Culinary Equipment and Installation Request for Proposals

This Request for Proposals (RFP #2026-001) is issued by Orange County Public Schools (OCPS) in Orange, Virginia, for the supply and installation of culinary equipment at the Orange County Career and Technical Education (CTE) Facility located at 208 Hornet Drive, Orange, Virginia 22960. The scope of work encompasses furnishing, delivering, unloading, rigging, installing, starting up, testing, commissioning, and providing training for all culinary equipment as identified in the project specifications and equipment schedule. The successful contractor must provide a complete, operational installation including all labor, supervision, materials, equipment, accessories, transportation, coordination, and incidental items necessary for a fully functional culinary equipment system. Proposals must be received by 2:00 P.M. EST on December 3, 2026, submitted in sealed format to the Orange County Public Schools Finance Department at 200 Dailey Drive, Orange, Virginia 22960. The contact for this solicitation is Bobbie Bernard, Accounts Payable, Purchasing, & Federal Programs, at (540) 661-4550 x1514 or bbernard@ocss-va.org. The RFP was issued on November 19, 2026, and the contract will be governed by Orange County Public School Procurement Policy and the Virginia Public Procurement Act.

The contractor shall submit a single lump-sum price covering all equipment, accessories, freight, delivery, unloading, rigging, storage, installation, labor, supervision, connections, start-up, testing, commissioning, training, warranty support, documentation, cleaning, and debris removal. Payment terms allow a minimum of 30 days after receipt of an approved invoice by the School Board. The contractor is responsible for all federal, state, and local taxes, permits, governmental fees, and licenses necessary for execution and completion of the work. All equipment must be new, commercial-grade, and of the highest quality, with submittals requiring review and approval prior to procurement. The contractor must verify field conditions, coordinate with other trades, provide comprehensive training to Owner personnel, and deliver complete operation and maintenance documentation. Standard manufacturer's warranties apply unless otherwise specified. No set-asides are indicated in this solicitation. Insurance requirements include Workers' Compensation, Employer's Liability ($1,000,000), Commercial General Liability ($1,000,000), and Automobile Liability ($1,000,000). The School Board reserves the right to accept or reject all bids, award on a lump-sum or individual item basis, negotiate with the lowest responsive and responsible bidder, and terminate the contract for convenience with at least 30 working days' notice.

View the file

Other files

File Type Posted
114000 - Food Service Equipment.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The Orange County School Board does not discriminate on the basis of race, color, creed, religion, national origin, ancestry, political affiliation, sex, sexual orientation, gender, gender identity, age, pregnancy, childbirth or related medical conditions, marital status, status as a veteran, genetic information, disability, or any other characteristics protected by law in its employment practices or educational program and activities. Compliance inquiries should be directed to the Director of Human Resources, 200 Dailey Drive, Orange, VA 22960 or by phone at 540-661-4550.

REQUEST FOR PROPOSALS

CULINARY EQUIPMENT AND INSTALLATION

ORANGE COUNTY CTE BUILDING

ISSUE DATE: November 19, 2026

DUE DATE: December 3, 2026

TIME: 2:00 P.M.

RFP #: 2026-001

ISSUING DEPARTMENT: Orange County Public Schools

Finance Department-Bobbie Bernard

200 Dailey Drive

Orange, VA 22960

CONTACT: Bobbie Bernard

Accounts Payable, Purchasing, & Federal Programs

Phone: (540) 661-4550 x 1514

Email: bbernard@ocss-va.org

Orange County Public Schools (OCPS) invites qualified firms to submit sealed proposals to supply and install the Culinary Equipment at the Orange County Career and Technical Education Facility located at 208 Hornet

Drive Orange, Virginia 22960. This Request for Proposal and resulting contract(s) shall be consistent with and governed by the Orange County Public School Procurement Policy and the Virginia Public Procurement Act.

All proposals shall be received no later than 2:00 P.M. EST December 3, 2026, to the Finance Office located at 200 Dailey Drive Orange, Virginia 22960. If proposals are sent via a mailing service, digital copy thru eVA, or hand delivered, please address the proposals to the issuing department listed above.

Any proposals that are submitted by e-mail, phone, or facsimile shall not be considered. Any proposals received after the deadline shall be deemed non-responsive and returned unopened. If the Owner closes its office due to inclement weather, scheduled receipt of proposals will be extended to the next business day, same time. It is the Offeror’s sole responsibility to ensure all information, including addendums, are complete and delivered on time.

1. PURPOSE

Orange County Public Schools is soliciting proposals from qualified culinary equipment contractors to furnish, deliver, unload, rig, install, start-up, test, commission, and provide training for the culinary equipment identified in the project specifications and equipment schedule for the Orange County CTE Building.

The intent of this Request for Proposals (RFP) is to obtain a complete, operational culinary equipment installation. The successful proposer shall provide all labor, supervision, materials, equipment, accessories, transportation, coordination, installation, testing, commissioning, and incidental items necessary to provide a complete and functional installation in accordance with the Contract Documents.

The Contractor shall be responsible for verifying field conditions and coordinating its work with the General

Contractor, Owner, Architect/Engineer, and other trades prior to ordering and installation.

2. SCOPE OF WORK

The Culinary Equipment Contractor shall provide a complete lump-sum proposal for the culinary equipment work shown and specified in the Contract Documents.

The scope shall include, but not necessarily be limited to, the following:

A. Equipment Procurement

1. Furnish all culinary equipment identified in the project equipment schedule and specifications.

2. Provide new, unused, commercial-grade equipment unless specifically noted otherwise.

3. Equipment shall be the manufacturer and model specified or an approved equal in accordance with the

Contract Documents.

4. Provide all standard accessories, components, trim, controls, hardware, supports, legs, casters, shelves, racks, panels, fittings, and other items required for a complete installation.

5. Verify equipment dimensions and specifications prior to purchase.

6. Coordinate equipment requirements with architectural, mechanical, electrical, plumbing, fire protection, and other applicable drawings.

7. Provide equipment that is compatible with the utilities and conditions indicated in the Contract

Documents.

B. Submittals

The Contractor shall provide complete equipment submittals for review and approval prior to procurement.

Submittals shall include, as applicable:

• Manufacturer

• Model number

• Equipment description

• Dimensions

• Weight

• Electrical requirements

• Voltage, phase, and amperage

• Gas requirements

• Water requirements

• Drain requirements

• Plumbing connections

• Ventilation requirements

• Exhaust requirements

• Refrigeration requirements

• Clearances

• Mounting requirements

• Installation requirements

• Manufacturer's installation instructions

• Product data

• Shop drawings

• Rough-in requirements

• Utility connection locations

• Accessories

• Warranty information

• Maintenance requirements

The Contractor shall not order equipment until required submittals have been reviewed and accepted in accordance with the Contract Documents.

C. Delivery

The Contractor shall:

1. Coordinate all deliveries with the General Contractor.

2. Provide adequate notice prior to delivery.

3. Deliver equipment to the project site in a manner that prevents damage.

4. Unload and properly handle all equipment.

5. Provide all necessary labor and equipment for unloading and movement of equipment.

6. Protect equipment from weather, construction activities, theft, damage, and other conditions that could adversely affect the equipment.

7. Inspect equipment upon delivery and promptly report any damage or discrepancies.

Delivery, unloading, transportation within the project site, and placement of equipment shall be included in the lump-sum proposal.

D. Rigging and Movement

The Contractor shall provide all necessary rigging and material-handling operations required to place equipment in its final location.

This shall include, as required:

• Forklifts

• Pallet jacks

• Dollies

• Hoisting equipment

• Cranes

• Specialized rigging equipment

• Labor

• Protection of existing and new construction

• Coordination with the General Contractor

No additional compensation will be permitted for normal equipment handling, movement, or rigging required to complete the installation.

3. INSTALLATION

The Contractor shall provide complete installation of all culinary equipment included within its scope.

Installation shall include all labor, materials, fittings, hardware, accessories, supports, connections, adjustments, and incidental work necessary for a complete and operational installation.

The Contractor shall:

1. Set and level equipment.

2. Anchor equipment where required.

3. Install equipment legs, casters, supports, brackets, and accessories.

4. Install equipment trim and closure panels.

5. Install equipment against walls, counters, cabinets, and other adjacent construction as required.

6. Provide required equipment-to-equipment connections.

7. Provide all manufacturer-required installation components.

8. Coordinate final equipment locations with the General Contractor.

9. Verify that equipment is installed in accordance with manufacturer requirements.

10. Maintain required clearances and accessibility.

11. Protect finished surfaces and adjacent construction during installation.

All equipment shall be left clean, level, secure, properly adjusted, and ready for operation.

4. UTILITY CONNECTIONS AND COORDINATION

The Contractor shall coordinate all equipment utility requirements with the General Contractor and applicable subcontractors prior to installation.

The Contractor shall verify that equipment requirements are consistent with the utility rough-ins provided by others.

The Contractor shall coordinate, as applicable:

• Electrical connections

• Plumbing connections

• Domestic water

• Hot water

• Waste and drainage

• Natural gas

• Refrigeration

• Exhaust/ventilation

• Makeup air

• Fire protection requirements

• Data/control connections

• Other equipment-specific utilities

Unless specifically identified as work by others, the Culinary Equipment Contractor shall provide all connections, fittings, valves, hoses, adapters, flexible connections, and accessories required for a complete connection to the designated rough-in points.

Any discrepancies between the equipment requirements and the rough-in conditions shall be reported to the

General Contractor prior to installation.

The Contractor shall not proceed with installation of equipment where utility conditions are inadequate without notifying the General Contractor.

5. FIELD VERIFICATION

Prior to ordering equipment, the Contractor shall verify field conditions that affect the equipment installation.

Field verification shall include, as applicable:

• Room dimensions

• Door openings

• Equipment locations

• Equipment clearances

• Utility locations

• Utility capacities

• Rough-in locations

• Finished floor elevations

• Wall conditions

• Countertop conditions

• Access routes

• Equipment delivery paths

• Ceiling heights

• Structural conditions affecting equipment installation

The Contractor shall immediately notify the General Contractor of discrepancies between the Contract

Documents and actual field conditions.

Failure to verify field conditions shall not relieve the Contractor of responsibility for providing a complete and properly installed system.

6. START-UP AND COMMISSIONING

The Contractor shall provide complete start-up and commissioning of all equipment.

Start-up shall be performed by qualified personnel and, where required by the manufacturer, by manufacturer-authorized service personnel.

Commissioning shall include:

1. Equipment start-up.

2. Equipment adjustment.

3. Verification of proper operation.

4. Verification of safety controls.

5. Verification of temperature controls.

6. Verification of water and drainage functions.

7. Verification of gas operation where applicable.

8. Verification of electrical operation.

9. Verification of refrigeration systems where applicable.

10. Verification of controls and displays.

11. Verification of equipment interlocks where applicable.

12. Correction of deficiencies.

13. Final operational testing.

All equipment shall be demonstrated to be fully operational prior to final acceptance.

7. TESTING

The Contractor shall test all equipment and associated components in accordance with manufacturer requirements and applicable codes.

Testing shall verify that:

• Equipment operates properly.

• Equipment reaches required operating temperatures.

• Safety devices function properly.

• Controls operate correctly.

• Connections are secure.

• Water supplies and drains operate properly.

• Gas-fired equipment operates properly.

• Refrigeration equipment operates properly.

• Exhaust-related equipment operates properly where applicable.

• Equipment does not interfere with adjacent equipment or building systems.

Any deficiencies identified during testing shall be corrected by the Contractor at no additional cost to the

Owner.

8. TRAINING

The Contractor shall provide on-site training for Owner personnel responsible for operation and maintenance of the culinary equipment.

Training shall include, as applicable:

• Normal equipment operation

• Start-up and shutdown procedures

• Cleaning procedures

• Preventive maintenance

• Safety procedures

• Temperature controls

• Control operation

• Troubleshooting

• Manufacturer recommendations

• Warranty procedures

• Service procedures

Training shall be conducted after equipment has been fully installed, started, tested, and commissioned.

The Contractor shall coordinate training dates with the Owner and General Contractor.

9. OPERATION AND MAINTENANCE INFORMATION

The Contractor shall provide complete operation and maintenance information for all equipment.

Closeout information shall include, as applicable:

• Operation manuals

• Maintenance manuals

• Manufacturer literature

• Parts lists

• Recommended spare parts

• Warranty information

• Service contact information

• Equipment start-up documentation

• Testing documentation

• Training documentation

• Manufacturer's maintenance requirements

• Cleaning instructions

• Equipment certifications

• Final approved equipment schedules

Documentation shall identify the manufacturer and model number for each piece of equipment.

10. WARRANTY

All equipment shall be provided with the manufacturer's standard warranty unless a longer warranty is specifically required by the Contract Documents.

The Contractor shall provide all warranty documentation to the Owner prior to final completion.

The Contractor shall be responsible for coordinating warranty service and shall assist the Owner in obtaining warranty repairs or replacement when required.

Warranty work shall include labor and materials covered by the applicable manufacturer's warranty.

The Contractor shall correct defective equipment, installation deficiencies, or workmanship issues in accordance with the applicable warranty requirements.

11. PROTECTION OF EQUIPMENT

The Contractor shall protect all equipment from damage during transportation, storage, installation, and construction.

Equipment shall remain protected until the area is ready for final use.

Damaged equipment shall be repaired or replaced at the Contractor's expense if the damage resulted from the

Contractor's operations, handling, storage, or failure to properly protect the equipment.

The Contractor shall coordinate final removal of protective materials with the General Contractor.

12. CLEANING

Upon completion of installation, the Contractor shall thoroughly clean all equipment.

Cleaning shall include:

• Removal of labels and temporary protective materials

• Removal of construction debris

• Removal of packaging

• Cleaning of stainless-steel surfaces

• Cleaning of interior and exterior equipment surfaces

• Cleaning of equipment accessories

• Removal of adhesive residue

• Removal of dirt and dust resulting from installation

Equipment shall be left in a clean and ready-to-use condition.

13. PACKAGING AND DEBRIS

The Contractor shall remove all packaging materials, pallets, cartons, crates, protective materials, and installation debris generated by its work.

All debris shall be removed from the project site and disposed of in accordance with project requirements.

The Contractor shall not use the project dumpsters unless specifically authorized by the General Contractor.

14. COORDINATION WITH OTHER TRADES

The Culinary Equipment Contractor shall coordinate its work with all other trades and shall attend coordination meetings when requested.

Coordination shall include, but not be limited to:

• General Contractor

• Architect

• Mechanical Contractor

• Electrical Contractor

• Plumbing Contractor

• Fire Protection Contractor

• HVAC Contractor

• Refrigeration Contractor

• Casework Contractor

• Flooring Contractor

• Other applicable subcontractors

The Contractor shall provide timely information regarding equipment requirements so that other trades can properly complete their work.

15. CODE AND REGULATORY REQUIREMENTS

All equipment and installation shall comply with applicable federal, state, and local laws, codes, regulations, and standards.

The Contractor shall provide equipment that is properly certified and listed by applicable nationally recognized testing laboratories and regulatory agencies where required.

Equipment shall comply with applicable requirements of authorities having jurisdiction, including requirements applicable to:

• Electrical systems

• Plumbing

• Gas

• Fire protection

• Mechanical systems

• Ventilation

• Food service equipment

• Accessibility

• Health and sanitation

The Contractor shall be responsible for obtaining required inspections and certifications associated with its scope of work unless specifically assigned to another party in the Contract Documents.

16. SUBSTITUTIONS

Any proposed substitutions shall be submitted for review and approval prior to procurement.

Substitutions shall clearly identify:

• Specified manufacturer

• Specified model

• Proposed manufacturer

• Proposed model

• Technical differences

• Dimensional differences

• Utility differences

• Cost impact

• Schedule impact

• Warranty differences

• Other relevant differences

The Contractor shall not substitute equipment without written approval.

Approved substitutions shall meet or exceed the performance, quality, functionality, capacity, and appearance requirements of the specified equipment.

17. EQUIPMENT SCHEDULE

The equipment schedule provided with the Contract Documents shall establish the basis of the culinary equipment scope.

The Contractor shall review the complete equipment schedule and verify that its lump-sum proposal includes all equipment, accessories, installation requirements, and incidental items necessary for a complete installation.

Equipment Schedule:

Please see Attachments

The Contractor shall identify any discrepancies, omissions, conflicts, or questions concerning the equipment schedule prior to submission of its proposal.

18. LUMP-SUM PROPOSAL

The Contractor shall provide a single lump-sum price for the complete Culinary Equipment and Installation scope described in the Contract Documents.

The lump-sum price shall include all costs necessary to provide a complete and operational installation, including, but not limited to:

• Equipment

• Accessories

• Freight

• Delivery

• Unloading

• Rigging

• Material handling

• Storage

• Installation

• Labor

• Supervision

• Equipment connections within the Contractor's scope

• Start-up

• Testing

• Commissioning

• Training

• Warranty support

• Documentation

• Cleaning

• Packaging removal

• Debris removal

• Permits and inspections applicable to the Contractor's scope

• All incidental costs required for a complete installation

No additional compensation shall be allowed for items reasonably inferable from the Contract Documents and necessary for a complete and operational culinary equipment installation.

19. COMPLETION AND ACCEPTANCE

The Culinary Equipment scope shall not be considered complete until:

1. All equipment has been delivered.

2. All equipment has been installed.

3. All required connections have been completed.

4. Equipment has been started and tested.

5. Equipment has been commissioned.

6. Deficiencies have been corrected.

7. Required training has been completed.

8. Operation and maintenance manuals have been submitted.

9. Warranty information has been submitted.

10. Equipment has been cleaned.

11. Packaging and debris have been removed.

12. Equipment is fully operational and ready for use by the Owner.

Final acceptance shall be subject to the Owner and/or General Contractor's verification that the work is complete and in accordance with the Contract Documents.

20. CONTRACTOR RESPONSIBILITY

The successful Contractor shall be responsible for furnishing a complete culinary equipment installation regardless of whether every minor component or accessory is individually identified in the Contract Documents.

The Contractor shall review all drawings, specifications, equipment schedules, and applicable project information and shall notify the General Contractor of conflicts or omissions prior to procurement.

The intent of this RFP is to obtain a complete, functional, and operational culinary equipment package, and the Contractor shall include all items reasonably required to accomplish that intent.

END OF CULINARY EQUIPMENT AND INSTALLATION SCOPE

I. GENERAL TERMS AND CONDITIONS

The following terms, conditions and instructions to bidders/offerors shall be binding on all bidders or offerors and are incorporated by reference to all contracts resulting from any written Request for Quotes, Invitation for Bids or Request for Proposals in which they are included. Use of the term “bid” in these terms, conditions and instructions to bidders is not intended to be restricted to an Invitation for Bids and shall also affect written Request for Quotes or Request for Proposals.

1. SUBMISSION AND RECEIPT OF BIDS/PROPOSALS

a. To receive consideration, bids/proposals must be received prior to the specific time of the opening as designated.

b. Unless otherwise specified, bidders/offerors must use the bid/proposal form furnished by the School Board. Failure to do so may be cause for bid/proposal to be rejected. Removal of any part of invitation may invalidate the bid.

c. Bids/proposals having erasures or corrections must be initialed by the bidder in ink. Bids/proposals shall be signed in ink by an officer or employee having the authority to bind the bidder in contractual matters. All information on the bid/proposal shall by typewritten or completed in ink. Original signature is required on all Invitation for Bids and Requests for Proposals.

d. Separate bids/proposals must be submitted for each invitation number.

e. When specified, each bid/proposal shall be accompanied by a bid bond with surety satisfactory to the School Board or a cashier’s check or money order, in an amount equal to five percent of the total bid/proposal price. In the event of a default by the bidder, the five percent deposit shall represent liquidated damages to the School Board.

f. If specified as a sealed solicitation, electronic or facsimile transmission of bid/proposal responses will not be accepted.

g. If not bidding, complete and return the signature page of the Request marked “NO BID” or a letter stating the reason for not bidding. Failure to respond may result in removal from the bidders/offerors list for commodity being bid.

2. DEFAULT PROVISION

In case of default by the bidder, the declaration of which shall be at the sole discretion of the School Board, the School Board may procure the articles or services from other sources. The defaulting bidder shall be liable for any and all costs in excess of the contract price resulting from such default, whether directly or indirectly.

3. PRICING AND QUANTITIES

a. By submitting a bid, the Bidder warrants that the pricing will be firm for acceptance for a period of 60 days from the date of bid/proposal opening unless otherwise specified by the School Board.

b. Unless otherwise specified by the School Board, only firm pricing shall be considered. General terms such as “price in effect at time of delivery” shall not be considered for award. Prices shall be stated in the units of quantity specified in the bid/proposal form. In the case of an error in extension of prices in the bid, the unit prices shall govern.

c. When a bid/proposal is sought seeking a source of supply for a contract for goods and services, the quantities or usage shown are estimates only. No guarantee is given or implied by the School Board as to the total amount that may or may not be purchased from any resulting contract. These quantities are informational only but may be used for bid/proposal evaluation.

4. DELIVERY

All items shall be delivered F.O.B. destination, with delivery costs (including inside delivery when specified) and charges included in the bid/proposal price. Failure to do so may be cause for rejection of bid. The School Board reserves the right to cancel any orders, or any part thereof without obligation, if delivery is not made on the time specified in the bid.

5. REJECTION AND AWARD OF BIDS/PROPOSALS

The School Board reserves the right to accept or reject all bids/proposals or parts of bids/proposals, to waive informalities and to request rebids. The rejection of bids/proposals, award of contracts and renewal of contracts resulting from the issuance of a bid/proposal shall be made by the School Board and any such actions shall be subject to the procurement regulations and policies of the School Board.

The School Board reserves the right to award the contract as it deems will best serve its interests. It further reserves the right to award on a lump sum basis, individual item basis or such combination as shall best serve the interest of the School Board, unless otherwise specified. The School Board reserves the right to negotiate with the lowest responsive and responsible bidder, if the bid/proposal amount exceeds available funds. The School Board reserves the right to increase or decrease quantities at the quoted price.

6. WITHDRAWAL OF BID/PROPOSAL DUE TO ERROR

a. Upon proper request and identification, bids/proposals may be withdrawn at any time prior to the date and time set for the bid/proposal opening. If the Purchasing Officer or Purchasing Assistant denies the withdrawal of a bid, the Bidder shall be notified in writing stating the reasons for the decision. Award of the contract shall be made to the Bidder at the bid/proposal price, provided the Bidder is a responsible and responsive bidder.

b. Bidders/offerors may request withdrawal of their bid/proposal from consideration if the price in the bid/proposal was substantially lower than the other bids/proposals due solely to a mistake therein.

The bidder shall give written notice to the Purchasing Officer or the Purchasing Assistant of a claim to withdraw the bid/proposal prior to the award of the contract or issuance of the purchase order. The cause and nature to the mistake shall be stated in the claim to withdraw.

c. A minor defect of variation (“an informality not affecting price, quantity, quality, delivery or contractual conditions”), in a bid or proposal that does not prejudice other bidders/offerors may, at the discretion of the Purchasing Officer, be waived or the bidder required to correct the informality.

d. If a bid/proposal is withdrawn under the authority of this section, the lowest remaining bid/proposal shall be deemed to be the low bid.

e. No bid/proposal may be withdrawn under this section when the result would be the awarding of the contract on another bid/proposal of the same Bidder or of another bidder in which the ownership of the withdrawing bidder is more the five percent. No bidder who is permitted to withdraw a bid/proposal shall, for compensation, supply any material or labor to or perform any subcontract work or other work agreement for the person or firm to whom the contract is awarded or otherwise benefit, directly or indirectly, from the performance of the project for which the withdrawn bid/proposal was submitted.

7. TERMINATION FOR CONVENIENCE

Unless otherwise stated, any resultant contract may be terminated by the School Board, in whole or in part, whenever the School Board determines that such a termination is in its best interests. Any such termination shall become effective on the date stated in a written notice of termination to the Contractor send at least five days prior to the stated termination date. The notice of termination shall state the extent to which performance shall be terminated. The Contractor shall be paid for all goods delivered or services successfully completed prior to the termination date. Any resultant contract shall terminate immediately upon failure of the Board of Supervisors or School Board to appropriate sufficient funds for its continuation.

8. TAXES

The School Board is tax exempt from Federal Excise and State Sales and Use Tax on all tangible personal property purchased or leased by it for its use or consumption. The Contractor shall pay all County, City, State and Federal taxes required by law enacted at the time bids/proposals are received and resulting from the work or traceable thereto, under whatever name levied. Said taxes shall not be in addition to the contract price between the School Board and the Contractor, as the taxes shall be an obligation of the Contractor and not the School Board, and the School Board shall be held harmless for same by the Contractor. Exemption certification will be supplied upon request.

9. LICENSES, PERMITS AND FEES

The Contractor shall secure and pay for all permits, governmental fees and licenses necessary for the proper execution of and completion of the work which are legally required prior to and during the work, unless otherwise specified by the School Board in the bid.

10. BRAND NAMES

Unless otherwise provided in the bid, the name of a certain brand, make or manufacturer does not restrict bidders/offerors to the specific brand, make or manufacturer. It conveys the general style, type, character and quality of the article desired and any article which the public body, in its sole discretion, determines to be the equal of that specified, considering quality, workmanship, economy of operation, and suitability for the purpose intended shall be accepted.

11. QUALITY

All materials used for the manufacture or construction of any supplies, materials or equipment covered by this bid/proposal shall be new, unless otherwise specified. The items bid/proposed must be new, the latest model, of the best quality and highest-grade workmanship.

12. ACCEPTANCE OF MATERIAL

The material delivered under this bid/proposal shall remain the property of the seller until a physical inspection and actual usage of this material and/or services is made and thereafter accepted to the satisfaction of the School Board and must comply with the terms herein, and be fully in accord with specifications and of the highest quality. In the event that material and/or services supplied to the School Board is found to be defective, or does not conform to specifications, the School Board reserves the right to cancel the order upon written notice to the seller and return product to the seller at the seller’s expense.

13. VARIATIONS TO SPECIFICATIONS

For the purpose of evaluation, the bidder must indicate any variances from the specifications and/or conditions, no matter how slight. If variations are not stated in the bid, it will be assumed that the product or service fully complies with the specifications.

14. SAMPLES

When requested, samples must be furnished at no charge to the School Board within ten calendar days of the request. Samples not used in testing or not destroyed will be returned, upon request, within 30 days of bid/proposal award at the bidder’s expense.

15. MANUFACTURER’S CERTIFICATION/REFERENCES

The School Board reserves the right to request from bidders/offerors separate manufacturer certification of all statements made in the bid. Upon request, the bidder must provide additional information (including references) within ten calendar days of the request.

16. SIGNED BID/PROPOSAL CONSIDERED AN OFFER

The signed bid/proposal shall be considered an offer on the part of the bidder, which shall be deemed accepted upon approval by the School Board, and in case of default on the part of the bidder after such acceptance, the School Board may take such actions as it deems appropriate, including legal action, for damages or specific performance.

17. VENDOR RESPONSIBILITIES

Bid/proposals must be properly identified on the return envelope and properly submitted as specified within the bid. Failure to do so may result in rejection of the bid. The outside of the envelope must indicate the name of the vendor submitting the bid.

18. COMMENTS CONCERNING SPECIFICATIONS

Any vendor wishing to make comments concerning specifications or other provisions of School Board Invitations to Bid, Request for Proposals or Requests for Quotations may do so by submitting such comments in writing to the Purchasing Officer or Purchasing Assistant no later than seven working days prior to the specific date of opening. Any revisions will be made by addendum issued by the Purchasing Officer/ Purchasing Assistant.

19. LICENSING

Any bidder not licensed as may be required by Federal, State or County law shall be determined a non-responsive bidder.

20. BIDDERS/OFFERORS MUST COMPLY

Bidders/offerors must comply with the Code of Virginia, the Virginia Public Procurement Act and School Board policy and regulations adopted pursuant thereto.

21. REQUIRED CONTRACTOR CERTIFICATION RELATING TO BACKGROUND

CHECKS

The Contractor shall provide written certification that states that no employee or representative of the Contractor who will have direct contact with students on school property during regular school hours or during school sponsored activities has been convicted of a felony or any offense involving the sexual molestation or physical or sexual abuse or rape of a child. Such certification shall be provided to the Owner prior to awarding the Contract.

22. IMMIGRATION REFORM AND CONTROL ACT OF 1986

By submitting their bid/proposals, the Offerors certify that they do not and will not during the performance of this contract employ illegal alien workers or otherwise violate the provisions of the Federal Immigration Reform and Control Act of 1986, as amended.

23. PAYMENT TERMS

A minimum of 30 days after receipt of an approved invoice by the School Board shall be allowed for payment.

24. COPYRIGHTS OR PATENT RIGHTS

The bidder warrants that there has been no violation of copyrights or patent rights in manufacturing, producing or selling the good shipped or ordered as a result of this bid, and the seller agrees to hold the School Board harmless from any and all liability, loss or expense occasioned by such violation.

25. CONTRACTOR RESPONSIBILITY FOR DAMAGE TO PROPERTY

The Contractor shall be responsible for damages to property caused by work performed under the Contract or Purchase Order. The Contractor shall repair to proper working order or replace, to the School Board’s satisfaction, any property damaged either directly or indirectly by its actions.

26. COMPLIANCE WITH ALL REQUIREMENTS

The Contractor shall comply with all applicable Federal, State, and Local laws, codes and regulations.

The Contractor shall give notice and comply with all laws, ordinances, rules, regulations, and lawful orders of any public authority bearing on the performance of the work.

27. ANTI-DISCRIMINATION

In every Contract over $10,000, during the performance of this Contract, the Contractor agrees as follows:

a. The Contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, nation origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where there is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this non-discrimination clause.

b. The Contractor, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, will state that such Contractor is an equal opportunity employer.

c. Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this section.

d. The Contractor will include the provisions of the foregoing paragraphs a, b, and c in every subcontract or purchase order of over $10,000, so that the provisions will be binding upon each subcontractor or vendor.

28. CONTRACTUAL CLAIMS

Contractual claims, whether for money or other relief, shall be submitted in writing no later than 60 days after final payment; however, written notice of the Contractor’s intention to file such claim shall have been given at the time of the occurrence or beginning of the work upon which the claim is based. Any notice or claim shall be delivered to the Superintendent of Schools, Orange County Public Schools, 200 Dailey Drive, Orange, VA 22960, and shall include a description of the factual basis for the claim and a statement of the amounts claimed or other relief requested. The Superintendent of Schools shall render a decision on the claim and shall notify the Contractor within 30 days of receipt of the claim. The Contractor may appeal the decision of the Superintendent of Schools to the School Board by providing written notice to the Superintendent of Schools within 15 days of the date of decision. The School Board shall render a decision on the claim within 60 days of date of receipt of the appeal notice and such decision shall be final unless the Contractor appeals the decision in accordance with the Virginia Public Procurement Act and any other applicable requirements. Invoices for all services or goods provided by the Contractor shall be delivered to the School Board no later than 30 days following the conclusion of the work or delivery of the goods.

29. PAYMENTS TO CONTRACTORS

In accordance with Virginia Code Section 2.2-4354 the Contractor agrees that:

A. Should any subcontractor be employed by the Contractor for the provision of any goods or services under this Contract, the Contractor agrees to the following:

i) The Contractor shall, within seven days after receipt of any payments from the School Board pursuant to this Contract, either:

a) Pay the subcontractor for the proportionate share of the total payment received from the School Board attributable to the goods or services provided by the subcontractor, or

b) Notify the School Board and the subcontractor in writing of the intention to withhold all or a part of the subcontractor’s payment with the reason of nonpayment. Written notice shall be given to: Superintendent of Schools, Orange County Public Schools, 200 Dailey Drive, Orange, VA 22960.

ii) The Contractor shall pay interest to the subcontractor, at the rate of one percent per month on all amounts owed to the subcontractor that remain unpaid after seven days following receipt of the payment from the School Board for the goods or services provided under this Contract, except for amounts withheld under subparagraph 1)b) above.

iii) The Contractor shall include in each of its subcontracts a provision requiring each subcontractor to include or otherwise be subject to the same payment and interest requirements with respect to each lower-tier subcontractor.

iv) The Contractor’s obligation to pay an interest charge to a subcontractor shall not be an obligation of the School Board.

v) No contract modification shall be allowed for the purpose of providing reimbursement for these interest charges. No cost reimbursement claim shall include any amount for reimbursement of these interest charges.

B. The Contractor shall provide, in the space provided or directed in the Request, (i)its social security number if an individual, or (ii)its federal employer identification number if a proprietorship, partnership or corporation.

30. APPLICABLE LAWS AND COURTS

This solicitation and any resulting contract shall be governed in all respects by the laws of the Commonwealth of Virginia and any litigation with respect thereto shall be brought in the courts of the County Of Orange. The agency and the Contractor are encouraged to resolve any issues arising from the award of the contract or any contractual dispute using Alternate Dispute Resolution. The Contractor shall comply with all applicable Federal, State and local laws, rules and regulations.

31. FINANCIAL STATEMENTS

a. Any Bidder/Offeror responding to this solicitation shall provide the County and/or the School Board, within 10 calendar days of the County’s and/or the School Board’s request, a copy of its most recent audited financial statement(s), if available, or a statement including items of financial information required by the county and/or the School Board and financial statements of any of its parent companies and/or subsidiaries having any material influence on the goods/services provided, or to be provided, under the Contract, and shall allow access by the county and/or School Board or its designees, to all financial records. The financial statement(s) shall be accompanied by a letter signed by, as applicable to the type of business, a corporate officer, partner, or owner, stating that the accompanying financial statement(s) is complete and is the most recent financial statement(s) available.

b. The financial statement(s) shall be provided at no charge to the County and/or the School Board, and the County and/or School Board shall be under no obligation to return the financial statement(s).

c. The Bidder or Offeror to whom the contract is awarded (“the Contractor”) shall require this same provision to be included in the contracts of all subcontractors and any other entities providing any services related to the Contract so as to guarantee the County’s and/or School Board’s rights to obtain financial statements. Should the Contract fail to ensure the County’s and/or the School Board’s rights under this section, the Contractor shall be liable to the County and/or the School Board for all reasonable costs and expenses the County and/or the School Board may incur in obtaining financial statements and information which would have otherwise been available under the provisions of this sections.

32. ETHICS IN PUBLIC CONTRACTING

By submitting their proposals, Offerors certify that their proposals are made without collusion or fraud and that they have not offered or received any kickbacks or inducements from any other Offeror, supplier, manufacturer, or subcontractor in connection with their proposal, and that they have not conferred on any public employee having official responsibility for this procurement transaction any payment, loan, subscription, advance, deposit of money, services, or anything more than nominal value, present or promised unless consideration of substantially equal or greater value was exchanged.

33. DEBARMENT STATUS

By submitting their proposals, Offerors certify that they are not currently debarred by Orange County Public Schools or the Commonwealth of Virginia from submitting bids or proposals on contracts for the type of goods and/or services covered by this solicitation, nor are they an agent of any person or entity that is currently debarred.

34. PRECEDENCE OF TERMS

In the event there is a conflict between any of the other General Terms and Conditions and any Special Terms and Conditions in this solicitation, the Special Terms and Conditions shall apply

35. QUALIFICATION OF OFFERORS

Orange County Public Schools may make such reasonable investigations as deemed proper and necessary to determine the ability of the Offeror to perform the services/furnish the goods and the Offeror shall furnish to Orange County Public Schools all such information and data for this purpose as may be requested. Orange County Public Schools reserves the right to inspect Offerors physical facilities prior to an award to satisfy questions regarding the Offerors capabilities. Orange County Public Schools further reserves the right to reject any proposal if the evidence submitted by, or investigations of, such Offeror fails to satisfy Orange County Public Schools that such Offeror is properly qualified to carry out the obligations of the contract and to provide the services and/or furnish the goods contemplated therein.

36. TESTING AND INSPECTION

Orange County Public Schools reserves the right to conduct any test/inspection it may deem advisable to assure goods and services conform to the specification.

37. CHANGES TO THE CONTRACT

Changes can be made to the contract in any of the following way:

1) The parties may agree in writing to modify the scope of the contract. An increase or decrease in the price of the contract resulting from such modification shall be agreed to by the parties as part of their written agreement to modify the scope of the contract.

2) Orange County Public Schools may order changes within the general scope of the contract at any time by written notice to the Contractor. Changes within the scope of the contract include, but are not limited to, services to be performed, the method of packing or shipment, and the place of delivery or installation. The Contractor shall comply with the notice upon receipt. The Contractor shall be compensated for any additional costs incurred as the result of such order and shall give Orange County Public Schools a credit for any savings. Said compensation shall be determined by one of the following methods:

a. By mutual agreement between the parties in writing; or

b. By agreeing upon a unit price or using a unit price set forth in the contract, if the work to be done can be expressed in units, and the Contractor accounts for the number of units of work performed, subject to Orange County Public Schools right to audit the Contractor’s records and/or to determine the correct number of units independently; or

c. By ordering the Contractor to proceed with the work and to keep a record of all cost incurred and saving realized. A markup for overhead and profit may be allowed if provided by the contract. The Contractor shall present Orange County Public Schools with all vouchers and records of expenses incurred and savings realized. Orange County Public Schools shall have the right to audit the records of the Contractor, as it deems necessary to determine costs or savings. Any claim for an adjustment in price under this provision must be asserted by written notice to Orange County Public Schools within thirty (30) days from the date of receipt of the written order from the Purchasing Agency. If the parties fail to agree on an amount of adjustment, the question of an increase or decrease in the contract price or time for performance shall be resolved in accordance with the procedures for resolving disputes provided by the Disputes Clause of this contract or, if there is none, in accordance with the disputes provision of the Commonwealth of Virginia. Neither the existence of a claim nor a dispute resolution process, litigation or any other provision of this contract shall excuse the Contractor from promptly complying with the changes ordered by Orange County Public Schools or with the performance of the contract generally.

38. INSURANCE

By signing and submitting a proposal under this solicitation, the offeror certifies that if awarded the contract, it will have the following insurance coverage at the time the contract is awarded. For construction contracts, if any subcontractors are involved, the subcontractor will have workers’ compensation insurance in accordance with 2.2-4332 and 65.2-800 et seq. of the Code of Virginia. The Offeror further certifies that the Contractor and any subcontractors will maintain these insurance overage’s during the entire term of the contract and that all insurance coverage’s will be provided by insurance companies authorized to sell insurance in Virginia by the Virginia State Corporation Commission.

Minimum Insurance Coverages and Limits Required for Most Contracts:

1) Worker’s Compensation – Statutory requirements and benefits. Coverage is compulsory for employers of three or more employees, to include the employer.

2) Employer’s Liability - $1,000,000

3) Commercial General Liability - $1,000,000 per person and/or per occurrence. Coverage is to include bodily injury and property damage, personal injury and advertising injury, products and completed operations coverage.

4) Automobile Liability - $1,000,000 per person and/or per each occurrence to include bodily injury and property damage. (If motor vehicle is to be used in the contract.)

39. DRUG FREE WORKPLACE

Orange County Public Schools are a smoke and drug free workplace. During the performance of this contract, the Contractor agrees that all employees and subcontractors will comply with Orange County Public Schools smoke and drug free policies and Virginia law.

II. SPECIAL TERMS AND CONDITIONS

A. Audit The contractor shall retain all books, records and other documents relative to this contract for five (5) years after final payment, or until audited, whichever comes sooner. The agency, its authorized agents, and/or state auditors shall have full access to and the right to examine any of said materials during said period.

There shall be no fees or costs charged to the County and/or the School Board by the Contractor for any such audit activities.

The Contractor shall include the audit provisions of this section in all subcontracts and contracts of any entity providing goods or services pursuant to this contract so as to guarantee the County’s and/or School Board’s rights to audit any person or entity performing work pursuant to the Contract, all at no additional cost to the County and/or School Board.

Should the contractor fail to ensure the County’s and/or the School Board’s rights under this section, the Contractor shall be liable to the County and/or the School Board for all reasonable costs and expenses the County and/or the School Board may incur to obtain an audit or inspection of the records which would have otherwise been available under the provisions of this section.

B. Availability of Funds It is understood and agreed between the parties herein that the contractor shall be bound hereunder only to the extent of the fund available for the purpose of this agreement. If this RFP exceeds the budgeted amount, the Owner may negotiate the scope of work to fit within the budget.

C. Identification of Bid/Proposal Envelope The signed IFB/RFP should be returned sealed, addressed as directed on the cover page, and identified with bidder’s name, address, due date, due time and IFP/RFP title and purchasing contact. IFB/RFP may be hand-delivered to the designated locations. No other correspondence or other bids/proposals should be placed in the envelope.

D. Indemnification The contractor shall indemnify, save and hold harmless Orange County Public Schools, its officers, agents, employees and volunteers against and from any and all injuries, death, loss, damage, claims, patent claims, suits, liabilities, judgments, cost of investigations, attorney fees, cost of appeals arising out of any such claims or suits, and other expenses which may or otherwise accrue against Orange County Public School in consequence of the granting of a contract or which may or otherwise result in connection with work thereof, if it shall be determined that the act caused through negligence, omission or commission of the Contractor, including its agents, subcontractors, employees, and volunteers. The Contractor expressly understands and agrees that any performance bond or insurance shall in no way limit the responsibility to indemnify, keep and save harmless and defend Orange County Public Schools as herein provided. Furthermore, it is understood and agreed that the Contractor is at all times herein action as an independent contractor.

E. Receipt of IFBS/RFPS To be considered for selection, IFB/RFPs must be received by the designated person listed by the designated date and time.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .