This request for proposal (RFP) solicits technical assistance services for the Carlsbad Field Office. The Department of Energy Office of Environmental Management is seeking proposals to provide quality assurance, technical support, and project management services under the Carlsbad Technical Assistance Contract. Proposals are due by the date specified in solicitation number 89303320REM000073. The resulting contract will have a one-year base period and four one-year options periods, providing support services for TRU waste characterization, certification, transportation, and disposal operations at the Waste Isolation Pilot Plant. The RFP includes templates for offerors to propose pricing for labor categories on both time-and-materials and firm-fixed-price bases over the five-year period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Carlsbad Technical Assistance Contract (CTAC) Solicitation# 89303320REM000073 L-4 Total Price
Category NTE DPLH Hours NTE Dollar Amount Category NTE DPLH Hours NTE Dollar Amount
Labor: Line item will be awarded as not-to-exceed total price
Labor: Line item will be awarded as not-to-exceed total price
Travel, Materials, ODCs DOE-Provided 1,500,000$ Travel, Materials, ODCs DOE-Provided 1,500,000$
Indirect Cost (Rate: %) Offeror Fill-In Rate
Rate to be Applied to Other Than
Direct Labor Cost Indirect Cost (Rate: %) Offeror Fill-In Rate
Rate to be Applied to Other Than
Direct Labor Cost
Subtotal: Other Than Direct Labor Costs
(Travel Cost +Indirect Cost Applied to
Other Than Direct Labor Cost):
Subtotal: Other Than Direct Labor Costs
(Travel Cost +Indirect Cost Applied to Other
Than Direct Labor Cost):
Year 1 Total -$ Year 2 Total -$
Category NTE DPLH Hours NTE Dollar Amount Category NTE DPLH Hours NTE Dollar Amount
Labor: Line item will be awarded as not-to-exceed total price
Labor: Line item will be awarded as not-to-exceed total price
Travel, Materials, ODCs DOE-Provided 1,500,000$ Travel, Materials, ODCs DOE-Provided 1,500,000$
Indirect Cost (Rate: %) Offeror Fill-In Rate
Rate to be Applied to Other Than
Direct Labor Cost Indirect Cost (Rate: %) Offeror Fill-In Rate
Rate to be Applied to Other Than
Direct Labor Cost
Subtotal: Other Than Direct Labor Costs
(Travel Cost +Indirect Cost Applied to
Other Than Direct Labor Cost):
Subtotal: Other Than Direct Labor Costs
(Travel Cost +Indirect Cost Applied to Other
Than Direct Labor Cost):
Year 3 Total -$ Year 4 Total -$
Category NTE DPLH Hours NTE Dollar Amount Category NTE DPLH Hours NTE Dollar Amount
Labor: Line item will be awarded as not-to-exceed total price
Labor: Line item will be awarded as not-to-exceed total price 0 -$
Travel, Materials, ODCs DOE-Provided 1,500,000$ Travel, Materials, ODCs DOE-Provided 7,500,000$
Indirect Cost (Rate: %) Offeror Fill-In Rate
Rate to be Applied to Other Than
Direct Labor Cost Indirect Cost
Subtotal: Other Than Direct Labor Costs
(Travel Cost +Indirect Cost Applied to
Other Than Direct Labor Cost):
Subtotal: Other Than Direct Labor Costs
(Travel Cost +Indirect Cost Applied to Other
Than Direct Labor Cost):
Year 5 Total -$ Total Price (Years 1-5) -$
Other Than Direct Labor Costs:
Pricing Schedule
Year 1 Year 2
Year 3
Total Price
Other Than Direct Labor Costs: Other Than Direct Labor Costs:
Other Than Direct Labor Costs:
Year 4
Other Than Direct Labor Costs:
Year 5
Other Than Direct Labor Costs:
L-4 Total Price
Carlsbad Technical Assistance Contract (CTAC) Solicitation# 89303320REM000073 L-4 Labor Category DPLH
Category Year 1 Year 2 Year 3 Year 4 Year 5 Total
Program Manager* 1,880 1,880 1,880 1,880 1,880 9,400
QA Manager* 1,880 1,880 1,880 1,880 1,880 9,400
QA Assistant Manager* 3,760 3,760 3,760 3,760 3,760 18,800
QA Auditor I* 3,760 3,760 3,760 3,760 3,760 18,800
QA Auditor II* 3,760 3,760 3,760 3,760 3,760 18,800
QA Auditor III* 3,760 3,760 3,760 3,760 3,760 18,800
QA Technical Specialist I * 1,880 1,880 1,880 1,880 1,880 9,400
QA Technical Specialist I (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
QA Technical Specialist II * 3,760 3,760 3,760 3,760 3,760 18,800
QA Technical Specialist II (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
QA Technical Specialist III * 3,760 3,760 3,760 3,760 3,760 18,800
QA Technical Specialist III (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
QA Data Analyst* 3,760 3,760 3,760 3,760 3,760 18,800
Technical Writer/Editor I* 3,760 3,760 3,760 3,760 3,760 18,800
Technical Writer/Editor II* 3,760 3,760 3,760 3,760 3,760 18,800
TRU Waste Packaging Specialist * 1,880 1,880 1,880 1,880 1,880 9,400
TRU Waste Packaging Specialist (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
TRU Waste Transportation Specialist * 1,880 1,880 1,880 1,880 1,880 9,400
TRU Waste Transportation Specialist (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
PDP Specialist * 500 500 500 500 500 2,500
PDP Specialist (Off-Site) 500 500 500 500 500 2,500
PDP Custodian * 500 500 500 500 500 2,500
PDP Custodian (Off-Site) 500 500 500 500 500 2,500
Nuclear Safety Specialist I * 1,880 1,880 1,880 1,880 1,880 9,400
Nuclear Safety Specialist I (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Nuclear Safety Specialist II * 1,880 1,880 1,880 1,880 1,880 9,400
Nuclear Safety Specialist II (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Nuclear Safeguards and Security Specialist* 1,880 1,880 1,880 1,880 1,880 9,400
Health Physics/Rad Protection Specialist* 1,880 1,880 1,880 1,880 1,880 9,400
Fire Protection Specialist* 1,880 1,880 1,880 1,880 1,880 9,400
Industrial Hygiene/ Safety Specialist I* 1,880 1,880 1,880 1,880 1,880 9,400
Industrial Hygiene/ Safety Specialist II* 1,880 1,880 1,880 1,880 1,880 9,400
Environmental Compliance Specialist* 500 500 500 500 500 2,500
Environmental Compliance Specialist (Off-Site) 500 500 500 500 500 2,500
Nuclear Mining & Facility Operations Specialist* 500 500 500 500 500 2,500
International Programs and Repository Scientist* 1,880 1,880 1,880 1,880 1,880 9,400
International Programs and Repository Scientist (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
NAMP Specialist * 1,880 1,880 1,880 1,880 1,880 9,400
NAMP Specialist (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Executive Management Consultant * 1,880 1,880 1,880 1,880 1,880 9,400
Executive Management Consultant (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Admin Assistant I* 1,880 1,880 1,880 1,880 1,880 9,400
Admin Assistant II* 11,280 11,280 11,280 11,280 11,280 56,400
Admin Assistant III* 3,760 3,760 3,760 3,760 3,760 18,800
Contract Specialist I (Off- Site) 1,880 1,880 1,880 1,880 1,880 9,400
Contract Specialist II (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Contract Specialist III (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Business Specialist* 9,400 9,400 9,400 9,400 9,400 47,000
Financial Analyst I * 1,880 1,880 1,880 1,880 1,880 9,400
Financial Analyst I (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Financial Analyst II * 1,880 1,880 1,880 1,880 1,880 9,400
Financial Analyst II (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Financial Analyst III * 1,880 1,880 1,880 1,880 1,880 9,400
Financial Analyst III (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Information and Records Mgmt. Specialist* 1,880 1,880 1,880 1,880 1,880 9,400
IT Specialist* 3,760 3,760 3,760 3,760 3,760 18,800
Project Management Specialist I* 1,880 1,880 1,880 1,880 1,880 9,400
Project Management Specialist II* 1,880 1,880 1,880 1,880 1,880 9,400
Project Management Specialist III* 5,640 5,640 5,640 5,640 5,640 28,200
Project Controls Specialist I * 1,880 1,880 1,880 1,880 1,880 9,400
Project Controls Specialist I (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Labor Catgories Identified with a "*" are On-Site Positions.
L-4 Labor Category DPLH
Carlsbad Technical Assistance Contract (CTAC) Solicitation# 89303320REM000073 L-4 Labor Category DPLH
Project Controls Specialist II * 1,880 1,880 1,880 1,880 1,880 9,400
Project Controls Specialist II (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Project Controls Specialist III * 1,880 1,880 1,880 1,880 1,880 9,400
Project Controls Specialist III (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Technical Qualifications/ Training Specialist* 1,880 1,880 1,880 1,880 1,880 9,400
NEPA Specialist * 500 500 500 500 500 2,500
NEPA Specialist (Off-Site) 500 500 500 500 500 2,500
Corrective Action Manager * 1,880 1,880 1,880 1,880 1,880 9,400
Corrective Action Manager (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Communications Professional * 1,880 1,880 1,880 1,880 1,880 9,400
Communications Professional (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Facility Representative I* 1,880 1,880 1,880 1,880 1,880 9,400
Facility Representative II* 1,880 1,880 1,880 1,880 1,880 9,400
TRU Waste Certification Specialist I * 1,880 1,880 1,880 1,880 1,880 9,400
TRU Waste Certification Specialist I (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
TRU Waste Certification Specialist II * 1,880 1,880 1,880 1,880 1,880 9,400
TRU Waste Certification Specialist II (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
TRU Waste Certification Specialist III * 1,880 1,880 1,880 1,880 1,880 9,400
TRU Waste Certification Specialist III (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Technical Consultant I * 1,880 1,880 1,880 1,880 1,880 9,400
Technical Consultant I (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Technical Consultant II * 1,880 1,880 1,880 1,880 1,880 9,400
Technical Consultant II (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Technical Consultant III * 1,880 1,880 1,880 1,880 1,880 9,400
Technical Consultant III (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Business Operations Manager* 1,880 1,880 1,880 1,880 1,880 9,400
Chemist * 940 940 940 940 940 4,700
Chemist (Off-Site) 940 940 940 940 940 4,700
Facilitator* 1,880 1,880 1,880 1,880 1,880 9,400
Engineer I* 1,880 1,880 1,880 1,880 1,880 9,400
Engineer II* 1,880 1,880 1,880 1,880 1,880 9,400
Engineer III* 1,880 1,880 1,880 1,880 1,880 9,400
Mining & Hoisting Specialist* 1,880 1,880 1,880 1,880 1,880 9,400
Human Resource Specialist * 1,880 1,880 1,880 1,880 1,880 9,400
Human Resource Specialist (Off-Site) 1,880 1,880 1,880 1,880 1,880 9,400
Total: 207,540 207,540 207,540 207,540 207,540 1,037,700
L-4 Labor Category DPLH
Carlsbad Technical Assistance Contract (CTAC) Solicitation# 89303320REM000073 L-4 DOE-Provided Rates
The DOE-provided base rates are for informational purposes only. An Offeror may choose to utilize its own base rates when calculating its total price
Category Base Rate
Program Manager 94.95$
QA Manager 60.89$
QA Assistant Manager 51.69$
QA Auditor I 31.72$
QA Auditor II 40.00$
QA Auditor III 48.27$
QA Technical Specialist I 34.72$
QA Technical Specialist II 48.57$
QA Technical Specialist III 60.00$
QA Data Analyst 27.09$
Technical Writer/Editor I 27.12$
Technical Writer/Editor II 36.25$
TRU Waste Packaging Specialist 39.69$
TRU Waste Transportation Specialist 39.69$
PDP Specialist 32.33$
PDP Custodian 30.16$
Nuclear Safety Specialist I 35.00$
Nuclear Safety Specialist II 45.90$
Nuclear Safeguards and Security Specialist 18.07$
Health Physics/Rad Protection Specialist 53.00$
Fire Protection Specialist 38.60$
Industrial Hygiene/ Safety Specialist I 38.50$
Industrial Hygiene/ Safety Specialist II 45.00$
Environmental Compliance Specialist 48.54$
Nuclear Mining & Facility Operations Specialist 40.37$
International Programs and Repository Scientist 50.10$
NAMP Specialist 30.16$
Executive Management Consultant 70.00$
Admin Assistant I 21.00$
Admin Assistant II 25.00$
Admin Assistant III 29.00$
Contract Specialist I 37.00$
Contract Specialist II 44.00$
Contract Specialist III 53.00$
Business Specialist 29.26$
Financial Analyst I 34.00$
Financial Analyst II 42.00$
Financial Analyst III 51.00$
Information and Records Mgmt. Specialist 26.26$
IT Specialist 44.87$
Project Management Specialist I 51.97$
Project Management Specialist II 57.08$
Project Management Specialist III 63.75$
Project Controls Specialist I 30.00$
Project Controls Specialist II 35.00$
Project Controls Specialist III 40.00$
Technical Qualifications/ Training Specialist 30.00$
NEPA Specialist 30.00$
Corrective Action Manager 60.00$
Communications Professional 30.00$
Facility Representative I 30.00$
Facility Representative II 35.00$
TRU Waste Certification Specialist I 39.69$
TRU Waste Certification Specialist II 45.00$
TRU Waste Certification Specialist III 50.00$
Technical Consultant I 56.58$
Technical Consultant II 65.00$
Technical Consultant III 75.00$
Business Operations Manager 46.70$
Chemist 30.00$
Facilitator 30.00$
Engineer I 30.00$
Engineer II 38.00$
Engineer III 45.00$
Mining & Hoisting Specialist 40.00$
Human Resource Specialist 29.27$
L-4 DOE-Provided Rates
Carlsbad Technical Assistance Contract (CTAC) Solicitation# 89303320REM000073 L-6 Labor Category Crosswalk
# RFP Labor Category Offeror's Labor Category
1 Program Manager
2 QA Manager
3 QA Assistant Manager
4 QA Auditor I
5 QA Auditor II
6 QA Auditor III
7 QA Technical Specialist I
8 QA Technical Specialist II
9 QA Technical Specialist III
10 QA Data Analyst
11 Technical Writer/Editor I
12 Technical Writer/Editor II
13 TRU Waste Packaging Specialist
14 TRU Waste Transportation Specialist
15 PDP Specialist
16 PDP Custodian
17 Nuclear Safety Specialist I
18 Nuclear Safety Specialist II
19 Nuclear Safeguards and Security Specialist
20 Health Physics/Radiological Protection Specialist
21 Fire Protection Specialist
22 Industrial / Hygiene Safety Specialist I
23 Industrial / Hygiene Safety Specialist II
24 Environmental Compliance Specialist
25 Nuclear & Mining Facility Operations Specialist
26 International Program & Repository Scientist
27 NAMP Specialist
28 Executive Management Consultant
29 Administrative Assistant I
30 Administrative Assistant II
31 Administrative Assistant III
32 Contract Specialist I
33 Contract Specialist II
34 Contract Specialist III
35 Business Specialist
36 Financial Analyst I
37 Financial Analyst II
38 Financial Analyst III
39 Information and Records Management Specialist
40 IT Specialist
41 Project Management Specialist I
42 Project Management Specialist II
43 Project Management Specialist III
44 Project Controls Specialist I
45 Project Controls Specialist II
46 Project Controls Specialist III
47 Technical Qualification / Training Specialist
48 Corrective Actions Manager
49 Communications Professional
50 NEPA Program Support
51 Facility Representative I
52 Facility Representative II
53 TRU Waste Certification Specialist I
54 TRU Waste Certification Specialist II
55 TRU Waste Certification Specialist III
56 Technical Consultant I
57 Technical Consultant II
58 Technical Consultant III
59 Business Operations Manager
60 Chemist
LABOR CATEGORY CROSSWALK
Attachment L-6
Carlsbad Field Office Technical Assistance Contract
L-6 Labor Category Crosswalk
Carlsbad Technical Assistance Contract (CTAC) Solicitation# 89303320REM000073 L-6 Labor Category Crosswalk
61 Facilitator
62 Engineer I
63 Engineer II
64 Engineer III
65 Mining & Hoisting Specialist
66 Human Resource Specialist
L-6 Labor Category Crosswalk
Carlsbad Technical Assistance Contract (CTAC) Solicitation# 89303320REM000073 J-7 T&M Rates
(a) (b) ( c ) (d) ( e ) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q)
Labor Category Base Hourly Rate
Cumulative
Escalation mount at
[Offeror-Fill-In] %
Contract Period
Base Rate
Fringe Benefit
Amount at
[Offeror-Fill-
In] %
Overhead
Amount at
[Offeror-Fill-
In] %
G & A
Amount at
[Offeror-Fill-
In] %
Subtotal
Rate
Profit at
[Offeror-
Fill-In]%
Fully
Burdened
Hourly Rate
Prime
Estimate
DPLH
Prime
Estimated Price
Subcontractor
Fully
Burdened
Hourly Rate
Prime G & A
Amount at [Offeror-
Fill-In %]
Prime Profit
Amount at
[Offeror-Fill-In
Fully
Burdened
Hourly
Rate
Subcontractor
Estimate DPLH
Subcontractor
Estimated Price
Total
DPLH
Total
Estimated
Price
( a * %) (a + b) (c*%) ((c+d)*%) ((c+d+e)*%) (c+d+e+f) (g*%) (g+h) (i*j) (l*%) ((l+m)*%) (l+m+n) (o*p)
Program Manager*
QA Manager*
QA Assistant Manager*
QA Auditor I*
QA Auditor II*
QA Auditor III*
QA Technical Specialist I *
QA Technical Specialist I (Off-Site)
QA Technical Specialist II *
QA Technical Specialist II (Off-Site)
QA Technical Specialist III *
QA Technical Specialist III (Off-Site)
QA Data Analyst*
Technical Writer/Editor I*
Technical Writer/Editor II*
TRU Waste Packaging Specialist *
TRU Waste Packaging Specialist (Off-Site)
TRU Waste Transportation Specialist *
TRU Waste Transportation Specialist (Off-Site)
PDP Specialist *
PDP Specialist (Off-Site)
PDP Custodian *
PDP Custodian (Off-Site) Nuclear Safety Specialist I *
Nuclear Safety Specialist I (Off-Site)
Nuclear Safety Specialist II *
Nuclear Safety Specialist II (Off-Site)
Nuclear Safeguards and Security Specialist*
Health Physics/Rad Protection Specialist*
Fire Protection Specialist*
Industrial Hygiene/ Safety Specialist I*
Industrial Hygiene/ Safety Specialist II*
Environmental Compliance Specialist *
Environmental Compliance Specialist (Off-Site)
Nuclear Mining & Facility Operations Specialist*
International Programs and Repository Scientist *
International Programs and Repository Scientist (Off-Site)
NAMP Specialist *
NAMP Specialist (Off-Site)
Executive Management Consultant *
Executive Management Consultant (Off-Site)
Admin Assistant I*
Admin Assistant II*
Admin Assistant III*
Contract Specialist I (Off- Site)
Contract Specialist II (Off-Site)
Contract Specialist III (Off-Site)
Business Specialist*
Financial Analyst I *
Financial Analyst I (Off-Site)
Financial Analyst II *
Financial Analyst II (Off-Site)
Financial Analyst III *
Financial Analyst III (Off-Site)
Information and Records Mgmt. Specialist*
IT Specialist*
Project Management Specialist I*
Project Management Specialist II*
Project Management Specialist III*
Project Controls Specialist I *
Project Controls Specialist I (Off-Site)
Project Controls Specialist II *
Project Controls Specialist II (Off-Site)
Project Controls Specialist III *
Project Controls Specialist III (Off-Site)
Technical Qualifications/ Training Specialist*
NEPA Specialist *
NEPA Specialist (Off-Site)
Corrective Action Manager *
Corrective Action Manager (Off-Site)
Communications Professional *
Communications Professional (Off-Site)
Facility Representative I*
Facility Representative II*
TRU Waste Certification Specialist I *
TRU Waste Certification Specialist I (Off-Site)
TRU Waste Certification Specialist II *
TRU Waste Certification Specialist II (Off-Site)
TRU Waste Certification Specialist III *
TRU Waste Certification Specialist III (Off-Site)
Technical Consultant I *
Technical Consultant I (Off-Site)
Technical Consultant II *
Technical Consultant II (Off-Site)
Technical Consultant III *
Technical Consultant III (Off-Site)
Business Operations Manager*
Chemist *
Year 1
Labor Catgories Identified with a "*" are On-Site Positions.
Prime Contractor Subcontractor Totals
J-7 T&M Rates
Chemist (Off-Site)
Facilitator*
Engineer I*
Engineer II*
Engineer III*
Mining & Hoisting Specialist*
Human Resource Specialist *
Human Resource Specialist (Off-Site)
Year 1 Labor Total
(a) (b) ( c ) (d) ( e ) (f) (g) (h) (i)
Labor Category Base Hourly Rate
Cumulative
Escalation mount at
[Offeror-Fill-In] %
Contract Period
Base Rate
Fringe Benefit
Amount at
[Offeror-Fill-
In] %
Overhead
Amount at
[Offeror-Fill-
In] %
G & A
Amount at
[Offeror-Fill-
In] %
Subtotal
Rate
Profit at
[Offeror-
Fill-In]%
Fully
Burdened
Hourly Rate
( a * %) (a + b) (c*%) ((c+d)*%) ((c+d+e)*%) (c+d+e+f) (g*%) (g+h)
*The above subcontract labor table shall be provided for each subcontractor proposed
(a) (b) ( c ) (d) ( e ) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q)
Labor Category Base Hourly Rate
Cumulative
Escalation mount at
[Offeror-Fill-In] %
Contract Period
Base Rate
Fringe Benefit
Amount at
[Offeror-Fill-
In] %
Overhead
Amount at
[Offeror-Fill-
In] %
G & A
Amount at
[Offeror-Fill-
In] %
Subtotal
Rate
Profit at
[Offeror-
Fill-In]%
Fully
Burdened
Hourly Rate
Prime
Estimate
DPLH
Prime
Estimated Price
Subcontractor
Fully
Burdened
Hourly Rate
Prime G & A
Amount at [Offeror-
Fill-In %]
Prime Profit
Amount at
[Offeror-Fill-In
Fully
Burdened
Hourly
Rate
Subcontractor
Estimate DPLH
Subcontractor
Estimated Price
Total
DPLH
Total
Estimated
Price
( a * %) (a + b) (c*%) ((c+d)*%) ((c+d+e)*%) (c+d+e+f) (g*%) (g+h) (i*j) (l*%) ((l+m)*%) (l+m+n) (o*p)
Program Manager*
QA Manager*
QA Assistant Manager*
QA Auditor I*
QA Auditor II*
QA Auditor III*
QA Technical Specialist I *
QA Technical Specialist I (Off-Site)
QA Technical Specialist II *
QA Technical Specialist II (Off-Site)
QA Technical Specialist III *
QA Technical Specialist III (Off-Site)
QA Data Analyst*
Technical Writer/Editor I*
Technical Writer/Editor II*
TRU Waste Packaging Specialist *
TRU Waste Packaging Specialist (Off-Site)
TRU Waste Transportation Specialist *
TRU Waste Transportation Specialist (Off-Site)
PDP Specialist *
PDP Specialist (Off-Site)
PDP Custodian *
PDP Custodian (Off-Site) Nuclear Safety Specialist I *
Nuclear Safety Specialist I (Off-Site)
Nuclear Safety Specialist II *
Nuclear Safety Specialist II (Off-Site)
Nuclear Safeguards and Security Specialist*
Health Physics/Rad Protection Specialist*
Fire Protection Specialist*
Industrial Hygiene/ Safety Specialist I*
Industrial Hygiene/ Safety Specialist II*
Environmental Compliance Specialist *
Environmental Compliance Specialist (Off-Site)
Nuclear Mining & Facility Operations Specialist*
International Programs and Repository Scientist *
International Programs and Repository Scientist (Off-Site)
NAMP Specialist *
NAMP Specialist (Off-Site)
Executive Management Consultant *
Executive Management Consultant (Off-Site)
Admin Assistant I*
Admin Assistant II*
Admin Assistant III*
Contract Specialist I (Off- Site)
Contract Specialist II (Off-Site)
Contract Specialist III (Off-Site)
Business Specialist*
Financial Analyst I *
Financial Analyst I (Off-Site)
Financial Analyst II *
Financial Analyst II (Off-Site)
Financial Analyst III *
Year 1 Subcontract Labor
(Subcontractor Name)
Prime Contractor Subcontractor Totals
Year 2
Subcontractor Labor Rate Details
Financial Analyst III (Off-Site)
Information and Records Mgmt. Specialist*
IT Specialist*
Project Management Specialist I*
Project Management Specialist II*
Project Management Specialist III*
Project Controls Specialist I *
Project Controls Specialist I (Off-Site)
Project Controls Specialist II *
Project Controls Specialist II (Off-Site)
Project Controls Specialist III *
Project Controls Specialist III (Off-Site)
Technical Qualifications/ Training Specialist*
NEPA Specialist *
NEPA Specialist (Off-Site)
Corrective Action Manager *
Corrective Action Manager (Off-Site)
Communications Professional *
Communications Professional (Off-Site)
Facility Representative I*
Facility Representative II*
TRU Waste Certification Specialist I *
TRU Waste Certification Specialist I (Off-Site)
TRU Waste Certification Specialist II *
TRU Waste Certification Specialist II (Off-Site)
TRU Waste Certification Specialist III *
TRU Waste Certification Specialist III (Off-Site)
Technical Consultant I *
Technical Consultant I (Off-Site)
Technical Consultant II *
Technical Consultant II (Off-Site)
Technical Consultant III *
Technical Consultant III (Off-Site)
Business Operations Manager*
Chemist *
Chemist (Off-Site)
Facilitator*
Engineer I*
Engineer II*
Engineer III*
Mining & Hoisting Specialist*
Human Resource Specialist *
Human Resource Specialist (Off-Site)
Year 2 Labor Total
(a) (b) ( c ) (d) ( e ) (f) (g) (h) (i)
Labor Category Base Hourly Rate
Cumulative
Escalation mount at
[Offeror-Fill-In] %
Contract Period
Base Rate
Fringe Benefit
Amount at
[Offeror-Fill-
In] %
Overhead
Amount at
[Offeror-Fill-
In] %
G & A
Amount at
[Offeror-Fill-
In] %
Subtotal
Rate
Profit at
[Offeror-
Fill-In]%
Fully
Burdened
Hourly Rate
( a * %) (a + b) (c*%) ((c+d)*%) ((c+d+e)*%) (c+d+e+f) (g*%) (g+h)
(a) (b) ( c ) (d) ( e ) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q)
Labor Category Base Hourly Rate
Cumulative
Escalation mount at
[Offeror-Fill-In] %
Contract Period
Base Rate
Fringe Benefit
Amount at
[Offeror-Fill-
In] %
Overhead
Amount at
[Offeror-Fill-
In] %
G & A
Amount at
[Offeror-Fill-
In] %
Subtotal
Rate
Profit at
[Offeror-
Fill-In]%
Fully
Burdened
Hourly Rate
Prime
Estimate
DPLH
Prime
Estimated Price
Subcontractor
Fully
Burdened
Hourly Rate
Prime G & A
Amount at [Offeror-
Fill-In %]
Prime Profit
Amount at
[Offeror-Fill-In
Fully
Burdened
Hourly
Rate
Subcontractor
Estimate DPLH
Subcontractor
Estimated Price
Total
DPLH
Total
Estimated
Price
( a * %) (a + b) (c*%) ((c+d)*%) ((c+d+e)*%) (c+d+e+f) (g*%) (g+h) (i*j) (l*%) ((l+m)*%) (l+m+n) (o*p)
Program Manager*
QA Manager*
QA Assistant Manager*
QA Auditor I*
QA Auditor II*
QA Auditor III*
QA Technical Specialist I *
QA Technical Specialist I (Off-Site)
QA Technical Specialist II *
QA Technical Specialist II (Off-Site)
QA Technical Specialist III *
QA Technical Specialist III (Off-Site)
QA Data Analyst*
Technical Writer/Editor I*
Technical Writer/Editor II*
TRU Waste Packaging Specialist *
TRU Waste Packaging Specialist (Off-Site)
TRU Waste Transportation Specialist *
TRU Waste Transportation Specialist (Off-Site)
PDP Specialist *
PDP Specialist (Off-Site)
Subcontractor Labor Rate Details
Year 2 Subcontract Labor
(Subcontractor Name)
Prime Contractor
Year 3
Subcontractor Totals
PDP Custodian *
PDP Custodian (Off-Site) Nuclear Safety Specialist I *
Nuclear Safety Specialist I (Off-Site)
Nuclear Safety Specialist II *
Nuclear Safety Specialist II (Off-Site)
Nuclear Safeguards and Security Specialist*
Health Physics/Rad Protection Specialist*
Fire Protection Specialist*
Industrial Hygiene/ Safety Specialist I*
Industrial Hygiene/ Safety Specialist II*
Environmental Compliance Specialist *
Environmental Compliance Specialist (Off-Site)
Nuclear Mining & Facility Operations Specialist*
International Programs and Repository Scientist *
International Programs and Repository Scientist (Off-Site)
NAMP Specialist *
NAMP Specialist (Off-Site)
Executive Management Consultant *
Executive Management Consultant (Off-Site)
Admin Assistant I*
Admin Assistant II*
Admin Assistant III*
Contract Specialist I (Off- Site)
Contract Specialist II (Off-Site)
Contract Specialist III (Off-Site)
Business Specialist*
Financial Analyst I *
Financial Analyst I (Off-Site)
Financial Analyst II *
Financial Analyst II (Off-Site)
Financial Analyst III *
Financial Analyst III (Off-Site)
Information and Records Mgmt. Specialist*
IT Specialist*
Project Management Specialist I*
Project Management Specialist II*
Project Management Specialist III*
Project Controls Specialist I *
Project Controls Specialist I (Off-Site)
Project Controls Specialist II *
Project Controls Specialist II (Off-Site)
Project Controls Specialist III *
Project Controls Specialist III (Off-Site)
Technical Qualifications/ Training Specialist*
NEPA Specialist *
NEPA Specialist (Off-Site)
Corrective Action Manager *
Corrective Action Manager (Off-Site)
Communications Professional *
Communications Professional (Off-Site)
Facility Representative I*
Facility Representative II*
TRU Waste Certification Specialist I *
TRU Waste Certification Specialist I (Off-Site)
TRU Waste Certification Specialist II *
TRU Waste Certification Specialist II (Off-Site)
TRU Waste Certification Specialist III *
TRU Waste Certification Specialist III (Off-Site)
Technical Consultant I *
Technical Consultant I (Off-Site)
Technical Consultant II *
Technical Consultant II (Off-Site)
Technical Consultant III *
Technical Consultant III (Off-Site)
Business Operations Manager*
Chemist *
Chemist (Off-Site)
Facilitator*
Engineer I*
Engineer II*
Engineer III*
Mining & Hoisting Specialist*
Human Resource Specialist *
Human Resource Specialist (Off-Site)
Year 3 Labor Total
(a) (b) ( c ) (d) ( e ) (f) (g) (h) (i)
Labor Category Base Hourly Rate
Cumulative
Escalation mount at
[Offeror-Fill-In] %
Contract Period
Base Rate
Fringe Benefit
Amount at
[Offeror-Fill-
In] %
Overhead
Amount at
[Offeror-Fill-
In] %
G & A
Amount at
[Offeror-Fill-
In] %
Subtotal
Rate
Profit at
[Offeror-
Fill-In]%
Fully
Burdened
Hourly Rate
( a * %) (a + b) (c*%) ((c+d)*%) ((c+d+e)*%) (c+d+e+f) (g*%) (g+h)
Subcontractor Labor Rate Details
Year 3 Subcontract Labor
(Subcontractor Name)
(a) (b) ( c ) (d) ( e ) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q)
Labor Category Base Hourly Rate
Cumulative
Escalation mount at
[Offeror-Fill-In] %
Contract Period
Base Rate
Fringe Benefit
Amount at
[Offeror-Fill-
In] %
Overhead
Amount at
[Offeror-Fill-
In] %
G & A
Amount at
[Offeror-Fill-
In] %
Subtotal
Rate
Profit at
[Offeror-
Fill-In]%
Fully
Burdened
Hourly Rate
Prime
Estimate
DPLH
Prime
Estimated Price
Subcontractor
Fully
Burdened
Hourly Rate
Prime G & A
Amount at [Offeror-
Fill-In %]
Prime Profit
Amount at
[Offeror-Fill-In
Fully
Burdened
Hourly
Rate
Subcontractor
Estimate DPLH
Subcontractor
Estimated Price
Total
DPLH
Total
Estimated
Price
( a * %) (a + b) (c*%) ((c+d)*%) ((c+d+e)*%) (c+d+e+f) (g*%) (g+h) (i*j) (l*%) ((l+m)*%) (l+m+n) (o*p)
Program Manager*
QA Manager*
QA Assistant Manager*
QA Auditor I*
QA Auditor II*
QA Auditor III*
QA Technical Specialist I *
QA Technical Specialist I (Off-Site)
QA Technical Specialist II *
QA Technical Specialist II (Off-Site)
QA Technical Specialist III *
QA Technical Specialist III (Off-Site)
QA Data Analyst*
Technical Writer/Editor I*
Technical Writer/Editor II*
TRU Waste Packaging Specialist *
TRU Waste Packaging Specialist (Off-Site)
TRU Waste Transportation Specialist *
TRU Waste Transportation Specialist (Off-Site)
PDP Specialist *
PDP Specialist (Off-Site)
PDP Custodian *
PDP Custodian (Off-Site) Nuclear Safety Specialist I *
Nuclear Safety Specialist I (Off-Site)
Nuclear Safety Specialist II *
Nuclear Safety Specialist II (Off-Site)
Nuclear Safeguards and Security Specialist*
Health Physics/Rad Protection Specialist*
Fire Protection Specialist*
Industrial Hygiene/ Safety Specialist I*
Industrial Hygiene/ Safety Specialist II*
Environmental Compliance Specialist *
Environmental Compliance Specialist (Off-Site)
Nuclear Mining & Facility Operations Specialist*
International Programs and Repository Scientist *
International Programs and Repository Scientist (Off-Site)
NAMP Specialist *
NAMP Specialist (Off-Site)
Executive Management Consultant *
Executive Management Consultant (Off-Site)
Admin Assistant I*
Admin Assistant II*
Admin Assistant III*
Contract Specialist I (Off- Site)
Contract Specialist II (Off-Site)
Contract Specialist III (Off-Site)
Business Specialist*
Financial Analyst I *
Financial Analyst I (Off-Site)
Financial Analyst II *
Financial Analyst II (Off-Site)
Financial Analyst III *
Financial Analyst III (Off-Site)
Information and Records Mgmt. Specialist*
IT Specialist*
Project Management Specialist I*
Project Management Specialist II*
Project Management Specialist III*
Project Controls Specialist I *
Project Controls Specialist I (Off-Site)
Project Controls Specialist II *
Project Controls Specialist II (Off-Site)
Project Controls Specialist III *
Project Controls Specialist III (Off-Site)
Technical Qualifications/ Training Specialist*
NEPA Specialist *
NEPA Specialist (Off-Site)
Corrective Action Manager *
Corrective Action Manager (Off-Site)
Communications Professional *
Communications Professional (Off-Site)
Facility Representative I*
Facility Representative II*
TRU Waste Certification Specialist I *
TRU Waste Certification Specialist I (Off-Site)
TRU Waste Certification Specialist II *
TRU Waste Certification Specialist II (Off-Site)
TRU Waste Certification Specialist III *
TRU Waste Certification Specialist III (Off-Site)
Technical Consultant I *
Technical Consultant I (Off-Site)
Technical Consultant II *
Technical Consultant II (Off-Site)
Technical Consultant III *
Technical Consultant III (Off-Site)
Business Operations Manager*
Chemist *
Prime Contractor Subcontractor Totals
Year 4
Chemist (Off-Site)
Facilitator*
Engineer I*
Engineer II*
Engineer III*
Mining & Hoisting Specialist*
Human Resource Specialist *
Human Resource Specialist (Off-Site)
Year 4 Labor Total
(a) (b) ( c ) (d) ( e ) (f) (g) (h) (i)
Labor Category Base Hourly Rate
Cumulative
Escalation mount at
[Offeror-Fill-In] %
Contract Period
Base Rate
Fringe Benefit
Amount at
[Offeror-Fill-
In] %
Overhead
Amount at
[Offeror-Fill-
In] %
G & A
Amount at
[Offeror-Fill-
In] %
Subtotal
Rate
Profit at
[Offeror-
Fill-In]%
Fully
Burdened
Hourly Rate
( a * %) (a + b) (c*%) ((c+d)*%) ((c+d+e)*%) (c+d+e+f) (g*%) (g+h)
(a) (b) ( c ) (d) ( e ) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q)
Labor Category Base Hourly Rate
Cumulative
Escalation mount at
[Offeror-Fill-In] %
Contract Period
Base Rate
Fringe Benefit
Amount at
[Offeror-Fill-
In] %
Overhead
Amount at
[Offeror-Fill-
In] %
G & A
Amount at
[Offeror-Fill-
In] %
Subtotal
Rate
Profit at
[Offeror-
Fill-In]%
Fully
Burdened
Hourly Rate
Prime
Estimate
DPLH
Prime
Estimated Price
Subcontractor
Fully
Burdened
Hourly Rate
Prime G & A
Amount at [Offeror-
Fill-In %]
Prime Profit
Amount at
[Offeror-Fill-In
Fully
Burdened
Hourly
Rate
Subcontractor
Estimate DPLH
Subcontractor
Estimated Price
Total
DPLH
Total
Estimated
Price
( a * %) (a + b) (c*%) ((c+d)*%) ((c+d+e)*%) (c+d+e+f) (g*%) (g+h) (i*j) (l*%) ((l+m)*%) (l+m+n) (o*p)
Program Manager*
QA Manager*
QA Assistant Manager*
QA Auditor I*
QA Auditor II*
QA Auditor III*
QA Technical Specialist I *
QA Technical Specialist I (Off-Site)
QA Technical Specialist II *
QA Technical Specialist II (Off-Site)
QA Technical Specialist III *
QA Technical Specialist III (Off-Site)
QA Data Analyst*
Technical Writer/Editor I*
Technical Writer/Editor II*
TRU Waste Packaging Specialist *
TRU Waste Packaging Specialist (Off-Site)
TRU Waste Transportation Specialist *
TRU Waste Transportation Specialist (Off-Site)
PDP Specialist *
PDP Specialist (Off-Site)
PDP Custodian *
PDP Custodian (Off-Site) Nuclear Safety Specialist I *
Nuclear Safety Specialist I (Off-Site)
Nuclear Safety Specialist II *
Nuclear Safety Specialist II (Off-Site)
Nuclear Safeguards and Security Specialist*
Health Physics/Rad Protection Specialist*
Fire Protection Specialist*
Industrial Hygiene/ Safety Specialist I*
Industrial Hygiene/ Safety Specialist II*
Environmental Compliance Specialist *
Environmental Compliance Specialist (Off-Site)
Nuclear Mining & Facility Operations Specialist*
International Programs and Repository Scientist *
International Programs and Repository Scientist (Off-Site)
NAMP Specialist *
NAMP Specialist (Off-Site)
Executive Management Consultant *
Executive Management Consultant (Off-Site)
Admin Assistant I*
Admin Assistant II*
Admin Assistant III*
Contract Specialist I (Off- Site)
Contract Specialist II (Off-Site)
Contract Specialist III (Off-Site)
Business Specialist*
Financial Analyst I *
Financial Analyst I (Off-Site)
Financial Analyst II *
Financial Analyst II (Off-Site)
Financial Analyst III *
Financial Analyst III (Off-Site)
Information and Records Mgmt. Specialist*
(Subcontractor Name)
Prime Contractor Subcontractor Totals
Year 5
Subcontractor Labor Rate Details
Year 4 Subcontract Labor
IT Specialist*
Project Management Specialist I*
Project Management Specialist II*
Project Management Specialist III*
Project Controls Specialist I *
Project Controls Specialist I (Off-Site)
Project Controls Specialist II *
Project Controls Specialist II (Off-Site)
Project Controls Specialist III *
Project Controls Specialist III (Off-Site)
Technical Qualifications/ Training Specialist*
NEPA Specialist *
NEPA Specialist (Off-Site)
Corrective Action Manager *
Corrective Action Manager (Off-Site)
Communications Professional *
Communications Professional (Off-Site)
Facility Representative I*
Facility Representative II*
TRU Waste Certification Specialist I *
TRU Waste Certification Specialist I (Off-Site)
TRU Waste Certification Specialist II *
TRU Waste Certification Specialist II (Off-Site)
TRU Waste Certification Specialist III *
TRU Waste Certification Specialist III (Off-Site)
Technical Consultant I *
Technical Consultant I (Off-Site)
Technical Consultant II *
Technical Consultant II (Off-Site)
Technical Consultant III *
Technical Consultant III (Off-Site)
Business Operations Manager*
Chemist *
Chemist (Off-Site)
Facilitator*
Engineer I*
Engineer II*
Engineer III*
Mining & Hoisting Specialist*
Human Resource Specialist *
Human Resource Specialist (Off-Site)
Year 5 Labor Total
(a) (b) ( c ) (d) ( e ) (f) (g) (h) (i)
Labor Category Base Hourly Rate
Cumulative
Escalation mount at
[Offeror-Fill-In] %
Contract Period
Base Rate
Fringe Benefit
Amount at
[Offeror-Fill-
In] %
Overhead
Amount at
[Offeror-Fill-
In] %
G & A
Amount at
[Offeror-Fill-
In] %
Subtotal
Rate
Profit at
[Offeror-
Fill-In]%
Fully
Burdened
Hourly Rate
( a * %) (a + b) (c*%) ((c+d)*%) ((c+d+e)*%) (c+d+e+f) (g*%) (g+h)
Labor Category Prime Estimated DPLH Prime Estimated
Price
Subcontractor
Estimated
DPLH
Subcontractor
Estimated Price Total DPLH
Total
Estimated
Price
Program Manager*
QA Manager*
QA Assistant Manager*
QA Auditor I*
QA Auditor II*
QA Auditor III*
QA Technical Specialist I *
QA Technical Specialist I (Off-Site)
QA Technical Specialist II *
QA Technical Specialist II (Off-Site)
QA Technical Specialist III *
QA Technical Specialist III (Off-Site)
QA Data Analyst*
Technical Writer/Editor I*
Technical Writer/Editor II*
TRU Waste Packaging Specialist *
TRU Waste Packaging Specialist (Off-Site)
TRU Waste Transportation Specialist *
TRU Waste Transportation Specialist (Off-Site)
PDP Specialist *
PDP Specialist (Off-Site)
PDP Custodian *
PDP Custodian (Off-Site) Nuclear Safety Specialist I *
Nuclear Safety Specialist I (Off-Site)
Total DPLH / Price (Years 1-5)
Prime Contractor Subcontractor Total
(Subcontractor Name)
Year 5 Subcontract Labor
Subcontractor Labor Rate Details
Nuclear Safety Specialist II *
Nuclear Safety Specialist II (Off-Site)
Nuclear Safeguards and Security Specialist*
Health Physics/Rad Protection Specialist*
Fire Protection Specialist*
Industrial Hygiene/ Safety Specialist I*
Industrial Hygiene/ Safety Specialist II*
Environmental Compliance Specialist *
Environmental Compliance Specialist (Off-Site)
Nuclear Mining & Facility Operations Specialist*
International Programs and Repository Scientist *
International Programs and Repository Scientist (Off-Site)
NAMP Specialist *
NAMP Specialist (Off-Site)
Executive Management Consultant *
Executive Management Consultant (Off-Site)
Admin Assistant I*
Admin Assistant II*
Admin Assistant III*
Contract Specialist I (Off- Site)
Contract Specialist II (Off-Site)
Contract Specialist III (Off-Site)
Business Specialist*
Financial Analyst I *
Financial Analyst I (Off-Site)
Financial Analyst II *
Financial Analyst II (Off-Site)
Financial Analyst III *
Financial Analyst III (Off-Site)
Information and Records Mgmt. Specialist*
IT Specialist*
Project Management Specialist I*
Project Management Specialist II*
Project Management Specialist III*
Project Controls Specialist I *
Project Controls Specialist I (Off-Site)
Project Controls Specialist II *
Project Controls Specialist II (Off-Site)
Project Controls Specialist III *
Project Controls Specialist III (Off-Site)
Technical Qualifications/ Training Specialist*
NEPA Specialist *
NEPA Specialist (Off-Site)
Corrective Action Manager *
Corrective Action Manager (Off-Site)
Communications Professional *
Communications Professional (Off-Site)
Facility Representative I*
Facility Representative II*
TRU Waste Certification Specialist I *
TRU Waste Certification Specialist I (Off-Site)
TRU Waste Certification Specialist II *
TRU Waste Certification Specialist II (Off-Site)
TRU Waste Certification Specialist III *
TRU Waste Certification Specialist III (Off-Site)
Technical Consultant I *
Technical Consultant I (Off-Site)
Technical Consultant II *
Technical Consultant II (Off-Site)
Technical Consultant III *
Technical Consultant III (Off-Site)
Business Operations Manager*
Chemist *
Chemist (Off-Site)
Facilitator*
Engineer I*
Engineer II*
Engineer III*
Mining & Hoisting Specialist*
Human Resource Specialist *
Human Resource Specialist (Off-Site)
Total
Carlsbad Technical Assistance Contract (CTAC)Solicitation# 89303320REM000073 J-7 DOE-Provided Non-Labor Cost
Year 1 Year 2 Year 3 Year 4 Year 5 Total
Non-Labor Cost
(Materials, Travel, ODCs, etc.) ######### $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 7,500,000
J-7 DOE-Provided Non-Labor Cost
Carlsbad Technical Assistance Contract (CTAC)Solicitation# 89303320REM000073 J-7 Indirect Ceiling Rate
Year 1 Year 2 Year 3 Year 4 Year 5
Ceiling Rate
[Offeror
Fill-in %]
[Offeror
Fill-in %]
[Offeror
Fill-in %]
[Offeror
Fill-in %]
[Offeror
Fill-in %] Description of
Allocation Base (e.g.
Material, Subcontracts, etc.)
J-7 Indirect Ceiling Rate
Carlsbad Technical Assistance Contract (CTAC) Solicitation# 89303320REM000073 J-7 IDIQ Rates
Labor Categories
Total DPLH (Prime
Estimated DPLH plus
Subcontractor
Estimated DPLH)
Prime Estimated DPLH Subcontractor
Estimated DPLH
Prime Fully
Burdened
Hourly Rate
Subcontractor
Fully Burdened
Hourly Rate
Extended Price
Program Manager* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Manager* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Assistant Manager* 3,760 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Auditor I* 3,760 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Auditor II* 3,760 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Auditor III* 3,760 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Technical Specialist I * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Technical Specialist I (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Technical Specialist II * 3,760 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Technical Specialist II (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Technical Specialist III * 3,760 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Technical Specialist III (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
QA Data Analyst* 3,760 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Technical Writer/Editor I* 3,760 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Technical Writer/Editor II* 3,760 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
TRU Waste Packaging Specialist * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
TRU Waste Packaging Specialist (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
TRU Waste Transportation Specialist * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
TRU Waste Transportation Specialist (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
PDP Specialist * 500 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
PDP Specialist (Off-Site) 500 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
PDP Custodian * 500 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Schedule of Fully Burdened Labor Rates Year 1
J-7 IDIQ Rates
PDP Custodian (Off-Site) 500 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Nuclear Safety Specialist I * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Nuclear Safety Specialist I (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Nuclear Safety Specialist II * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Nuclear Safety Specialist II (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Nuclear Safeguards and Security Specialist* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Health Physics/Rad Protection Specialist* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Fire Protection Specialist* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Industrial Hygiene/ Safety Specialist I* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Industrial Hygiene/ Safety Specialist II* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Environmental Compliance Specialist * 500 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Environmental Compliance Specialist (Off-Site) 500 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Nuclear Mining & Facility Operations Specialist* 500 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
International Programs and Repository Scientist * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
International Programs and Repository Scientist (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
NAMP Specialist * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
NAMP Specialist (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Executive Management Consultant * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Executive Management Consultant (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Admin Assistant I* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Admin Assistant II* 11,280 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Admin Assistant III* 3,760 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Contract Specialist I (Off- Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Contract Specialist II (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Contract Specialist III (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Business Specialist* 9,400 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Financial Analyst I * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Financial Analyst I (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Financial Analyst II * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Financial Analyst II (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Financial Analyst III * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Financial Analyst III (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Information and Records Mgmt. Specialist* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
IT Specialist* 3,760 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Project Management Specialist I* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Project Management Specialist II* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Project Management Specialist III* 5,640 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Project Controls Specialist I * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Project Controls Specialist I (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Project Controls Specialist II * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Project Controls Specialist II (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Project Controls Specialist III * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Project Controls Specialist III (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Technical Qualifications/ Training Specialist* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
NEPA Specialist * 500 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
NEPA Specialist (Off-Site) 500 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Corrective Action Manager * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Corrective Action Manager (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Communications Professional * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Communications Professional (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Facility Representative I* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Facility Representative II* 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
TRU Waste Certification Specialist I * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
TRU Waste Certification Specialist I (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
TRU Waste Certification Specialist II * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
TRU Waste Certification Specialist II (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
TRU Waste Certification Specialist III * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
TRU Waste Certification Specialist III (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Technical Consultant I * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Technical Consultant I (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Technical Consultant II * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Technical Consultant II (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Technical Consultant III * 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Technical Consultant III (Off-Site) 1,880 [Offeror-Fill-In] [Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In] $[Offeror-Fill-In]
Business Operations Manager* 1,880 [Offeror-Fill-In] [Offeror-Fill-In]…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .