PERFORMANCE STATEMENT OF WORK
1. LOCATION: The location of the work is at the Federal Emergency Management Agency / DHS Boston Facility 99 High Street, 6th Floor, Boston, MA 02110.
2. DESCRIPTION OF WORK: The work consists of providing all labor, transportation, materials, parts, supplies, equipment, tools, subcontracts, and performing all work necessary to remove and install new workspace furniture in the Mitigation Division of the FEMA Region I main office.
3. PRINCIPAL ELEMENTS:
3.1. The work to be performed includes the following principal elements:
(The quantities of work listed are approximate and are provided only for the purpose of illustrating the general magnitude of work. The brief descriptions of work do not in any way limit the responsibility of the contractor (and any subcontractors) to perform all work and furnish labor, material, and equipment shown, specified or reasonably inferred by the below descriptions.) The contractor is encouraged to submit any alternative design options that meet all the elements listed below.
3.1.1.1. The contractor shall remove existing shelving from work area 0650 and 0656 and install new 6’ X 8’work surfaces and two 4’ overhead locking cabinets with keys at each work station to match the existing configuration. The top of the work surfaces are to be installed 29.5” from the floor
3.1.1.2. The contractor shall install a 48’ X 68” divider partition between workstation 0643 & 0644, 0640 &0650, 0652 & 0653, and 0655 & 0656. The divider is to match the existing configuration. FEMA shall provide two divider walls the contractor shall provide all necessary connector fittings and trim needed to finish installation.
3.1.1.3. The contractor shall install one new 6’ X 8’ complete workstation adjacent to work station 0629. This will include wall partitions with electrical connections 6’ X 8’work surfaces installed at 29.5” from the floor and two 4’ overhead locking cabinets with keys a 48’ X 68” divider partition between workstation the new work station and work station 0629. The contractor shall provide one 41.5” X 19.5” X 26” 2-drawer lateral file cabinet with keys and one 14.5” X 19.5” X 26” 2-drawer vertical cabinet with keys. All components shall match the existing configuration.
3.1.1.4. The contractor shall provide one 41.5” X 19.5” X 26” 2-drawer lateral file cabinet with keys and one 14.5” X 19.5” X 26” 2-drawer vertical cabinet with keys for work stations 0650, 0653 & 0656.
3.1.1.5. The contractor shall install locks with keys on the overhead cabinets in work station 0644.
3.1.1.6. The contractor shall provide under a separate quote the cost for 6 medium black, graphite frame, adjustable forward tilt lock forward tilt adjs & posture fit, adjustable graphite arms with black vinyl arm pads Herman Miller Aeron Chairs.
4. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
4.1. The contractor shall be required to (a) coordinate scheduling of work with the government to minimize disruption, (b) prosecute the work diligently, (c) commence work under this contract within 10 calendar days after the date the contractor receives notice to proceed, and (d) complete the entire work ready for use not later than 30 calendar days after the notice to proceed.
4.2. Work shall be performed during normal duty hours for Government personnel, 7:00 am to 3:30 PM Monday through Friday, excluding Federal holidays.
4.3. All work methods and completed work must be in compliance with current industry accepted codes and standards, and in a professional and workmanlike manner. IBC, state, national and other codes and ordinances which apply to this project include, but not limited to the following (latest editions):
· OSHA Part: 1910
4.4. It is the responsibility of the contractor to properly dispose of all cut materials.
5. GOVERNMENT PERFORMED WORK: The Contracting Officer will establish the boundary of Contractor’s work area, including staging area, and the Government will limit its activities inside the work area to a minimum during the time the Contractor is at work.
7. CONSTRUCTION SIGN: Construction sign is not required, nor permitted, for this project.
8. SPECIFICATIONS: Work is to be performed in accordance with 4.3 above.