Cullman Co DHR Blind Installation.docx
DOCX document 17 KB Posted
- Attached to
- Cullman Co DHR Blinds Installation
- Solicitation number
- SRC0000033621
- Issued by
- Coosa County, Alabama
About this file
This is a specification document for window blinds installation services issued by Cullman County Department of Human Resources in Cullman, Alabama. The project requires suppliers to provide all labor, tools, and equipment necessary to install window blinds throughout designated areas of the DHR facility, with all blinds to be provided by DHR. The scope of work includes installing blinds in designated areas, ensuring proper fit and secure installation, verifying operational functionality, maintaining a clean work environment, and removing installation-related debris. Suppliers must coordinate scheduling directly with the Point of Contact, Paula Holmes, and are prohibited from reporting to the site without prior confirmation. A site visit is not required but may be coordinated with the Point of Contact for clarification. All work must comply with applicable building and safety codes, be performed in a professional and workmanlike manner, and be completed to the satisfaction of Cullman County DHR for final acceptance and sign-off.
Payment shall be made on a Net 30 basis in arrears, with no payment issued until all work is completed and accepted by the county. Suppliers must verify all measurements prior to installation and coordinate all work to minimize disruption to daily operations. All installed blinds must be fully operational upon completion, and the work will be subject to inspection by Cullman County DHR personnel. This is a Request for Quote round 1 for the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QQ_Standard_Boilerplate.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specification Window Blinds Installation Cullman County Department of Human Resources Project Location:
Cullman County DHR Cullman, AL 35055 Point of Contact:
Paula Holmes A site visit is not required for this project; however, suppliers may coordinate with the Point of Contact if additional clarification is needed.
Scope of Work:
The supplier shall provide all labor, tools, and equipment necessary to install window blinds throughout designated areas of the facility.
All window blinds will be provided by DHR; the supplier shall provide labor, tools, and equipment for installation only.
· Install window blinds in designated areas
· Ensure all blinds are properly fitted, and securely installed
· Ensure all blinds are fully operational upon completion
· Maintain a clean and safe work environment
· Remove and dispose of all installation-related debris Project Requirements:
· Coordinate scheduling directly with the Point of Contact
· Do not report to the site without prior confirmation from the Point of Contact
· Verify all measurements prior to installation
· Complete all work in a professional and workmanlike manner Payment Terms:
· Payment terms shall be Net 30
· Payment will be made in arrears
· No payment will be issued until all work has been completed and accepted by Cullman County DHR General Requirements:
· All work must comply with applicable building and safety codes
· Work must be performed in a safe and professional manner
· Coordinate all work to minimize disruption to daily operations Inspection and Acceptance:
· All work will be subject to inspection by Cullman County DHR
· Work must be completed to satisfaction prior to final acceptance
· DHR shall perform inspection and sign-off upon completion of all work
File details come from the government source that posted it. Updated .