DOT reserves the right to reject any and or all bids. |
| 12.5 |
| All hardware installed shall not obstruct any lubrication points. In addition all components and systems shall be easily accessible to the operator. |
| 12.6 |
| All safety, warning, and instructional decals shall be properly displayed and appropriate for this application. |
| 12.7 |
| Maine DOT Fleet Services reserves the right to pre-inspect the Trailer Mounted Culvert Thawer before delivery. |
| 12.8 |
| Exceptions to specifications shall be listed on a separate paper and noted as exceptions, and submitted with bid proposal. If exceptions are not listed as such it shall be considered that the vendor will comply with all specifications as listed. |
| 12.9 |
| Equipment offered shall comply with all applicable Federal and State of Maine laws. |
| 12.10 |
| Upon delivery of unit or units all necessary paperwork such as (Certificate of Origin, dealer’s certificate, and invoices) shall accompany unit and or units. |
| 12.11 |
| All bid proposals shall include shipping and delivery to: Maine Department of Transportation Fleet Services, 66 Industrial Dr. Augusta, Me. 04330 |
| 12.12 |
| The floor of the trailer shall be reinforced underneath where bolts go through the floor for` mounting all machinery. Direct mounting solely on plywood floor is not acceptable. |
| 12.13 |
| A walk thru access space shall be required on the inside of the trailer running the length of the trailer on the curb side. Space between machinery and wall of trailer. |
| 12.14 |
| All gauges, valves, switches, filters or any other necessary accessories that is needed to operate this unit shall not be obscured or hidden. All these accessories shall be easily identified by the operator. |
| 12.15 |
| This unit shall exhibit safe towing characteristics at highway speeds up to and including fifty-five (55) MPH fully loaded with fuel, and water without sway, or bounce. Any equipment not meeting this requirement will be returned to the vendor for corrections, replacement, or full refund of the purchase price. |
| 13.0 Services Requirement |
| Abbreviation |
| Actual Dimension |
| Notes |
| 13.1 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .