CTD 6114 SOW Julabo Waterbaths 250403.pdf
PDF 522 KB Posted
- Attached to
- Julabo Refrigerated/Heating Circulators Federal contract opportunity
- Solicitation number
- W911S625QA021
About this file
This document is a Scope of Work (SOW) for the U.S. Army Dugway Proving Ground's West Desert Test Center, detailing the procurement of Julabo temperature control equipment. The SOW requires the contractor to provide one Julabo Presto A85 208-230V/3PPE/60Hz Highly Dynamic Temperature Control System and two Julabo MAGIO MS-1000F 115V/60Hz Refrigerated/Heating Circulators. Additionally, the contractor must supply an extended one-year warranty covering replacement of malfunctioning parts, labor, shipping, priority service, repairs, cleaning, calibration, software and firmware updates, and proactive replacement of worn parts, which begins after the initial two-year factory warranty expires.
The final delivery location is the West Desert Test Center at U.S. Army Dugway Proving Ground in Utah, with key personnel from the facility identified as Conder, Cory J; Phan, Richard M; and Madron, Denise M. The contractor is required to ship immediately available items promptly and provide estimated shipping dates for any remaining equipment. The warranty terms are comprehensive, ensuring full service and support for the temperature control systems beyond the standard manufacturer's coverage.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Local Site requirments.pdf | ||
| Solicitation - W911S625QA021.pdf | ||
| Julabo Equipment List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
U.S. ARMY DUGWAY PROVING GROUND
WEST DESERT TEST CENTER
DUGWAY, UTAH 84022-5000
1. Subject: Julabo waterbaths and heated/refrigerated circulators
2. Final Delivery Location: West Desert Test Center, U.S. Army Dugway Proving Ground, Utah.
3. Key Personnel from Dugway Proving Ground: Conder, Cory J; Phan, Richard M; Madron, Denise M
Scope Of Work Required:
The Contractor shall provide one Julabo Presto A85 208-230V/3PPE/60Hz Highly Dynamic Temperature Control System upon payment of invoice.
The Contractor shall provide two Julabo MAGIO MS-1000F 115V/60Hz Refrigerated/Heating Circulators upon payment of invoice.
The Contractor shall provide an extended one-year warranty, which includes:
Replacement of malfunctioning parts, labor, shipping of the unit to and from the Julabo service center, priority service to fast-track repairs, cleaning, calibration, software and firmware updates, and proactive replacement of worn parts. 1-year coverage begins upon payment of invoice and after the two-year factory warranty has expired.
The Contractor shall ship the items that are in stock promptly and provide the estimated shipping date for remaining items.
File details come from the government source that posted it. Updated .